| Let date | Job piece | County / Division | Highway | Description | Estimate | Status | |
|---|---|---|---|---|---|---|---|
| Nov 1, 2026 estimated | 31222(04) J3-1222(004)PM | SequoyahDivision 1 | I-40 | Bridge & Approaches I-40: OVER US-64, 9.10 MI. & OVER OLD US-64 (SEQUOYAH ST.), 15.0 MI E OF US-59 JCT. | $16,800,000 | Planned | |
| Nov 1, 2026 estimated | 31893(04) NHPP-210N(113)PM | CarterDivision 7 | SH-142 | Bridge & Approaches SH-142: OVER THE BNSF RAILROAD 3.8 MIS. E. OF I-35 | $17,600,000 | Planned | |
| Nov 1, 2026 estimated | 35881(04) J3-5881(004)PM | KayDivision 4 | SH-11 | Bank Protection SH-11: OVER THE CHICKASKIA , 0.2 MILE EAST OF BLACKWELL | $1,000,000 | Planned | |
| Jan 1, 2027 estimated | 24406(04) J2-4406(004) | McCurtainDivision 2 | SH-37 | Widen, Resurface & Bridge SH-37: FROM APPROX 7.5 MI NORTH & EAST OF TEXAS S/L, EAST APPROX 5.0 MI | $21,100,000 | Planned | |
| Jan 1, 2027 estimated | 29106(05) NHPPI-3500-(194)PM | ClevelandDivision 3 | I-35 | Interchange I-35: AT INDIAN HILLS ROAD, 7.4 MILES NORTH OF MCCLAIN COUNTY LINE | — | Planned | |
| Jan 1, 2027 estimated | 31056(04) STP-215C(061)PM | CoalDivision 3 | SH-48 | Bridge & Approaches SH-48: OVER UNNAMED CREEK, 3.0 MILES SOUTH OF SH-3 | $1,000,000 | Planned | |
| Jan 1, 2027 estimated | 32682(04) NHPPI-4000-(209)PM | CaddoDivision 5 | I-40 | Resurface I-40: BEGIN AT MP 95.76 AND EXT TO MP 102.2 | $15,100,000 | Planned | |
| Jan 1, 2027 estimated | 33762(04) NHPPI-4000-(210)FP | CaddoDivision 5 | I-40 | Resurface I-40: BEGIN AT MP 102.2 AND EXT TO MP 104.26. | $4,200,000 | Planned | |
| Jan 1, 2027 estimated | 35235(04) SSP-3500(165)PM | ClevelandDivision 3 | I-35 | Grade, Drain & Surface I-35 FRONTAGE: OPERATIONAL IMPROVEMENT FROM SW 34TH STREET TO SW 19TH STREET IN MOORE | $26,000,000 | Planned | |
| Jan 1, 2027 estimated | 35860(10) J3-5860(010)PM | GarvinDivision 3 | SH-19 | Money Only SH-19: FROM THE JUNCTION OF US-177, EAST 1.1 MILES IN STRATFORD MONEY ONLY | $800,000 | Planned | |
| Feb 1, 2027 estimated | 31078(04) SSP-2440(057)PM | TulsaDivision 8 | I-244 | Bridge Rehabilitation I-244: AT UTICA AND LEWIS LOCATED 0.65 AND 1.2 MILES EAST OF I-444 | $5,000,000 | Planned | |
| Feb 1, 2027 estimated | 32425(08) NHPPI-3500-(171)FP | OklahomaDivision 4 | I-35 | Grade,Drain,Bridge & Surface I-35: FROM MEMORIAL RD, EXTEND NORTH 3 MILES TO SH-66 | $45,000,000 | Planned | |
| Feb 1, 2027 estimated | 38546(04) J3-8546(004)PM | CarterDivision 7 | SH-53 | Intersect Modif SH-53: FROM 0.06 MIS. N. OF JCT SH-53/SH-53A, EXTEND S. & THEN E. 1.38 MIS. | $4,600,000 | Planned | |
| Mar 1, 2027 estimated | 26555(04) SSP-160B(191)SS | NoblePayneDivision 4 | US-177 | Grade, Drain & Surface US-177: FROM THE CIMARRON TURNPIKE SPUR, EXTEND NORTH 6 MILES | $8,300,000 | Planned | |
| Mar 1, 2027 estimated | 27992(04) STP-219B(148)PM | CreekDivision 8 | SH-51 | Pavement Rehabilitation SH-51: FROM CREEK COUNTY LINE, EAST 2.5 MILES | $5,600,000 | Planned | |
| Mar 1, 2027 estimated | 29672(04) STP-225B(143)PM | GarvinDivision 3 | SH-19 | Widen, Resurface & Bridge SH-19: FROM 2.0 MILES NORTHEAST OF US-77, NORTHEAST THEN EAST 5.0 MILES | $18,300,000 | Planned | |
| Mar 1, 2027 estimated | 30323(06) STP-266C(097)PM | RogersDivision 8 | SH-266 | Surface SH-266: 0.45 MILES EAST OF TULSA C/L EAST TO JCT SH-266/SH-167 | $16,800,000 | Planned | |
| Mar 1, 2027 estimated | 32695(04) J3-2695(004)PM | OttawaDivision 8 | US-60 | Pavement Rehabilitation US-60: FROM (I-44) WILL ROGERS TOLL GATE TO SH-125 | $23,300,000 | Planned | |
| Mar 1, 2027 estimated | 33795(04) STP-202C(093)PM | AlfalfaDivision 6 | US-64 | Widen, Resurface & Bridge US-64: BEGIN AT THE JCT SH-8, EXTEND EAST APPROX 7.2 MILES | $20,700,000 | Planned | |
| Mar 1, 2027 estimated | 34333(17) J3-4333(017)PM | McCurtainDivision 2 | US-259 | Retaining, Visual & Sound Walls US-259: FROM 8.25 MI N. OF JCT SH-3, EXTEND N. 4.00 MI | $12,000,000 | Planned | |
| Mar 1, 2027 estimated | 35108(04) J3-5108(004)PM | TulsaDivision 8 | SH-51 | Pavement Rehabilitation SH-51: FROM 4.43 MILES EAST OF SH-151 EXTEND EAST 5.67 MILES TO SH-97 | $8,800,000 | Planned | |
| Mar 1, 2027 estimated | 35477(04) NHPP-030N(084)FP | TulsaDivision 8 | US-169 | Resurface US-169: FROM 1.6 MI NORTH OF I-44, EXTEND NORTH 4.68 MI | $5,300,000 | Planned | |
| Mar 1, 2027 estimated | 35858(04) J3-5858(004)PM | HughesOkfuskeeDivision 3 | SH-27 | Widen & Resurface SH-27: FROM SH-9, NORTH 7.8 MILES TO NORTH CANADIAN RIVER | $15,900,000 | Planned | |
| Apr 1, 2027 estimated | 30364(04) STP-226B(164)PM | GradyDivision 7 | US-277 | Bridge & Approaches US-277: OVER SMITH CREEK 2.7 MIS. W. OF US-81 | $7,300,000 | Planned | |
| Apr 1, 2027 estimated | 31079(04) J3-1079(004)PM | TulsaDivision 8 | SH-11 | Bridge & Approaches SH-11: OVER BIRD CREEK, LOCATED 2 MI SOUTH WASHINGTON C/L | $5,600,000 | Planned | |
| Apr 1, 2027 estimated | 32100(04) J3-2100(004)PM | MuskogeeSequoyahDivision 1 | SH-100 | Bridge & Approaches SH-100: OVER ARKANSAS RIVER AT THE MUSKOGEE/SEQUOYAH C/L | $33,555,000 | Planned | |
| Apr 1, 2027 estimated | 33362(04) J3-3362(004)PM | KayDivision 4 | US-77 | Grade, Drain & Surface US-77: FROM US-60, EXTEND SOUTH 1 MILE TO US-60B. EAST ALONG US-60B, THEN NORTH TO US-60 | $5,800,000 | Planned | |
| Apr 1, 2027 estimated | 33814(04) J3-3814(004)PM | HughesDivision 3 | SH-48 | Bridge Rehabilitation SH-48: OVER SOUTH CANADIAN RIVER, 3.2 MILES NORTH OF SH-1 | $5,800,000 | Planned | |
| Apr 1, 2027 estimated | 34831(04) J3-4831(004)PM | CanadianDivision 4 | SH-3 | Resurface SH-3: FROM THE KINGFISHER C/L EXTEND SOUTHEAST TO RADIO ROAD | $9,300,000 | Planned | |
| Apr 1, 2027 estimated | 34979(04) J3-0035(004)PM | PayneDivision 4 | I-35 | Pavement Rehabilitation I-35: FROM THE NORTH END OF NBI 14517 OVER THE CIMARRON RIVER EXTEND 5 MILES. | $5,000,000 | Planned | |
| Apr 1, 2027 estimated | 35063(04) J3-5063(004)PM | GreerDivision 5 | US-283 | Widen & Resurface US-283: BEGIN 0.2 MILE N OF THE SH-9 SOUTH JCT AND EXT N 5.8 MILES. | $9,100,000 | Planned | |
| Apr 1, 2027 estimated | 38532(04) J3-8532(004)PM | OkfuskeeDivision 3 | US-62 | Resurface US-62: FROM LINCOLN COUNTY LINE, EAST 7.4 MILES | $6,600,000 | Planned | |
| Apr 1, 2027 estimated | 39429(04) J3-9429(004)PM | WagonerDivision 1 | US-64 | Resurface US-64: FROM 0.53 MI. S OF TULSA C/L, S 7.44 MI. TO SH-104 JCT IN HASKELL | $3,200,000 | Planned | |
| May 1, 2027 estimated | 24409(08) NHPP-245N(091)FP | McCurtainDivision 2 | SH-3 | Grade,Drain,Bridge & Surface SH-3: FROM 17.55 MI EAST OF THE PUSHMATAHA C/L EAST 4.5 MI | $12,100,000 | Planned | |
| May 1, 2027 estimated | 28802(04) STP-250C(061)PM | MurrayDivision 7 | US-77 | Bridge Rehabilitation US-77: OVER HONEY CREEK, BEGIN APPROX. 5.0 MI N. OF CARTER C/L, EXTEND N. 0.15 MIS. | $3,300,000 | Planned | |
| May 1, 2027 estimated | 30427(04) J3-0427(004)PM | ComancheDivision 7 | SH-58 | Grade,Drain,Bridge & Surface SH-58: FROM SH-49 NW 6.4 MIS. | $13,000,000 | Planned | |
| May 1, 2027 estimated | 32159(04) J3-2159(004)PM | CoalDivision 3 | US-75 | Bridge & Approaches US-75: OVER BLACK CREEK, 6.5 MILES NORTH OF SH-3 | $3,700,000 | Planned | |
| May 1, 2027 estimated | 33791(04) STP-276B(075)PM | WoodsDivision 6 | US-64 | Grade,Drain,Bridge & Surface US-64: BEGIN APPROX 0.25 MI EAST OF JCT US-281, EXTEND EAST APPROX 2.0 MI | $5,600,000 | Planned | |
| May 1, 2027 estimated | 38537(04) J3-8537(004)PM | GarvinDivision 3 | SH-19 | Resurface SH-19: FROM GRADY COUNTY LINE, EAST 8.0 MILES | $2,200,000 | Planned | |
| May 1, 2027 estimated | 38537(05) J3-8537(005)PM | GarvinDivision 3 | SH-19 | Resurface SH-19: FROM 8.0 MILES EAST OF GRADY COUNTY LINE, EAST 7.2 MILES TO SH-74 | $2,400,000 | Planned | |
| Jun 1, 2027 estimated | 30410(04) SSP-013N(241)PM | AtokaDivision 2 | US-69 | Grade, Drain & Surface US-69: FROM 12 MI NORTH OF BRYAN C/L, EXT NORTH APPROX 2.5 MI THRU TUSHKA | $27,100,000 | Planned | |
| Jun 1, 2027 estimated | 31058(04) J3-1058(004)PM | McClainDivision 3 | SH-24 | Grade,Drain,Bridge & Surface SH-24: FROM 3.0 MILES WEST OF SH-74, NORTH 3.0 MILES | $2,800,000 | Planned | |
| Jun 1, 2027 estimated | 32694(04) J3-2694(004)PM | RogersDivision 8 | US-412 | Pavement Rehabilitation US-412: FROM 1.06 MILES EAST OF SH-66, EXTEND EAST 6.44 MILES | $61,000,000 | Planned | |
| Jun 1, 2027 estimated | 32703(04) J3-2703(004)PM | CreekDivision 8 | SH-51 | Bridge Rehabilitation SH-51: EB OVER SALT CREEK, 16.2 MILES EAST OF JCT. OF SH-99 | $5,900,000 | Planned | |
| Jun 1, 2027 estimated | 33409(04) J3-3409(004)PM | GarfieldDivision 4 | SH-15 | Grade, Drain & Surface SH-74: FROM US-412, NORTH 3.5 MILES THROUGH GARBER | $14,900,000 | Planned | |
| Jun 1, 2027 estimated | 35435(06) J3-5435(006)PM | JacksonRoger MillsDivision 5 | I-40 | Bridge S.H. 34 over GYPSUM CREEK BRIDGE PAINT PROJECTS | $650,000 | Planned | |
| Jun 1, 2027 estimated | 35732(08) J3-5732(008)PM | AtokaDivision 2 | US-69 | Resurface US-69: FROM 14.5 MI NORTH OF BRYAN C/L, EXTEND NORTH APPROX 1.6 MI | $3,500,000 | Planned | |
| Jun 1, 2027 estimated | 35774(04) J3-5774(004)PM | EllisDivision 6 | SH-46 | Bridge Rehabilitation SH-46: OVER WOLF CREEK, APPROX 0.80 MI NORTH OF JCT SH-15 (NBI 15205) | $1,700,000 | Planned | |
| Jul 1, 2027 estimated | 29829(04) J2-9829(004)PM | CreekDivision 8 | SH-99 | Bridge & Approaches SH-99: OVER THE CIMARRON RIVER, 4.4 MILES E S PAYNE C/L | $8,400,000 | Planned | |
| Jul 1, 2027 estimated | 30991(04) STP-220B(118)PM | CusterDivision 5 | SH-33 | Grade, Drain & Surface SH-33: BEGIN 0.37 M EAST OF SH-47 AND EXT EAST .67 MI IN THE CITY OF THOMAS. | $13,100,000 | Planned | |
| Jul 1, 2027 estimated | 31960(04) NHPP-019N(185)PM | TulsaDivision 8 | US-64 | Bridge Rehabilitation US-64: OVER QUANAH AVENUE, 14.5 MILES SE OSAGE C/L | $1,200,000 | Planned | |
| Jul 1, 2027 estimated | 33806(04) NHPP-273N(118)PM | WagonerDivision 1 | SH-51 | Grade,Drain,Bridge & Surface SH-51: FROM 0.45 MI. NORTH OF E. 111TH ST. ALONG SH-51, EXTEND NE 0.85 MI. TO INTERCHANGE OVER THE MUSKOGEE TURNPIKE | $13,500,000 | Planned | |
| Jul 1, 2027 estimated | 36185(04) J3-6185(004)PM | McClainDivision 3 | I-35 | Grade, Drain & Surface I-35: FROM JOHNSON ROAD, NORTH 2.0 MILES | $33,300,000 | Planned | |
| Jul 1, 2027 estimated | 38946(04) J3-8946(004)PM | TexasDivision 6 | US-54 | Resurface US-54: BEGIN 11,75 MI E OF JCT SH-95, EXT E 7.05 MILES ON THE EB LNS. | $2,500,000 | Planned | |
| Aug 1, 2027 estimated | 18835(13) J1-8835(013)PM | MarshallDivision 2 | 00PHWY | Grade & Drain US-70: MADILL REALIGNMENT FROM JCT US-70 & SH-199 1.63 MI EAST EXTEND 1.05 MI | $5,100,000 | Planned | |
| Aug 1, 2027 estimated | 31692(04) J3-1692(004)PM | BeckhamDivision 5 | I-40 | Bridge & Approaches I-40: AT TURKEY CR, EAST & WEST BOUND LANES AND SAND CR EAST BOUND LANES, LOCATED 16.2 & 19.9 MILES EAST OF THE TEXAS STATE LINE. | $12,000,000 | Planned | |
| Aug 1, 2027 estimated | 31812(04) STP-237B(113)PM | KingfisherDivision 4 | SH-33 | Grade,Drain,Bridge & Surface SH-33: FROM THE LOGAN COUNTY LINE, EXTEND WEST 5.0 MILES | $18,700,000 | Planned | |
| Aug 1, 2027 estimated | 33797(04) J3-3797(004)PM | BeaverDivision 6 | US-64 | Widen & Resurface US-64: BEGIN AT JCT US-83, EXTEND EAST 6.0 MILES | $12,600,000 | Planned | |
| Aug 1, 2027 estimated | 38337(04) J3-8337(004)PM | CherokeeDivision 1 | SH-10 | Safety Improvement SH-10: APPROX 12.3 MI NE. OF JCT SH-51 (ILLINOIS RIVER) | $5,600,000 | Planned | |
| Aug 1, 2027 estimated | 39197(04) NHPPI-4000-(257)PM | BeckhamDivision 5 | I-40 | Grade, Drain & Surface I-40: SOUTH FRONTAGE ROAD NEAR MILEPOST 20. LOW WATER CROSSING | $500,000 | Planned | |
| Sep 1, 2027 estimated | 29650(08) J2-9650(008)PM | LoveDivision 7 | US-77 | Widen & Resurface US-77: FROM APPROX 1.0 MILE N. OF TEXAS STATE LINE, EXTEND N. 3.4 MILES | $5,000,000 | Planned | |
| Sep 1, 2027 estimated | 29682(04) J2-9682(004)PM | CreekDivision 8 | SH-16 | Bridge & Approaches SH-16: OVER SAND CREEK, 0.7 MILES EAST OF THE JCT. SH-48 | $7,100,000 | Planned | |
| Sep 1, 2027 estimated | 33821(04) STP-249C(088)PM | MayesDivision 8 | SH-412B | Pavement Rehabilitation SH-412B: FROM SH-69A TO US-412 | $17,600,000 | Planned | |
| Sep 1, 2027 estimated | 34236(04) J3-4236(004)FP | HarmonDivision 5 | US-62 | Bridge & Approaches US-62: AT THE EAST FORK OF SANDY CREEK LOCATED 2.9 M EAST OF SH-30. | $4,600,000 | Planned | |
| Sep 1, 2027 estimated | 34970(04) J3-4970(004)PM | HarmonDivision 5 | SH-30 | Bridge & Approaches SH-30: AT EAST FORK OF SANDY CREEK, LOCATED 3.4 M NORTH OF US-62. | $3,100,000 | Planned | |
| Sep 1, 2027 estimated | 35353(04) SSP-249C(066)PM | MayesDivision 8 | SH-412B | Intersect Modif SH-412B: AT PATROL RD | $4,200,000 | Planned | |
| Sep 1, 2027 estimated | 35601(04) STP-241C(099)PM | LincolnDivision 3 | SH-66 | Bridge Rehabilitation SH-66: OVER SALT CREEK, 1.6 MI EAST OF JCT SH-99. | $1,300,000 | Planned | |
| Sep 1, 2027 estimated | 35619(04) J3-5619(004)PM | NobleDivision 4 | US-177 | Bridge Rehabilitation US-177: OVER BNSF RR 11.5 MILES NORTH OF US-64 | $1,000,000 | Planned | |
| Sep 1, 2027 estimated | 35730(04) NHPP-020N(065)FP | ComancheDivision 7 | US-62 | Interchange US-62: GOODYEAR BLVD EXTENSION FROM CACHE ROAD, N. 0.50 MILES, AND NEW INTERCHANGE AT US-62 | $21,300,000 | Planned | |
| Sep 1, 2027 estimated | 9032(08) NHPPI-3500-(184)FP | OklahomaDivision 4 | I-35 | Interchange I-35: UNDER I-240 INTERCHANGE RECONSTRUCTION (PHASE IV) | $48,900,000 | Planned | |
| Nov 1, 2027 estimated | 31873(04) J3-1873(004)PM | GarvinDivision 3 | US-177 | Widen, Resurface & Bridge US-177: FROM MURRAY COUNTY LINE, NORTH 5.5 MILES | $19,300,000 | Planned | |
| Nov 1, 2027 estimated | 35577(04) STP-208C(129)PM | CaddoDivision 7 | SH-58 | Widen & Resurface SH-58: FROM 6.00 MIS. N. OF SH-152, EXTEND N. 5.00 MIS. | $13,300,000 | Planned | |
| Nov 1, 2027 estimated | 35624(04) NHPP-255N(696)PM | OklahomaDivision 4 | US-62 | Bridge Rehabilitation US-62: OVER CRUTCHO CREEK, 0.1 MILE EAST OF AIR DEPOT BLVD | $1,600,000 | Planned | |
| Nov 1, 2027 estimated | 35645(04) J3-5645(004)PM | GarvinDivision 3 | SH-19 | Widen, Resurface & Bridge SH-19: FROM SH-74, EAST 5.0 MILES | $13,200,000 | Planned | |
| Jan 1, 2028 estimated | 32806(04) J3-2806(004)FP | TexasDivision 6 | US-64 | Grade, Drain & Surface US-64: BEGIN AT JCT OF MAIN STREET IN GUYMON, EXTEND EAST 0.8 MILES TO JCT US-54 | $9,000,000 | Planned | |
| Jan 1, 2028 estimated | 32806(08) NHPP-017N(277)PM | TexasDivision 6 | US-64 | Crossing Impr. & R/R Signals UPRR CONCRETE SURFACE, DOT 596139E, MILEPOST 472.86 | $60,000 | Planned | |
| Jan 1, 2028 estimated | 34285(09) J3-4285(009)PM | SeminoleDivision 3 | SH-39 | Money Only SH-39: FROM 1.0 MILE EAST OF POTTAWATOMIE COUNTY LINE, SOUTH AND EAST 1.0 MILE FROM KONAWA ST TO SWAN AVE IN KONAWA | $300,000 | Planned | |
| Jan 1, 2028 estimated | 34343(04) J3-4343(004)FP | OkmulgeeDivision 1 | US-75 | Grade,Drain,Bridge & Surface US-75: FROM US-62 N 1.02 MI TO SH-56 JCT. | $12,300,000 | Planned | |
| Jan 1, 2028 estimated | 38189(04) J3-8189(004)PM | CoalDivision 3 | US-75 | Resurface US-75: FROM 0.2 MILES NORTH OF SH-3, NORTH 6.35 MILES | $10,300,000 | Planned | |
| Jan 1, 2028 estimated | 38529(04) J3-8529(004)PM | OkfuskeeSeminoleDivision 3 | I-40 | Resurface I-40: FROM 0.2 MILE WEST OF SEMINOLE COUNTY LINE, EAST 7.3 MILES | $3,000,000 | Planned | |
| Jan 1, 2028 estimated | 38532(05) J3-8532(005)PM | OkfuskeeDivision 3 | US-62 | Resurface US-62: FROM 7.4 MILES EAST OF LINCOLN COUNTY LINE, EAST 7.0 MILES TO SH-48 | $5,400,000 | Planned | |
| Feb 1, 2028 estimated | 31865(04) STP-276B(078)PM | WoodsDivision 6 | US-64 | Widen, Resurface & Bridge US-64: BEGIN 3.05 MI EAST OF THE JCT SH-14, EXTEND EAST 8.1 MILES | $19,200,000 | Planned | |
| Feb 1, 2028 estimated | 33845(04) STP-254C(080)PM | OkfuskeeDivision 3 | SH-84 | Widen, Resurface & Bridge SH-84: OVER BAD AND UNNAMED CREEKS, 3.8 & 4.8 MILES EAST OF US-75 | $5,800,000 | Planned | |
| Feb 1, 2028 estimated | 35578(04) J3-5578(004)PM | BeckhamDivision 5 | SH-152 | Bridge & Approaches SH-152: OVER DEEP CREEK, 1.9 MILES EAST OF US-283. | $4,100,000 | Planned | |
| Mar 1, 2028 estimated | 17427(21) NHPP-022N(263)PM | McCurtainDivision 2 | US-70 | Grade,Drain,Bridge & Surface US-70: FROM 15.11 MI EAST OF BROKEN BOW EAST 0.59 MI | $9,400,000 | Planned | |
| Mar 1, 2028 estimated | 27944(04) STP-258B(073)PM | OttawaDivision 8 | SH-69A | Grade,Drain,Bridge & Surface SH-69A: FROM APPROX. 1.65 MILES NORTH OF SH-10, NORTH 1.3 MILES | $4,700,000 | Planned | |
| Mar 1, 2028 estimated | 31100(04) STP-228B(031)PM | GreerDivision 5 | SH-6 | Widen & Resurface SH-6: BEGIN 1.0 MILE NORTH OF SH-9 AND EXTEND NORTH 4.0 MILES. NORTH BOUND LANES ONLY. | $9,300,000 | Planned | |
| Mar 1, 2028 estimated | 31866(04) J3-1866(004)PM | CoalDivision 3 | SH-48 | Grade, Drain & Surface SH-48: FROM 3.1 MILES NORTH OF SH-31, NORTH 4.6 MILES TO SH-3 | $14,500,000 | Planned | |
| Mar 1, 2028 estimated | 34255(04) J3-4255(004)FP | HarmonJacksonDivision 5 | US-62 | Widen & Resurface US-62: BEGIN 2.0 MILES WEST OF THE JACKSON C/L AND EXTEND EAST 7.0 MILES. | $16,300,000 | Planned | |
| Mar 1, 2028 estimated | 35507(04) J3-5507(004)PM | MayesDivision 8 | SH-20 | Safety Improvement SH-20: AT CARBIDE RD 3.5 MILES EAST OF PRYOR | $3,600,000 | Planned | |
| Mar 1, 2028 estimated | 36241(04) J3-6241(004)PM | OkmulgeeDivision 1 | US-75 | Pavement Rehabilitation US-75: FROM SH-16 N TO TULSA C/L, SB LANES ONLY | $4,700,000 | Planned | |
| Mar 1, 2028 estimated | 38205(04) J3-8205(004)PM | OklahomaDivision 4 | I-44 | Resurface I-44: FROM SW 74TH STREET IN OKC, EXT SOUTH 1.2 MILES TO SW 89TH ST | $2,900,000 | Planned | |
| Apr 1, 2028 estimated | 17670(20) J1-7670(020)PM | SequoyahDivision 1 | I-40 | Resurface I-40: I40/US59 INTERCHANGE IN SALLISAW | $1,800,000 | Planned | |
| Apr 1, 2028 estimated | 33456(04) J3-3456(004)PM | SequoyahDivision 1 | I-40 | Pavement Rehabilitation I-40: FROM 0.15 MI. E OF MP 299 TO 0.35 MI. E OF DWIGHT MISSION RD. | $25,800,000 | Planned | |
| Apr 1, 2028 estimated | 34354(04) NHPP-264N(107)FP | PushmatahaDivision 2 | SH-3 | Grade,Drain,Bridge & Surface SH-3: FROM JCT US-271, EXTEND E. 1.37 MI | $10,400,000 | Planned | |
| Apr 1, 2028 estimated | 34357(04) J3-4357(004)PM | MuskogeeWagonerDivision 1 | SH-72 | Resurface SH-72: FROM US-64 JCT. N APPROX 4.44 MI | $4,100,000 | Planned | |
| Apr 1, 2028 estimated | 39375(04) J3-9375(004)PM | CanadianDivision 4 | I-40 | Bridge & Approaches I-40: UNDER NORTH CIMARRON ROAD 7.0 MILES EAST OF US-81 | $15,500,000 | Planned | |
| Apr 1, 2028 estimated | 39428(04) J3-9428(004)PM | HaskellDivision 1 | SH-9 | Resurface SH-9: FROM 1.0 MI E OF SH-2 JCT., EAST 5.0 MI | $1,300,000 | Planned | |
| May 1, 2028 estimated | 24265(04) SSP-157B(113)SS | OsageDivision 8 | SH-11 | Widen & Resurface SH-11: FROM 2.0 MILES S.E. OF BARNSDALL EXTEND S.E. 3.75 MILES | $10,700,000 | Planned | |
| May 1, 2028 estimated | 27119(04) J2-7119(004)PM | KayDivision 4 | US-177 | Bridge & Approaches US-177: OVER UNNAMED CREEK 7.3 MILES NORTH OF SH-11 | $1,100,000 | Planned |
1–100 of 598Next ›
Source: ODOT 8-Year Construction Work Plan (roads and bridges layers on the ODOT open data hub). Years are federal fiscal years; let months are shown only where ODOT lists one. Right of way and utility pieces are left out. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.