| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$25,000.00 |
$35,600.00 |
$41,200.00 |
$42,000.00 |
$120,000.00 |
$21,813.56 |
$43,500.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 7,061 | CY |
$10.00 |
$10.00 |
$8.00 |
$6.43 |
$10.50 |
$9.93 |
$3.86 |
$13.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 6,734 | CY |
$12.00 |
$10.00 |
$11.00 |
$7.36 |
$10.75 |
$18.89 |
$15.71 |
$13.00 |
| 40 | 202(E)2600 |
SELECT BORROW | 1,469 | CY |
$30.00 |
$60.00 |
$83.77 |
$22.66 |
$70.00 |
$34.47 |
$81.41 |
$78.70 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$16,000.00 |
$21,192.00 |
$12,360.00 |
$25,000.00 |
$16,883.43 |
$20,416.38 |
$26,000.00 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 413 | LF |
$3.50 |
$5.00 |
$6.90 |
$4.89 |
$4.75 |
$5.46 |
$6.14 |
$7.00 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 450 | LF |
$15.00 |
$15.20 |
$22.00 |
$14.93 |
$10.00 |
$19.43 |
$18.74 |
$25.00 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 25,351 | SY |
$3.50 |
$3.35 |
$3.84 |
$2.96 |
$3.50 |
$3.46 |
$3.26 |
$5.00 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 5.24 | AC |
$1,250.00 |
$2,000.00 |
$220.00 |
$2,060.00 |
$1,000.00 |
$3,035.31 |
$2,037.42 |
$4,000.00 |
| 100 | 509(A)0200 |
CLASS AA CONCRETE | 103 | CY |
$700.00 |
$700.00 |
$782.00 |
$626.68 |
$771.50 |
$1,055.42 |
$982.12 |
$1,380.00 |
| 110 | 509(D)0500 |
CLASS C CONCRETE | 61 | CY |
$415.00 |
$450.00 |
$473.00 |
$563.89 |
$465.00 |
$552.65 |
$646.08 |
$900.00 |
| 120 | 511(A)2200 |
REINFORCING STEEL | 17,360 | LB |
$1.50 |
$1.15 |
$1.43 |
$1.38 |
$1.39 |
$0.8700 |
$1.67 |
$3.00 |
| 130 | 613(B)5516 |
24" CORR. GALV. STEEL PIPE | 313 | LF |
$75.00 |
$60.00 |
$68.67 |
$66.95 |
$75.00 |
$121.63 |
$93.08 |
$82.00 |
| 140 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 12 | EA |
$1,500.00 |
$550.00 |
$670.00 |
$515.00 |
$537.50 |
$1,282.94 |
$562.33 |
$590.00 |
| 150 | 623(F)1704 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 2 | EA |
$3,000.00 |
$1,400.00 |
$1,950.00 |
$1,236.00 |
$1,320.00 |
$1,456.95 |
$1,550.61 |
$1,500.00 |
| 160 | 623(F)1712 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 2 | EA |
$1,300.00 |
$1,100.00 |
$1,050.00 |
$927.00 |
$1,000.00 |
$1,092.71 |
$1,162.96 |
$1,100.00 |
| 170 | 623(F)1724 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,900.00 |
$2,400.00 |
$2,500.00 |
$2,369.00 |
$2,550.00 |
$2,792.49 |
$2,972.01 |
$2,760.00 |
| 180 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$32.50 |
$20.00 |
$28.00 |
$41.20 |
$17.12 |
$13.26 |
$18.60 |
$25.00 |
| 190 | 501(G)1800 |
CLSM BACKFILL | 76 | CY |
$310.00 |
$250.00 |
$252.00 |
$322.74 |
$270.00 |
$225.59 |
$367.12 |
$450.00 |
| 200 | 503(A)4220 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 178 | LF |
$272.00 |
$330.00 |
$396.00 |
$373.57 |
$346.00 |
$435.76 |
$414.11 |
$600.00 |
| 210 | 503(A)4230 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 239 | LF |
$340.00 |
$330.00 |
$355.27 |
$344.28 |
$332.00 |
$387.32 |
$388.53 |
$575.00 |
| 220 | 504(D)5410 |
CONCRETE RAIL (TR3) | 357.5 | LF |
$100.00 |
$100.00 |
$128.50 |
$120.10 |
$106.00 |
$96.14 |
$142.27 |
$145.00 |
| 230 | 506(A)7200 |
STRUCTURAL STEEL | 1,220 | LB |
$4.00 |
$3.50 |
$4.06 |
$3.82 |
$3.72 |
$2.05 |
$6.99 |
$10.00 |
| 240 | 507(A)8210 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$1,500.00 |
$800.00 |
$1,299.00 |
$1,710.60 |
$1,125.00 |
$726.64 |
$1,053.47 |
$1,600.00 |
| 250 | 507(B)8310 |
WEATHERING STL EXP. BEARING ASSEMBLY | 12 | EA |
$1,700.00 |
$800.00 |
$1,351.00 |
$1,754.93 |
$1,100.00 |
$726.64 |
$1,058.65 |
$1,700.00 |
| 260 | 509(A)0210 |
CLASS AA CONCRETE | 118.5 | CY |
$900.00 |
$800.00 |
$900.00 |
$987.18 |
$941.00 |
$1,437.43 |
$1,464.62 |
$1,300.00 |
| 270 | 509(B)0320 |
CLASS A CONCRETE | 142.1 | CY |
$950.00 |
$800.00 |
$850.00 |
$987.18 |
$974.00 |
$917.23 |
$1,122.20 |
$1,390.00 |
| 280 | 511(A)2210 |
REINFORCING STEEL | 52,640 | LB |
$1.50 |
$1.15 |
$1.49 |
$1.54 |
$1.38 |
$1.51 |
$1.89 |
$3.00 |
| 290 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 344 | LF |
$50.00 |
$55.00 |
$55.19 |
$64.45 |
$60.00 |
$54.14 |
$64.89 |
$85.00 |
| 300 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 836 | LF |
$60.00 |
$65.00 |
$63.77 |
$78.18 |
$72.80 |
$61.40 |
$82.85 |
$95.00 |
| 310 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 344 | LF |
$20.00 |
$20.00 |
$26.00 |
$25.75 |
$15.00 |
$45.25 |
$46.11 |
$50.00 |
| 320 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 836 | LF |
$21.00 |
$20.00 |
$25.00 |
$25.75 |
$18.20 |
$37.80 |
$44.58 |
$50.00 |
| 330 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 340 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 338 | LF |
$1,200.00 |
$1,000.00 |
$1,249.82 |
$1,411.98 |
$1,650.00 |
$1,201.44 |
$1,513.31 |
$1,250.00 |
| 350 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$2,250.00 |
$3,500.00 |
$3,800.00 |
$3,605.00 |
$3,500.00 |
$3,642.37 |
$2,455.13 |
$3,000.00 |
| 360 | 518(B)0300 |
SEALED EXPANSION JOINTS | 33.7 | LF |
$360.00 |
$300.00 |
$324.00 |
$378.01 |
$325.00 |
$306.67 |
$286.39 |
$400.00 |
| 370 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 1,800 | TON |
$66.00 |
$78.00 |
$71.55 |
$84.68 |
$81.50 |
$66.10 |
$80.18 |
$175.00 |
| 380 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 200 | TON |
$50.00 |
$57.00 |
$67.54 |
$64.73 |
$61.50 |
$48.40 |
$70.43 |
$150.00 |
| 390 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$52.00 |
$35.00 |
$35.00 |
$53.68 |
$54.00 |
$13.63 |
$41.07 |
$30.00 |
| 400 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 82 | LF |
$51.00 |
$35.00 |
$30.00 |
$53.68 |
$50.00 |
$17.71 |
$40.83 |
$30.00 |
| 410 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 13 | SF |
$45.00 |
$105.00 |
$108.00 |
$103.00 |
$120.00 |
$121.41 |
$129.21 |
$120.00 |
| 420 | 851(C)2405 |
1 1/2" SQUARE TUBE POST | 24 | LF |
$25.00 |
$10.00 |
$9.86 |
$9.27 |
$10.00 |
$10.93 |
$11.63 |
$11.00 |
| 430 | 853 5100 |
DELINEATORS(TYPE 1, CODE 1) | 4 | EA |
$25.00 |
$20.00 |
$2,500.00 |
$16.73 |
$25.00 |
$19.73 |
$21.00 |
$19.50 |
| 440 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,640 | SD |
$0.3000 |
$0.0400 |
$0.0400 |
$0.0200 |
$0.0500 |
$0.0200 |
$0.0300 |
$0.0200 |
| 450 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 480 | SD |
$1.25 |
$6.00 |
$4.88 |
$4.63 |
$8.00 |
$5.46 |
$5.81 |
$4.50 |
| 460 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 960 | SD |
$1.00 |
$5.00 |
$4.80 |
$4.48 |
$8.00 |
$5.28 |
$5.62 |
$4.35 |
| 470 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 5,040 | SD |
$0.5000 |
$0.0400 |
$0.0400 |
$0.0200 |
$0.0300 |
$0.0200 |
$0.0300 |
$0.0200 |
| 480 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$23,000.00 |
$9,800.00 |
$15,900.00 |
$9,167.00 |
$12,500.00 |
$6,700.91 |
$43,843.61 |
$15,000.00 |
| 490 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$3,000.00 |
$3,605.00 |
$6,350.00 |
$3,642.37 |
$4,522.62 |
$3,500.00 |
| 500 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$115,000.00 |
$80,000.00 |
$91,000.00 |
$138,100.98 |
$117,450.00 |
$133,400.00 |
$98,659.47 |
$250,000.00 |