$316.47Avg low bid / CY
$317.04Avg of all bids
$225.00Avg engineer's estimate
1Jobs · 222 CY
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2026 | 1 | 222 | $316.47 | $317.04 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Oct 22, 2026 | 260259 | Rogers, WagonerDivision 8 | 198.2 CY | $250.51 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 22, 2026 | 260266 | PittsburgDivision 2 | 429.2 CY | $400.00 | Built Right Construction, LLC |
| Oct 22, 2026 | 260284 | NobleDivision 4 | 222 CY | $316.47 | Treas Construction Inc |
| Oct 15, 2026 | 260248 | CreekDivision 8 | 200 CY | $120.00 | BECCO CONTRACTORS, INC. |
| Oct 15, 2026 | 260248 | CreekDivision 8 | 200 CY | $120.00 | BECCO CONTRACTORS, INC. |
| Sep 17, 2026 | 260238 | OkmulgeeDivision 1 | 21 CY | $550.00 | Wyatt Contracting |
| Sep 17, 2026 | 260242 | TulsaDivision 8 | 50 CY | $200.00 | Central Bridge Company |
| Sep 17, 2026 | 260233 | Canadian, Garfield, Kay, OklahomaDivision 4 | 10 CY | $400.00 | Built Right Construction, LLC |
| Sep 17, 2026 | 260064 | GarfieldDivision 4 | 243.9 CY | $530.00 | PBX Corporation |
| Sep 17, 2026 | 260231 | CimarronDivision 6 | 729 CY | $207.00 | K & R BUILDERS, INC. |
| Sep 17, 2026 | 260228 | PayneDivision 4 | 176.8 CY | $279.00 | K & R BUILDERS, INC. |
| Sep 17, 2026 | 260228 | PayneDivision 4 | 163 CY | $297.50 | K & R BUILDERS, INC. |
| Sep 17, 2026 | 260225 | ClevelandDivision 3 | 223.5 CY | $225.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2026 | 260225 | ClevelandDivision 3 | 223.5 CY | $225.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2026 | 260243 | TulsaDivision 8 | 7 CY | $800.00 | PBX Corporation |
| Sep 10, 2026 | 260224 | TulsaDivision 8 | 3 CY | $1,159.18 | Frontier Bridge, Inc. |
| Sep 10, 2026 | 260223 | TulsaDivision 8 | 203.2 CY | $180.71 | Frontier Bridge, Inc. |
| Sep 10, 2026 | 260223 | TulsaDivision 8 | 151.9 CY | $205.50 | Frontier Bridge, Inc. |
| Sep 10, 2026 | 260218 | PittsburgDivision 2 | 404 CY | $250.00 | L & N BRIDGE, LLC |
| Sep 10, 2026 | 260217 | Logan, OklahomaDivision 4 | 299.7 CY | $250.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 10, 2026 | 260217 | Logan, OklahomaDivision 4 | 300 CY | $275.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 10, 2026 | 260210 | JacksonDivision 5 | 15 CY | $200.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Aug 20, 2026 | 260202 | TulsaDivision 8 | 277 CY | $225.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Aug 20, 2026 | 260131 | OklahomaDivision 4 | 14 CY | $750.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Aug 20, 2026 | 260194 | ClevelandDivision 3 | 223.4 CY | $281.54 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2026 | 260194 | ClevelandDivision 3 | 223.4 CY | $281.54 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 13, 2026 | 260191 | TexasDivision 6 | 50 CY | $350.00 | Bridges, Inc. DBA Scudder Bridge Co. |
| Aug 13, 2026 | 260189 | OkmulgeeDivision 1 | 10 CY | $550.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Aug 13, 2026 | 260183 | BeaverDivision 6 | 182.8 CY | $319.49 | Frontier Bridge, Inc. |
| Jul 16, 2026 | 260178 | AlfalfaDivision 6 | 70 CY | $297.00 | K & R BUILDERS, INC. |
| Jul 16, 2026 | 260177 | RogersDivision 8 | 584 CY | $200.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Jul 16, 2026 | 260177 | RogersDivision 8 | 586 CY | $200.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Jul 16, 2026 | 260176 | Canadian, OklahomaDivision 4 | 200 CY | $222.48 | C3 Construction, Inc. |
| Jul 16, 2026 | 260176 | Canadian, OklahomaDivision 4 | 1,271.5 CY | $222.47 | C3 Construction, Inc. |
| Jul 16, 2026 | 260176 | Canadian, OklahomaDivision 4 | 344.5 CY | $220.73 | C3 Construction, Inc. |
| Jul 16, 2026 | 260176 | Canadian, OklahomaDivision 4 | 344.5 CY | $220.73 | C3 Construction, Inc. |
| Jul 16, 2026 | 260176 | Canadian, OklahomaDivision 4 | 460.1 CY | $220.73 | C3 Construction, Inc. |
| Jul 16, 2026 | 260176 | Canadian, OklahomaDivision 4 | 460.1 CY | $220.73 | C3 Construction, Inc. |
| Jul 16, 2026 | 260175 | LincolnDivision 3 | 338 CY | $336.15 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 9, 2026 | 260173 | PottawatomieDivision 3 | 120 CY | $240.00 | SEWELL BROS., INC. |
| Jun 18, 2026 | 260162 | Noble, Oklahoma, PayneDivision 4 | 5 CY | $400.00 | Built Right Construction, LLC |
| Jun 18, 2026 | 260161 | LincolnDivision 3 | 76 CY | $250.00 | SEWELL BROS., INC. |
| Jun 18, 2026 | 260144 | ClevelandDivision 3 | 528.8 CY | $221.50 | Haskell Lemon Group, LLC |
| Jun 18, 2026 | 260157 | Carter, LoveDivision 7 | 14 CY | $400.00 | Built Right Construction, LLC |
| Jun 18, 2026 | 260157 | Carter, LoveDivision 7 | 14 CY | $400.00 | Built Right Construction, LLC |
| Jun 18, 2026 | 260153 | McclainDivision 3 | 315 CY | $214.86 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jun 18, 2026 | 260153 | McclainDivision 3 | 233 CY | $214.86 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jun 18, 2026 | 260153 | McclainDivision 3 | 233 CY | $214.86 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jun 18, 2026 | 260153 | McclainDivision 3 | 180.8 CY | $214.87 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jun 18, 2026 | 260153 | McclainDivision 3 | 180.8 CY | $214.87 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jun 18, 2026 | 260153 | McclainDivision 3 | 198 CY | $214.84 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jun 18, 2026 | 260153 | McclainDivision 3 | 260 CY | $214.87 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jun 11, 2026 | 260149 | MuskogeeDivision 1 | 240 CY | $130.00 | BECCO CONTRACTORS, INC. |
| May 14, 2026 | 260163 | Pontotoc | 6 CY | $220.00 | SAC Services, Inc. |
| May 7, 2026 | 260124 | BryanDivision 2 | 180 CY | $275.00 | Built Right Construction, LLC |
| May 7, 2026 | 260124 | BryanDivision 2 | 320 CY | $275.00 | Built Right Construction, LLC |
| May 7, 2026 | 260124 | BryanDivision 2 | 263 CY | $275.00 | Built Right Construction, LLC |
| May 7, 2026 | 260124 | BryanDivision 2 | 314 CY | $275.00 | Built Right Construction, LLC |
| Apr 16, 2026 | 260121 | Craig, Delaware, OttawaDivision 8 | 45 CY | $400.00 | Built Right Construction, LLC |
| Apr 16, 2026 | 260121 | Craig, Delaware, OttawaDivision 8 | 6 CY | $400.00 | Built Right Construction, LLC |
| Apr 16, 2026 | 260121 | Craig, Delaware, OttawaDivision 8 | 8 CY | $400.00 | Built Right Construction, LLC |
| Apr 16, 2026 | 260112 | TulsaDivision 8 | 60 CY | $329.06 | BRIDGECO CONTRACTORS, INC. |
| Apr 16, 2026 | 260112 | TulsaDivision 8 | 72.5 CY | $310.56 | BRIDGECO CONTRACTORS, INC. |
| Apr 16, 2026 | 260112 | TulsaDivision 8 | 141 CY | $300.00 | BRIDGECO CONTRACTORS, INC. |
| Apr 16, 2026 | 260112 | TulsaDivision 8 | 131.8 CY | $302.00 | BRIDGECO CONTRACTORS, INC. |
| Apr 16, 2026 | 260112 | TulsaDivision 8 | 174.8 CY | $320.41 | BRIDGECO CONTRACTORS, INC. |
| Apr 16, 2026 | 260100 | PushmatahaDivision 2 | 110 CY | $233.27 | Frontier Bridge, Inc. |
| Apr 16, 2026 | 260100 | PushmatahaDivision 2 | 110 CY | $233.27 | Frontier Bridge, Inc. |
| Apr 16, 2026 | 260102 | CaddoDivision 7 | 98.2 CY | $267.00 | K & R BUILDERS, INC. |
| Apr 16, 2026 | 260102 | CaddoDivision 7 | 98.2 CY | $267.00 | K & R BUILDERS, INC. |
| Apr 16, 2026 | 260105 | KayDivision 4 | 10 CY | $450.00 | LOGOS CONSTRUCTION CO., LLC |
| Apr 16, 2026 | 260105 | KayDivision 4 | 10 CY | $450.00 | LOGOS CONSTRUCTION CO., LLC |
| Apr 9, 2026 | 260096 | TulsaDivision 8 | 2 CY | $1,800.00 | PBX Corporation |
| Apr 9, 2026 | 260093 | Atoka, Choctaw, PushmatahaDivision 2 | 2 CY | $900.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Apr 9, 2026 | 260093 | Atoka, Choctaw, PushmatahaDivision 2 | 2 CY | $1,000.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Apr 9, 2026 | 260003 | CanadianDivision 4 | 134 CY | $203.07 | Frontier Bridge, Inc. |
| Apr 9, 2026 | 240200 | ComancheDivision 7 | 78 CY | $189.31 | Frontier Bridge, Inc. |
| Apr 9, 2026 | 260088 | Leflore | 76.8 CY | $325.06 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Mar 19, 2026 | 250331 | Oklahoma, PottawatomieDivision 4 | 48 CY | $319.22 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 19, 2026 | 250331 | Oklahoma, PottawatomieDivision 4 | 230 CY | $319.22 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 19, 2026 | 260074 | Pontotoc | 100.5 CY | $387.23 | Treas Construction Inc |
| Mar 19, 2026 | 260079 | TillmanDivision 5 | 145.2 CY | $248.60 | K & R BUILDERS, INC. |
| Mar 19, 2026 | 260075 | TulsaDivision 8 | 64 CY | $314.34 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 19, 2026 | 260075 | TulsaDivision 8 | 64 CY | $314.34 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 19, 2026 | 260066 | HughesDivision 3 | 70 CY | $316.19 | Treas Construction Inc |
| Mar 12, 2026 | 260009 | OklahomaDivision 4 | 454 CY | $225.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Mar 12, 2026 | 260061 | PawneeDivision 8 | 167.2 CY | $230.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Mar 12, 2026 | 260072 | OklahomaDivision 4 | 280 CY | $220.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Mar 12, 2026 | 260072 | OklahomaDivision 4 | 95 CY | $225.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Feb 19, 2026 | 240181 | StephensDivision 7 | 180 CY | $296.98 | SHERWOOD CONSTRUCTION CO., INC. |
| Feb 12, 2026 | 250340 | ComancheDivision 7 | 236 CY | $190.59 | C3 Construction, Inc. |
| Jan 22, 2026 | 260024 | Tulsa, WagonerDivision 8 | 321.1 CY | $277.66 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 22, 2026 | 250207 | ComancheDivision 7 | 92 CY | $203.00 | K & R BUILDERS, INC. |
| Jan 22, 2026 | 250207 | ComancheDivision 7 | 86 CY | $207.50 | K & R BUILDERS, INC. |
| Jan 22, 2026 | 260017 | OklahomaDivision 4 | 105.8 CY | $190.78 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jan 22, 2026 | 260017 | OklahomaDivision 4 | 222.9 CY | $190.78 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jan 22, 2026 | 260017 | OklahomaDivision 4 | 167 CY | $190.79 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jan 22, 2026 | 260016 | OklahomaDivision 4 | 566.4 CY | $158.89 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jan 22, 2026 | 260019 | BeckhamDivision 5 | 100 CY | $225.00 | Lopp Construction, LLC |
| Jan 15, 2026 | 250241 | TulsaDivision 8 | 328 CY | $255.49 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 15, 2026 | 250241 | TulsaDivision 8 | 326.2 CY | $255.49 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 15, 2026 | 260001 | Beckham, Roger MillsDivision 5 | 101.2 CY | $252.95 | J&R Constructors Group |
| Dec 11, 2025 | 250295 | ClevelandDivision 3 | 273 CY | $200.00 | L & N BRIDGE, LLC |
| Dec 11, 2025 | 250295 | ClevelandDivision 3 | 273 CY | $200.00 | L & N BRIDGE, LLC |
| Nov 20, 2025 | 250309 | Osage, PawneeDivision 8 | 18 CY | $1,197.00 | K & R BUILDERS, INC. |
| Nov 20, 2025 | 250309 | Osage, PawneeDivision 8 | 2 CY | $1,900.00 | K & R BUILDERS, INC. |
| Nov 20, 2025 | 250334 | CanadianDivision 4 | 460 CY | $263.59 | DUIT CONSTRUCTION COMPANY, INC. |
| Nov 20, 2025 | 250336 | Cleveland, McclainDivision 3 | 330 CY | $220.12 | Crossland Construction Company, Inc. |
| Nov 20, 2025 | 250336 | Cleveland, McclainDivision 3 | 330 CY | $269.22 | Crossland Construction Company, Inc. |
| Nov 20, 2025 | 250336 | Cleveland, McclainDivision 3 | 190 CY | $203.93 | Crossland Construction Company, Inc. |
| Nov 20, 2025 | 250336 | Cleveland, McclainDivision 3 | 190 CY | $203.93 | Crossland Construction Company, Inc. |
| Nov 20, 2025 | 250338 | PayneDivision 4 | 155.7 CY | $450.00 | PBX Corporation |
| Nov 20, 2025 | 250353 | CanadianDivision 4 | 377.6 CY | $291.30 | Treas Construction Inc |
| Nov 13, 2025 | 250284 | Hughes, Okfuskee, PittsburgDivision 3 | 10 CY | $400.00 | Built Right Construction, LLC |
| Nov 13, 2025 | 250284 | Hughes, Okfuskee, PittsburgDivision 3 | 6 CY | $400.00 | Built Right Construction, LLC |
| Nov 13, 2025 | 250284 | Hughes, Okfuskee, PittsburgDivision 3 | 3 CY | $400.00 | Built Right Construction, LLC |
| Nov 13, 2025 | 250284 | Hughes, Okfuskee, PittsburgDivision 3 | 4 CY | $400.00 | Built Right Construction, LLC |
| Nov 13, 2025 | 250284 | Hughes, Okfuskee, PittsburgDivision 3 | 1 CY | $400.00 | Built Right Construction, LLC |
| Nov 13, 2025 | 250284 | Hughes, Okfuskee, PittsburgDivision 3 | 1 CY | $400.00 | Built Right Construction, LLC |
| Nov 13, 2025 | 250284 | Hughes, Okfuskee, PittsburgDivision 3 | 3 CY | $400.00 | Built Right Construction, LLC |
| Nov 13, 2025 | 250284 | Hughes, Okfuskee, PittsburgDivision 3 | 2 CY | $400.00 | Built Right Construction, LLC |
| Nov 13, 2025 | 250265 | Creek, Lincoln, Pawnee, PayneDivision 8 | 1 CY | $1,505.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 | Creek, Lincoln, Pawnee, PayneDivision 8 | 3 CY | $1,505.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 | Creek, Lincoln, Pawnee, PayneDivision 8 | 2 CY | $1,505.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 | Creek, Lincoln, Pawnee, PayneDivision 8 | 16 CY | $355.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 | Creek, Lincoln, Pawnee, PayneDivision 8 | 5 CY | $1,505.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 | Creek, Lincoln, Pawnee, PayneDivision 8 | 3 CY | $1,255.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 | Creek, Lincoln, Pawnee, PayneDivision 8 | 6 CY | $905.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 | Creek, Lincoln, Pawnee, PayneDivision 8 | 24 CY | $505.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 | Creek, Lincoln, Pawnee, PayneDivision 8 | 3 CY | $1,505.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250265 | Creek, Lincoln, Pawnee, PayneDivision 8 | 4 CY | $1,255.00 | K & R BUILDERS, INC. |
| Nov 13, 2025 | 250354 | OkmulgeeDivision 1 | 245 CY | $261.42 | SHERWOOD CONSTRUCTION CO., INC. |
| Nov 13, 2025 | 250322 | BeaverDivision 6 | 97.2 CY | $275.00 | SEWELL BROS., INC. |
| Nov 13, 2025 | 250322 | BeaverDivision 6 | 97.2 CY | $275.00 | SEWELL BROS., INC. |
| Nov 13, 2025 | 250251 | Blaine, Garfield, Kingfisher, LoganDivision 5 | 3 CY | $450.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 | Blaine, Garfield, Kingfisher, LoganDivision 5 | 2 CY | $450.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 | Blaine, Garfield, Kingfisher, LoganDivision 5 | 3 CY | $450.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 | Blaine, Garfield, Kingfisher, LoganDivision 5 | 4 CY | $450.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 | Blaine, Garfield, Kingfisher, LoganDivision 5 | 4 CY | $450.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 | Blaine, Garfield, Kingfisher, LoganDivision 5 | 8 CY | $450.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 | Blaine, Garfield, Kingfisher, LoganDivision 5 | 5 CY | $450.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 | Blaine, Garfield, Kingfisher, LoganDivision 5 | 3 CY | $450.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 | Blaine, Garfield, Kingfisher, LoganDivision 5 | 24 CY | $450.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 | Blaine, Garfield, Kingfisher, LoganDivision 5 | 3 CY | $450.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 | Blaine, Garfield, Kingfisher, LoganDivision 5 | 26 CY | $450.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250251 | Blaine, Garfield, Kingfisher, LoganDivision 5 | 13 CY | $450.00 | Redlands Contracting, LLC |
| Nov 13, 2025 | 250351 | GradyDivision 7 | 356 CY | $249.75 | Robinson Construction, LLC |
| Nov 13, 2025 | 250351 | GradyDivision 7 | 174 CY | $246.00 | Robinson Construction, LLC |
| Nov 13, 2025 | 250351 | GradyDivision 7 | 185 CY | $250.00 | Robinson Construction, LLC |
| Nov 13, 2025 | 250351 | GradyDivision 7 | 138 CY | $241.00 | Robinson Construction, LLC |