| Oct 22, 2026 | 260187 |
OklahomaDivision 4 | 29 TON |
$525.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Oct 22, 2026 | 260274 |
OklahomaDivision 4 | 55 TON |
$627.50 | ACTION SAFETY SUPPLY CO., LLC |
| Oct 22, 2026 | 260250 |
GarfieldDivision 4 | 5,213.39 TON |
$111.15 | THE CUMMINS CONSTRUCTION CO., INC. |
| Oct 22, 2026 | 260268 |
CherokeeDivision 1 | 1,196 TON |
$112.00 | Robinson Construction, LLC |
| Oct 22, 2026 | 260266 |
PittsburgDivision 2 | 396 TON |
$230.00 | Built Right Construction, LLC |
| Oct 15, 2026 | 260319 |
TulsaDivision 8 | 17 TON |
$225.00 | Tri Star Construction, LLC |
| Oct 15, 2026 | 260282 |
PushmatahaDivision 2 | 588 TON |
$220.00 | HUB Construction, Inc. |
| Oct 15, 2026 | 260281 |
PottawatomieDivision 3 | 11,586 TON |
$112.00 | Haskell Lemon Group, LLC |
| Oct 15, 2026 | 260255 |
McintoshDivision 1 | 7,451 TON |
$127.00 | APAC-CENTRAL, INC. |
| Oct 15, 2026 | 260252 |
MarshallDivision 2 | 4,007 TON |
$127.75 | THE CUMMINS CONSTRUCTION CO., INC. |
| Oct 15, 2026 | 260234 |
Leflore | 665.9 TON |
$149.48 | Treas Construction Inc |
| Oct 15, 2026 | 260249 |
Craig, Delaware, Mayes, Osage, Pawnee, Rogers, TulsaDivision 8 | 1,311 TON |
$230.00 | ACTION SAFETY SUPPLY CO., LLC |
| Sep 17, 2026 | 260241 |
TulsaDivision 8 | 30 TON |
$560.00 | K & R BUILDERS, INC. |
| Sep 17, 2026 | 260225 |
ClevelandDivision 3 | 639 TON |
$135.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2026 | 260226 |
ClevelandDivision 3 | 634 TON |
$137.00 | DUIT CONSTRUCTION COMPANY, INC. |
| Sep 17, 2026 | 260226 |
ClevelandDivision 3 | 1,919 TON |
$114.00 | DUIT CONSTRUCTION COMPANY, INC. |
| Sep 17, 2026 | 260226 |
ClevelandDivision 3 | 463 TON |
$150.00 | DUIT CONSTRUCTION COMPANY, INC. |
| Sep 17, 2026 | 260228 |
PayneDivision 4 | 174 TON |
$230.00 | K & R BUILDERS, INC. |
| Sep 10, 2026 | 250243 |
TulsaDivision 8 | 2,597 TON |
$110.00 | BECCO CONTRACTORS, INC. |
| Sep 10, 2026 | 260223 |
TulsaDivision 8 | 46 TON |
$308.00 | Frontier Bridge, Inc. |
| Sep 10, 2026 | 260111 |
OklahomaDivision 4 | 500 TON |
$155.00 | Haskell Lemon Group, LLC |
| Sep 10, 2026 | 260207 |
CanadianDivision 4 | 313 TON |
$190.00 | Redlands Contracting, LLC |
| Aug 20, 2026 | 260202 |
TulsaDivision 8 | 8 TON |
$600.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Aug 20, 2026 | 260198 |
LoveDivision 7 | 376 TON |
$182.31 | SCHIRALLI CONSTRUCTION CORP. |
| Aug 20, 2026 | 260196 |
DeweyDivision 5 | 386 TON |
$208.00 | BRIDGECO CONTRACTORS, INC. |
| Aug 20, 2026 | 260194 |
ClevelandDivision 3 | 909 TON |
$171.82 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2026 | 260194 |
ClevelandDivision 3 | 48 TON |
$451.40 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2026 | 260197 |
DeweyDivision 5 | 6,526 TON |
$112.50 | OVERLAND CORPORATION |
| Aug 13, 2026 | 260186 |
CusterDivision 5 | 12 TON |
$310.00 | SAC Services, Inc. |
| Aug 13, 2026 | 260182 |
AtokaDivision 2 | 2,570 TON |
$115.00 | OVERLAND CORPORATION |
| Aug 13, 2026 | 260185 |
CusterDivision 5 | 1,604.37 TON |
$121.34 | Caswell Contracting, Inc. |
| Aug 13, 2026 | 260184 |
CraigDivision 8 | 1,419 TON |
$123.81 | DUIT CONSTRUCTION COMPANY, INC. |
| Aug 13, 2026 | 260183 |
BeaverDivision 6 | 148 TON |
$328.60 | Frontier Bridge, Inc. |
| Jul 16, 2026 | 260177 |
RogersDivision 8 | 2,504 TON |
$98.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Jul 16, 2026 | 260176 |
Canadian, OklahomaDivision 4 | 853 TON |
$241.49 | C3 Construction, Inc. |
| Jul 16, 2026 | 260175 |
LincolnDivision 3 | 7,845 TON |
$125.96 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 9, 2026 | 260169 |
HarperDivision 6 | 542 TON |
$197.00 | K & R BUILDERS, INC. |
| Jul 9, 2026 | 260170 |
Jefferson | 305 TON |
$187.25 | K & R BUILDERS, INC. |
| Jul 9, 2026 | 260174 |
PushmatahaDivision 2 | 4,190 TON |
$137.50 | C-GAWF CONSTRUCTION, INC. |
| Jul 9, 2026 | 250214 |
McclainDivision 3 | 14,126 TON |
$105.00 | Haskell Lemon Group, LLC |
| Jul 9, 2026 | 260181 |
MayesDivision 8 | 5,526 TON |
$126.59 | C3 Construction, Inc. |
| Jun 18, 2026 | 260159 |
JohnstonDivision 3 | 720 TON |
$175.00 | Wyatt Contracting |
| Jun 18, 2026 | 260144 |
ClevelandDivision 3 | 9,416 TON |
$105.00 | Haskell Lemon Group, LLC |
| Jun 18, 2026 | 260083 |
AdairDivision 1 | 7,728 TON |
$95.20 | Robinson Construction, LLC |
| Jun 18, 2026 | 260153 |
McclainDivision 3 | 1,037 TON |
$136.83 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jun 18, 2026 | 260153 |
McclainDivision 3 | 303 TON |
$136.85 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jun 18, 2026 | 260153 |
McclainDivision 3 | 93 TON |
$173.77 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jun 18, 2026 | 240129 |
GarfieldDivision 4 | 1,457.76 TON |
$181.50 | Redlands Contracting, LLC |
| Jun 11, 2026 | 260147 |
KiowaDivision 5 | 1,134 TON |
$120.00 | Wyatt Contracting |
| May 14, 2026 | 260163 |
Pontotoc | 66 TON |
$420.00 | SAC Services, Inc. |
| May 14, 2026 | 260130 |
Caddo, GradyDivision 7 | 9,966 TON |
$110.00 | OVERLAND CORPORATION |
| May 14, 2026 | 260129 |
Blaine, DeweyDivision 5 | 7,833.9 TON |
$99.82 | CORNELL CONSTRUCTION COMPANY, INC. |
| May 14, 2026 | 260128 |
BeaverDivision 6 | 427.03 TON |
$192.50 | Redlands Contracting, LLC |
| May 14, 2026 | 230338 |
Comanche, CottonDivision 7 | 4,725 TON |
$119.40 | DUIT CONSTRUCTION COMPANY, INC. |
| May 14, 2026 | 260166 |
PayneDivision 4 | 2,300 TON |
$109.00 | Atlas Paving Company |
| May 7, 2026 | 260124 |
BryanDivision 2 | 84 TON |
$300.00 | Built Right Construction, LLC |
| May 7, 2026 | 260113 |
HarperDivision 6 | 5,953 TON |
$113.85 | THE CUMMINS CONSTRUCTION CO., INC. |
| Apr 16, 2026 | 260109 |
OkfuskeeDivision 3 | 26,396 TON |
$105.00 | C-GAWF CONSTRUCTION, INC. |
| Apr 16, 2026 | 260110 |
OklahomaDivision 4 | 558 TON |
$141.75 | Frontier Bridge, Inc. |
| Apr 16, 2026 | 260115 |
PottawatomieDivision 3 | 188 TON |
$176.50 | Wyatt Contracting |
| Apr 16, 2026 | 260112 |
TulsaDivision 8 | 107 TON |
$443.73 | BRIDGECO CONTRACTORS, INC. |
| Apr 16, 2026 | 260134 |
CimarronDivision 6 | 28,775 TON |
$115.00 | J&R Constructors Group |
| Apr 16, 2026 | 260099 |
PittsburgDivision 2 | 491 TON |
$144.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Apr 16, 2026 | 260100 |
PushmatahaDivision 2 | 183 TON |
$328.65 | Frontier Bridge, Inc. |
| Apr 16, 2026 | 260100 |
PushmatahaDivision 2 | 122 TON |
$328.65 | Frontier Bridge, Inc. |
| Apr 16, 2026 | 260102 |
CaddoDivision 7 | 1,270 TON |
$163.38 | K & R BUILDERS, INC. |
| Apr 16, 2026 | 260107 |
MurrayDivision 7 | 2,569 TON |
$117.00 | Silver Star Construction Company, Inc. |
| Apr 9, 2026 | 260118 |
PayneDivision 4 | 1,900 TON |
$85.00 | BECCO CONTRACTORS, INC. |
| Apr 9, 2026 | 260122 |
SequoyahDivision 1 | 15,127 TON |
$108.80 | APAC-CENTRAL, INC. |
| Apr 9, 2026 | 260122 |
SequoyahDivision 1 | 35 TON |
$300.00 | APAC-CENTRAL, INC. |
| Apr 9, 2026 | 260094 |
TulsaDivision 8 | 935 TON |
$103.31 | DUIT CONSTRUCTION COMPANY, INC. |
| Apr 9, 2026 | 260084 |
BeaverDivision 6 | 8,983 TON |
$105.00 | J&R Constructors Group |
| Apr 9, 2026 | 260088 |
Leflore | 217 TON |
$160.46 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Mar 19, 2026 | 260067 |
JohnstonDivision 3 | 653 TON |
$159.38 | SCHIRALLI CONSTRUCTION CORP. |
| Mar 19, 2026 | 260065 |
GarfieldDivision 4 | 9,700 TON |
$108.67 | Evans & Associates Construction Co., Inc. |
| Mar 19, 2026 | 260063 |
CarterDivision 7 | 6,600 TON |
$113.30 | SCHIRALLI CONSTRUCTION CORP. |
| Mar 19, 2026 | 250331 |
Oklahoma, PottawatomieDivision 4 | 4,862.42 TON |
$112.19 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 19, 2026 | 250331 |
Oklahoma, PottawatomieDivision 4 | 2,592 TON |
$118.09 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 19, 2026 | 260074 |
Pontotoc | 4,337 TON |
$93.00 | Treas Construction Inc |
| Mar 19, 2026 | 260079 |
TillmanDivision 5 | 700 TON |
$146.26 | K & R BUILDERS, INC. |
| Mar 19, 2026 | 260075 |
TulsaDivision 8 | 869 TON |
$123.68 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 19, 2026 | 260080 |
MuskogeeDivision 1 | 961 TON |
$102.95 | APAC-CENTRAL, INC. |
| Mar 12, 2026 | 260057 |
KayDivision 4 | 283 TON |
$184.31 | Evans & Associates Construction Co., Inc. |
| Mar 12, 2026 | 260057 |
KayDivision 4 | 679 TON |
$184.31 | Evans & Associates Construction Co., Inc. |
| Mar 12, 2026 | 260009 |
OklahomaDivision 4 | 628 TON |
$188.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Mar 12, 2026 | 260050 |
BryanDivision 2 | 283 TON |
$170.00 | OVERLAND CORPORATION |
| Feb 19, 2026 | 250347 |
DelawareDivision 8 | 4,763 TON |
$80.00 | BECCO CONTRACTORS, INC. |
| Feb 19, 2026 | 250347 |
DelawareDivision 8 | 10,272 TON |
$80.00 | BECCO CONTRACTORS, INC. |
| Feb 19, 2026 | 250270 |
HarmonDivision 5 | 11,073 TON |
$95.98 | Caswell Contracting, Inc. |
| Feb 19, 2026 | 260045 |
MurrayDivision 7 | 737.09 TON |
$193.25 | C3 Construction, Inc. |
| Feb 19, 2026 | 260043 |
WashingtonDivision 8 | 105 TON |
$103.50 | APAC-CENTRAL, INC. |
| Feb 19, 2026 | 260041 |
CimarronDivision 6 | 10,128.44 TON |
$124.00 | J&R Constructors Group |
| Feb 19, 2026 | 260041 |
CimarronDivision 6 | 10,083.7 TON |
$124.00 | J&R Constructors Group |
| Feb 19, 2026 | 240181 |
StephensDivision 7 | 8,489 TON |
$112.23 | SHERWOOD CONSTRUCTION CO., INC. |
| Feb 19, 2026 | 250217 |
PittsburgDivision 2 | 429 TON |
$150.00 | Built Right Construction, LLC |
| Feb 19, 2026 | 260039 |
OttawaDivision 8 | 11,791 TON |
$80.56 | APAC-CENTRAL, INC. |
| Feb 12, 2026 | 260036 |
MayesDivision 8 | 80 TON |
$203.50 | IOWA CIVIL CONTRACTING, INC. |
| Feb 12, 2026 | 260033 |
KayDivision 4 | 1,700 TON |
$108.48 | Evans & Associates Construction Co., Inc. |
| Feb 12, 2026 | 260031 |
CimarronDivision 6 | 6,950 TON |
$101.00 | J&R Constructors Group |
| Feb 12, 2026 | 260031 |
CimarronDivision 6 | 18,000 TON |
$103.00 | J&R Constructors Group |
| Feb 12, 2026 | 250340 |
ComancheDivision 7 | 326 TON |
$276.85 | C3 Construction, Inc. |
| Feb 12, 2026 | 260032 |
CusterDivision 5 | 6,186 TON |
$87.05 | Caswell Contracting, Inc. |
| Feb 12, 2026 | 260034 |
Logan, PayneDivision 4 | 1,906 TON |
$120.00 | Haskell Lemon Group, LLC |
| Feb 12, 2026 | 250111 |
OklahomaDivision 4 | 952 TON |
$130.38 | C3 Construction, Inc. |
| Jan 22, 2026 | 240139 |
Leflore | 4,942 TON |
$117.79 | DUIT CONSTRUCTION COMPANY, INC. |
| Jan 22, 2026 | 250207 |
ComancheDivision 7 | 422 TON |
$132.00 | K & R BUILDERS, INC. |
| Jan 22, 2026 | 250207 |
ComancheDivision 7 | 485 TON |
$132.00 | K & R BUILDERS, INC. |
| Jan 22, 2026 | 260017 |
OklahomaDivision 4 | 17 TON |
$146.66 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jan 22, 2026 | 260017 |
OklahomaDivision 4 | 98 TON |
$128.68 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jan 22, 2026 | 260016 |
OklahomaDivision 4 | 6,883 TON |
$108.24 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jan 22, 2026 | 260027 |
Major, WoodwardDivision 6 | 7,603.34 TON |
$99.95 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 22, 2026 | 260027 |
Major, WoodwardDivision 6 | 8,903.59 TON |
$102.90 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 22, 2026 | 260027 |
Major, WoodwardDivision 6 | 9,714.81 TON |
$101.40 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 15, 2026 | 240192 |
TulsaDivision 8 | 403.8 TON |
$204.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Jan 15, 2026 | 260001 |
Beckham, Roger MillsDivision 5 | 4,758 TON |
$110.00 | J&R Constructors Group |
| Jan 15, 2026 | 250241 |
TulsaDivision 8 | 2,241 TON |
$102.76 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 15, 2026 | 260012 |
Pontotoc | 8,083 TON |
$89.75 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 15, 2026 | 260007 |
LoveDivision 7 | 30 TON |
$216.00 | SCHIRALLI CONSTRUCTION CORP. |
| Jan 15, 2026 | 250273 |
KingfisherDivision 4 | 6,785 TON |
$102.00 | Silver Star Construction Company, Inc. |
| Jan 15, 2026 | 250273 |
KingfisherDivision 4 | 7,027 TON |
$99.00 | Silver Star Construction Company, Inc. |
| Dec 11, 2025 | 250349 |
Rogers, WagonerDivision 8 | 8,746 TON |
$91.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Dec 11, 2025 | 250349 |
Rogers, WagonerDivision 8 | 27,070 TON |
$90.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 20, 2025 | 250343 |
OkfuskeeDivision 3 | 93 TON |
$165.00 | Built Right Construction, LLC |
| Nov 20, 2025 | 250352 |
Cherokee, MayesDivision 1 | 2,533 TON |
$112.00 | Robinson Construction, LLC |
| Nov 20, 2025 | 250273 |
KingfisherDivision 4 | 6,785 TON |
$102.00 | Silver Star Construction Company, Inc. |
| Nov 20, 2025 | 250273 |
KingfisherDivision 4 | 7,027 TON |
$99.00 | Silver Star Construction Company, Inc. |
| Nov 20, 2025 | 250338 |
PayneDivision 4 | 139 TON |
$270.00 | PBX Corporation |
| Nov 20, 2025 | 250336 |
Cleveland, McclainDivision 3 | 1,015 TON |
$145.80 | Crossland Construction Company, Inc. |
| Nov 20, 2025 | 250339 |
BeaverDivision 6 | 175 TON |
$300.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250322 |
BeaverDivision 6 | 546 TON |
$275.00 | SEWELL BROS., INC. |
| Nov 13, 2025 | 250108 |
MurrayDivision 7 | 258 TON |
$210.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Nov 13, 2025 | 250351 |
GradyDivision 7 | 2,379 TON |
$155.00 | Robinson Construction, LLC |
| Nov 13, 2025 | 250351 |
GradyDivision 7 | 821 TON |
$140.00 | Robinson Construction, LLC |
| Oct 16, 2025 | 250318 |
TulsaDivision 8 | 47 TON |
$225.45 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 16, 2025 | 250298 |
CusterDivision 5 | 607 TON |
$142.21 | Frontier Bridge, Inc. |
| Oct 16, 2025 | 250246 |
LincolnDivision 3 | 75 TON |
$214.25 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 9, 2025 | 250093 |
TulsaDivision 8 | 42 TON |
$248.00 | Daris Contractors, LLC |
| Oct 9, 2025 | 250290 |
TulsaDivision 8 | 950 TON |
$150.00 | Daris Contractors, LLC |
| Oct 9, 2025 | 250279 |
MuskogeeDivision 1 | 251 TON |
$208.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 9, 2025 | 250316 |
GarvinDivision 3 | 566 TON |
$170.00 | SEWELL BROS., INC. |
| Oct 9, 2025 | 250269 |
ComancheDivision 7 | 684 TON |
$201.00 | Haskell Lemon Group, LLC |
| Oct 9, 2025 | 250153 |
CherokeeDivision 1 | 2,472.1 TON |
$105.08 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 9, 2025 | 250274 |
Cherokee, Latimer, Leflore, Mccurtain, Okmulgee, Pittsburg, Division 1 | 512 TON |
$358.28 | ACTION SAFETY SUPPLY CO., LLC |
| Oct 9, 2025 | 250213 |
Leflore | 1,195 TON |
$120.55 | Robinson Construction, LLC |
| Oct 9, 2025 | 250277 |
Beckham, Caddo, Garfield, Garvin, Grady, Hughes, Kay, LincolDivision 5 | 917 TON |
$385.00 | ACTION SAFETY SUPPLY CO., LLC |
| Sep 18, 2025 | 250263 |
OsageDivision 8 | 266 TON |
$162.00 | BRIDGECO CONTRACTORS, INC. |
| Sep 18, 2025 | 250260 |
MuskogeeDivision 1 | 414 TON |
$164.19 | Lopp Construction, LLC |
| Sep 11, 2025 | 250242 |
TulsaDivision 8 | 1,854 TON |
$128.78 | C3 Construction, Inc. |
| Sep 11, 2025 | 250235 |
Garfield, Grant, Kay, OklahomaDivision 4 | 1,200 TON |
$270.00 | Built Right Construction, LLC |
| Aug 14, 2025 | 250200 |
Johnston, MurrayDivision 3 | 10,407 TON |
$115.00 | OVERLAND CORPORATION |