286BidsJan 18, 2018 to Feb 16, 2023
51Wins (low bidder)
17.8%Win rate
$181,406,845Total won
Competitor scorecard
Last 5 years in Oklahoma25.5%Win rate14 of 55 bids
+23.0%Average bid vs estimate
+14.1%Winning bids vs estimate
+18.3%Over the low bid when they loseAverage field: 4.3 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| T.J. CAMPBELL CONSTRUCTION COMPANY | 14 | 7 | 7 | 50% |
| K & R BUILDERS, INC. | 13 | 3 | 10 | 23% |
| THE CUMMINS CONSTRUCTION CO., INC. | 10 | 3 | 7 | 30% |
| BRIDGECO CONTRACTORS, INC. | 9 | 4 | 5 | 44% |
| Silver Star Construction Company, Inc. | 8 | 4 | 4 | 50% |
| Frontier Bridge, Inc. | 8 | 4 | 4 | 50% |
| Rosscon, LLC | 8 | 2 | 6 | 25% |
| RRY SERVICES LLC | 7 | 1 | 6 | 14% |
| OBC, INC. | 7 | 7 | 0 | 100% |
| ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) | 7 | 6 | 1 | 86% |
| Let date | Contract | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Feb 16, 2023 | 210118 | RESURFACE (ASPHALT ) I-40: FROM 1.9 MILES EAST OF THE JOHN KILPATRICK TURNPIKE INTERCHANGE, EXTEND EAST IN OKLAHOMA CITY . PROJECT LENGTH = 3.16 MILESCanadian, Oklahoma · | 1 of 2 | $6,203,784 | $6,203,784 | Won |
| Dec 22, 2022 | 220365 | WIDEN, RESURFACE , AND BRIDGE SH-39: FROM 7.4 MILES EAST OF THE US-77 JUNCTION, EXTEND EAST NEAR LEXINGTON . PROJECT LENGTH = 3.580 MILESCleveland · Division 3 | 1 of 3 | $15,653,782 | $15,653,782 | Won |
| Dec 22, 2022 | 220369 | BRIDGE AND APPROACHES US-266: OVER ELK CREEK AND UNNAMED CREEK , 1.2 MILES AND 1.7 MILES EAST OF THE US -69 BUS JUNCTION NEAR CHECOTAH . PROJECT LENGTH = 0.400 MILEMcintosh · Division 1 | 6 of 6 | $5,321,086 | $4,835,947BRIDGECO CONTRACTORS, INC. | +10.0% |
| Nov 17, 2022 | 220349 | RESURFACE (ASPHALT ) US-77: FROM 0.62 MILES NORTH OF MEMORIAL ROAD , EXTEND NORTH ON BROADWAY THEN EAST ON 2ND STREET IN EDMOND . PROJECT LENGTH = 5.511 MILESOklahoma · Division 4 | 1 of 1 | $8,599,958 | $8,599,958 | Won |
| Nov 17, 2022 | 220351 | BRIDGE AND APPROACHES SH-51: OVER UNNAMED CREEK, 1.6 MILES SOUTHEAST OF THE SH -86 JUNCTION NEAR STILLWATER . PROJECT LENGTH = 1.060 MILESPayne · Division 4 | 6 of 6 | $9,433,342 | $8,292,007C3 Construction, Inc. | +13.8% |
| Nov 17, 2022 | 220357 | BRIDGE REHABILITATION SH-115: OVER SPRING CREEK, 8.2 MILES SOUTH OF THE SH-152 JUNCTION NEAR MOUNTAINVIEW . PROJECT LENGTH = 0.167 MILEWashita · Division 5 | 5 of 7 | $1,342,810 | $1,077,302K & R BUILDERS, INC. | +24.6% |
| Nov 17, 2022 | 220373 | OKLAHOMA WIDEN, RESURFACE , BRIDGE, GRADE, DRAIN, AND SURFACE SH-66: FROM 4.0 MILES EAST OF I -35, EXTEND NORTHEAST IN EDMOND AND ARCADIA . PROJECT LENGTH = 8.054 MILESStp-155c(610)pm · | 2 of 2 | $32,363,648 | $30,961,330T.J. CAMPBELL CONSTRUCTION … | +4.5% |
| Oct 20, 2022 | 220192 | GRADE, DRAIN, SURFACE , AND BRIDGE US-77: FROM 6.4 MILES NORTH OF THE SH -39 JUNCTION, EXTEND NORTHWEST NEAR NOBLE . PROJECT LENGTH = 3.370 MILESCleveland · Division 3 | 2 of 3 | $24,489,182 | $22,992,675Silver Star Construction Co… | +6.5% |
| Sep 15, 2022 | 220288 | WIDEN, RESURFACE , AND BRIDGE SH-19: FROM 1.0 MILE EAST OF THE US -177 JUNCTION, EXTEND EAST NEAR STRATFORD . PROJECT LENGTH = 4.661 MILEGarvin, Pontotoc · | 4 of 4 | $20,861,999 | $17,761,240Wyatt Contracting, Inc./Cen… | +17.5% |
| Sep 15, 2022 | 220298 | BRIDGE AND APPROACHES COUNTY ROAD (N. 108TH STREET): OVER UNNAMED CREEK, 6.5 MILES EAST OF I -44 IN JONES. PROJECT LENGTH = 0.263 MILEOklahoma · Division 4 | 7 of 7 | $1,234,210 | $910,370RRY SERVICES LLC | +35.6% |
| Aug 18, 2022 | 220268 | SEMINOLE GRADE, DRAIN, SURFACE , AND BRIDGE US-270: FROM 0.1 MILES WEST OF THE SH -270A JUNCTION, EXTEND SOUTHEAST NEAR SEMINOLE . PROJECT LENGTH = 7.628 MILESStp-167b(091)pm · | 3 of 4 | $63,838,975 | $56,954,722OVERLAND CORPORATION | +12.1% |
| Jul 14, 2022 | 220215 | RESURFACE (ASPHALT ) SH-37: FROM THE US -62 JUNCTION, EXTEND EAST IN OKLAHOMA CITY . PROJECT LENGTH = 4.56 MILESCleveland · Division 3 | 1 of 5 | $1,825,731 | $1,825,731 | Won |
| Jul 14, 2022 | 220230 | RESURFACE (UTBWC) SH-51: FROM 0.07 MILES EAST OF FAIRGROUNDS ROAD, EXTEND EAST NEAR STILLWATER . PROJECT LENGTH = 4.220 MILESPayne · Division 4 | 2 of 2 | $2,173,712 | $1,979,981T.J. CAMPBELL CONSTRUCTION … | +9.8% |
| Jul 14, 2022 | 220233 | RESURFACE (ASPHALT ) COUNTY ROAD (OLD STATE HIGHWAY 18): FROM 1.0 MILE NORTH OF THE SH -39 JUNCTION, EXTEND NORTH NEAR ASHER . PROJECT LENGTH = 5.798 MILESPottawatomie · Division 3 | 3 of 4 | $2,442,324 | $2,331,307Rosscon, LLC | +4.8% |
| Jul 14, 2022 | 220246 | 33764(04) NHPP-012N(109)3P LINCOLN RESURFACE (ASPHALT ) SH-99: FROM 0.9 MILES NORTH OF THE US -62 JUNCTION, EXTEND NORTH NEAR PRAGUE . PROJECT LENGTH = 17.29 MILESNhpp-012n(111)3p · | 1 of 1 | $9,477,065 | $9,477,065 | Won |
| Jun 16, 2022 | 220202 | RESURFACE (ASPHALT ) SH-15: FROM THE I -35 RAMPS, EXTEND EAST NEAR BILLINGS . PROJECT LENGTH = 3.190 MILESNoble · Division 4 | 2 of 2 | $1,899,650 | $1,387,972Evans & Associates Construc… | +36.9% |
| Jun 16, 2022 | 220204 | RESURFACE (ASPHALT ) US-75: FROM 0.43 MILES NORTH OF THE US -266 JUNCTION, EXTEND NORTH NEAR HENRYETTA . PROJECT LENGTH = 4.840 MILESOkmulgee · Division 1 | 3 of 3 | $7,317,763 | $6,757,000BECCO CONTRACTORS, INC. | +8.3% |
| May 19, 2022 | 220163 | GRADE, DRAIN, AND SURFACE SH-39: FROM 2.9 MILES WEST OF THE SH -76 JUNCTION, EXTEND EAST NEAR DIBBLE . PROJECT LENGTH = 2.75 MILESGrady, Mcclain · | 2 of 4 | $13,132,628 | $10,679,999Silver Star Construction Co… | +23.0% |
| May 19, 2022 | 220167 | RESURFACE (ASPHALT ) SH-74: FROM THE SH -33 JUNCTION, EXTEND NORTH NEAR CRESCENT . PROJECT LENGTH = 5.240 MILESLogan · Division 4 | 2 of 2 | $3,326,486 | $2,949,141T.J. CAMPBELL CONSTRUCTION … | +12.8% |
| May 19, 2022 | 220168 | RESURFACE (ASPHALT ) I-35: FROM 3.9 MILES SOUTHEAST OF THE SH -9 INTERCHANGE, EXTEND NORTHWEST IN GOLDSBY . PROJECT LENGTH = 4.320 MILESMcclain · Division 3 | 2 of 2 | $2,961,841 | $2,663,879Silver Star Construction Co… | +11.2% |
| May 19, 2022 | 220174 | RESURFACE (ASPHALT ) I-35:FROM 0.4 MILES NORTH OF SH-66, EXTEND NORTH IN EDMOND . PROJECT LENGTH = 4.680 MILESOklahoma · Division 4 | 2 of 2 | $2,365,929 | $2,320,478T.J. CAMPBELL CONSTRUCTION … | +2.0% |
| May 19, 2022 | 220175 | RESURFACE (ASPHALT ) I-40: FROM 3.5 MILES SOUTHEAST OF THE I -35 INTERCHANGE, EXTEND EAST IN MIDWEST CITY . PROJECT LENGTH = 3.650 MILESOklahoma · Division 4 | 3 of 3 | $4,372,797 | $4,061,475Silver Star Construction Co… | +7.7% |
| Apr 14, 2022 | 220124 | BRIDGE AND APPROACHES COUNTY ROAD (EW-129): OVER TIGER CREEK , 0.8 MILES EAST OF THE SH -48 JUNCTION NEAR HOLDENVILLE. PROJECT LENGTH = 0.255 MILEHughes · Division 3 | 6 of 8 | $639,789 | $525,634Cowboy Contracting, Inc. | +21.7% |
| Apr 14, 2022 | 220126 | BRIDGE AND APPROACHES COUNTY ROAD (EW-88): OVER UNCLE JOHN CREEK, 2.9 MILES EAST OF THE US -81 JUNCTION NEAR OKARCHE. PROJECT LENGTH = 0.322 MILEKingfisher · Division 4 | 3 of 5 | $1,610,007 | $1,500,473SEWELL BROS., INC. | +7.3% |
| Apr 14, 2022 | 220127 | BRIDGE AND APPROACHES COUNTY ROAD (EW-72): OVER TREATY CREEK , 4.1 MILES WEST OF US -81 NEAR DOVER. PROJECT LENGTH = 0.208 MILEKingfisher · Division 4 | 3 of 4 | $969,840 | $922,368RRY SERVICES LLC | +5.1% |
| Apr 14, 2022 | 220130 | BRIDGE REHABILITATION US-412: OVER BARNEY CREEK , 10.8 MILES EAST OF THE US-281 JUNCTION NEAR CHEYENNE VALLEY . PROJECT LENGTH = 0.217 MILEMajor · Division 6 | 1 of 2 | $1,069,198 | $1,069,198 | Won |
| Apr 14, 2022 | 220134 | RESURFACE (ASPHALT ) I-35: FROM 0.23 MILES SOUTH OF NE 10TH STREET, EXTEND NORTH IN OKLAHOMA CITY . PROJECT LENGTH = 3.940 MILESOklahoma · Division 4 | 1 of 2 | $4,917,824 | $4,917,824 | Won |
| Apr 14, 2022 | 220144 | BRIDGE REHABILITATION US-270: OVER US-177NB, 0.3 MILES NORTH OF THE SH -9 INTERCHANGE IN TECUMSEH . PROJECT LENGTH = 0.345 MILEPottawatomie · Division 3 | 1 of 7 | $738,798 | $738,798 | Won |
| Apr 14, 2022 | 220155 | BRIDGE REHABILITATION US-183: OVER SPRING CREEK, 0.4 MILES EAST OF THE US -412 JUNCTION IN WOODWARD . PROJECT LENGTH = 0.083 MILEWoodward · Division 6 | 1 of 6 | $1,724,137 | $1,724,137 | Won |
| Apr 14, 2022 | 220184 | BRIDGE REHABILITATION US-81: OVER UNNAMED CREEK, 1.1 MILES SOUTH OF THE US -412 JUNCTION IN ENID. PROJECT LENGTH = 0.029 MILEGarfield · Division 4 | 1 of 4 | $770,196 | $770,196 | Won |
| Apr 12, 2022 | 220113 | PAVEMENT REHABILITATION (ASPHALT ) TURNER TURNPIKE : FROM MILEPOST 179 TO MILEPOST 184, NEAR STROUD. PROJECT LENGTH = 4.880 MILESCreek, Lincoln · | 1 of 1 | $3,944,934 | $3,944,934 | Won |
| Mar 17, 2022 | 220116 | RESURFACE (ASPHALT ) SH-99A: FROM THE SH -99 JUNCTION, EXTEND EAST NEAR SEMINOLE . PROJECT LENGTH = 3.970 MILESSeminole · Division 3 | 2 of 2 | $672,648 | $535,598Rosscon, LLC | +25.6% |
| Mar 17, 2022 | 220018 | BRIDGE AND APPROACHES COUNTY ROAD (EW-46): OVER TURKEY CREEK , 1.3 MILES EAST OF THE SH -132 JUNCTION NEAR DRUMMOND. PROJECT LENGTH = 0.246 MILEGarfield · Division 4 | 5 of 10 | $1,195,516 | $1,046,449H & H BRIDGE COMPANY | +14.2% |
| Mar 17, 2022 | 220088 | RESURFACE (ASPHALT ) SH-31: FROM THE SH -131 JUNCTION, EXTEND NORTH NEAR COALGATE . PROJECT LENGTH = 2.950 MILESCoal · Division 3 | 4 of 4 | $776,618 | $595,533Rosscon, LLC | +30.4% |
| Mar 17, 2022 | 220089 | BRIDGE REHABILITATION SH-74: OVER WILD HORSE CREEK, 0.6 MILES NORTH OF THE CARTER COUNTY LINE . PROJECT LENGTH = 0.187 MILEGarvin · Division 3 | 6 of 6 | $967,234 | $644,996Central Bridge Company | +50.0% |
| Mar 17, 2022 | 220090 | RESURFACE (ASPHALT ) US-81: FROM 1.4 MILES SOUTH OF THE SH -37E JUNCTION, EXTEND NORTH NEAR MINCO . PROJECT LENGTH = 4.90 MILESGrady · Division 7 | 3 of 4 | $2,561,191 | $2,393,737THE CUMMINS CONSTRUCTION CO… | +7.0% |
| Mar 17, 2022 | 220097 | RESURFACE (ASPHALT ) US-177: FROM 8.02 MILES NORTH OF SH -66 JUNCTION, EXTEND NORTH IN CARNEY . PROJECT LENGTH = 4.87 MILESLincoln · Division 3 | 1 of 4 | $740,445 | $740,445 | Won |
| Mar 17, 2022 | 220103 | BRIDGE AND APPROACHES COUNTY ROAD (EAST 86TH STREET): OVER STILLWATER CREEK, 0.9 MILES WEST OF SH -108 NEAR RIPLEY. PROJECT LENGTH = 0.402 MILEPayne · Division 4 | 6 of 8 | $1,969,061 | $1,545,639H & H BRIDGE COMPANY | +27.4% |
| Mar 17, 2022 | 220104 | RESURFACE (ASPHALT ) SH-48: FROM 3.0 MILES SOUTH OF THE SH -1 JUNCTION, EXTEND NORTH NEAR ALLEN . PROJECT LENGTH = 2.730 MILESPontotoc · | 3 of 5 | $739,061 | $619,521THE CUMMINS CONSTRUCTION CO… | +19.3% |
| Mar 17, 2022 | 210310 | BRIDGE AND APPROACHES COUNTY ROAD (NS-370): OVER DEEP FORK RIVER AND OVERFLOWS , 1.6 MILES WEST OF SH -48 NEAR GYPSY. PROJECT LENGTH = 0.567 MILESCreek · Division 8 | 5 of 8 | $4,466,050 | $3,946,712H & H BRIDGE COMPANY | +13.2% |
| Mar 17, 2022 | 220110 | PEDESTRIAN IMPROVEMENTS (SIDEWALKS ) SH-44: FROM 3.9 MILES NORTH OF THE SH -152 JUNCTION, EXTEND NORTH IN BURNS FLAT . PROJECT LENGTH = 0.544 MILEWashita · Division 5 | 3 of 4 | $503,374 | $390,221RUDY CONSTRUCTION CO. | +29.0% |
| Mar 15, 2022 | 220114 | INTERSECTION MODIFICATION (PROTECTED TURN AROUNDS ) SH-74: AT THE INTERSECTION OF MEMORIAL ROAD IN OKLAHOMA CITY. PROJECT LENGTH = 0.312 MILEOklahoma · Division 4 | 5 of 5 | $6,274,627 | $4,462,677ALLEN CONTRACTING, INC./SHE… | +40.6% |
| Feb 17, 2022 | 220056 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-115: FROM 2.9 MILES NORTH OF THE SH -49 JUNCTION, EXTEND NORTH NEAR MEERS . PROJECT LENGTH = 0.143 MILEComanche · Division 7 | 4 of 4 | $633,303 | $565,455Wyatt Contracting | +12.0% |
| Feb 17, 2022 | 220061 | BRIDGE AND APPROACHES SH-115: OVER UNNAMED CREEKS, 0.3 MILES AND 6.6 MILES NORTH OF THE SH -19 JUNCTION NEAR MOUNTAINVIEW . PROJECT LENGTH = 0.340 MILEKiowa · Division 5 | 5 of 5 | $1,944,043 | $1,548,658SEWELL BROS., INC. | +25.5% |
| Feb 17, 2022 | 220067 | RESURFACE (ASPHALT ) SH-27: FROM 6.0 MILES SOUTH OF I-40/US-62, EXTEND NORTH NEAR OKEMAH . PROJECT LENGTH = 4.820 MILESOkfuskee · Division 3 | 2 of 3 | $1,299,249 | $1,233,315Rosscon, LLC | +5.3% |
| Feb 17, 2022 | 220074 | GRADE, DRAIN, SURFACE , AND EROSION US-183: FROM THE SH -55 JUNCTION, EXTEND NORTH NEAR ROCKY . PROJECT LENGTH = 7.724 MILESWashita · Division 5 | 4 of 5 | $26,998,655 | $22,127,353Caswell Contracting, Inc. | +22.0% |
| Feb 17, 2022 | 220078 | BRIDGE AND APPROACHES COUNTY ROAD (D-1756): OVER ROCK CREEK, 1.0 MILE EAST OF US -259 NEAR SMITHVILLE. PROJECT LENGTH = 0.303 MILEMccurtain · Division 2 | 1 of 4 | $1,483,562 | $1,483,562 | Won |
| Jan 20, 2022 | 220017 | BRIDGE AND APPROACHES COUNTY ROAD (EW-088): OVER WEST BARNITZ CREEK , 10.0 MILES EAST OF THE SH -34 JUNCTION NEAR MOOREWOOD. PROJECT LENGTH = 0.151 MILECuster · Division 5 | 7 of 7 | $1,222,555 | $917,874K & R BUILDERS, INC. | +33.2% |
| Jan 20, 2022 | 220019 | RESURFACE (ASPHALT ) SH-132: FROM 0.11 MILES NORTH OF THE SH -45 WEST JUNCTION , EXTEND NORTH NEAR CARRIER . PROJECT LENGTH = 8.000 MILESGarfield · Division 4 | 2 of 2 | $2,589,375 | $2,463,429THE CUMMINS CONSTRUCTION CO… | +5.1% |
| Jan 20, 2022 | 220022 | RESURFACE (ASPHALT ) SH-37: FROM 0.01 MILES EAST OF GREGORY ROAD , EXTEND EAST IN TUTTLE . PROJECT LENGTH = 3.00 MILEGrady · Division 7 | 1 of 6 | $1,499,797 | $1,499,797 | Won |
| Jan 20, 2022 | 220034 | NOBLE RESURFACE (ASPHALT ) US-77: FROM THE SH -15E JUNCTION, EXTEND NORTH NEAR BILLINGS . PROJECT LENGTH = 8.95 MILESSsr-252c(090)sr · | 2 of 3 | $3,576,983 | $2,744,369Evans & Associates Construc… | +30.3% |
| Jan 20, 2022 | 220039 | PONTOTOC RESURFACE (ASPHALT ) SH-3W: FROM 1.21 MILES SOUTH OF THE POTTAWATOMIE COUNTY LINE , EXTEND SOUTHEAST NEAR MAXWELL AND ADA . PROJECT LENGTH = 15.500 MILESSsr-262b(070)sr · | 3 of 4 | $4,540,261 | $3,523,732OVERLAND CORPORATION | +28.8% |
| Jan 20, 2022 | 220040 | RESURFACE (ASPHALT ) US-177: FROM I-40, EXTEND NORTH NEAR SHAWNEE . PROJECT LENGTH = 0.680 MILEPottawatomie · Division 3 | 4 of 5 | $419,557 | $362,294H & G Paving Contractors In… | +15.8% |
| Jan 20, 2022 | 220041 | BRIDGE REHABILITATION SH-99: OVER JUMPER CREEK, 0.4 MILES NORTH OF THE SH -39 JUNCTION NEAR KONAWA . PROJECT LENGTH = 0.212 MILESeminole · Division 3 | 2 of 7 | $1,796,269 | $1,757,325BRIDGECO CONTRACTORS, INC. | +2.2% |
| Jan 11, 2022 | 220050 | POSITIVE BARRIER AND RCB REPAIR CIMARRON TURNPIKE SPUR : FROM M.P. 19.20A TO M.P. 27.92A NEAR STILLWATER. PROJECT LENGTH = 8.50 MILESPayne · Division 4 | 3 of 5 | $6,304,944 | $4,624,027MANHATTAN ROAD & BRIDGE COM… | +36.4% |
| Nov 18, 2021 | 210335 | BRIDGE AND APPROACHES COUNTY ROAD (EW-129): OVER UNNAMED CREEK, 1.4 MILES WEST OF US-69 NEAR CROWDER. PROJECT LENGTH = 0.113 MILEPittsburg · Division 2 | 8 of 8 | $562,899 | $444,969BRIGHT LIGHTING, INC. DBA B… | +26.5% |
| Nov 18, 2021 | 210344 | BRIDGE AND APPROACHES SH-55: OVER UNNAMED CREEK, 2.7 MILES EAST OF THE SH-44 JUNCTION NEAR SENTINEL. PROJECT LENGTH = 0.421 MILEWashita · Division 5 | 5 of 6 | $1,715,504 | $1,428,821SEWELL BROS., INC. | +20.1% |
| Nov 18, 2021 | 210311 | RESURFACE (ASPHALT ) I-40: FROM 1.7 MILES WEST OF THE US -183 JUNCTION, EXTEND EAST IN CLINTON . PROJECT LENGTH = 4.160 MILESCuster · Division 5 | 3 of 3 | $1,310,806 | $1,080,842Caswell Contracting, Inc. | +21.3% |
| Nov 18, 2021 | 210313 | BRIDGE AND APPROACHES COUNTY ROAD (N4355 ROAD): OVER UNNAMED CREEK, 0.6 MILES NORTH OF THE SH -9 JUNCTION NEAR WHITEFIELD. PROJECT LENGTH = 0.058 MILEHaskell · Division 1 | 4 of 7 | $551,998 | $447,819H & G Paving Contractors In… | +23.3% |
| Nov 18, 2021 | 210323 | GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (NS-341/KICKAPOO STREET): FROM THE US -62 JUNCTION, EXTEND SOUTH NEAR MEEKER. PROJECT LENGTH = 3.004 MILESLincoln · Division 3 | 2 of 3 | $3,869,680 | $3,769,612T.J. CAMPBELL CONSTRUCTION … | +2.7% |
| Oct 14, 2021 | 210273 | BRIDGE AND APPROACHES COUNTY ROAD (NS-181): OVER OTTER CREEK, 0.7 MILES SOUTH OF THE HARPER COUNTY LINE . PROJECT LENGTH = 0.208 MILEEllis · Division 6 | 5 of 7 | $925,226 | $686,856Lopp Construction, LLC | +34.7% |
| Oct 14, 2021 | 210279 | GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (NE 36TH STREET): FROM HARRAH ROAD, EXTEND EAST NEAR HARRAH . PROJECT LENGTH = 0.062 MILEOklahoma · Division 4 | 6 of 10 | $569,400 | $491,874SAC Services, Inc. | +15.8% |
| Oct 14, 2021 | 210294 | BRIDGE AND APPROACHES COUNTY ROAD (EW-125): OVER UNNAMED CREEK, 0.6 MILES WEST OF THE SH -44 JUNCTION NEAR SENTINEL. PROJECT LENGTH = 0.161 MILEWashita · Division 5 | 5 of 8 | $594,741 | $435,496Lopp Construction, LLC | +36.6% |
| Oct 14, 2021 | 210298 | BRIDGE AND APPROACHES SH-102: OVER EAST CAPTAIN CREEK , 2.8 MILES SOUTH OF THE SH -66 JUNCTION NEAR WELLSTON . PROJECT LENGTH = 0.245 MILELincoln · Division 3 | 3 of 8 | $2,999,374 | $2,986,167Treas Construction Inc | +0.4% |
| Aug 10, 2021 | 210221 | GRADE, DRAIN, AND SURFACE CITY STREET (SARA ROAD ): FROM THE SH -152 JUNCTION, EXTEND NORTH TO SW 29TH STREET IN OKLAHOMA CITY AND MUSTANG . PROJECT LENGTH = 2.940 MILESCanadian · Division 4 | 4 of 5 | $22,323,665 | $19,391,245ALLEN CONTRACTING, INC./SHE… | +15.1% |
| Jul 15, 2021 | 210203 | RESURFACE (ASPHALT ) US-62: FROM 0.38 MILES EAST OF THE SH -9 JUNCTION, EXTEND EAST NEAR ANADARKO . PROJECT LENGTH = 5.900 MILESCaddo · Division 7 | 3 of 5 | $1,653,517 | $1,371,087T & G CONSTRUCTION, INC. | +20.6% |
| Jul 15, 2021 | 210219 | RESURFACE (ASPHALT ) SH-4: FROM 0.53 MILES NORTH OF I -44 (H.E. BAILEY TURNPIKE ), EXTEND NORTH NEAR BRIDGE CREEK . PROJECT LENGTH = 4.690 MILESGrady · Division 7 | 1 of 7 | $1,292,057 | $1,292,057 | Won |
| Jul 15, 2021 | 210228 | RESURFACE (ASPHALT ) I-35: FROM 1.0 MILE SOUTH OF US-60, EXTEND NORTH NEAR TONKAWA AND BLACKWELL . PROJECT LENGTH = 10.540 MILESKay · Division 4 | 1 of 3 | $6,586,809 | $6,586,809 | Won |
| Jul 15, 2021 | 210111 | WIDEN AND RESURFACE SH-66: FROM THE OKLAHOMA COUNTY LINE , EXTEND EAST NEAR WELLSTON . PROJECT LENGTH = 2.848 MILESLincoln · Division 3 | 1 of 4 | $6,999,820 | $6,999,820 | Won |
| Jun 17, 2021 | 210171 | BRIDGE AND APPROACHES SH-34: OVER CANADIAN RIVER, 10.5 MILES SOUTH OF THE US-60/SH-51 JUNCTION NEAR CAMARGO. PROJECT LENGTH = 1.344 MILESDewey · Division 5 | 7 of 7 | $19,791,823 | $14,927,181Frontier Bridge, Inc. | +32.6% |
| Jun 17, 2021 | 210172 | BRIDGE AND APPROACHES COUNTY ROAD (NS-229): OVER UNNAMED CREEK, 0.8 MILES SOUTH OF THE US -270/US-281/SH-3/SH-51 JUNCTION NEAR SEILING. PROJECT LENGTH = 0.085 MILESDewey · Division 5 | 4 of 6 | $499,046 | $421,766Wyatt Contracting | +18.3% |
| Jun 17, 2021 | 210173 | RESURFACE (ASPHALT ) US-177: FROM THE MURRAY COUNTY LINE , EXTEND NORTH NEAR STRATFORD . PROJECT LENGTH = 7.020 MILESGarvin · Division 3 | 5 of 5 | $1,204,458 | $945,465OVERLAND CORPORATION | +27.4% |
| Jun 17, 2021 | 210177 | WIDEN AND RESURFACE SH-33: FROM 0.2 MILES WEST OF THE SH -74F JUNCTION, EXTEND EAST AND NORTHEAST NEAR CIMARRON CITY . PROJECT LENGTH = 3.806 MILESKingfisher, Logan · | 2 of 4 | $10,400,000 | $9,958,102T.J. CAMPBELL CONSTRUCTION … | +4.4% |
| Jun 17, 2021 | 210178 | RESURFACE (ASPHALT ) I-44: FROM 0.29 MILES SOUTH OF THE SH-37 JUNCTION, EXTEND NORTH IN NEWCASTLE. PROJECT LENGTH = 6.090 MILESCleveland, Mcclain · | 2 of 4 | $1,872,851 | $1,631,040Silver Star Construction Co… | +14.8% |
| Jun 17, 2021 | 210186 | BRIDGE REHABILITATION COUNTY ROAD (NS-378): OVER DEEP FORK TRIBUTARY OF THE CANADIAN RIVER AND TRIBUTARIES , 2.2 MILES, 2.3 MILES, 2.4 MILES, AND 2.8 MILES NORTH OF THE SH -56 JUNCTION NEAR HAYDENVILLE . PROJECT LENGTH = 0.353 MILEOkfuskee · Division 3 | 1 of 5 | $1,225,468 | $1,225,468 | Won |
| Jun 17, 2021 | 210188 | RESURFACE (ASPHALT ) SH-99: FROM THE JOHNSTON COUNTY LINE , EXTEND NORTH NEAR FITTSTOWN . PROJECT LENGTH = 7.160 MILESPontotoc · | 3 of 3 | $1,295,603 | $1,160,327OVERLAND CORPORATION | +11.7% |
| Jun 17, 2021 | 210189 | RESURFACE (ASPHALT ) SH-1: FROM 3.6 MILES EAST OF THE SH-99 JUNCTION, EXTEND EAST NEAR ADA . PROJECT LENGTH = 4.840 MILESPontotoc · | 2 of 2 | $1,707,860 | $1,556,491OVERLAND CORPORATION | +9.7% |
| Jun 17, 2021 | 210192 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (EW-119): FROM 1.0 MILE WEST OF THE SH-99 JUNCTION, EXTEND EAST NEAR SEMINOLE . PROJECT LENGTH = 0.990 MILESeminole · Division 3 | 3 of 5 | $1,386,176 | $1,247,677CP3 ENTERPRISES, INC. | +11.1% |
| Jun 17, 2021 | 210199 | GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (CLEARVIEW ROAD ): FROM 2.0 MILES SOUTH OF I-40, EXTEND SOUTHEAST THEN EAST IN CLEARVIEW . PROJECT LENGTH = 4.042 MILESOkfuskee · Division 3 | 1 of 2 | $5,566,998 | $5,566,998 | Won |
| May 20, 2021 | 210127 | GRADE DRAIN AND SURFACE COUNTY ROADS (EW-094 ROAD/AMERICAN HORSE LAKE ROAD/NS-252): FROM 7.5 MILES NORTH OF I -40 EXTEND NORTH ON NS -252 ROAD THEN EAST ON EW -094 ROAD NEAR GEARY . PROJECT LENGTH = 5.974 MILESBlaine · Division 5 | 2 of 3 | $7,734,372 | $6,893,690THE CUMMINS CONSTRUCTION CO… | +12.2% |
| May 20, 2021 | 210128 | RESURFACE (ASPHALT ) US-270: FROM 5.5 MILES SOUTHEAST OF THE SH -8 JUNCTION, EXTEND SOUTHEAST NEAR WATONGA . PROJECT LENGTH = 5.550 MILESBlaine · Division 5 | 2 of 3 | $3,732,837 | $3,569,054THE CUMMINS CONSTRUCTION CO… | +4.6% |
| May 20, 2021 | 210134 | PEDESTRIAN IMPROVEMENTS (SIDEWALKS ) US-283: FROM S 5TH STREET, EXTEND NORTH IN LAVERNE . PROJECT LENGTH = 0.375 MILEHarper · Division 6 | 3 of 3 | $561,677 | $296,718SCHIRALLI CONSTRUCTION CORP. | +89.3% |
| May 20, 2021 | 210139 | WIDEN AND RESURFACE SH-76: FROM 3.4 MILES NORTH OF THE SH -19 JUNCTION, EXTEND NORTH NEAR LINDSAY . PROJECT LENGTH = 4.886 MILESMcclain · Division 3 | 3 of 4 | $9,730,165 | $8,956,200Silver Star Construction Co… | +8.6% |
| May 20, 2021 | 210140 | GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (NW 180TH STREET/EW-141): FROM THE SH-59 JUNCTION, EXTEND WEST NEAR CRINER . PROJECT LENGTH = 2.277 MILESMcclain · Division 3 | 7 of 6 | $5,882,343 | $5,018,860Treas Construction Inc | +17.2% |
| May 20, 2021 | 200338 | BRIDGE AND APPROACHES SH-34: OVER FARMRAIL RAILROAD AND UNNAMED CREEK , 1.1 MILES AND 1.3 MILES SOUTH OF I-40 NEAR ELK CITY. PROJECT LENGTH = 0.553 MILEBeckham · Division 5 | 3 of 5 | $4,998,800 | $4,326,927OBC, INC. | +15.5% |
| May 20, 2021 | 210153 | POTTAWATOMIE RESURFACE (ASPHALT ) SH-9A: FROM THE SH -59 JUNCTION, EXTEND NORTH NEAR MAUD . PROJECT LENGTH = 10.22 MILESStp-263c(075)3p · | 1 of 4 | $1,978,832 | $1,978,832 | Won |
| May 20, 2021 | 210156 | RESURFACE (ASPHALT ) SH-56: FROM 0.8 MILES SOUTH OF THE SH -99A JUNCTION, EXTEND NORTH IN CROMWELL . PROJECT LENGTH = 4.990 MILESSeminole · Division 3 | 3 of 4 | $1,254,070 | $1,225,445Rosscon, LLC | +2.3% |
| May 20, 2021 | 210082 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-59: FROM 5.6 MILES SOUTH OF THE SH -39 JUNCTION, EXTEND NORTH NEAR CRINER . PROJECT LENGTH = 0.857 MILEMcclain · Division 3 | 8 of 9 | $4,030,665 | $3,455,100Silver Star Construction Co… | +16.7% |
| Apr 15, 2021 | 210116 | RESURFACE (ASPHALT ) SH-56: FROM THE SEMINOLE COUNTY LINE , EXTEND EAST NEAR OKEMAH . PROJECT LENGTH = 3.880 MILESOkfuskee · Division 3 | 3 of 3 | $693,950 | $595,043Rosscon, LLC | +16.6% |
| Apr 15, 2021 | 210117 | OKLAHOMA GRADE, DRAIN, SURFACE , AND BRIDGE REHABILITATION SH-152: FROM 0.4 MILES EAST OF JOHN KILPATRICK TURNPIKE , EXTEND EAST IN OKLAHOMA CITY. PROJECT LENGTH = 3.641 MILESNhpp-255n(535)pm · | 4 of 4 | $7,810,986 | $7,177,335T.J. CAMPBELL CONSTRUCTION … | +8.8% |
| Apr 15, 2021 | 210036 | RESURFACE (ASPHALT ) SH-48: FROM 9.0 MILES NORTH OF THE COAL COUNTY LINE , EXTEND NORTH NEAR ALLEN . PROJECT LENGTH = 2.80 MILESPontotoc · | 3 of 3 | $581,356 | $463,709OVERLAND CORPORATION | +25.4% |
| Apr 15, 2021 | 210100 | RESURFACE (ASPHALT ) US-81: FROM 0.6 MILES NORTH OF THE I -40 BUSINESS JUNCTION, EXTEND NORTH IN EL RENO . PROJECT LENGTH = 4.790 MILESCanadian · Division 4 | 3 of 5 | $2,246,000 | $2,009,101T.J. CAMPBELL CONSTRUCTION … | +11.8% |
| Apr 15, 2021 | 210102 | GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (DAILY WOODS ROAD /NS-369): FROM 4.8 MILES SOUTH OF THE SH -3 JUNCTION, EXTEND NORTH NEAR TUPELO . PROJECT LENGTH = 1.780 MILESCoal · Division 3 | 5 of 6 | $3,135,385 | $2,715,518L & N BRIDGE, LLC | +15.5% |
| Apr 15, 2021 | 210107 | RESURFACE (ASPHALT ) SH-19: FROM THE GRADY COUNTY LINE , EXTEND EAST NEAR LINDSAY . PROJECT LENGTH = 2.400 MILESGarvin · Division 3 | 4 of 6 | $478,279 | $450,042T.J. CAMPBELL CONSTRUCTION … | +6.3% |
| Apr 15, 2021 | 210113 | MCINTOSH, MUSKOGEE WIDEN, RESURFACE , AND BRIDGE REHABILITATION I-40/US-266: I-40, OVER US-266 0.6 MILES WEST OF THE MUSKOGEE COUNTY LINE . US-266, FROM 1.4 MILES EAST OF I -40 EXTEND EAST NEAR WARNER . PROJECT LENGTH = 0.375 MILESbr-4000(107)sb · | 5 of 5 | $6,317,771 | $4,796,356Built Right Construction, L… | +31.7% |
| Apr 15, 2021 | 210114 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (NS-327): FROM 2.5 MILES SOUTH OF US-412, EXTEND NORTH NEAR RED ROCK . PROJECT LENGTH = 3.489 MILESNoble · Division 4 | 5 of 5 | $5,214,875 | $3,818,322T.J. CAMPBELL CONSTRUCTION … | +36.6% |
| Apr 15, 2021 | 210115 | BRIDGE AND APPROACHES COUNTY ROAD (NS-317): OVER LITTLE STILLWATER CREEK , 6.0 MILES SOUTH OF US-77 NEAR PERRY . PROJECT LENGTH = 0.227 MILENoble · Division 4 | 5 of 13 | $728,078 | $697,164SEWELL BROS., INC. | +4.4% |
| Mar 18, 2021 | 200030 | BRIDGE AND APPROACHES COUNTY ROAD (E0590): OVER SH-88 AND THE UNION PACIFIC RAILROAD, 9.8 MILES WEST OF THE US -69 JUNCTION NEAR INOLA. PROJECT LENGTH = 0.380 MILERogers · Division 8 | 5 of 7 | $3,599,397 | $2,826,236CONCRETE SERVICES CORPORATI… | +27.4% |
| Mar 18, 2021 | 210071 | RESURFACE (ASPHALT ) US-270: FROM 0.74 MILES EAST OF THE SH -33 JUNCTION, EXTEND EAST NEAR WATONGA . PROJECT LENGTH = 6.280 MILESBlaine · Division 5 | 1 of 3 | $4,199,337 | $4,199,337 | Won |
| Mar 18, 2021 | 210073 | PAVEMENT REHABILITATION (ASPHALT ) US-281 SPUR: FROM THE US -281 JUNCTION, EXTEND SOUTHEAST NEAR GEARY . PROJECT LENGTH = 4.210 MILESCanadian · Division 4 | 1 of 2 | $1,079,999 | $1,079,999 | Won |
| Mar 18, 2021 | 210078 | BRIDGE AND APPROACHES COUNTY ROAD (NORTH AVENUE /EW-23): OVER DEER CREEK, 0.7 MILES WEST OF I -35 NEAR TONKAWA . PROJECT LENGTH = 0.397 MILEKay · Division 4 | 4 of 6 | $1,121,573 | $991,764RRY SERVICES LLC | +13.1% |
| Mar 18, 2021 | 210081 | LINCOLN RESURFACE (ASPHALT ) SH-18: FROM THE US -62 JUNCTION, EXTEND NORTH NEAR MEEKER AND CHANDLER . PROJECT LENGTH = 13.26 MILESStp-241c(071)3p · | 1 of 7 | $2,998,726 | $2,998,726 | Won |
| Feb 18, 2021 | 210043 | BANK PROTECTION US-64: OVER EAST CLAY CREEK , 1.0 MILE EAST OF THE SH -8 JUNCTION NEAR CHEROKEE. PROJECT LENGTH = 0.000 MILEAlfalfa · Division 6 | 3 of 9 | $630,987 | $565,886K & R BUILDERS, INC. | +11.5% |
| Feb 18, 2021 | 210045 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-9: FROM 72ND AVENUE , EXTEND EAST IN NORMAN . PROJECT LENGTH = 3.042 MILESCleveland · Division 3 | 3 of 3 | $16,919,508 | $15,770,949T.J. CAMPBELL CONSTRUCTION … | +7.3% |
| Feb 18, 2021 | 210048 | BRIDGE AND APPROACHES COUNTY ROAD (NS-445): OVER LITTLE CABIN CREEK, 1.6 MILES NORTH OF THE SH -25 JUNCTION NEAR BLUE JACKET. PROJECT LENGTH = 0.415 MILESCraig · Division 8 | 7 of 7 | $1,858,392 | $1,627,329CONCRETE SERVICES CORPORATI… | +14.2% |
| Feb 18, 2021 | 210049 | RESURFACE (ASPHALT ) US-277: FROM I-44, EXTEND EAST NEAR NINNEKAH . PROJECT LENGTH = 4.260 MILESGrady · Division 7 | 3 of 4 | $1,334,337 | $983,780OVERLAND CORPORATION | +35.6% |
| Feb 18, 2021 | 210052 | RESURFACE (ASPHALT ) SH-102: FROM 2.0 MILES NORTH OF THE SH -62 JUNCTION, EXTEND NORTH NEAR WELLSTON . PROJECT LENGTH = 7.000 MILESLincoln · Division 3 | 2 of 4 | $892,647 | $864,776H & G Paving Contractors In… | +3.2% |
| Feb 18, 2021 | 210055 | BRIDGE AND APPROACHES SH-7 WB: OVER GUY SANDY CREEK , 3.7 MILES WEST OF THE US -177 JUNCTION NEAR SULPHUR. PROJECT LENGTH = 0.634 MILEMurray · Division 7 | 5 of 6 | $4,492,131 | $3,978,816HUB Construction, Inc. | +12.9% |
| Feb 18, 2021 | 210056 | RESURFACE (ASPHALT ) US-64: FROM THE GARFIELD COUNTY LINE , EXTEND EAST NEAR PERRY . PROJECT LENGTH = 7.100 MILESNoble · Division 4 | 1 of 2 | $2,692,235 | $2,692,235 | Won |
| Feb 18, 2021 | 210057 | RESURFACE (ASPHALT ) I-35: FROM 0.35 MILES SOUTH OF US-77, EXTEND NORTH NEAR PERRY . PROJECT LENGTH = 7.230 MILESNoble · Division 4 | 1 of 4 | $3,798,615 | $3,798,615 | Won |
| Feb 18, 2021 | 210062 | WIDEN AND RESURFACE SH-99: FROM 3.6 MILES NORTH OF THE SH -99A JUNCTION, EXTEND NORTH NEAR FITTSTOWN . PROJECT LENGTH = 1.598 MILESPontotoc · | 1 of 3 | $4,139,582 | $4,139,582 | Won |
| Feb 18, 2021 | 210068 | BRIDGE REHABILITATION SH-3: OVER CHIQUITA CREEK , 9.6 MILES WEST OF THE US-83 JUNCTION NEAR HARDESTY. PROJECT LENGTH = 0.182 MILETexas · Division 6 | 3 of 7 | $1,145,796 | $921,356CONCRETE SERVICES CORPORATI… | +24.4% |
| Feb 18, 2021 | 210002 | 33010(04) TAP-206E(059)TP BLAINE PEDESTRIAN IMPROVEMENTS (TRAIL CONSTRUCTION ) ROMAN NOSE LODGE, STATE PARK , AND BOARDWALK : TRAILS AT MULTIPLE LOCATIONS WITHIN THE PARK. PROJECT LENGTH = 1.310 MILESTap-206e(058)tp · | 1 of 4 | $1,680,565 | $1,680,565 | Won |
| Jan 21, 2021 | 210008 | BRIDGE AND APPROACHES COUNTY ROAD (EW-134): OVER FORMER WASHITA RIVER , 0.6 MILES WEST OF THE SH -9 JUNCTION IN ANADARKO . PROJECT LENGTH = 0.321 MILECaddo · Division 7 | 6 of 10 | $1,462,242 | $1,267,273Treas Construction Inc | +15.4% |
| Jan 21, 2021 | 210009 | RESURFACE (ASPHALT ) AND BRIDGE REPAIR US-62: FROM 0.58 MILES EAST OF THE SH -8 SOUTH JUNCTION, EXTEND EAST IN ANADARKO . PROJECT LENGTH = 7.580 MILESCaddo · Division 7 | 4 of 5 | $2,751,945 | $1,857,904T & G CONSTRUCTION, INC. | +48.1% |
| Jan 21, 2021 | 210010 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (156TH AVENUE S .E./NS-325): FROM MAGUIRE ROAD, EXTEND NORTH NEAR ETOWAH . PROJECT LENGTH = 3.742 MILESCleveland · Division 3 | 2 of 4 | $4,274,504 | $4,208,830T.J. CAMPBELL CONSTRUCTION … | +1.6% |
| Jan 21, 2021 | 210012 | BRIDGE AND APPROACHES US-75: OVER CANEY CREEK , 0.8 MILES NORTHWEST OF THE SH -31 JUNCTION NEAR COALGATE . PROJECT LENGTH = 0.056 MILECoal · Division 3 | 6 of 8 | $1,657,383 | $1,241,460Treas Construction Inc | +33.5% |
| Jan 21, 2021 | 210014 | BRIDGE AND APPROACHES COUNTY ROAD (NS-296): OVER RED ROCK CREEK, 6.5 MILES NORTH OF THE US -64 JUNCTION NEAR BRECKINRIDGE. PROJECT LENGTH = 0.454 MILEGarfield · Division 4 | 6 of 6 | $1,067,760 | $921,008K & R BUILDERS, INC. | +15.9% |
| Jan 21, 2021 | 210016 | BRIDGE AND APPROACHES COUNTY ROAD (EW-137): OVER EAST BITTER CREEK , 1.1 MILES SOUTH OF THE US -277 JUNCTION NEAR CHICKASHA. PROJECT LENGTH = 0.266 MILEGrady · Division 7 | 9 of 8 | $1,654,205 | $1,060,215K & R BUILDERS, INC. | +56.0% |
| Jan 21, 2021 | 210017 | BRIDGE AND APPROACHES COUNTY ROAD (NS-2958): OVER RUSH CREEK, 5.4 MILES NORTH OF THE SH -29 JUNCTION NEAR COX CITY. PROJECT LENGTH = 0.464 MILEGrady · Division 7 | 6 of 6 | $2,296,129 | $2,069,514Treas Construction Inc | +11.0% |
| Jan 21, 2021 | 210025 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-51: FROM THE US -81 JUNCTION, EXTEND EAST NEAR HENNESSEY . PROJECT LENGTH = 6.984 MILESKingfisher · Division 4 | 3 of 3 | $14,283,000 | $12,515,005THE CUMMINS CONSTRUCTION CO… | +14.1% |
| Jan 21, 2021 | 210035 | GRADE, DRAIN, AND SURFACE SH-1: FROM 1.3 MILES SOUTH OF THE SH -3 INTERCHANGE, EXTEND NORTH NEAR ADA . PROJECT LENGTH = 1.483 MILESPontotoc · | 3 of 3 | $12,657,908 | $9,022,083THE CUMMINS CONSTRUCTION CO… | +40.3% |
| Jan 21, 2021 | 200282 | PEDESTRIAN IMPROVEMENTS (SIDEWALKS ) US-183: FROM THE SH -19 JUNCTION, EXTEND SOUTH IN ROOSEVELT . PROJECT LENGTH = 0.372 MILEKiowa · Division 5 | 5 of 6 | $634,492 | $466,664TOM HUDSON PAVING, INC. | +36.0% |
| Jan 21, 2021 | 210005 | BRIDGE AND APPROACHES COUNTY ROAD (EW-30): OVER EAST CLAY CREEK , 3.3 MILES WEST OF THE SH -58 JUNCTION NEAR HELENA. PROJECT LENGTH = 0.312 MILEAlfalfa · Division 6 | 4 of 6 | $848,852 | $742,079K & R BUILDERS, INC. | +14.4% |
| Nov 19, 2020 | 200339 | WIDEN AND RESURFACE SH -3: FROM 5.0 MILES EAST OF THE US -270 JUNCTION, EXTEND EAST NEAR WATONGA . PROJECT LENGTH = 6.463 MILESBlaine · Division 5 | 3 of 4 | $12,414,072 | $11,583,458CORNELL CONSTRUCTION COMPAN… | +7.2% |
| Nov 19, 2020 | 200344 | BRIDGE AND APPROACHES COUNTY ROAD (NS-256): OVER COBB CREEK, 1.9 MILES SOUTH OF THE SH -146 JUNCTION NEAR FORT COBB . PROJECT LENGTH = 0.274 MILECaddo · Division 7 | 5 of 7 | $769,649 | $673,241K & R BUILDERS, INC. | +14.3% |
| Nov 19, 2020 | 200349 | BRIDGE AND APPROACHES SH-19: OVER PEAVINE CREEK , 0.3 MILES EAST OF THE SH-133 JUNCTION NEAR PAULS VALLEY . PROJECT LENGTH = 0.366 MILEGarvin · Division 3 | 3 of 11 | $1,999,612 | $1,970,021Treas Construction Inc | +1.5% |
| Nov 19, 2020 | 200350 | PEDESTRIAN IMPROVEMENTS (SIDEWALKS ) SH-92: FROM 0.4 MILES SOUTH OF THE SH -37 JUNCTION EXTEND NORTH IN TUTTLE . PROJECT LENGTH = 0.300 MILEGrady · Division 7 | 5 of 6 | $335,035 | $184,995RUDY CONSTRUCTION CO. | +81.1% |
| Nov 19, 2020 | 200356 | BRIDGE REHABILITATION SH-3E: OVER LITTLE RIVER, 1.5 MILES SOUTH OF THE SH -59 JUNCTION NEAR BOWLEGS. PROJECT LENGTH = 0.218 MILESeminole · Division 3 | 8 of 8 | $3,716,860 | $2,192,309Frontier Bridge, Inc. | +69.5% |
| Nov 19, 2020 | 200156 | BRIDGE AND APPROACHES COUNTY ROAD (NS-262): OVER DEEP CREEK , 3.9 MILES NORTH OF THE SH -51 JUNCTION NEAR OKEENE. PROJECT LENGTH = 0.208 MILEMajor · Division 6 | 4 of 4 | $581,635 | $529,774K & R BUILDERS, INC. | +9.8% |
| Oct 15, 2020 | 200297 | PEDESTRIAN IMPROVEMENTS (SIDEWALKS ) SH-50: FROM THE 4TH STREET (MAIN STREET) INTERSECTION, EXTEND NORTH IN FREEDOM . PROJECT LENGTH = 0.174 MILESWoods · Division 6 | 1 of 3 | $349,715 | $349,715 | Won |
| Oct 15, 2020 | 200304 | BRIDGE AND APPROACHES COUNTY ROAD (NS-254): OVER WEAVERS CREEK , 3.0 MILES SOUTH OF THE US-270 JUNCTION NEAR WATONGA . PROJECT LENGTH = 0.161 MILEBlaine · Division 5 | 4 of 8 | $728,084 | $641,854K & R BUILDERS, INC. | +13.4% |
| Oct 15, 2020 | 200306 | BRIDGE REHABILITATION US-81: OVER NORTH CANADIAN RIVER , 2.1 MILES NORTH OF THE SH -66 JUNCTION NEAR EL RENO . PROJECT LENGTH = 0.194 MILECanadian · Division 4 | 2 of 8 | $2,792,206 | $2,698,903Frontier Bridge, Inc. | +3.5% |
| Oct 15, 2020 | 200310 | BRIDGE REHABILITATION US-60: OVER TURKEY CREEK , 1.3 MILES EAST OF THE MAJOR COUNTY LINE NEAR LAHOMA . PROJECT LENGTH = 0.00 MILEGarfield · Division 4 | 1 of 8 | $1,446,087 | $1,446,087 | Won |
| Oct 15, 2020 | 200312 | BRIDGE AND APPROACHES COUNTY ROAD (EW-151): OVER UNNAMED CREEK, 4.0 MILES WEST OF THE SH -44/US-283 JUNCTION NEAR MANGUM. PROJECT LENGTH = 0.043 MILEGreer · Division 5 | 3 of 7 | $311,170 | $268,793K & R BUILDERS, INC. | +15.8% |
| Oct 15, 2020 | 200314 | BRIDGE AND APPROACHES COUNTY ROAD (EW-67): OVER TURKEY CREEK , 2.5 MILES WEST OF THE US -81 JUNCTION NEAR HENNESSEY. PROJECT LENGTH = 0.284 MILEKingfisher · Division 4 | 4 of 8 | $928,297 | $768,168K & R BUILDERS, INC. | +20.8% |
| Oct 15, 2020 | 200316 | BRIDGE AND APPROACHES COUNTY ROADS (EW-141 (180TH STREET) / NS-299): EW-141, OVER TRIBUTARY TO LAFLIN CREEK 1.7 MILES WEST OF SH -76. NS-299, FROM EW-141 EXTEND NORTH NEAR CRINER . PROJECT LENGTH = 0.354 MILEGrady, Mcclain · | 10 of 10 | $1,066,948 | $766,364Treas Construction Inc | +39.2% |
| Oct 15, 2020 | 200077 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-39: FROM 3.0 MILES EAST OF THE SH -102 JUNCTION, EXTEND EAST NEAR ASHER . PROJECT LENGTH = 2.880 MILESPottawatomie · Division 3 | 3 of 6 | $7,440,234 | $6,927,007OVERLAND CORPORATION | +7.4% |
| Sep 17, 2020 | 200273 | CADDO GRADE, DRAIN, AND SURFACE US-62: FROM THE SH -19 JUNCTION, EXTEND NORTH IN APACHE . PROJECT LENGTH = 6.518 MILESStp-208b(091)pm · | 5 of 5 | $23,667,620 | $16,187,405OVERLAND CORPORATION | +46.2% |
| Sep 17, 2020 | 200278 | BRIDGE AND APPROACHES COUNTY ROAD (NS-215): OVER KIZER CREEK, 4.3 MILES SOUTH OF SH-51 NEAR CAMARGO. PROJECT LENGTH = 0.123 MILESDewey · Division 5 | 1 of 8 | $578,689 | $578,689 | Won |
| Sep 17, 2020 | 200281 | BRIDGE AND APPROACHES COUNTY ROAD (NS-230): OVER UNNAMED CREEK, 1.8 MILES NORTH OF THE SH-9 JUNCTION NEAR GOTEBO. PROJECT LENGTH = 0.114 MILEKiowa · Division 5 | 4 of 6 | $519,544 | $487,898SEWELL BROS., INC. | +6.5% |
| Sep 17, 2020 | 200284 | BRIDGE AND APPROACHES COUNTY ROAD (NS-228): OVER WEST CREEK , 4.1 MILES NORTH OF THE US -412 JUNCTION NEAR WAYNOKA . PROJECT LENGTH = 0.189 MILESMajor · Division 6 | 4 of 7 | $796,506 | $729,412BRIDGECO CONTRACTORS, INC. | +9.2% |
| Sep 17, 2020 | 200287 | BRIDGE AND APPROACHES COUNTY ROAD (EW-093/NORTH 192ND STREET): OVER BIDDY CREEK , 4.1 MILES WEST OF THE SH -74 JUNCTION NEAR OKLAHOMA CITY . PROJECT LENGTH = 0.140 MILEOklahoma · Division 4 | 3 of 5 | $1,028,778 | $1,000,000Cowboy Contracting, Inc. | +2.9% |
| Sep 17, 2020 | 200292 | WIDEN AND RESURFACE SH-102: FROM THE SH -9 JUNCTION, EXTEND NORTH NEAR TECUMSEH . PROJECT LENGTH = 3.096 MILESPottawatomie · Division 3 | 7 of 7 | $12,934,094 | $10,665,800Silver Star Construction Co… | +21.3% |
| Aug 20, 2020 | 200163 | PAVEMENT REHABILITATION (ASPHALT ) I-40: FROM 0.4 MILES WEST OF SH -27, EXTEND EAST NEAR OKEMAH. PROJECT LENGTH = 5.792 MILESOkfuskee · Division 3 | 1 of 4 | $17,697,697 | $17,697,697 | Won |
| Aug 20, 2020 | 200225 | GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROADS (NINNEKAH RD/EW-142/EW-142.5 (DELL ST)/NS-284): AT MULTIPLE LOCATIONS IN NINNEKAH. PROJECT LENGTH = 5.158 MILESGrady · Division 7 | 6 of 6 | $12,646,646 | $9,911,422SEWELL BROS., INC. | +27.6% |
| Aug 20, 2020 | 200262 | BRIDGE AND APPROACHES COUNTY ROAD (EW-112): OVER WEST ELK CREEK , 3.4 MILES EAST OF THE I-40 BUSINESS JUNCTION IN ELK CITY. PROJECT LENGTH = 0.151 MILEBeckham · Division 5 | 4 of 7 | $888,502 | $762,027SEWELL BROS., INC. | +16.6% |
| Aug 20, 2020 | 200263 | JOINT SEAL /REPAIR I -40: OVER I-40 BUSINESS AND FMRC RAILROAD , 2.2 MILES EAST OF THE SH-54 JUNCTION NEAR WEATHERFORD . PROJECT LENGTH - 0.000 MILECuster · Division 5 | 2 of 7 | $648,240 | $535,904PBX Corporation | +21.0% |
| Aug 20, 2020 | 200265 | BRIDGE AND APPROACHES COUNTY ROAD (EW-71): OVER TRIBUTARY TO SKELETON CREEK , 5.9 MILES EAST OF THE SH -74 JUNCTION NEAR CRESCENT. PROJECT LENGTH = 0.208 MILELogan · Division 4 | 5 of 15 | $1,018,146 | $882,069Wyatt Contracting | +15.4% |
| Jul 23, 2020 | 190283 | BRIDGE REHABILITATION I -35: OVER WILDHORSE CREEK OVERFLOW, 1.5 MILES NORTH OF THE SH-7 JUNCTION NEAR DAVIS . PROJECT LENGTH = 0.267 MILEGarvin · Division 3 | 4 of 5 | $1,180,604 | $1,093,005B & B CONSTRUCTION SERVICE … | +8.0% |
| Jul 23, 2020 | 200244 | BRIDGE REHABILITATION SH -19: OVER EAST CACHE CREEK , 0.9 MILES WEST OF THE US -62 JUNCTION NEAR APACHE . PROJECT LENGTH = 0.132 MILECaddo · Division 7 | 2 of 9 | $1,387,528 | $1,379,224Frontier Bridge, Inc. | +0.6% |
| Jul 23, 2020 | 200247 | INTERSECTION MODIFICATION AND TRAFFIC SIGNALS US -77: AT THE INTERSECTION OF THE SH-9 EB ON/OFF RAMP, IN THE CITY OF NORMAN. PROJECT LENGTH = 0.132 MILECleveland · Division 3 | 4 of 4 | $1,307,192 | $840,242CGC, LLC. | +55.6% |
| Jul 23, 2020 | 200248 | BRIDGE AND APPROACHES COUNTY ROAD (EW-195): OVER TRIBUTARY TO WHISKEY CREEK , 0.7 MILES EAST OF THE SH -65 JUNCTION NEAR TEMPLE . PROJECT LENGTH = 0.080 MILECotton · | 5 of 10 | $312,909 | $243,876SEWELL BROS., INC. | +28.3% |
| Jul 23, 2020 | 200249 | BRIDGE REHABILITATION SH -73: OVER WASHITA RIVER , 1.7 MILES AND 5.9 MILES WEST OF THE I-40 BUSINESS JUNCTION NEAR CLINTON . PROJECT LENGTH = 0.321 MILECuster · Division 5 | 4 of 7 | $1,997,049 | $1,904,221SEWELL BROS., INC. | +4.9% |
| Jul 23, 2020 | 200261 | WIDEN AND RESURFACE SH -19: FROM 4.3 MILES EAST OF THE GARVIN COUNTY LINE , EXTEND EAST NEAR STRATFORD . PROJECT LENGTH = 5.641 MILESPontotoc · | 4 of 4 | $20,211,722 | $16,884,257THE CUMMINS CONSTRUCTION CO… | +19.7% |
| Jun 18, 2020 | 200229 | BRIDGE AND APPROACHES SH -66B:OVER CAPTAIN CREEK , 1.6 MILES NORTHEAST OF THE SH -66 JUNCTION IN WELLSTON . PROJECT LENGTH = 0.352 MILELincoln · Division 3 | 3 of 7 | $2,557,000 | $2,372,504L & N BRIDGE, LLC | +7.8% |
| Jun 18, 2020 | 200237 | BRIDGE AND APPROACHES COUNTY ROAD (NS-2836): OVER TRIBUTARY TO COW CREEK , 2.1 MILES NORTH OF THE SH -53 JUNCTION NEAR COMANCHE. PROJECT LENGTH = 0.207 MILEStephens · Division 7 | 8 of 8 | $806,172 | $585,857SEWELL BROS., INC. | +37.6% |
| Jun 18, 2020 | 200242 | PEDESTRIAN IMPROVEMENTS (TRAIL CONSTRUCTION ) CITY STREETS : FROM CLAYTON AVE , EXT N ON CHISHOLM TRAIL PKWY THEN E ON ELK AVE THEN S ON WHISENANT DR IN DUNCAN . PROJECT LENGTH = 1.710 MILESStephens · Division 7 | 3 of 3 | $1,482,204 | $1,101,976SCHIRALLI CONSTRUCTION CORP. | +34.5% |
| May 14, 2020 | 200187 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (NS-250): FROM 2.9 MILES SOUTH OF THE US -270 JUNCTION, EXTEND NORTH NEAR WATONGA . PROJECT LENGTH = 0.021 MILEBlaine · Division 5 | 3 of 7 | $184,568 | $157,274Wyatt Contracting | +17.4% |
| May 14, 2020 | 200190 | CARTER BRIDGE AND APPROACHES COUNTY ROADS (NS-314/EW-189): OVER WALNUT BAYOU AND WHISKEY CR , 2.4 MI N OF US-70 AND 2.5 MI W OF SH-53 NEAR HEALDTON . PROJECT LENGTH = 0.339 MILECirb-210d(071)rb · | 5 of 6 | $1,471,481 | $1,264,660Treas Construction Inc | +16.4% |
| May 14, 2020 | 200192 | BRIDGE AND APPROACHES COUNTY ROAD (COOMBS ROAD/EW-169): OVER EAST CACHE CREEK , 1.2 MILES EAST OF I -44 NEAR LAWTON . PROJECT LENGTH = 0.245 MILEComanche · Division 7 | 7 of 7 | $1,683,134 | $1,360,552Frontier Bridge, Inc. | +23.7% |
| May 14, 2020 | 200194 | BRIDGE AND APPROACHES SH -132: OVER UNNAMED CREEK, 6.6 MILES NORTH OF THE SH -45 JUNCTION NEAR CARRIER. PROJECT LENGTH = 0.020 MILEGarfield · Division 4 | 1 of 6 | $861,833 | $861,833 | Won |
| May 14, 2020 | 200207 | PAVEMENT RECONSTRUCTION (NO ADDED LANES ) COUNTY ROAD (CHOATE PRAIRIE ROAD ): FROM THE SH -113 JUNCTION, EXTEND WEST NEAR INDIANOLA . PROJECT LENGTH = 4.840 MILESPittsburg · Division 2 | 4 of 4 | $3,291,353 | $2,662,312APAC-CENTRAL, INC. | +23.6% |
| May 14, 2020 | 200211 | RESURFACE (ASPHALT ) SH-3W: 1.9 MILES NORTHWEST OF THE SH -19 JUNCTION, NEAR ADA . PROJECT LENGTH = 1.380 MILESPontotoc · | 1 of 4 | $472,560 | $472,560 | Won |
| May 14, 2020 | 200212 | BRIDGE AND APPROACHES COUNTY ROAD (EW-186): OVER COW CREEK, 0.7 MILES EAST OF THE US-81 JUNCTION NEAR COMANCHE. PROJECT LENGTH = 0.245 MILEStephens · Division 7 | 4 of 6 | $661,032 | $584,760SEWELL BROS., INC. | +13.0% |
| May 14, 2020 | 200218 | RESURFACE (ASPHALT ) SH-33: FROM 3.0 MILES EAST OF THE SH -54 JUNCTION, EXTEND NORTHEAST NEAR THOMAS . PROJECT LENGTH = 7.500 MILESBlaine, Custer, Dewey · | 1 of 1 | $1,921,971 | $1,921,971 | Won |
| May 14, 2020 | 200219 | RESURFACE (ASPHALT ) US-183: FROM 0.45 MILES NORTH OF THE SH -9 JUNCTION, EXTEND NORTH NEAR HOBART . PROJECT LENGTH = 13.260 MILESKiowa, Washita · | 4 of 4 | $2,067,415 | $1,502,905CORNELL CONSTRUCTION COMPAN… | +37.6% |
| Apr 16, 2020 | 200185 | BRIDGE REHABILITATION SH -77H (SOONER ROAD): OVER I-240, 4.0 MILES EAST OF THE I -35 INTERCHANGE IN OKLAHOMA CITY . PROJECT LENGTH = 0.131 MILEOklahoma · Division 4 | 6 of 6 | $4,817,287 | $3,664,145Frontier Bridge, Inc. | +31.5% |
| Apr 16, 2020 | 200186 | RESURFACE (ASPHALT AND UTBWC ) I-35 (NB LANES ONLY ): FROM 0.5 MILES SOUTH OF THE US-77 JUNCTION, EXTEND NORTH IN NORMAN . PROJECT LENGTH = 0.530 MILECleveland · Division 3 | 1 of 1 | $247,892 | $247,892 | Won |
| Apr 16, 2020 | 200065 | BRIDGE AND APPROACHES US -75: OVER SALT CREEK , 5.7 MILES SOUTH OF THE US -270 JUNCTION NEAR CALVIN . PROJECT LENGTH = 0.159 MILEHughes · Division 3 | 5 of 10 | $2,165,452 | $1,832,059Treas Construction Inc | +18.2% |
| Apr 16, 2020 | 200216 | BRIDGE AND APPROACHES SH -58: OVER MINNEHAHA CREEK , 0.1 MILES SOUTH OF THE SH -51 JUNCTION IN CANTON . PROJECT LENGTH = 0.156 MILEBlaine · Division 5 | 4 of 4 | $2,992,479 | $2,279,999K & R BUILDERS, INC. | +31.2% |
| Apr 16, 2020 | 200079 | PAVEMENT REHABILITATION (ASPHALT ) OLD STATE HIGHWAY 99: FROM THE SH -39 JUNCTION, EXTEND NORTHEAST IN KONAWA . PROJECT LENGTH = 6.784 MILESSeminole · Division 3 | 4 of 4 | $4,688,418 | $3,921,366THE CUMMINS CONSTRUCTION CO… | +19.6% |
| Apr 16, 2020 | 200142 | RESURFACE (ASPHALT ) US-62: FROM 6.3 MILES EAST OF THE SH -9 JUNCTION, EXTEND EAST THEN NORTH IN ANADARKO . PROJECT LENGTH = 1.620 MILESCaddo · Division 7 | 3 of 5 | $963,033 | $735,101T & G CONSTRUCTION, INC. | +31.0% |
| Apr 16, 2020 | 200147 | RESURFACE (ASPHALT ) SH-16: FROM 7.16 MILES SOUTHEAST OF THE SH -33 JUNCTION, EXTEND EAST NEAR SHAMROCK . PROJECT LENGTH = 8.000 MILESCreek · Division 8 | 5 of 5 | $2,277,669 | $1,674,761Rosscon, LLC | +36.0% |
| Apr 16, 2020 | 200151 | BRIDGE REHABILITATION US -64/US-412: OVER SKELETON CREEK , 4.3 MILES EAST OF THE US -81 JUNCTION IN ENID. PROJECT LENGTH 0.071 MILEGarfield · Division 4 | 6 of 6 | $1,136,312 | $892,764BRIDGECO CONTRACTORS, INC. | +27.3% |
| Apr 16, 2020 | 200159 | BRIDGE REHABILITATION SH -72: OVER COAL CREEK , 1.3 MILES NORTH OF THE US -64 JUNCTION NEAR HASKELL. PROJECT LENGTH = 0.160 MILEMuskogee · Division 1 | 5 of 5 | $2,131,472 | — | |
| Mar 19, 2020 | 200027 | RESURFACE (ASPHALT ) COUNTY ROAD (FAIRGROUNDS / NS-337): FROM THE SH -51 JUNCTION, EXTEND SOUTH NEAR STILLWATER . PROJECT LENGTH = 4.930 MILESPayne · Division 4 | 3 of 3 | $1,165,195 | $907,376Atlas Paving Company | +28.4% |
| Mar 19, 2020 | 200098 | RESURFACE (ASPHALT ) US-281: FROM THE SH -152 JUNCTION, EXTEND SOUTH NEAR BINGER. PROJECT LENGTH = 4.160 MILESCaddo · Division 7 | 3 of 3 | $1,819,745 | $1,257,110T & G CONSTRUCTION, INC. | +44.8% |
| Mar 19, 2020 | 200099 | RESURFACE (ASPHALT ) SH-3: FROM 4.0 MILES SOUTHEAST OF US -81, EXTEND SOUTHEAST NEAR OKARCHE. PROJECT LENGTH = 3.35 MILESCanadian · Division 4 | 3 of 4 | $4,890,000 | $3,794,837Atlas Paving Company | +28.9% |
| Mar 19, 2020 | 200101 | BRIDGE REHABILITATION SH -73: OVER LITTLE PANTHER CREEK , 5.7 MILES EAST OF THE SH -34 JUNCTION NEAR FOSS LAKE. PROJECT LENGTH = 0.170 MILECuster · Division 5 | 1 of 4 | $1,010,954 | $1,010,954 | Won |
| Mar 19, 2020 | 200103 | JACKSON BRIDGE REHABILITATION US -62/US-62 EB: OVER BITTER CREEK AND TURKEY CREEK , 2.8 MILES AND 15.8 MILES WEST OF US -283 NEAR ALTUS AND DUKE . PROJECT LENGTH = 0.295 MILESbr-020n(047)sb · | 3 of 6 | $2,652,075 | $2,365,212B & B CONSTRUCTION SERVICE … | +12.1% |
| Mar 19, 2020 | 200109 | BRIDGE REHABILITATION COUNTY ROAD (D0553): OVER CIMARRON RIVER, 3.5 MILES WEST OF THE SH-8 JUNCTION NEAR AMES . PROJECT LENGTH = 0.288 MILEMajor · Division 6 | 2 of 2 | $723,716 | $647,869WILDCAT CONSTRUCTION CO., I… | +11.7% |
| Mar 19, 2020 | 200120 | WIDEN, RESURFACE , AND BRIDGE OLD STATE HIGHWAY 99: FROM 2.0 MILES NORTH OF THE SH -1 JUNCTION, EXTEND NORTH NEAR ADA . PROJECT LENGTH = 5.800 MILESPontotoc · | 3 of 3 | $3,948,505 | $3,074,257OVERLAND CORPORATION | +28.4% |
| Mar 19, 2020 | 200121 | POTTAWATOMIE, SEMINOLE RESURFACE (ASPHALT AND UTBWC ) I-40: FROM THE SH -18 JUNCTION, EXTEND EAST NEAR SHAWNEE . PROJECT LENGTH = 14.050 MILESNhppi-4000(096)3p · | 1 of 2 | $5,924,420 | $5,924,420 | Won |
| Mar 19, 2020 | 200132 | GRADE, DRAIN, AND SURFACE I -40 ON RAMP/FRONTAGE ROAD : FROM 2.2 MILES EAST OF THE SH-54 JUNCTION, EXTEND NORTHEAST IN WEATHERFORD . PROJECT LENGTH = 0.759 MILECuster · Division 5 | 3 of 4 | $2,880,900 | $2,379,626SEWELL BROS., INC. | +21.1% |
| Mar 19, 2020 | 200136 | BRIDGE REHABILITATION US -60: OVER INDIAN CREEK, 0.1 MILES EAST OF THE SH -58 JUNCTION NEAR RINGWOOD. PROJECT LENGTH = 0.090 MILEMajor · Division 6 | 2 of 5 | $2,931,391 | $2,797,243Frontier Bridge, Inc. | +4.8% |
| Feb 20, 2020 | 200057 | GRADE, DRAIN, AND SURFACE US -77: FROM 1.0 MILE NORTH OF THE SH -39 JUNCTION, EXTEND NORTH IN LEXINGTON . PROJECT LENGTH = 3.315 MILESCleveland · Division 3 | 4 of 5 | $13,669,500 | $11,580,500Silver Star Construction Co… | +18.0% |
| Feb 20, 2020 | 200069 | BRIDGE AND APPROACHES COUNTY ROAD (EW-90): OVER DOSIE CREEK, 2.1 MILES EAST OF THE SH-66 JUNCTION NEAR DAVENPORT . PROJECT LENGTH = 0.391 MILELincoln · Division 3 | 7 of 7 | $1,245,123 | $840,777Cowboy Contracting, Inc. | +48.1% |
| Feb 20, 2020 | 200071 | PAVEMENT REHABILITATION (ASPHALT ) SH-74: FROM 1.28 MILES NORTH OF THE SH -74F JUNCTION, EXTEND NORTH NEAR CEDAR VALLEY . PROJECT LENGTH = 3.780 MILESLogan · Division 4 | 2 of 2 | $1,543,765 | $1,344,425T.J. CAMPBELL CONSTRUCTION … | +14.8% |
| Feb 20, 2020 | 190255 | BRIDGE AND APPROACHES COUNTY ROAD (EW-151): OVER LITTLE SANDY CREEK , 2.4 MILES EAST OF THE US -377 JUNCTION NEAR ADA . PROJECT LENGTH = 0.171 MILEPontotoc · | 6 of 7 | $1,265,585 | $1,114,836BRIDGECO CONTRACTORS, INC. | +13.5% |
| Feb 20, 2020 | 200078 | RESURFACE (ASPHALT ) SH-39: FROM THE CLEVELAND COUNTY LINE , EXTEND EAST NEAR EASON. PROJECT LENGTH = 6.640 MILESPottawatomie · Division 3 | 2 of 3 | $1,663,960 | $1,577,900Silver Star Construction Co… | +5.5% |
| Feb 20, 2020 | 200090 | BRIDGE REHABILITATION US -75/SH-3: OVER BRIAR CREEK, 2.9 MILES SOUTH OF THE SH -43 JUNCTION NEAR LEHIGH. PROJECT LENGTH = 0.043 MILECoal · Division 3 | 8 of 8 | $983,761 | $745,766Built Right Construction, L… | +31.9% |
| Feb 20, 2020 | 200135 | RESURFACE (ASPHALT ) I-40 EB: FROM 2.0 MILES EAST OF THE US -177 INTERCHANGE, EXTEND EAST NEAR SHAWNEE . PROJECT LENGTH = 0.019 MILEPottawatomie · Division 3 | 2 of 2 | $83,444 | $68,973CGC, LLC. | +21.0% |
| Jan 16, 2020 | 200009 | GRADE, DRAIN, SURFACE , AND EROSION SH-54: FROM SH-33, EXTEND SOUTH NEAR THOMAS . PROJECT LENGTH = 4.771 MILESCuster · Division 5 | 2 of 2 | $6,737,000 | $6,518,012SEWELL BROS., INC. | +3.4% |
| Jan 16, 2020 | 200015 | LOGAN RESURFACE (ASPHALT ) US-77/SH-33: US-77, FROM 0.05 MI S OF INDUSTRIAL AVE EXT N . SH-33, FROM 0.16 MI WEST OF 19TH ST EXT EAST IN GUTHRIE . PROJECT LENGTH = 3.210 MILESSsr-242b(074)sr · | 1 of 3 | $2,425,000 | $2,425,000 | Won |
| Jan 16, 2020 | 200018 | BRIDGE AND APPROACHES SH -52: OVER MILL CREEK AND CHISHOLM CREEK , 3.6 MILES AND 1.7 MILES SOUTH OF THE SH -9 JUNCTION NEAR HANNA. PROJECT LENGTH = 0.233 MILEMcintosh · Division 1 | 6 of 7 | $4,246,517 | $4,100,175L & N BRIDGE, LLC | +3.6% |
| Jan 16, 2020 | 190207 | BRIDGE AND APPROACHES COUNTY ROAD (EW-176/CARGO ROAD): OVER RATLIFF WEST CREEK , 0.8 MILES WEST OF THE SH -76 JUNCTION NEAR RATLIFF CITY . PROJECT LENGTH = 0.156 MILECarter · Division 7 | 4 of 7 | $995,894 | $912,956K & R BUILDERS, INC. | +9.1% |
| Jan 16, 2020 | 200033 | RESURFACE (ASPHALT ) SH-39: FROM THE POTTAWATOMIE COUNTY LINE , EXTEND EAST NEAR KONOWA . PROJECT LENGTH = 6.190 MILESSeminole · Division 3 | 3 of 3 | $1,389,569 | $1,249,097THE CUMMINS CONSTRUCTION CO… | +11.2% |
| Jan 16, 2020 | 200035 | BRIDGE AND APPROACHES US -70: OVER BOTTLE CREEK AND SUTTLE CREEK , 1.1 MILES AND 3.3 MILES EAST OF THE US -183 JUNCTION NEAR DAVIDSON . PROJECT LENGTH = 0.378 MILETillman · Division 5 | 4 of 6 | $3,463,794 | $3,199,744K & R BUILDERS, INC. | +8.3% |
| Nov 14, 2019 | 190340 | BRIDGE AND APPROACHES SH -8: OVER SALT CREEK , 7.3 MILES SOUTH OF THE SH -51 JUNCTION NEAR HITCHCOCK. PROJECT LENGTH = 0.226 MILEBlaine · Division 5 | 2 of 3 | $2,390,112 | $2,266,211BRIDGECO CONTRACTORS, INC. | +5.5% |
| Nov 14, 2019 | 190341 | GRADE, DRAIN, AND SURFACE US -281: FROM 0.3 MILES SOUTH OF I-40, EXTEND SOUTH IN HINTON . PROJECT LENGTH = 0.322 MILECaddo · Division 7 | 4 of 4 | $3,080,308 | $1,925,914ALLEN CONTRACTING, INC./SHE… | +59.9% |
| Nov 14, 2019 | 190375 | BRIDGE AND APPROACHES SH -53: OVER MUD CREEK AND OVERFLOWS , 11.1 MILES AND 11 .0 MILES EAST OF THE US -81 JUNCTION NEAR COMANCHE. PROJECT LENGTH = 0.572 MILEStephens · Division 7 | 2 of 6 | $4,739,164 | $4,699,293Treas Construction Inc | +0.8% |
| Nov 14, 2019 | 190387 | BRIDGE AND APPROACHES COUNTY ROAD (NS-333): OVER DUGOUT CREEK , 1.0 MILE NORTH OF THE SH-105 JUNCTION NEAR CARNEY. PROJECT LENGTH = 0.302 MILELincoln · Division 3 | 3 of 3 | $756,346 | $591,127BRIDGECO CONTRACTORS, INC. | +27.9% |
| Nov 14, 2019 | 190392 | BRIDGE REPAIR I -35: REPAIR VEHICLE IMPACT DAMAGE OVER SH-51, 11.2 MILES SOUTH OF US-77 NEAR STILLWATER . PROJECT LENGTH = 0.00 MILEPayne · Division 4 | 2 of 5 | $699,846 | $643,850MANHATTAN ROAD & BRIDGE COM… | +8.7% |
| Oct 17, 2019 | 180304 | BRIDGE AND APPROACHES US -270: OVER WEWOKA CREEK AND RAILROAD , 3.5 MILES AND 3.7 MILES NORTHWEST OF THE US -59 JUNCTION NEAR WEWOKA. PROJECT LENGTH = 0.586 MILESeminole · Division 3 | 5 of 6 | $14,091,157 | $11,794,404OVERLAND CORPORATION | +19.5% |
| Oct 17, 2019 | 190314 | BRIDGE AND APPROACHES COUNTY ROAD (NS-2760): OVER LAKE LOUIS BURTSCHI , 2.4 MILES NORTH OF THE US -277 JUNCTION NEAR CEMENT. PROJECT LENGTH = 0.387 MILEGrady · Division 7 | 3 of 3 | $1,248,942 | $925,000Central Bridge Company | +35.0% |
| Oct 17, 2019 | 190316 | BRIDGE AND APPROACHES COUNTY ROAD (EW-1415): OVER TITTLE CREEK , 1.5 MILES WEST OF THE SH-6 JUNCTION NEAR GRANITE. PROJECT LENGTH = 0.066 MILEGreer · Division 5 | 5 of 6 | $439,746 | $300,835KLAVER CONSTRUCTION COMPANY… | +46.2% |
| Oct 17, 2019 | 190319 | RESURFACE (ASPHALT ) SH-74: FROM 0.64 MILES SOUTH OF WATERLOO ROAD , EXTEND NORTH NEAR EDMOND. PROJECT LENGTH = 6.920 MILESLogan, Oklahoma · | 2 of 2 | $1,804,804 | $1,803,497T.J. CAMPBELL CONSTRUCTION … | +0.1% |
| Sep 19, 2019 | 190216 | GRADE, DRAIN, AND SURFACE I -35: FROM 0.5 MILES NORTHWEST OF SH -74, EXTEND SOUTHEAST IN GOLDSBY. PROJECT LENGTH = 1.065 MILESMcclain · Division 3 | 3 of 3 | $5,851,758 | $4,792,565ALLEN CONTRACTING, INC./SHE… | +22.1% |
| Sep 19, 2019 | 190225 | RESURFACE (ASPHALT ) I-40: FROM THE I -35 INTERCHANGE, EXTEND SOUTHEAST IN DEL CITY . PROJECT LENGTH = 2.64 MILESOklahoma · Division 4 | 2 of 3 | $1,425,000 | $1,419,438T.J. CAMPBELL CONSTRUCTION … | +0.4% |
| Aug 22, 2019 | 190238 | GRADE, DRAIN, AND SURFACE SH -3: FROM 1.0 MILE EAST OF THE US -270 JUNCTION, EXTEND EAST IN WATONGA . PROJECT LENGTH = 4.109 MILESBlaine · Division 5 | 2 of 3 | $10,735,445 | $9,866,476THE CUMMINS CONSTRUCTION CO… | +8.8% |
| Aug 22, 2019 | 190244 | BRIDGE AND APPROACHES COUNTY ROAD (EW-099): OVER BARNITZ CREEK, 4.5 MILES WEST OF THE US-183 JUNCTION NEAR ARAPAHO . PROJECT LENGTH = 0.161 MILECuster · Division 5 | 4 of 5 | $997,169 | $821,182SEWELL BROS., INC. | +21.4% |
| Aug 22, 2019 | 190250 | BRIDGE AND APPROACHES COUNTY ROAD (BRITTON ROAD ): OVER TRIBUTARY OF NORTH CANADIAN RIVER, 11.3 MILES EAST OF I -35 IN JONES. PROJECT LENGTH = 0.133 MILEOklahoma · Division 4 | 9 of 9 | $758,200 | $508,497Wyatt Contracting | +49.1% |
| Jun 20, 2019 | 190182 | RESURFACE (ASPHALT ) AND CABLE BARRIER I-40: FROM 0.5 MILES WEST OF SH -27, EXTEND EAST NEAR OKEMAH. PROJECT LENGTH = 5.793 MILESOkfuskee · Division 3 | 1 of 3 | $18,920,365 | $18,920,365 | Won |
| Jun 20, 2019 | 190194 | RESURFACE (ASPHALT ) US-281: FROM 6.6 MILES SOUTH OF THE SH -152 JUNCTION, EXTEND NORTH NEAR GRACEMONT . PROJECT LENGTH = 2.350 MILESCaddo · Division 7 | 3 of 3 | $1,336,700 | $875,399T & G CONSTRUCTION, INC. | +52.7% |
| Jun 20, 2019 | 190199 | RESURFACE (A.C. AND P.C.) US-62: FROM THE SH -99 JUNCTION, EXTEND EAST IN PRAGUE . PROJECT LENGTH = 3.60 MILESLincoln · Division 3 | 4 of 5 | $2,467,125 | $2,027,247EMERY SAPP & SONS, INC. | +21.7% |
| Jun 20, 2019 | 190201 | RESURFACE (ASPHALT ) SH-48: FROM 5.2 MILES NORTH OF THE COAL COUNTY LINE , EXTEND NORTH NEAR JAYDEE . PROJECT LENGTH = 4.00 MILESPontotoc · | 3 of 3 | $934,183 | $684,497THE CUMMINS CONSTRUCTION CO… | +36.5% |
| Jun 20, 2019 | 190069 | RESURFACE (ASPHALT ) SH-51A: FROM THE SH -51 SPUR JUNCTION, EXTEND NORTH NEAR CANTON . PROJECT LENGTH = 7.57 MILESBlaine · Division 5 | 2 of 2 | $3,094,299 | $2,658,521J & R SAND COMPANY, INC. | +16.4% |
| Jun 20, 2019 | 190092 | RESURFACE (ASPHALT ) SH-1: FROM 0.2 MILES NORTH OF THE CHICKASAW TURNPIKE , EXTEND NORTHEAST NEAR ROFF . PROJECT LENGTH = 8.00 MILESPontotoc · | 3 of 3 | $4,391,746 | $3,146,973OVERLAND CORPORATION | +39.6% |
| May 16, 2019 | 190175 | RESURFACE (ASPHALT ) I-35 (SB LANES): FROM THE SH -29 JUNCTION, EXTEND SOUTH NEAR WYNNEWOOD. PROJECT LENGTH = 6.59 MILESGarvin · Division 3 | 3 of 3 | $3,114,400 | $2,796,665THE CUMMINS CONSTRUCTION CO… | +11.4% |
| May 16, 2019 | 180277 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (EW-72): FROM 2.3 MILES EAST OF THE SH -8 JUNCTION, EXTEND EAST NEAR HITCHCOCK . PROJECT LENGTH = 4.019 MILESBlaine · Division 5 | 1 of 2 | $3,851,196 | $3,851,196 | Won |
| May 16, 2019 | 190024 | GRADE, DRAIN, AND SURFACE SH -9: FROM 6.8 MILES EAST OF THE US -377 JUNCTION, EXTEND EAST NEAR SEMINOLE . PROJECT LENGTH = 1.022 MILESSeminole · Division 3 | 1 of 2 | $3,467,035 | $3,467,035 | Won |
| Apr 18, 2019 | 190187 | RESURFACE (ASPHALT ) SH-9: FROM 0.2 MILES EAST OF THE SH -102 JUNCTION, EXTEND EAST NEAR TECUMSEH . PROJECT LENGTH = 5.50 MILESPottawatomie · Division 3 | 2 of 5 | $531,000 | $469,148Rosscon, LLC | +13.2% |
| Mar 14, 2019 | 190107 | RESURFACE (ASPHALT ) US-281: FROM 0.01 MILES WEST OF THE SH -152 JUNCTION, EXTEND WEST NEAR BINGER . PROJECT LENGTH = 4.10 MILESCaddo · Division 7 | 2 of 3 | $2,095,295 | $1,961,516THE CUMMINS CONSTRUCTION CO… | +6.8% |
| Mar 14, 2019 | 190114 | RESURFACE (ASPHALT ) US-62: FROM 1.0 MILE EAST OF THE CADDO COUNTY LINE , EXTEND EAST NEAR CHICKASHA. PROJECT LENGTH = 6.49 MILESGrady · Division 7 | 1 of 5 | $2,018,070 | $2,018,070 | Won |
| Mar 14, 2019 | 190131 | PEDESTRIAN IMPROVEMENTS (SIDEWALKS , BRIDGE, AND CHANNEL) CITY STREET (DUCK STREET): FROM MCELROY ROAD , EXTEND SOUTH IN STILLWATER . PROJECT LENGTH = 0.000 MILEPayne · Division 4 | 4 of 4 | $2,931,213 | $1,440,020T. McDonald Construction, I… | +103.6% |
| Feb 14, 2019 | 190014 | RESURFACE (ASPHALT ) COUNTY ROAD (EW-136/230TH STREET): FROM EASTERN ROAD, EXTEND EAST THEN SOUTH ON BRYANT AVENUE (NS-311 ) NEAR WASHINGTON . PROJECT LENGTH = 3.617 MILESMcclain · Division 3 | 1 of 4 | $935,098 | $935,098 | Won |
| Feb 14, 2019 | 190073 | RESURFACE (ASPHALT ) US-75: FROM 0.8 MILES NORTHWEST OF THE SH -31 JUNCTION, EXTEND NORTHWEST NEAR COALGATE . PROJECT LENGTH = 3.00 MILESCoal · Division 3 | 6 of 7 | $940,756 | $720,294THE CUMMINS CONSTRUCTION CO… | +30.6% |
| Feb 14, 2019 | 190076 | BRIDGE REHABILITATION I -35: OVER COUNTY ROAD (EW-161), 2.1 MILES NORTH OF SH -29 NEAR WYNNEWOOD. PROJECT LENGTH = 0.019 MILEGarvin · Division 3 | 5 of 5 | $861,504 | $609,926C3 Construction, Inc. | +41.2% |
| Feb 14, 2019 | 190084 | RESURFACE (ASPHALT ) SH-37: FROM THE GRADY COUNTY LINE , EXTEND EAST NEAR NEWCASTLE. PROJECT LENGTH = 4.03 MILESMcclain · Division 3 | 1 of 3 | $1,209,913 | $1,209,913 | Won |
| Feb 14, 2019 | 190095 | RESURFACE (ASPHALT ) US-270: FROM THE US -270B JUNCTION, EXTEND SOUTHEAST NEAR WEWOKA. PROJECT LENGTH = 4.33 MILESSeminole · Division 3 | 3 of 6 | $1,096,709 | $1,046,251Rosscon, LLC | +4.8% |
| Feb 14, 2019 | 190101 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (EW-165/OLD FITTSTOWN HIGHWAY ): FROM THE US-377 JUNCTION, EXTEND WEST NEAR FITTSTOWN . PROJECT LENGTH = 5.979 MILESPontotoc · | 3 of 3 | $7,367,500 | $5,534,406THE CUMMINS CONSTRUCTION CO… | +33.1% |
| Jan 17, 2019 | 180242 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (COLTRANE ROAD ): FROM SIMPSON ROAD, EXTEND NORTH NEAR EDMOND . PROJECT LENGTH = 1.991 MILESLogan · Division 4 | 1 of 4 | $3,156,262 | $3,156,262 | Won |
| Jan 17, 2019 | 190005 | BRIDGE AND APPROACHES COUNTY ROAD (EW-133/SLAUGHTERVILLE RD ): OVER UNNAMED CREEK, 0.3 MILES WEST OF THE US -77 JUNCTION IN SLAUGHTERVILLE . PROJECT LENGTH = 0.033 MILECleveland · Division 3 | 4 of 9 | $332,956 | $294,990Silver Star Construction Co… | +12.9% |
| Jan 17, 2019 | 190008 | RESURFACE (ASPHALT ) SH-74D: FROM THE SH -74 JUNCTION, EXTEND WEST NEAR LOVELL . PROJECT LENGTH = 2.687 MILESLogan · Division 4 | 1 of 2 | $391,000 | $391,000 | Won |
| Jan 17, 2019 | 190019 | PAVEMENT REHABILITATION (A.C. AND P.C.) CITY STREET (NW 10TH STREET): FROM NORTH MAY AVENUE EXTEND EAST IN THE CITY OF OKLAHOMA CITY. PROJECT LENGTH = 0.980 MILEOklahoma · Division 4 | 3 of 3 | $2,558,334 | $2,171,000CROSSLAND HEAVY CONTRACTORS… | +17.8% |
| Jan 17, 2019 | 190038 | CREEK RESURFACE (ASPHALT ) SH-33: FROM 0.28 MILES EAST OF THE SH -16/SH-99B JUNCTION, EXTEND EAST NEAR DRUMRIGHT . PROJECT LENGTH = 8.022 MILESSsr-219b(068)sr · | 4 of 4 | $3,270,406 | $2,205,000BECCO CONTRACTORS, INC. | +48.3% |
| Jan 17, 2019 | 190039 | BRIDGE AND APPROACHES I -40 NORTH FRONTAGE ROAD : OVER LITTLE DEEP CREEK , 1.0 MILE WEST OF THE CADDO COUNTY LINE NEAR WEATHERFORD . PROJECT LENGTH = 0.094 MILECuster · Division 5 | 5 of 6 | $1,748,778 | $1,533,773SEWELL BROS., INC. | +14.0% |
| Jan 17, 2019 | 190043 | RESURFACE (ASPHALT ) SH-92: FROM THE US -62/US-277 JUNCTION, EXTEND NORTH NEAR CHICKASHA. PROJECT LENGTH = 5.00 MILESGrady · Division 7 | 3 of 3 | $1,346,855 | $1,224,600Silver Star Construction Co… | +10.0% |
| Jan 17, 2019 | 190055 | NOBLE RESURFACE (ASPHALT ) SH-156: FROM 0.10 MILES EAST OF THE US -77 JUNCTION, EXTEND EAST THEN NORTHEAST NEAR MARLAND . PROJECT LENGTH = 10.290 MILESSsr-252c(042)sr · | 3 of 3 | $3,664,480 | $3,123,647Evans & Associates Construc… | +17.3% |
| Nov 15, 2018 | 180284 | RESURFACE (ASPHALT ) SH-19/SH-74: SH-19, FROM 0.32 MILES WEST OF SH -74, EXTEND EAST. SH-74, FROM SH-19, EXTEND SOUTH NEAR MAYSVILLE . PROJECT LENGTH = 8.000 MILESGarvin · Division 3 | 6 of 6 | $1,442,696 | $1,122,621THE CUMMINS CONSTRUCTION CO… | +28.5% |
| Sep 20, 2018 | 180300 | RESURFACE (ASPHALT ) SH-48: FROM THE COAL COUNTY LINE , EXTEND NORTH NEAR STONEWALL . PROJECT LENGTH = 5.000 MILESPontotoc · | 3 of 3 | $954,948 | $786,640THE CUMMINS CONSTRUCTION CO… | +21.4% |
| Sep 20, 2018 | 180305 | RESURFACE (ASPHALT ) US-270: FROM SH-9, EXTEND SOUTHEAST IN SEMINOLE . PROJECT LENGTH = 2.39 MILESSeminole · Division 3 | 3 of 5 | $1,073,949 | $978,973OVERLAND CORPORATION | +9.7% |
| Aug 16, 2018 | 180269 | BRIDGE AND APPROACHES COUNTY ROAD (NS-328/NORTH HARRAH ROAD ): OVER UNNAMED CREEK, 0.8 MILES SOUTH OF I-44 (TURNER TURNPIKE ) NEAR LUTHER. PROJECT LENGTH = 0.081 MILEOklahoma · Division 4 | 10 of 10 | $627,475 | $396,326KLAVER CONSTRUCTION COMPANY… | +58.3% |
| Jun 14, 2018 | 180181 | RESURFACE (P.C. CONCRETE) SH-9: FROM 0.2 MILES WEST OF THE US -270 JUNCTION, EXTEND EAST IN SEMINOLE . PROJECT LENGTH = 2.91 MILESSeminole · Division 3 | 1 of 6 | $959,375 | $959,375 | Won |
| Jun 14, 2018 | 180231 | BRIDGE AND APPROACHES SH -152: OVER EAST ELK CREEK , 0.1 MILES EAST OF THE SH -44 JUNCTION NEAR DILL CITY . PROJECT LENGTH = 0.280 MILEWashita · Division 5 | 4 of 8 | $2,549,930 | $2,270,084CASWELL CONSTRUCTION, INC. | +12.3% |
| May 17, 2018 | 180152 | RESURFACE (ASPHALT )AND CABLE BARRIER I-40: FROM 0.4 MILES WEST OF SH -44, EXTEND WEST NEAR FOSS. PROJECT LENGTH = 7.841 MILESWashita · Division 5 | 3 of 3 | $10,625,185 | $8,502,098CASWELL CONSTRUCTION, INC. | +25.0% |
| May 17, 2018 | 180198 | RESURFACE (UTBWC) US-183: FROM 0.6 MILES NORTH OF THE US -62B JUNCTION, EXTEND NORTH NEAR SNYDER . PROJECT LENGTH = 14.430 MILESKiowa · Division 5 | 2 of 3 | $1,846,204 | $1,616,823CORNELL CONSTRUCTION COMPAN… | +14.2% |
| May 17, 2018 | 180199 | RESURFACE (ASPHALT ) SH-105: FROM THE LINCOLN COUNTY LINE , EXTEND WEST NEAR MERIDIAN. PROJECT LENGTH = 7.840 MILESLogan · Division 4 | 1 of 3 | $1,492,000 | $1,492,000 | Won |
| May 17, 2018 | 180200 | RESURFACE (ASPHALT ) SH-74: FROM THE SH -24 JUNCTION, EXTEND NORTH NEAR GOLDSBY . PROJECT LENGTH = 5.00 MILESMcclain · Division 3 | 3 of 5 | $634,840 | $611,658MARKWELL PAVING COMPANY, IN… | +3.8% |
| May 17, 2018 | 180211 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-29: FROM 2.4 MILES EAST OF THE US -81 JUNCTION, EXTEND EAST NEAR MARLOW . PROJECT LENGTH = 4.418 MILESStephens · Division 7 | 5 of 5 | $14,542,245 | $12,462,832OVERLAND CORPORATION | +16.7% |
| Apr 19, 2018 | 180058 | RESURFACE (ASPHALT ) COUNTY ROAD (PADEN ROAD /NS-362): FROM 0.7 MILES NORTH OF US -62, EXTEND NORTH NEAR PADEN . PROJECT LENGTH = 4.602 MILESOkfuskee · Division 3 | 2 of 5 | $687,426 | $673,272THE QUAPAW COMPANY | +2.1% |
| Apr 19, 2018 | 180101 | RESURFACE (ASPHALT ) CITY STREET (WEST MEMORIAL ROAD ): FROM THE SH -74 (N PORTLAND AVENUE ) INTERSECTION, EXTEND EAST IN OKLAHOMA CITY . PROJECT LENGTH = 2.075 MILESOklahoma · Division 4 | 1 of 2 | $2,868,868 | $2,868,868 | Won |
| Apr 19, 2018 | 180157 | RESURFACE (UTBWC) SH-77H: FROM THE US -77 JUNCTION, EXTEND NORTH NEAR NORMAN . PROJECT LENGTH = 8.00 MILESCleveland · Division 3 | 3 of 4 | $1,448,568 | $1,108,945MARKWELL PAVING COMPANY, IN… | +30.6% |
| Apr 19, 2018 | 180162 | RESURFACE (ASPHALT ) SH-76: FROM THE SH -19 JUNCTION, EXTEND SOUTH IN LINDSAY . PROJECT LENGTH = 2.76 MILESGarvin · Division 3 | 3 of 6 | $519,952 | $425,149MARKWELL PAVING COMPANY, IN… | +22.3% |
| Apr 19, 2018 | 180176 | RESURFACE (ASPHALT ) SH-18/SH-99: FROM THE LINCOLN COUNTY LINE , EXTEND NORTH NEAR CUSHING. PROJECT LENGTH = 6.210 MILESPayne · Division 4 | 4 of 6 | $1,376,560 | $1,155,000BECCO CONTRACTORS, INC. | +19.2% |
| Apr 19, 2018 | 180182 | RESURFACE (ASPHALT ) SH-99: FROM THE US -270 JUNCTION, EXTEND NORTH IN SEMINOLE . PROJECT LENGTH = 1.54 MILESSeminole · Division 3 | 4 of 4 | $199,165 | $160,996MARKWELL PAVING COMPANY, IN… | +23.7% |
| Mar 15, 2018 | 180054 | BRIDGE AND APPROACHES COUNTY ROAD (EW-136/SAND CREEK ROAD): OVER DIBBLE CREEK AND TRIBUTARY , 0.8 MILES AND 1.0 MILE EAST SH -76 NEAR DIBBLE. PROJECT LENGTH = 0.239 MILEMcclain · Division 3 | 7 of 7 | $884,896 | $684,813SEWELL BROS., INC. | +29.2% |
| Mar 15, 2018 | 180126 | BRIDGE AND APPROACHES SH -9: OVER LITTLE RIVER, 12.5 MILES EAST OF US -77 IN NORMAN. PROJECT LENGTH = 0.554 MILECleveland · Division 3 | 1 of 3 | $5,328,789 | $5,328,789 | Won |
| Mar 15, 2018 | 180130 | RESURFACE (ASPHALT ) I-40 BUSINESS: FROM 1.1 MILES EAST OF THE US -183 JUNCTION, EXTEND EAST IN CLINTON . PROJECT LENGTH = 1.26 MILESCuster · Division 5 | 2 of 3 | $779,566 | $697,287CASWELL CONSTRUCTION, INC. | +11.8% |
| Mar 15, 2018 | 180135 | RESURFACE (ASPHALT ) I-35: FROM 4.2 MILES NORTHWEST OF SH -74, EXTEND NORTHWEST NEAR PURCELL. PROJECT LENGTH = 4.850 MILESMcclain · Division 3 | 5 of 5 | $1,439,574 | $1,241,140Silver Star Construction Co… | +16.0% |
| Mar 15, 2018 | 180137 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (EW-58/CR 310): FROM THE SH -86 JUNCTION, EXTEND EAST NEAR PERRY . PROJECT LENGTH = 2.01 MILESNoble · Division 4 | 3 of 5 | $2,054,500 | $1,590,475Evans & Associates Construc… | +29.2% |
| Feb 15, 2018 | 180074 | RESURFACE (ASPHALT ) US-64: FROM 6.0 MILES EAST OF THE SH -14 JUNCTION, EXTEND EAST NEAR ALVA . PROJECT LENGTH = 5.17 MILESWoods · Division 6 | 4 of 4 | $884,422 | $689,514Venture Corporation dba VCO… | +28.3% |
| Feb 15, 2018 | 180080 | RESURFACE (ASPHALT ) I-44 (EB): FROM 3.45 MILES SOUTH OF THE US -62 JUNCTION, EXTEND NORTH NEAR FORT SILL . PROJECT LENGTH = 3.45 MILESComanche · Division 7 | 3 of 3 | $2,542,514 | $2,102,474T & G CONSTRUCTION, INC. | +20.9% |
| Feb 15, 2018 | 180083 | RESURFACE (ASPHALT ) SH-99: FROM THE SH -51 JUNCTION, EXTEND NORTH NEAR OILTON . PROJECT LENGTH = 3.02 MILESCreek · Division 8 | 7 of 7 | $882,557 | $565,377THE QUAPAW COMPANY | +56.1% |
| Feb 15, 2018 | 180087 | RESURFACE (ASPHALT ) US-62: FROM 3.0 MILES EAST OF THE CADDO COUNTY LINE , EXTEND EAST NEAR CHICKASHA . PROJECT LENGTH = 4.49 MILESGrady · Division 7 | 4 of 4 | $1,135,555 | $947,764MARKWELL PAVING COMPANY, IN… | +19.8% |
| Feb 15, 2018 | 180090 | RESURFACE (ASPHALT ) SH-156: FROM THE NOBLE COUNTY LINE , EXTEND NORTH NEAR PONCA CITY. PROJECT LENGTH = 6.130 MILESKay · Division 4 | 3 of 3 | $1,420,323 | $1,227,358Evans & Associates Construc… | +15.7% |
| Feb 15, 2018 | 180091 | BRIDGE AND APPROACHES SH -18: OVER DRY CREEK OVERFLOW AND DRY CREEK , 5.6 MILES AND 5.7 MILES NORTH OF I -44 NEAR CHANDLER. PROJECT LENGTH = 0.661 MILELincoln · Division 3 | 6 of 6 | $3,938,839 | $3,216,964BRIDGECO CONTRACTORS, INC. | +22.4% |
| Feb 15, 2018 | 180092 | RESURFACE (ASPHALT ) SH-8: FROM THE BLAINE COUNTY LINE , EXTEND NORTH . PROJECT LENGTH = 7.620 MILESMajor · Division 6 | 5 of 5 | $1,760,425 | $1,462,194HIGHWAY CONTRACTORS, INC. | +20.4% |
| Feb 15, 2018 | 180120 | BRIDGE AND APPROACHES I -40 NORTH FRONTAGE ROAD : OVER SAND CREEK, 0.1 MILES EAST OF SH-44 NEAR FOSS. PROJECT LENGTH = 0.012 MILEWashita · Division 5 | 7 of 8 | $1,219,890 | $740,533C-GAWF CONSTRUCTION, INC. | +64.7% |
| Feb 15, 2018 | 180121 | RESURFACE (ASPHALT ) SH-152: FROM 5.23 MILES EAST OF SH -44, EXTEND EAST NEAR CORDELL . PROJECT LENGTH = 5.19 MILESWashita · Division 5 | 3 of 4 | $1,645,408 | $1,460,279CORNELL CONSTRUCTION COMPAN… | +12.7% |
| Feb 15, 2018 | 180010 | KIOWA BRIDGE AND APPROACHES SH -19: OVER UNNAMED CREEKS, 0.2 MI AND 3.1 MI WEST OF THE CADDO COUNTY LINE . PROJECT LENGTH = 0.496 MILEStp-238c(046)ss · | 5 of 5 | $2,420,894 | $2,082,170RRY SERVICES LLC | +16.3% |
| Feb 15, 2018 | 180033 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-56: OVER JUMPER CREEK, 1.3 MILES EAST OF THE SH-99 INTERSECTION NEAR KONAWA . PROJECT LENGTH = 0.568 MILESeminole · Division 3 | 3 of 8 | $3,229,190 | $2,976,296Treas Construction Inc | +8.5% |
| Feb 15, 2018 | 180038 | RESURFACE (ASPHALT ) SH-58: FROM 1.0 MILE SOUTH OF SH-9, EXTEND NORTH NEAR CARNEGIE . PROJECT LENGTH = 1.52 MILESCaddo · Division 7 | 4 of 5 | $469,367 | $367,651T & G CONSTRUCTION, INC. | +27.7% |
| Jan 18, 2018 | 180046 | PAVEMENT REHABILITATION (ASPHALT ) SH-132: FROM THE SH -51 JUNCTION, EXTEND NORTH NEAR DRUMMOND. PROJECT LENGTH = 12.860 MILESGarfield, Kingfisher · | 3 of 3 | $801,233 | $694,520DUSTROL, INC. | +15.4% |
| Jan 18, 2018 | 180047 | BRIDGE REHABILITATION US -81: OVER WASHITA RIVER AND OVERFLOWS , 1.4 MI, 1.5 MI, AND 1.8 MI NORTH OF THE US -62 JUNCTION IN CHICKASHA.Grady · Division 7 | 3 of 3 | $4,734,172 | $3,540,418Frontier Bridge, Inc. | +33.7% |
| Jan 18, 2018 | 180048 | BRIDGE AND APPROACHES US -81: OVER KINGFISHER CREEK, 0.7 MILES NORTH OF THE SH -3 INTERSECTION IN KINGFISHER. PROJECT LENGTH = 0.146 MILEKingfisher · Division 4 | 6 of 9 | $4,357,936 | $3,481,003Frontier Bridge, Inc. | +25.2% |
| Jan 18, 2018 | 180055 | PAVEMENT REHABILITATION (ASPHALT ) US-69: FROM THE PITTSBURG COUNTY LINE , EXTEND NORTH NEAR EUFAULA . PROJECT LENGTH = 4.91 MILESMcintosh · Division 1 | 4 of 4 | $29,533,026 | $24,507,964KOSS CONSTRUCTION COMPANY &… | +20.5% |
| Jan 18, 2018 | 180067 | RESURFACE (ASPHALT ) US-270: FROM THE I -40 JUNCTION, EXTEND SOUTHEAST NEAR SHAWNEE . PROJECT LENGTH = 2.600 MILESPottawatomie · Division 3 | 1 of 3 | $983,804 | $983,804 | Won |
| Jan 18, 2018 | 180007 | RESURFACE (ASPHALT ) US-81: FROM 10.0 MILES SOUTH OF THE SH -19 JUNCTION, EXTEND NORTH NEAR NINEKAH . PROJECT LENGTH = 4.98 MILESGrady · Division 7 | 4 of 4 | $3,500,159 | $2,701,035T & G CONSTRUCTION, INC. | +29.6% |
| Jan 18, 2018 | 180012 | RESURFACE (ASPHALT ) SH-99: FROM THE POTTAWATOMIE COUNTY LINE , EXTEND NORTHWEST NEAR PRAGUE. PROJECT LENGTH = 2.520 MILESLincoln · Division 3 | 2 of 5 | $527,230 | $518,138MARKWELL PAVING COMPANY, IN… | +1.8% |
| Jan 18, 2018 | 180013 | RESURFACE (ASPHALT ) US-62: FROM THE US -177 JUNCTION, EXTEND EAST NEAR MEEKER . PROJECT LENGTH = 6.510 MILESLincoln · Division 3 | 2 of 5 | $873,127 | $838,030MARKWELL PAVING COMPANY, IN… | +4.2% |
| Jan 18, 2018 | 180017 | RESURFACE (ASPHALT ) US-77: FROM 0.72 MILES NORTH OF THE SH -7 JUNCTION, EXTEND NORTH NEAR DAVIS . PROJECT LENGTH = 7.790 MILESMurray · Division 7 | 6 of 6 | $1,869,626 | $1,492,683THE CUMMINS CONSTRUCTION CO… | +25.3% |
| Jan 18, 2018 | 180019 | BRIDGE AND APPROACHES US -62: OVER BOLEY CREEK , 4.3 MILES NORTHWEST OF THE SH -48 INTERSECTION NEAR BOLEY. PROJECT LENGTH = 0.320 MILEOkfuskee · Division 3 | 6 of 8 | $2,952,464 | $2,519,493Treas Construction Inc | +17.2% |
| Jan 18, 2018 | 180028 | RESURFACE (A.C. AND P.C.) SH-1: FROM THE SH -99 JUNCTION, EXTEND EAST IN ADA . PROJECT LENGTH = 3.640 MILESPontotoc · | 5 of 5 | $683,211 | $564,026SCHIRALLI CONSTRUCTION CORP. | +21.1% |
| Jan 18, 2018 | 180042 | RESURFACE (ASPHALT ) SH-39: FROM THE US -77 JUNCTION, EXTEND EAST IN LEXINGTON . PROJECT LENGTH = 2.07 MILESCleveland · Division 3 | 5 of 5 | $278,719 | $224,231MARKWELL PAVING COMPANY, IN… | +24.3% |
Subcontracts on active jobs 0
No subcontracts on TxDOT's active contract list.