| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$15,000.00 |
$20,000.00 |
$11,000.00 |
$16,735.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 3,665 | CY |
$10.00 |
$12.00 |
$12.00 |
$11.70 |
$20.00 |
| 30 | 202(C)2400 |
ROCK EXCAVATION | 150 | CY |
$35.00 |
$35.00 |
$50.00 |
$75.00 |
$45.00 |
| 40 | 202(D)2500 |
UNCLASSIFIED BORROW | 678 | CY |
$15.00 |
$30.00 |
$30.00 |
$20.00 |
$30.00 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$20,000.00 |
$20,000.00 |
$2,500.00 |
$5,174.00 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 912 | LF |
$2.50 |
$2.98 |
$3.30 |
$3.30 |
$3.35 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 77 | LF |
$12.00 |
$15.88 |
$17.50 |
$17.45 |
$17.80 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 779 | SY |
$5.00 |
$9.85 |
$13.50 |
$10.84 |
$11.10 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 0.16 | AC |
$1,000.00 |
$900.00 |
$990.00 |
$900.00 |
$1,011.00 |
| 100 | 241 3100 |
MOWING | 1.39 | AC |
$150.00 |
$400.00 |
$440.00 |
$400.00 |
$449.50 |
| 110 | 303(A)1210 |
AGGREGATE BASE TYPE A, PLANT MIXED | 21 | CY |
$70.00 |
$294.00 |
$300.00 |
$200.00 |
$463.50 |
| 120 | 310(B)5300 |
SUBGRADE, METHOD B | 480 | SY |
$2.00 |
$5.25 |
$10.00 |
$10.00 |
$15.70 |
| 130 | 325 0100 |
SEPARATOR FABRIC | 99 | SY |
$2.50 |
$27.30 |
$25.00 |
$20.00 |
$13.40 |
| 140 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 6 | TON |
$35.00 |
$55.00 |
$175.00 |
$200.00 |
$172.50 |
| 150 | 407(B)7300 |
TACK COAT | 106 | GAL |
$6.00 |
$8.00 |
$8.20 |
$8.00 |
$2.85 |
| 160 | 408 8100 |
PRIME COAT | 347 | GAL |
$10.00 |
$9.00 |
$6.20 |
$6.00 |
$8.10 |
| 170 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 183 | TON |
$140.00 |
$201.60 |
$242.50 |
$220.00 |
$149.50 |
| 180 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 331 | TON |
$150.00 |
$175.35 |
$232.50 |
$220.00 |
$146.50 |
| 190 | 412 3100 |
COLD MILLING PAVEMENT | 1,811 | SY |
$7.00 |
$10.00 |
$12.00 |
$10.00 |
$8.55 |
| 200 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 48 | CY |
$30.00 |
$30.00 |
$50.00 |
$50.00 |
$103.50 |
| 210 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$20,000.00 |
$20,000.00 |
$25,000.00 |
$55,000.00 |
$20,000.00 |
| 220 | 509(A)0200 |
CLASS AA CONCRETE | 125 | CY |
$550.00 |
$800.00 |
$700.00 |
$737.50 |
$890.50 |
| 230 | 511(A)2200 |
REINFORCING STEEL | 20,400 | LB |
$1.25 |
$1.45 |
$1.20 |
$1.42 |
$1.60 |
| 240 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 35 | TON |
$55.00 |
$65.00 |
$60.00 |
$74.00 |
$92.47 |
| 250 | 613(B)5528 |
36" CORR. GALV. STEEL PIPE | 108 | LF |
$65.00 |
$70.87 |
$95.00 |
$126.50 |
$120.00 |
| 260 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$10,000.00 |
$10,000.00 |
$3,849.00 |
| 270 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 435 | SY |
$5.75 |
$14.00 |
$10.00 |
$16.50 |
$21.40 |
| 280 | 619(C)6600 |
SAWING PAVEMENT | 108 | LF |
$4.00 |
$15.00 |
$10.00 |
$13.50 |
$32.20 |
| 290 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 379 | LF |
$22.00 |
$35.96 |
$38.00 |
$37.75 |
$31.20 |
| 300 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$1,200.00 |
$1,050.00 |
$1,100.00 |
$1,100.00 |
$2,247.00 |
| 310 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 1 | EA |
$2,700.00 |
$4,725.00 |
$4,950.00 |
$4,950.00 |
$3,371.00 |
| 320 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 156 | LF |
$7.50 |
$10.50 |
$30.00 |
$38.50 |
$39.30 |
| 330 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$20,000.00 |
$20,000.00 |
$13,000.00 |
$5,500.00 |
| 340 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 45 | SD |
$21.00 |
$150.00 |
$155.00 |
$165.00 |
$1,147.50 |
| 350 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 1,800 | LF |
$0.1500 |
$0.5000 |
$0.5200 |
$0.5500 |
$1.00 |
| 360 | 857(E)9630 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-2 | 76 | EA |
$0.7500 |
$2.00 |
$1.10 |
$1.10 |
$1.15 |
| 370 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 3,600 | LF |
$0.1500 |
$0.2500 |
$0.3000 |
$0.2800 |
$1.30 |
| 380 | 858(A)0216 |
PAVE.MARKERS CLASS A TYPE 2-A | 260 | EA |
$5.00 |
$3.50 |
$3.65 |
$3.85 |
$9.55 |
| 390 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 100 | SD |
$10.00 |
$5.00 |
$5.05 |
$5.50 |
$56.20 |
| 400 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 200 | LF |
$25.00 |
$40.00 |
$30.00 |
$48.00 |
$37.10 |
| 410 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 200 | LF |
$5.00 |
$5.00 |
$5.00 |
$6.00 |
$13.50 |
| 420 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 840 | SD |
$0.3500 |
$5.00 |
$5.05 |
$5.50 |
$0.0900 |
| 430 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,200 | SD |
$0.7000 |
$0.1000 |
$0.1200 |
$0.1100 |
$0.0900 |
| 440 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,440 | SD |
$1.35 |
$0.1000 |
$0.1200 |
$0.1100 |
$0.0900 |
| 450 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 360 | SD |
$1.50 |
$2.50 |
$2.60 |
$2.70 |
$0.0500 |
| 460 | 880(D)6500 |
VERTICAL PANELS | 720 | SD |
$0.2500 |
$0.2500 |
$0.2700 |
$0.2800 |
$2.25 |
| 470 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 2,280 | SD |
$0.3000 |
$1.00 |
$1.05 |
$1.10 |
$0.0200 |
| 480 | 880(E)6610 |
WARNING LIGHTS(TYPE C) | 5,400 | SD |
$0.3000 |
$0.1000 |
$0.1200 |
$0.1100 |
$0.0200 |
| 490 | 880(F)6700 |
DRUMS | 4,200 | SD |
$0.2500 |
$0.2500 |
$0.2700 |
$0.2800 |
$0.0200 |
| 500 | 880(G)6805 |
CHANNELIZER CONES | 1,920 | SD |
$0.3000 |
$0.7500 |
$0.8000 |
$0.8500 |
$0.0200 |
| 510 | 880(I)7000 |
FLAGGER | 15 | SD |
$21.00 |
$700.00 |
$200.00 |
$365.00 |
$238.00 |
| 520 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 148 | SD |
$16.00 |
$10.00 |
$11.00 |
$11.00 |
$39.30 |
| 530 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 22 | EA |
$100.00 |
$125.00 |
$130.00 |
$138.00 |
$84.30 |
| 540 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 61.13 | SF |
$21.50 |
$25.00 |
$28.00 |
$27.50 |
$73.00 |
| 550 | 851(C)2415 |
2" SQUARE TUBE POST | 145 | LF |
$9.50 |
$9.00 |
$9.25 |
$10.00 |
$7.85 |
| 560 | 856(A)8204 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 3,200 | LF |
$0.5000 |
$2.00 |
$2.05 |
$2.20 |
$2.10 |
| 570 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$4,305.00 |
$4,500.00 |
$10,000.00 |
$10,260.00 |
| 580 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$35,000.00 |
$41,895.00 |
$20,000.00 |
$62,250.00 |
$39,763.69 |