| Jun 18, 2026 | 260161 |
LincolnDivision 3 | 200 TON |
$57.00 | SEWELL BROS., INC. |
| Apr 16, 2026 | 260110 |
OklahomaDivision 4 | 100 TON |
$57.06 | Frontier Bridge, Inc. |
| Apr 16, 2026 | 260121 |
Craig, Delaware, OttawaDivision 8 | 6 TON |
$140.00 | Built Right Construction, LLC |
| Apr 16, 2026 | 260121 |
Craig, Delaware, OttawaDivision 8 | 3 TON |
$140.00 | Built Right Construction, LLC |
| Apr 16, 2026 | 260121 |
Craig, Delaware, OttawaDivision 8 | 10 TON |
$140.00 | Built Right Construction, LLC |
| Apr 16, 2026 | 260121 |
Craig, Delaware, OttawaDivision 8 | 6 TON |
$140.00 | Built Right Construction, LLC |
| Apr 16, 2026 | 260121 |
Craig, Delaware, OttawaDivision 8 | 5 TON |
$140.00 | Built Right Construction, LLC |
| Apr 16, 2026 | 260121 |
Craig, Delaware, OttawaDivision 8 | 10 TON |
$140.00 | Built Right Construction, LLC |
| Apr 16, 2026 | 260121 |
Craig, Delaware, OttawaDivision 8 | 8 TON |
$140.00 | Built Right Construction, LLC |
| Apr 16, 2026 | 260121 |
Craig, Delaware, OttawaDivision 8 | 20 TON |
$140.00 | Built Right Construction, LLC |
| Apr 16, 2026 | 260112 |
TulsaDivision 8 | 15 TON |
$95.00 | BRIDGECO CONTRACTORS, INC. |
| Apr 9, 2026 | 260088 |
Leflore | 230 TON |
$59.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Mar 19, 2026 | 260066 |
HughesDivision 3 | 560 TON |
$46.53 | Treas Construction Inc |
| Mar 19, 2026 | 260079 |
TillmanDivision 5 | 230 TON |
$46.27 | K & R BUILDERS, INC. |
| Feb 19, 2026 | 240181 |
StephensDivision 7 | 325 TON |
$48.14 | SHERWOOD CONSTRUCTION CO., INC. |
| Feb 12, 2026 | 250340 |
ComancheDivision 7 | 260 TON |
$46.23 | C3 Construction, Inc. |
| Feb 12, 2026 | 260028 |
AlfalfaDivision 6 | 125 TON |
$70.00 | SEWELL BROS., INC. |
| Jan 22, 2026 | 260024 |
Tulsa, WagonerDivision 8 | 605 TON |
$27.85 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 22, 2026 | 250207 |
ComancheDivision 7 | 610 TON |
$46.00 | K & R BUILDERS, INC. |
| Jan 22, 2026 | 250207 |
ComancheDivision 7 | 980 TON |
$46.00 | K & R BUILDERS, INC. |
| Jan 22, 2026 | 260017 |
OklahomaDivision 4 | 230 TON |
$65.14 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jan 22, 2026 | 260016 |
OklahomaDivision 4 | 640 TON |
$60.19 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jan 15, 2026 | 260001 |
Beckham, Roger MillsDivision 5 | 40 TON |
$56.21 | J&R Constructors Group |
| Jan 15, 2026 | 260011 |
OkmulgeeDivision 1 | 50 TON |
$51.61 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 15, 2026 | 260008 |
OkfuskeeDivision 3 | 160 TON |
$42.60 | K & R BUILDERS, INC. |
| Dec 11, 2025 | 250295 |
ClevelandDivision 3 | 210 TON |
$45.00 | L & N BRIDGE, LLC |
| Dec 11, 2025 | 250295 |
ClevelandDivision 3 | 210 TON |
$45.00 | L & N BRIDGE, LLC |
| Nov 20, 2025 | 250336 |
Cleveland, McclainDivision 3 | 380 TON |
$54.42 | Crossland Construction Company, Inc. |
| Nov 20, 2025 | 250336 |
Cleveland, McclainDivision 3 | 445 TON |
$52.75 | Crossland Construction Company, Inc. |
| Nov 20, 2025 | 250309 |
Osage, PawneeDivision 8 | 35 TON |
$94.50 | K & R BUILDERS, INC. |
| Nov 20, 2025 | 250309 |
Osage, PawneeDivision 8 | 20 TON |
$89.00 | K & R BUILDERS, INC. |
| Nov 20, 2025 | 250309 |
Osage, PawneeDivision 8 | 4 TON |
$358.00 | K & R BUILDERS, INC. |
| Nov 20, 2025 | 250309 |
Osage, PawneeDivision 8 | 4 TON |
$367.50 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250284 |
Hughes, Okfuskee, PittsburgDivision 3 | 7 TON |
$140.00 | Built Right Construction, LLC |
| Nov 13, 2025 | 250284 |
Hughes, Okfuskee, PittsburgDivision 3 | 12 TON |
$140.00 | Built Right Construction, LLC |
| Nov 13, 2025 | 250284 |
Hughes, Okfuskee, PittsburgDivision 3 | 17 TON |
$150.00 | Built Right Construction, LLC |
| Nov 13, 2025 | 250284 |
Hughes, Okfuskee, PittsburgDivision 3 | 21 TON |
$140.00 | Built Right Construction, LLC |
| Nov 13, 2025 | 250284 |
Hughes, Okfuskee, PittsburgDivision 3 | 14 TON |
$140.00 | Built Right Construction, LLC |
| Nov 13, 2025 | 250284 |
Hughes, Okfuskee, PittsburgDivision 3 | 25 TON |
$140.00 | Built Right Construction, LLC |
| Nov 13, 2025 | 250265 |
Creek, Lincoln, Pawnee, PayneDivision 8 | 5 TON |
$335.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 |
Creek, Lincoln, Pawnee, PayneDivision 8 | 25 TON |
$88.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 |
Creek, Lincoln, Pawnee, PayneDivision 8 | 10 TON |
$172.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 |
Creek, Lincoln, Pawnee, PayneDivision 8 | 20 TON |
$92.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 |
Creek, Lincoln, Pawnee, PayneDivision 8 | 20 TON |
$85.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 |
Creek, Lincoln, Pawnee, PayneDivision 8 | 40 TON |
$76.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 |
Creek, Lincoln, Pawnee, PayneDivision 8 | 45 TON |
$75.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 |
Creek, Lincoln, Pawnee, PayneDivision 8 | 35 TON |
$80.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 |
Creek, Lincoln, Pawnee, PayneDivision 8 | 65 TON |
$85.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 |
Creek, Lincoln, Pawnee, PayneDivision 8 | 40 TON |
$75.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 |
Creek, Lincoln, Pawnee, PayneDivision 8 | 15 TON |
$143.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250256 |
Grant, Kay, Noble, PawneeDivision 4 | 30 TON |
$89.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250256 |
Grant, Kay, Noble, PawneeDivision 4 | 30 TON |
$93.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250256 |
Grant, Kay, Noble, PawneeDivision 4 | 30 TON |
$86.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250256 |
Grant, Kay, Noble, PawneeDivision 4 | 140 TON |
$79.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250256 |
Grant, Kay, Noble, PawneeDivision 4 | 80 TON |
$86.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250351 |
GradyDivision 7 | 380 TON |
$52.00 | Robinson Construction, LLC |
| Nov 13, 2025 | 250351 |
GradyDivision 7 | 210 TON |
$35.55 | Robinson Construction, LLC |
| Nov 13, 2025 | 250251 |
Blaine, Garfield, Kingfisher, LoganDivision 5 | 25 TON |
$120.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 |
Blaine, Garfield, Kingfisher, LoganDivision 5 | 10 TON |
$120.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 |
Blaine, Garfield, Kingfisher, LoganDivision 5 | 15 TON |
$120.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 |
Blaine, Garfield, Kingfisher, LoganDivision 5 | 20 TON |
$120.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 |
Blaine, Garfield, Kingfisher, LoganDivision 5 | 15 TON |
$120.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 |
Blaine, Garfield, Kingfisher, LoganDivision 5 | 140 TON |
$120.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 |
Blaine, Garfield, Kingfisher, LoganDivision 5 | 80 TON |
$120.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 |
Blaine, Garfield, Kingfisher, LoganDivision 5 | 25 TON |
$120.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 |
Blaine, Garfield, Kingfisher, LoganDivision 5 | 15 TON |
$120.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 |
Blaine, Garfield, Kingfisher, LoganDivision 5 | 40 TON |
$120.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 |
Blaine, Garfield, Kingfisher, LoganDivision 5 | 10 TON |
$120.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 |
Blaine, Garfield, Kingfisher, LoganDivision 5 | 10 TON |
$120.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 |
Blaine, Garfield, Kingfisher, LoganDivision 5 | 10 TON |
$120.00 | Redlands Contracting, LLC |
| Oct 16, 2025 | 250304 |
Nowata, Osage, WashingtonDivision 8 | 4 TON |
$400.00 | K & R BUILDERS, INC. |
| Oct 16, 2025 | 250304 |
Nowata, Osage, WashingtonDivision 8 | 10 TON |
$175.00 | K & R BUILDERS, INC. |
| Oct 16, 2025 | 250304 |
Nowata, Osage, WashingtonDivision 8 | 30 TON |
$80.00 | K & R BUILDERS, INC. |
| Oct 16, 2025 | 250304 |
Nowata, Osage, WashingtonDivision 8 | 3 TON |
$500.00 | K & R BUILDERS, INC. |
| Oct 16, 2025 | 250306 |
Mcintosh, Muskogee, OkmulgeeDivision 1 | 10 TON |
$105.00 | K & R BUILDERS, INC. |
| Oct 16, 2025 | 250306 |
Mcintosh, Muskogee, OkmulgeeDivision 1 | 10 TON |
$95.00 | K & R BUILDERS, INC. |
| Oct 16, 2025 | 250306 |
Mcintosh, Muskogee, OkmulgeeDivision 1 | 2 TON |
$140.00 | K & R BUILDERS, INC. |
| Oct 16, 2025 | 250306 |
Mcintosh, Muskogee, OkmulgeeDivision 1 | 15 TON |
$99.00 | K & R BUILDERS, INC. |
| Oct 16, 2025 | 250306 |
Mcintosh, Muskogee, OkmulgeeDivision 1 | 25 TON |
$95.00 | K & R BUILDERS, INC. |
| Oct 16, 2025 | 250306 |
Mcintosh, Muskogee, OkmulgeeDivision 1 | 10 TON |
$120.00 | K & R BUILDERS, INC. |
| Oct 16, 2025 | 250311 |
Nowata, Rogers, WashingtonDivision 8 | 10 TON |
$168.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 16, 2025 | 250311 |
Nowata, Rogers, WashingtonDivision 8 | 14 TON |
$168.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 16, 2025 | 250311 |
Nowata, Rogers, WashingtonDivision 8 | 10 TON |
$168.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 16, 2025 | 250302 |
Cherokee, Delaware, MayesDivision 1 | 7 TON |
$165.00 | Built Right Construction, LLC |
| Oct 16, 2025 | 250302 |
Cherokee, Delaware, MayesDivision 1 | 5 TON |
$165.00 | Built Right Construction, LLC |
| Oct 16, 2025 | 250302 |
Cherokee, Delaware, MayesDivision 1 | 15 TON |
$165.00 | Built Right Construction, LLC |
| Oct 16, 2025 | 250302 |
Cherokee, Delaware, MayesDivision 1 | 4 TON |
$165.00 | Built Right Construction, LLC |
| Oct 16, 2025 | 250302 |
Cherokee, Delaware, MayesDivision 1 | 20 TON |
$165.00 | Built Right Construction, LLC |
| Oct 16, 2025 | 250302 |
Cherokee, Delaware, MayesDivision 1 | 3 TON |
$165.00 | Built Right Construction, LLC |
| Oct 16, 2025 | 250302 |
Cherokee, Delaware, MayesDivision 1 | 5 TON |
$165.00 | Built Right Construction, LLC |
| Oct 16, 2025 | 250302 |
Cherokee, Delaware, MayesDivision 1 | 4 TON |
$165.00 | Built Right Construction, LLC |
| Oct 16, 2025 | 250302 |
Cherokee, Delaware, MayesDivision 1 | 4 TON |
$165.00 | Built Right Construction, LLC |
| Oct 16, 2025 | 250302 |
Cherokee, Delaware, MayesDivision 1 | 4 TON |
$165.00 | Built Right Construction, LLC |
| Oct 16, 2025 | 250302 |
Cherokee, Delaware, MayesDivision 1 | 4 TON |
$165.00 | Built Right Construction, LLC |
| Oct 16, 2025 | 250302 |
Cherokee, Delaware, MayesDivision 1 | 5 TON |
$165.00 | Built Right Construction, LLC |
| Oct 16, 2025 | 250302 |
Cherokee, Delaware, MayesDivision 1 | 23 TON |
$165.00 | Built Right Construction, LLC |
| Oct 16, 2025 | 250301 |
Haskell, LefloreDivision 1 | 45 TON |
$155.00 | PBX Corporation |
| Oct 16, 2025 | 250317 |
CusterDivision 5 | 200 TON |
$55.00 | Wyatt Contracting |
| Oct 16, 2025 | 250297 |
Caddo, CusterDivision 7 | 28 TON |
$70.00 | K & R BUILDERS, INC. |
| Oct 16, 2025 | 250297 |
Caddo, CusterDivision 7 | 16 TON |
$83.00 | K & R BUILDERS, INC. |
| Oct 16, 2025 | 250296 |
BryanDivision 2 | 44 TON |
$110.00 | PBX Corporation |
| Oct 16, 2025 | 250296 |
BryanDivision 2 | 2 TON |
$900.00 | PBX Corporation |
| Oct 16, 2025 | 250296 |
BryanDivision 2 | 3 TON |
$650.00 | PBX Corporation |
| Oct 16, 2025 | 250246 |
LincolnDivision 3 | 205 TON |
$37.77 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 9, 2025 | 250271 |
HaskellDivision 1 | 115 TON |
$47.50 | K & R BUILDERS, INC. |
| Oct 9, 2025 | 250280 |
Mcintosh, Muskogee, Okmulgee, WagonerDivision 1 | 60 TON |
$105.00 | PBX Corporation |
| Oct 9, 2025 | 250280 |
Mcintosh, Muskogee, Okmulgee, WagonerDivision 1 | 30 TON |
$105.00 | PBX Corporation |
| Oct 9, 2025 | 250280 |
Mcintosh, Muskogee, Okmulgee, WagonerDivision 1 | 15 TON |
$150.00 | PBX Corporation |
| Oct 9, 2025 | 250280 |
Mcintosh, Muskogee, Okmulgee, WagonerDivision 1 | 20 TON |
$115.00 | PBX Corporation |
| Oct 9, 2025 | 250280 |
Mcintosh, Muskogee, Okmulgee, WagonerDivision 1 | 25 TON |
$105.00 | PBX Corporation |
| Oct 9, 2025 | 250280 |
Mcintosh, Muskogee, Okmulgee, WagonerDivision 1 | 15 TON |
$115.00 | PBX Corporation |
| Oct 9, 2025 | 250280 |
Mcintosh, Muskogee, Okmulgee, WagonerDivision 1 | 15 TON |
$170.00 | PBX Corporation |
| Oct 9, 2025 | 250282 |
Craig, OttawaDivision 8 | 100 TON |
$85.00 | PBX Corporation |
| Oct 9, 2025 | 250282 |
Craig, OttawaDivision 8 | 110 TON |
$85.00 | PBX Corporation |
| Oct 9, 2025 | 250282 |
Craig, OttawaDivision 8 | 10 TON |
$275.00 | PBX Corporation |
| Oct 9, 2025 | 250291 |
Creek, Rogers, Tulsa, WagonerDivision 8 | 160 TON |
$131.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 9, 2025 | 250291 |
Creek, Rogers, Tulsa, WagonerDivision 8 | 10 TON |
$131.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 9, 2025 | 250291 |
Creek, Rogers, Tulsa, WagonerDivision 8 | 20 TON |
$131.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 9, 2025 | 250291 |
Creek, Rogers, Tulsa, WagonerDivision 8 | 10 TON |
$131.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 9, 2025 | 250291 |
Creek, Rogers, Tulsa, WagonerDivision 8 | 10 TON |
$131.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 9, 2025 | 250291 |
Creek, Rogers, Tulsa, WagonerDivision 8 | 30 TON |
$131.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 9, 2025 | 250291 |
Creek, Rogers, Tulsa, WagonerDivision 8 | 35 TON |
$131.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 9, 2025 | 250291 |
Creek, Rogers, Tulsa, WagonerDivision 8 | 5 TON |
$131.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 9, 2025 | 250291 |
Creek, Rogers, Tulsa, WagonerDivision 8 | 20 TON |
$131.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 9, 2025 | 250291 |
Creek, Rogers, Tulsa, WagonerDivision 8 | 20 TON |
$131.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 9, 2025 | 250291 |
Creek, Rogers, Tulsa, WagonerDivision 8 | 10 TON |
$131.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 9, 2025 | 250291 |
Creek, Rogers, Tulsa, WagonerDivision 8 | 35 TON |
$131.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 9, 2025 | 250291 |
Creek, Rogers, Tulsa, WagonerDivision 8 | 25 TON |
$131.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 9, 2025 | 250293 |
Nowata, WashingtonDivision 8 | 55 TON |
$90.00 | LOGOS CONSTRUCTION CO., LLC |
| Oct 9, 2025 | 250278 |
MccurtainDivision 2 | 12 TON |
$200.00 | PBX Corporation |
| Oct 9, 2025 | 250278 |
MccurtainDivision 2 | 6 TON |
$425.00 | PBX Corporation |
| Oct 9, 2025 | 250278 |
MccurtainDivision 2 | 12 TON |
$210.00 | PBX Corporation |
| Oct 9, 2025 | 250278 |
MccurtainDivision 2 | 20 TON |
$150.00 | PBX Corporation |
| Oct 9, 2025 | 250316 |
GarvinDivision 3 | 900 TON |
$46.00 | SEWELL BROS., INC. |
| Oct 9, 2025 | 250153 |
CherokeeDivision 1 | 620 TON |
$29.03 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 9, 2025 | 250275 |
Haskell, Leflore, PushmatahaDivision 1 | 22 TON |
$145.00 | PBX Corporation |
| Oct 9, 2025 | 250275 |
Haskell, Leflore, PushmatahaDivision 1 | 10 TON |
$235.00 | PBX Corporation |
| Oct 9, 2025 | 250275 |
Haskell, Leflore, PushmatahaDivision 1 | 10 TON |
$185.00 | PBX Corporation |
| Oct 9, 2025 | 250275 |
Haskell, Leflore, PushmatahaDivision 1 | 2 TON |
$500.00 | PBX Corporation |
| Oct 9, 2025 | 250213 |
Leflore | 935 TON |
$35.00 | Robinson Construction, LLC |
| Sep 18, 2025 | 250262 |
Cleveland, OklahomaDivision 3 | 35 TON |
$68.00 | Haskell Lemon Group, LLC |
| Sep 18, 2025 | 250262 |
Cleveland, OklahomaDivision 3 | 30 TON |
$130.50 | Haskell Lemon Group, LLC |
| Sep 18, 2025 | 250262 |
Cleveland, OklahomaDivision 3 | 25 TON |
$148.00 | Haskell Lemon Group, LLC |
| Sep 18, 2025 | 250262 |
Cleveland, OklahomaDivision 3 | 40 TON |
$109.50 | Haskell Lemon Group, LLC |
| Sep 18, 2025 | 250259 |
Mccurtain, PushmatahaDivision 2 | 12 TON |
$220.00 | Built Right Construction, LLC |
| Sep 18, 2025 | 250259 |
Mccurtain, PushmatahaDivision 2 | 6 TON |
$220.00 | Built Right Construction, LLC |
| Sep 18, 2025 | 250259 |
Mccurtain, PushmatahaDivision 2 | 7 TON |
$220.00 | Built Right Construction, LLC |
| Sep 18, 2025 | 250259 |
Mccurtain, PushmatahaDivision 2 | 1 TON |
$220.00 | Built Right Construction, LLC |
| Sep 18, 2025 | 250258 |
Garfield, LoganDivision 4 | 35 TON |
$169.83 | TOM HUDSON PAVING, INC. |
| Sep 18, 2025 | 250258 |
Garfield, LoganDivision 4 | 40 TON |
$139.76 | TOM HUDSON PAVING, INC. |