| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$80,000.00 |
$126,000.00 |
$95,000.00 |
$101,150.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 275,705 | CY |
$8.00 |
$5.01 |
$8.50 |
$5.01 |
| 30 | 202(C)2400 |
ROCK EXCAVATION | 30,000 | CY |
$25.00 |
$16.08 |
$18.00 |
$17.50 |
| 40 | 202(D)2500 |
UNCLASSIFIED BORROW | 7,726 | CY |
$11.50 |
$6.10 |
$0.1000 |
$6.10 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$115,000.00 |
$225,000.00 |
$161,000.00 |
$267,850.00 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 22,342 | LF |
$2.50 |
$3.49 |
$3.55 |
$3.49 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 12,635 | LF |
$13.50 |
$12.95 |
$13.00 |
$12.95 |
| 80 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 13 | EA |
$400.00 |
$395.00 |
$400.00 |
$395.00 |
| 90 | 230(A)7200 |
SOLID SLAB SODDING | 306,060 | SY |
$3.00 |
$2.97 |
$3.05 |
$2.97 |
| 100 | 232(B)9300 |
SEEDING METHOD B | 87.44 | AC |
$1,000.00 |
$1,450.00 |
$1,480.00 |
$1,450.00 |
| 110 | 233(A)0200 |
VEGETATIVE MULCHING | 87.44 | AC |
$1,000.00 |
$1,450.00 |
$1,480.00 |
$1,450.00 |
| 120 | 241 3100 |
MOWING | 174.88 | AC |
$300.00 |
$249.00 |
$255.00 |
$249.00 |
| 130 | 303(A)1210 |
AGGREGATE BASE TYPE A, PLANT MIXED | 27,500 | CY |
$90.00 |
$61.00 |
$72.50 |
$68.51 |
| 140 | 307(K)4200 |
STABILIZED SUBGRADE | 171,422 | SY |
$8.00 |
$6.25 |
$7.50 |
$8.76 |
| 150 | 325 0100 |
SEPARATOR FABRIC | 141,199 | SY |
$2.00 |
$1.50 |
$1.30 |
$2.23 |
| 160 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 15,648 | TON |
$45.00 |
$34.00 |
$36.25 |
$31.11 |
| 170 | 407(B)7300 |
TACK COAT | 24,626 | GAL |
$5.00 |
$3.00 |
$4.00 |
$4.95 |
| 180 | 408 8100 |
PRIME COAT | 93,600 | GAL |
$2.00 |
$4.00 |
$4.00 |
$3.50 |
| 190 | 409(A)9200 |
FABRIC REINFORCEMENT | 7,211 | SY |
$2.00 |
$2.35 |
$2.00 |
$21.20 |
| 200 | 409(B)9300 |
BITUMINOUS BINDER | 1,443 | GAL |
$5.00 |
$7.75 |
$6.50 |
$17.50 |
| 210 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 12,358 | TON |
$125.00 |
$100.00 |
$94.00 |
$96.80 |
| 220 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 36,641 | TON |
$105.00 |
$93.00 |
$81.00 |
$88.60 |
| 230 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 8,328 | TON |
$145.00 |
$105.00 |
$105.00 |
$105.60 |
| 240 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 10,407 | TON |
$130.00 |
$115.00 |
$95.00 |
$89.35 |
| 250 | 411(H)1900 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 500 | TON |
$500.00 |
$200.00 |
$200.00 |
$167.70 |
| 260 | 412 3100 |
COLD MILLING PAVEMENT | 20,035 | SY |
$4.00 |
$2.15 |
$4.00 |
$7.90 |
| 270 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 271 | CY |
$40.00 |
$28.00 |
$25.50 |
$31.00 |
| 280 | 502 3101 |
TEMPORARY EARTH RETAINAGE | 200 | LF |
$500.00 |
$125.00 |
$560.00 |
$125.00 |
| 290 | 509(A)0200 |
CLASS AA CONCRETE | 945 | CY |
$700.00 |
$820.00 |
$665.00 |
$820.00 |
| 300 | 509(C)0400 |
CLASS A CONCRETE, SMALL STRUCTURES | 2 | CY |
$1,000.00 |
$2,000.00 |
$1,025.00 |
$2,000.00 |
| 310 | 511(A)2200 |
REINFORCING STEEL | 127,951 | LB |
$1.65 |
$1.25 |
$2.05 |
$1.25 |
| 320 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 297 | TON |
$65.00 |
$85.00 |
$102.00 |
$85.00 |
| 330 | 602(B)2310 |
REVETMENT MATTRESSES | 17,337 | SY |
$37.00 |
$40.20 |
$62.00 |
$56.53 |
| 340 | 611(G)0350 |
INLET (SMD-TYPE 1) | 2 | EA |
$5,000.00 |
$6,803.70 |
$3,070.00 |
$7,890.00 |
| 350 | 611(G)9000 |
INLET CDI RCP DES. 1 | 8 | EA |
$4,000.00 |
$4,223.92 |
$5,120.00 |
$5,000.00 |
| 360 | 611(G)9004 |
INLET CDI RCP DES. 2 | 3 | EA |
$4,500.00 |
$4,328.63 |
$5,120.00 |
$5,000.00 |
| 370 | 611(H)0680 |
ADD'L DEPTH IN INLET CDI RCP DES. 1 | 3 | VF |
$550.00 |
$917.24 |
$2,050.00 |
$1,460.00 |
| 380 | 611(L)1600 |
JUNCTION BOXES | 22 | CF |
$150.00 |
$504.14 |
$512.00 |
$650.00 |
| 390 | 613(A)5208 |
18" R.C.PIPE CLASS III | 446 | LF |
$90.00 |
$98.67 |
$60.40 |
$98.67 |
| 400 | 613(A)5220 |
30" R.C.PIPE CLASS III | 206 | LF |
$150.00 |
$157.67 |
$170.00 |
$157.67 |
| 410 | 613(A)5224 |
36" R.C.PIPE CLASS III | 110 | LF |
$175.00 |
$185.98 |
$126.00 |
$185.98 |
| 420 | 613(A)5350 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 920 | LF |
$115.00 |
$119.52 |
$79.00 |
$119.52 |
| 430 | 613(A)5358 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 420 | LF |
$125.00 |
$158.12 |
$103.00 |
$158.12 |
| 440 | 613(A)5382 |
65" X 40" R.C.PIPE ARCH CLASS A-III | 46 | LF |
$375.00 |
$629.34 |
$455.00 |
$629.34 |
| 450 | 613(B)5500 |
12" CORR. GALV. STEEL PIPE | 28 | LF |
$70.00 |
$67.43 |
$39.50 |
$67.43 |
| 460 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 112 | LF |
$80.00 |
$68.54 |
$46.00 |
$68.54 |
| 470 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 68 | LF |
$90.00 |
$96.41 |
$53.00 |
$96.41 |
| 480 | 613(B)5528 |
36" CORR. GALV. STEEL PIPE | 84 | LF |
$100.00 |
$128.42 |
$72.00 |
$128.24 |
| 490 | 613(B)5532 |
42" CORR. GALV. STEEL PIPE | 98 | LF |
$110.00 |
$141.16 |
$88.00 |
$141.16 |
| 500 | 613(B)5540 |
54" CORR. GALV. STEEL PIPE | 236 | LF |
$120.00 |
$208.80 |
$130.00 |
$208.80 |
| 510 | 613(B)5604 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 40 | LF |
$58.00 |
$85.06 |
$47.00 |
$85.06 |
| 520 | 613(H)6210 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 1,958 | LF |
$37.30 |
$31.14 |
$43.00 |
$31.14 |
| 530 | 613(I)6315 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 653 | LF |
$39.95 |
$31.14 |
$37.00 |
$31.35 |
| 540 | 613(L)6612 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 8 | EA |
$1,500.00 |
$1,548.93 |
$875.00 |
$1,548.93 |
| 550 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 5 | EA |
$1,065.00 |
$1,926.02 |
$970.00 |
$1,926.02 |
| 560 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,540.00 |
$2,784.26 |
$1,790.00 |
$2,784.26 |
| 570 | 613(M)6960 |
TYPE A4 CULVERT END TREATMENT | 16 | EA |
$2,000.00 |
$2,100.00 |
$1,550.00 |
$2,100.00 |
| 580 | 613(M)6964 |
TYPE B4 CULVERT END TREATMENT | 5 | EA |
$2,400.00 |
$2,200.00 |
$1,330.00 |
$2,200.00 |
| 590 | 613(M)6972 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$3,000.00 |
$2,800.00 |
$1,540.00 |
$2,800.00 |
| 600 | 613(M)6984 |
TYPE BB4 CULVERT END TREATMENT | 1 | EA |
$3,250.00 |
$3,400.00 |
$2,050.00 |
$3,400.00 |
| 610 | 613(M)6988 |
TYPE CC4 CULVERT END TREATMENT | 1 | EA |
$3,600.00 |
$4,000.00 |
$2,560.00 |
$4,000.00 |
| 620 | 613(M)6992 |
TYPE DD4 CULVERT END TREATMENT | 1 | EA |
$4,500.00 |
$4,000.00 |
$3,070.00 |
$4,000.00 |
| 630 | 613(M)7004 |
TYPE A6 CULVERT END TREATMENT | 13 | EA |
$2,500.00 |
$4,000.00 |
$3,070.00 |
$4,000.00 |
| 640 | 613(M)7008 |
TYPE B6 CULVERT END TREATMENT | 5 | EA |
$3,250.00 |
$4,300.00 |
$2,560.00 |
$4,300.00 |
| 650 | 613(M)7016 |
TYPE D6 CULVERT END TREATMENT | 2 | EA |
$3,750.00 |
$4,450.00 |
$2,560.00 |
$4,450.00 |
| 660 | 613(M)7028 |
TYPE BB6 CULVERT END TREATMENT | 1 | EA |
$3,500.00 |
$4,450.00 |
$4,100.00 |
$4,450.00 |
| 670 | 613(M)7032 |
TYPE CC6 CULVERT END TREATMENT | 1 | EA |
$4,000.00 |
$4,450.00 |
$5,200.00 |
$4,450.00 |
| 680 | 613(M)7036 |
TYPE DD6 CULVERT END TREATMENT | 1 | EA |
$5,000.00 |
$4,450.00 |
$3,100.00 |
$4,450.00 |
| 690 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$25,000.00 |
$80,000.00 |
$31,319.20 |
| 700 | 619(B)6300 |
REMOVAL OF HEADWALL | 16 | EA |
$1,000.00 |
$2,500.00 |
$1,750.00 |
$2,500.00 |
| 710 | 619(B)6352 |
REMOVAL OF FENCE | 27,298 | LF |
$2.00 |
$3.70 |
$1.55 |
$1.25 |
| 720 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 81,223 | SY |
$6.00 |
$10.30 |
$3.00 |
$8.00 |
| 730 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 695 | LF |
$5.00 |
$12.10 |
$5.15 |
$5.00 |
| 740 | 619(C)6600 |
SAWING PAVEMENT | 16,623 | LF |
$4.50 |
$4.00 |
$2.10 |
$2.50 |
| 750 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 275 | LF |
$30.00 |
$28.00 |
$29.00 |
$28.00 |
| 760 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,500.00 |
$2,500.00 |
$2,560.00 |
$2,500.00 |
| 770 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$4,000.00 |
$4,800.00 |
$4,900.00 |
$4,800.00 |
| 780 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$4,200.00 |
$4,500.00 |
$4,600.00 |
$4,500.00 |
| 790 | 624(A)3200 |
FENCE-STYLE WWF | 2,584 | LF |
$15.00 |
$8.90 |
$8.45 |
$8.90 |
| 800 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 6,264 | LF |
$11.00 |
$7.70 |
$7.30 |
$7.70 |
| 810 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 17,792 | LF |
$11.00 |
$7.95 |
$7.70 |
$7.95 |
| 820 | 624(E)3600 |
FENCE-STYLE CLF (4'HIGH, CLASS A) | 1,243 | LF |
$25.00 |
$40.00 |
$43.00 |
$40.00 |
| 830 | 629(A)7200 |
MAILBOX INSTALLATION-SINGLE | 13 | EA |
$250.00 |
$153.56 |
$155.00 |
$150.00 |
| 840 | 629(C)7400 |
REMOVAL OF MAILBOX INSTALLATION | 13 | EA |
$75.00 |
$51.19 |
$52.00 |
$50.00 |
| 850 | 629(E)7600 |
MAILBOX | 13 | EA |
$100.00 |
$153.56 |
$155.00 |
$150.00 |
| 860 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 8 | EA |
$30.00 |
$51.19 |
$52.00 |
$50.00 |
| 870 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 3,170 | CY |
$25.00 |
$10.00 |
$15.50 |
$15.00 |
| 880 | 501(C)1400 |
SUBSTRUCTURE EXCAVATION ROCK | 800 | CY |
$150.00 |
$53.00 |
$90.00 |
$53.00 |
| 890 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$30,000.00 |
$25,000.00 |
$41,000.00 |
$45,000.00 |
| 900 | 509(A)0210 |
CLASS AA CONCRETE | 477.7 | CY |
$650.00 |
$892.00 |
$665.00 |
$820.00 |
| 910 | 511(A)2210 |
REINFORCING STEEL | 69,550 | LB |
$1.50 |
$1.25 |
$2.05 |
$1.25 |
| 920 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 150 | TON |
$70.00 |
$94.00 |
$102.00 |
$85.00 |
| 930 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 44 | TON |
$60.00 |
$80.00 |
$102.00 |
$80.00 |
| 940 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$26,000.00 |
$31,000.00 |
$37,560.00 |
| 950 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 170 | CY |
$35.00 |
$25.00 |
$17.25 |
$25.00 |
| 960 | 501(G)1800 |
CLSM BACKFILL | 202 | CY |
$300.00 |
$300.00 |
$246.00 |
$286.00 |
| 970 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$50,000.00 |
$25,000.00 |
$108,000.00 |
$30,000.00 |
| 980 | 503(A)4230 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 970 | LF |
$300.00 |
$350.00 |
$305.00 |
$342.00 |
| 990 | 504(A)5200 |
APPROACH SLAB | 281.2 | SY |
$300.00 |
$390.00 |
$297.00 |
$390.00 |
| 1,000 | 504(B)5300 |
SAW-CUT GROOVING | 1,157.5 | SY |
$7.00 |
$7.20 |
$5.75 |
$7.20 |
| 1,010 | 504(D)5420 |
CONCRETE RAIL (TR4) | 513.4 | LF |
$130.00 |
$170.00 |
$116.00 |
$168.00 |
| 1,020 | 506(A)7200 |
STRUCTURAL STEEL | 1,410 | LB |
$6.00 |
$3.00 |
$5.20 |
$3.00 |
| 1,030 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$3,000.00 |
$2,152.00 |
$2,040.00 |
$2,152.00 |
| 1,040 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 20 | EA |
$3,000.00 |
$2,150.00 |
$2,040.00 |
$2,150.00 |
| 1,050 | 509(A)0210 |
CLASS AA CONCRETE | 229 | CY |
$800.00 |
$1,100.00 |
$1,056.00 |
$1,015.00 |
| 1,060 | 509(B)0320 |
CLASS A CONCRETE | 152.6 | CY |
$850.00 |
$1,100.00 |
$1,310.00 |
$1,015.00 |
| 1,070 | 509(D)0510 |
CLASS C CONCRETE | 40 | CY |
$600.00 |
$400.00 |
$535.00 |
$400.00 |
| 1,080 | 511(A)2210 |
REINFORCING STEEL | 360 | LB |
$1.50 |
$2.00 |
$1.75 |
$2.00 |
| 1,090 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 82,820 | LB |
$2.00 |
$1.78 |
$1.35 |
$1.78 |
| 1,100 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 444 | LF |
$65.00 |
$70.00 |
$131.00 |
$70.00 |
| 1,110 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 444 | LF |
$25.00 |
$15.00 |
$18.50 |
$12.00 |
| 1,120 | 514(K)6200 |
(PL)PILOT HOLES | 408 | LF |
$250.00 |
$350.00 |
$255.00 |
$325.00 |
| 1,130 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 1,140 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 897 | SY |
$6.00 |
$7.30 |
$5.65 |
$7.30 |
| 1,150 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 88 | LF |
$3,000.00 |
$3,000.00 |
$3,010.00 |
$2,800.00 |
| 1,160 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$4,000.00 |
$2,500.00 |
$2,130.00 |
$4,000.00 |
| 1,170 | 517 9110 |
ELASTOMERIC COATING | 1,080 | SF |
$30.00 |
$45.00 |
$15.00 |
$44.00 |
| 1,180 | 518(B)0300 |
SEALED EXPANSION JOINTS | 43.2 | LF |
$350.00 |
$350.00 |
$300.00 |
$321.00 |
| 1,190 | 523(A)3200 |
SEALER CRACK PREPARATION | 126.6 | LF |
$5.00 |
$7.71 |
$6.15 |
$7.71 |
| 1,200 | 523(B)3300 |
SEALER RESIN | 1.5 | GAL |
$150.00 |
$237.00 |
$190.00 |
$237.00 |
| 1,210 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 2,660 | TON |
$65.00 |
$75.00 |
$63.00 |
$75.00 |
| 1,220 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 530 | TON |
$55.00 |
$67.00 |
$41.00 |
$67.00 |
| 1,230 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$40.00 |
$38.00 |
$17.00 |
$38.00 |
| 1,240 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 58 | LF |
$40.00 |
$38.00 |
$19.00 |
$38.00 |
| 1,250 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$100,000.00 |
$125,000.00 |
$125,000.00 |
$142,500.00 |
| 1,260 | 104 3250 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 30 | DAY |
$1,300.00 |
$1,300.00 |
$1,300.00 |
$1,300.00 |
| 1,270 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 162,200 | LF |
$0.5000 |
$0.1600 |
$0.2000 |
$0.1600 |
| 1,280 | 857(E)9630 |
(PL)CONST.ZONE PAV.MKRS(FLEX TAB)TYP.2-2 | 2,972 | EA |
$0.2500 |
$1.02 |
$1.10 |
$1.00 |
| 1,290 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 55,000 | LF |
$1.00 |
$0.1400 |
$0.1500 |
$0.1400 |
| 1,300 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 4,228 | EA |
$6.00 |
$5.12 |
$5.15 |
$5.00 |
| 1,310 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 4,952 | EA |
$6.00 |
$5.12 |
$5.15 |
$5.00 |
| 1,320 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 4,002 | SD |
$17.00 |
$4.10 |
$4.10 |
$4.00 |
| 1,330 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 230 | SD |
$50.00 |
$5.12 |
$5.15 |
$5.00 |
| 1,340 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 4,540 | LF |
$25.00 |
$41.62 |
$29.00 |
$25.00 |
| 1,350 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 3,850 | LF |
$5.00 |
$10.95 |
$7.00 |
$3.00 |
| 1,360 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 18,113 | SD |
$0.3500 |
$0.7700 |
$0.8000 |
$0.7500 |
| 1,370 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 17,848 | SD |
$0.8000 |
$1.54 |
$1.55 |
$1.50 |
| 1,380 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 19,826 | SD |
$1.35 |
$1.79 |
$1.80 |
$1.75 |
| 1,390 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 15,180 | SD |
$0.6000 |
$1.54 |
$1.55 |
$1.50 |
| 1,400 | 880(D)6500 |
VERTICAL PANELS | 97,037 | SD |
$0.2000 |
$0.1500 |
$0.1500 |
$0.1500 |
| 1,410 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 54,510 | SD |
$0.2500 |
$0.1000 |
$1.00 |
$0.1000 |
| 1,420 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 51,106 | SD |
$0.2500 |
$0.1000 |
$0.1000 |
$0.1000 |
| 1,430 | 880(F)6700 |
DRUMS | 48,231 | SD |
$0.2000 |
$0.2600 |
$0.3000 |
$0.2500 |
| 1,440 | 880(G)6805 |
CHANNELIZER CONES | 65,999 | SD |
$0.3000 |
$1.02 |
$1.10 |
$1.00 |
| 1,450 | 880(I)7000 |
FLAGGER | 115 | SD |
$175.00 |
$11.56 |
$500.00 |
$50.00 |
| 1,460 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 80 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 1,470 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 2,342 | SD |
$15.00 |
$10.24 |
$11.00 |
$10.00 |
| 1,480 | 413(A)4210 |
RUMBLE STRIP-CENTERLINE HMA-CON | 27,800 | LF |
$0.4000 |
$0.2000 |
$0.2000 |
$0.2000 |
| 1,490 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 55,600 | LF |
$0.2500 |
$0.2700 |
$0.3000 |
$0.2600 |
| 1,500 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 61 | EA |
$150.00 |
$102.37 |
$105.00 |
$100.00 |
| 1,510 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 616.71 | SF |
$45.00 |
$30.71 |
$31.00 |
$30.00 |
| 1,520 | 851(B)2305 |
2"@3.65 GALV.STL.PIPE POST | 13 | LF |
$30.00 |
$51.19 |
$52.00 |
$50.00 |
| 1,530 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 948 | LF |
$15.00 |
$10.24 |
$10.30 |
$10.00 |
| 1,540 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 93,275 | LF |
$0.7500 |
$0.8600 |
$0.9000 |
$0.8400 |
| 1,550 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 60 | LF |
$15.00 |
$20.47 |
$25.00 |
$20.00 |
| 1,560 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$370,000.00 |
$130,000.00 |
$150,000.00 |
$254,000.00 |
| 1,570 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$20,000.00 |
$35,000.00 |
$40,000.00 |
$55,000.00 |
| 1,580 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$5,000.00 |
$25,000.00 |
$25,000.00 |
$46,750.00 |
| 1,590 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$1,070,000.00 |
|
$821,000.00 |
|