| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$230,000.00 |
$150,000.00 |
$121,500.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 18,872 | CY |
$9.50 |
$11.00 |
$6.21 |
$19.50 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 183,292 | CY |
$12.00 |
$10.50 |
$12.43 |
$22.50 |
| 40 | 202(F)2700 |
EMBANKMENTS | 128 | CY |
$5.50 |
$25.00 |
$406.91 |
$50.00 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$75,000.00 |
$300,000.00 |
$117,819.17 |
$185,600.00 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 13,073 | LF |
$3.50 |
$2.10 |
$3.61 |
$3.50 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 588 | LF |
$14.50 |
$15.00 |
$15.80 |
$20.00 |
| 80 | 221(F)2730 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 9 | CY |
$250.00 |
$175.00 |
$466.42 |
$500.00 |
| 90 | 221(M)3400 |
TEMPORARY ENVIRONMENTAL FENCE | 350 | LF |
$6.00 |
$11.00 |
$7.09 |
$30.00 |
| 100 | 230(A)7200 |
SOLID SLAB SODDING | 170,132 | SY |
$3.00 |
$2.02 |
$2.04 |
$3.20 |
| 110 | 241 3100 |
MOWING | 32.33 | AC |
$245.00 |
$250.11 |
$252.68 |
$850.00 |
| 120 | 242 4101 |
STABILIZED CONSTRUCTION EXIT | 4 | EA |
$3,775.00 |
$5,050.00 |
$2,809.95 |
$8,500.00 |
| 130 | 303(A)1200 |
AGGREGATE BASE TYPE A | 14,672 | CY |
$69.00 |
$62.50 |
$52.79 |
$62.00 |
| 140 | 307(K)4200 |
STABILIZED SUBGRADE | 69,748 | SY |
$8.50 |
$6.00 |
$5.57 |
$5.50 |
| 150 | 325 0100 |
SEPARATOR FABRIC | 77,757 | SY |
$2.00 |
$1.66 |
$1.51 |
$2.00 |
| 160 | 326(C)1100 |
(SP) WOVEN GEOSYNTHETIC REINFORCEMENT FABRIC | 1,149 | SY |
$7.00 |
$5.00 |
$16.72 |
$1.50 |
| 170 | 402(D)2500 |
TRAFFIC BOUND SURFACE COURSE TYPE D | 86 | TON |
$36.00 |
$38.50 |
$197.11 |
$85.00 |
| 180 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 14,581 | TON |
$36.00 |
$34.00 |
$14.80 |
$35.00 |
| 190 | 407(B)7300 |
TACK COAT | 15,195 | GAL |
$3.20 |
$4.10 |
$4.08 |
$3.50 |
| 200 | 408 8100 |
PRIME COAT | 43,198 | GAL |
$3.50 |
$2.05 |
$0.5500 |
$4.80 |
| 210 | 411(B)1300 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 6,788 | TON |
$116.00 |
$88.00 |
$92.66 |
$123.20 |
| 220 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 28,948 | TON |
$100.00 |
$86.00 |
$84.39 |
$100.05 |
| 230 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,504 | TON |
$121.00 |
$98.00 |
$120.71 |
$118.45 |
| 240 | 411(F)1700 |
STONE MATRIX ASPHALT | 4,404 | TON |
$141.00 |
$145.00 |
$183.91 |
$180.55 |
| 250 | 411(G)1800 |
RICH BOTTOM LAYER | 10,703 | TON |
$135.00 |
$110.00 |
$102.43 |
$133.50 |
| 260 | 509(B)0300 |
CLASS A CONCRETE | 107 | CY |
$720.00 |
$875.00 |
$1,192.42 |
$1,050.00 |
| 270 | 509(D)0500 |
CLASS C CONCRETE | 77 | CY |
$500.00 |
$465.00 |
$433.72 |
$850.00 |
| 280 | 511(A)2200 |
REINFORCING STEEL | 14,841 | LB |
$1.50 |
$1.50 |
$1.09 |
$1.80 |
| 290 | 601(A)1100 |
TYPE I PLAIN RIPRAP | 36 | TON |
$100.00 |
$60.00 |
$80.57 |
$125.00 |
| 300 | 613(B)5536 |
48" CORR. GALV. STEEL PIPE | 180 | LF |
$180.00 |
$127.00 |
$199.56 |
$385.00 |
| 310 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$100,000.00 |
$125,000.00 |
$85,000.00 |
| 320 | 619(B)6352 |
REMOVAL OF FENCE | 4,912 | LF |
$3.75 |
$1.00 |
$3.42 |
$5.00 |
| 330 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 45,650 | SY |
$7.50 |
$10.25 |
$10.63 |
$12.50 |
| 340 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 10,160 | LF |
$5.80 |
$5.50 |
$3.82 |
$5.00 |
| 350 | 619(B)6416 |
REMOVAL OF CONCRETE MEDIAN BARRIER | 3,950 | LF |
$9.50 |
$10.00 |
$23.55 |
$18.00 |
| 360 | 619(B)6440 |
REMOVAL OF EXISTING PIPE | 180 | LF |
$20.00 |
$25.00 |
$12.84 |
$20.00 |
| 370 | 619(C)6600 |
SAWING PAVEMENT | 4,706 | LF |
$4.50 |
$6.00 |
$2.45 |
$29.00 |
| 380 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 4,775 | LF |
$27.00 |
$25.00 |
$26.16 |
$65.00 |
| 390 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 4 | EA |
$2,320.00 |
$1,300.00 |
$1,362.45 |
$8,500.00 |
| 400 | 623(G)1800 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$3,850.00 |
$3,400.00 |
$3,542.37 |
$8,500.00 |
| 410 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$3,500.00 |
$3,500.00 |
$3,542.37 |
$8,500.00 |
| 420 | 624(A)3200 |
FENCE-STYLE WWF | 4,515 | LF |
$12.00 |
$7.25 |
$6.81 |
$65.00 |
| 430 | 627(A)6200 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 4,009 | LF |
$79.00 |
$66.00 |
$70.70 |
$55.00 |
| 440 | 202(A)2210 |
UNCLASSIFIED EXCAVATION | 745 | CY |
$15.00 |
$25.00 |
$19.47 |
$25.00 |
| 450 | 501(A)1210 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 205 | CY |
$40.00 |
$50.00 |
$21.80 |
$30.00 |
| 460 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$30,000.00 |
$35,000.00 |
$35,406.31 |
$68,500.00 |
| 470 | 509(A)0210 |
CLASS AA CONCRETE | 448.3 | CY |
$700.00 |
$750.00 |
$826.19 |
$1,020.00 |
| 480 | 511(A)2210 |
REINFORCING STEEL | 61,990 | LB |
$1.40 |
$1.50 |
$1.09 |
$1.90 |
| 490 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$20,000.00 |
$20,500.00 |
$22,889.16 |
$75,600.00 |
| 500 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 600 | CY |
$30.00 |
$25.00 |
$24.19 |
$30.00 |
| 510 | 501(G)1800 |
CLSM BACKFILL | 584 | CY |
$220.00 |
$200.00 |
$228.41 |
$250.00 |
| 520 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$30,000.00 |
$225,000.00 |
$51,732.64 |
$79,500.00 |
| 530 | 504(A)5200 |
APPROACH SLAB | 833.6 | SY |
$295.00 |
$275.00 |
$250.50 |
$425.00 |
| 540 | 504(B)5300 |
SAW-CUT GROOVING | 6,650 | SY |
$4.50 |
$5.00 |
$5.23 |
$55.00 |
| 550 | 504(E)5520 |
42" F-SHAPED PARAPET | 2,012.8 | LF |
$105.00 |
$85.00 |
$106.27 |
$398.00 |
| 560 | 506(A)7225 |
STRUCTURAL STEEL M270 GRADE 50W | 1,747,050 | LB |
$3.30 |
$2.55 |
$2.32 |
$3.20 |
| 570 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 56 | EA |
$2,800.00 |
$2,000.00 |
$1,834.35 |
$2,500.00 |
| 580 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 56 | EA |
$2,800.00 |
$2,000.00 |
$1,663.55 |
$2,500.00 |
| 590 | 509(A)0210 |
CLASS AA CONCRETE | 1,529.1 | CY |
$900.00 |
$950.00 |
$1,151.96 |
$1,023.00 |
| 600 | 509(B)0320 |
CLASS A CONCRETE | 780.3 | CY |
$950.00 |
$850.00 |
$1,138.89 |
$1,023.00 |
| 610 | 509(D)0510 |
CLASS C CONCRETE | 25 | CY |
$500.00 |
$875.00 |
$733.24 |
$850.00 |
| 620 | 511 2100 |
MECHANICAL SPLICES | 4,058 | EA |
$50.00 |
$36.50 |
$38.40 |
$50.00 |
| 630 | 511(A)2210 |
REINFORCING STEEL | 4,320 | LB |
$1.50 |
$1.40 |
$1.41 |
$1.90 |
| 640 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 433,900 | LB |
$1.60 |
$1.50 |
$1.46 |
$2.20 |
| 650 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 100 | SY |
$400.00 |
$5.00 |
$484.77 |
$1,500.00 |
| 660 | 513(C)4400 |
CLASS C BRIDGE DECK REPAIR | 100 | SY |
$600.00 |
$5.00 |
$685.29 |
$1,450.00 |
| 670 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 350 | LF |
$50.00 |
$65.00 |
$51.99 |
$79.00 |
| 680 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 2,874 | LF |
$55.00 |
$80.00 |
$65.66 |
$85.00 |
| 690 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 350 | LF |
$25.00 |
$22.00 |
$29.26 |
$45.00 |
| 700 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 2,874 | LF |
$25.00 |
$20.00 |
$26.87 |
$49.00 |
| 710 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 720 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 9,919 | SY |
$4.50 |
$5.65 |
$6.00 |
$5.00 |
| 730 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 1,278 | LF |
$1,000.00 |
$975.00 |
$1,154.62 |
$1,590.00 |
| 740 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 3 | EA |
$3,000.00 |
$2,500.00 |
$2,397.91 |
$3,000.00 |
| 750 | 517 9110 |
ELASTOMERIC COATING | 5,529 | SF |
$20.00 |
$17.50 |
$19.59 |
$22.30 |
| 760 | 518(B)0310 |
EXPANSION JOINT SYSTEM | 245.37 | LF |
$150.00 |
$165.00 |
$97.97 |
$125.00 |
| 770 | 523(A)3200 |
SEALER CRACK PREPARATION | 1,892 | LF |
$8.00 |
$5.20 |
$5.45 |
$25.00 |
| 780 | 523(B)3300 |
SEALER RESIN | 19 | GAL |
$260.00 |
$200.00 |
$201.64 |
$2,500.00 |
| 790 | 601(B)1210 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 6,610 | TON |
$65.00 |
$52.50 |
$46.83 |
$55.00 |
| 800 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 252 | LF |
$35.00 |
$37.50 |
$31.82 |
$45.00 |
| 810 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 44 | LF |
$50.00 |
$31.00 |
$35.43 |
$45.00 |
| 820 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$500,000.00 |
|
$333,052.69 |
$128,500.00 |
| 830 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 610 | CY |
$30.00 |
$25.00 |
$40.13 |
$30.00 |
| 840 | 501(G)1800 |
CLSM BACKFILL | 586 | CY |
$220.00 |
$200.00 |
$217.81 |
$250.00 |
| 850 | 502 3100 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$30,000.00 |
$175,000.00 |
$114,636.33 |
$79,850.00 |
| 860 | 504(A)5200 |
APPROACH SLAB | 833.6 | SY |
$295.00 |
$275.00 |
$315.25 |
$425.00 |
| 870 | 504(B)5300 |
SAW-CUT GROOVING | 11,985 | SY |
$4.50 |
$4.95 |
$5.23 |
$55.00 |
| 880 | 504(E)5520 |
42" F-SHAPED PARAPET | 3,627.4 | LF |
$105.00 |
$91.00 |
$94.58 |
$398.00 |
| 890 | 506(A)7225 |
STRUCTURAL STEEL M270 GRADE 50W | 3,175,990 | LB |
$3.30 |
$2.65 |
$2.87 |
$3.20 |
| 900 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 112 | EA |
$2,800.00 |
$2,000.00 |
$2,865.91 |
$2,500.00 |
| 910 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 112 | EA |
$2,800.00 |
$2,000.00 |
$2,865.91 |
$2,500.00 |
| 920 | 509(A)0210 |
CLASS AA CONCRETE | 2,920.3 | CY |
$900.00 |
$950.00 |
$1,060.39 |
$1,023.00 |
| 930 | 509(B)0320 |
CLASS A CONCRETE | 1,553.5 | CY |
$925.00 |
$950.00 |
$1,060.39 |
$1,023.00 |
| 940 | 509(D)0510 |
CLASS C CONCRETE | 25 | CY |
$500.00 |
$940.00 |
$974.41 |
$850.00 |
| 950 | 511 2100 |
MECHANICAL SPLICES | 7,586 | EA |
$50.00 |
$37.00 |
$42.98 |
$50.00 |
| 960 | 511(A)2210 |
REINFORCING STEEL | 12,020 | LB |
$1.45 |
$1.40 |
$1.72 |
$1.90 |
| 970 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 824,620 | LB |
$1.55 |
$1.50 |
$1.72 |
$2.20 |
| 980 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 200 | SY |
$400.00 |
$5.00 |
$484.77 |
$1,500.00 |
| 990 | 513(C)4400 |
CLASS C BRIDGE DECK REPAIR | 200 | SY |
$600.00 |
$5.00 |
$685.29 |
$1,450.00 |
| 1,000 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 330 | LF |
$50.00 |
$65.00 |
$74.51 |
$79.00 |
| 1,010 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 2,704 | LF |
$55.00 |
$80.00 |
$88.27 |
$85.00 |
| 1,020 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 330 | LF |
$25.00 |
$23.00 |
$24.07 |
$45.00 |
| 1,030 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 2,704 | LF |
$25.00 |
$21.00 |
$22.35 |
$49.00 |
| 1,040 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 1,050 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 18,107 | SY |
$6.00 |
$5.65 |
$6.00 |
$5.00 |
| 1,060 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 2,544 | LF |
$1,000.00 |
$1,000.00 |
$1,289.66 |
$1,590.00 |
| 1,070 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 7 | EA |
$3,000.00 |
$2,500.00 |
$2,397.91 |
$3,000.00 |
| 1,080 | 517 9110 |
ELASTOMERIC COATING | 9,243 | SF |
$20.00 |
$17.50 |
$19.59 |
$22.30 |
| 1,090 | 518(B)0310 |
EXPANSION JOINT SYSTEM | 490.72 | LF |
$150.00 |
$200.00 |
$97.97 |
$125.00 |
| 1,100 | 523(A)3200 |
SEALER CRACK PREPARATION | 3,744 | LF |
$8.00 |
$5.20 |
$5.45 |
$25.00 |
| 1,110 | 523(B)3300 |
SEALER RESIN | 37.5 | GAL |
$260.00 |
$195.00 |
$201.64 |
$2,500.00 |
| 1,120 | 601(B)1210 |
TYPE I PLAIN RIPRAP WITH FILTER BLANKET | 7,540 | TON |
$65.00 |
$51.75 |
$51.58 |
$55.00 |
| 1,130 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 252 | LF |
$35.00 |
$37.50 |
$40.13 |
$45.00 |
| 1,140 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 44 | LF |
$50.00 |
$31.00 |
$34.39 |
$45.00 |
| 1,150 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$1,150,000.00 |
|
|
$328,500.00 |
| 1,160 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 17,279 | LF |
$0.4000 |
$0.6500 |
$0.2700 |
$8.50 |
| 1,170 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 7 | EA |
$350.00 |
$257.50 |
$272.49 |
$350.00 |
| 1,180 | 853 5165 |
BARRIER DELINEATORS(TYPE 2, CODE 1) | 99 | EA |
$27.00 |
$36.00 |
$38.15 |
$45.00 |
| 1,190 | 853 5170 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 104 | EA |
$22.00 |
$36.00 |
$38.15 |
$45.00 |
| 1,200 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 45,221 | LF |
$0.9000 |
$1.25 |
$1.31 |
$1.80 |
| 1,210 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 97,865 | LF |
$1.50 |
$0.1000 |
$0.1100 |
$0.2000 |
| 1,215 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 97,865 | LF |
$1.00 |
$0.0400 |
$0.0400 |
$0.1000 |
| 1,220 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 2,260 | SD |
$16.60 |
$10.25 |
$10.90 |
$14.00 |
| 1,230 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 16,497 | LF |
$28.00 |
$22.50 |
$24.40 |
$45.00 |
| 1,240 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 12,116 | LF |
$4.10 |
$5.75 |
$4.11 |
$15.00 |
| 1,250 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 13,560 | SD |
$0.7500 |
$0.5500 |
$0.5500 |
$0.8000 |
| 1,260 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,520 | SD |
$1.00 |
$3.10 |
$3.27 |
$3.50 |
| 1,270 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 13,452 | SD |
$1.80 |
$3.10 |
$3.27 |
$3.50 |
| 1,280 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 13,560 | SD |
$0.9000 |
$0.5500 |
$0.5500 |
$0.8000 |
| 1,290 | 880(F)6700 |
DRUMS | 62,991 | SD |
$0.5000 |
$0.5500 |
$0.5500 |
$0.8000 |
| 1,300 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 360 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 1,310 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,144 | SD |
$20.00 |
$26.00 |
$27.25 |
$45.00 |
| 1,320 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$125,000.00 |
$150,000.00 |
$120,387.76 |
$85,600.00 |
| 1,330 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$30,000.00 |
$5,449.80 |
$28,500.00 |
| 1,340 | 640(A)1200 |
FIELD OFFICE | 1 | EA |
$45,000.00 |
$50,000.00 |
$82,234.40 |
$148,500.00 |
| 1,350 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$2,062,000.00 |
|
|
|