| Let date | Contract / J/P | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| FY 2033 | 17427(08) NHPP-045N(024)FP | McCurtainDivision 2 | US-70 | Grade, Drain & Surface US-70: FROM 9.32 MI EAST OF BROKEN BOW EAST 2.48 MI | $16,400,000 | Planned | ||
| FY 2033 | 20330(07) J2-0033(007)FP | OklahomaDivision 4 | I-35 | Grade,Drain,Bridge & Surface I-35: FROM FORT SMITH JCT, EXTEND NORTH 4.5 MI TO I-44 | $45,000,0006 items | Planned | ||
| FY 2033 | 23267(04) SSP-135B(083)PM | JohnstonDivision 3 | SH-99 | Widen & Resurface SH-99: FROM 0.6 MILES NORTH OF SH-22, NORTH 5.3 MILES | $19,400,000 | Planned | ||
| FY 2033 | 23289(04) STPY-167A(119)FP | SeminoleDivision 3 | SH-3E | Grade,Drain,Bridge & Surface SH-99: FROM 4.6 MILES SOUTH OF SH-09, SOUTH 4.1 MILES | $40,400,0003 items | Planned | ||
| FY 2033 | 24212(09) J2-4212(009)PM | LatimerDivision 2 | SH-2 | Widen, Resurface & Bridge SH-2: FROM 10.5 MI NORTH OF THE PUSHMATAHA C/L, EXT NORTH APPROX 5.4 MI | $4,500,000 | Planned | ||
| FY 2033 | 24226(04) J2-4226(004)PM | KayDivision 4 | I-35 | Grade, Drain & Surface I-35: FROM JUST NORTH OF HUBBARD RD, EXTEND NORTH APPROX. 4.75 MILES TO JUST NORTH OF ADOBE RD | $29,100,000 | Planned | ||
| FY 2033 | 24403(09) J2-4403(009)PM | LatimerDivision 2 | SH-2 | Resurface SH-2: FROM 15.9 MI NORTH OF THE PUSHMATAHA C/L, EXT NORTH APPROX 6.4 MI | $2,500,000 | Planned | ||
| FY 2033 | 28890(04) J2-8890(004)PM | CreekDivision 8 | SH-66 | Grade, Drain & Surface SH-66: FROM EAST OF DEPEW, EAST TO THE BRISTOW CITY LIMITS | $17,100,000 | Planned | ||
| FY 2033 | 28891(04) J2-8891(004)PM | MayesDivision 8 | SH-28 | Widen & Resurface SH-28: FROM EAST END OF THE I-44 INTERCHANGE, EXTEND EAST APROX. 5.45 MILES | $17,600,0005 items | Planned | ||
| FY 2033 | 29610(04) J2-9610(004)PM | OttawaDivision 8 | US-60 | Bridge & Approaches US-60: OVER SPRING AND NEOSHO RIVER, 11.1 MI EAST OF US-69 | $39,400,0002 items | Planned | ||
| FY 2033 | 29746(04) STP-273B(102)PM | WagonerDivision 1 | SH-51 | Grade, Drain & Surface SH-51:FROM 6.8 MILES EAST OF SH-51/US-69 JCT. IN WAGONER, EAST 0.95 MILES | $3,900,000 | Planned | ||
| FY 2033 | 29846(04) J2-9846(004)FP | OklahomaDivision 4 | I-40 | Bridge & Approaches I-40: EB & WB BRIDGES OVER SUNNYLANE 2 MILES EAST OF I-35 | $31,000,0002 items | Planned | ||
| FY 2033 | 30352(04) NHPPI-4000-(181)PM | CusterDivision 5 | I-40 | Resurface I-40: BEGIN AT MP 65.65 AND EXT TO MP 69.07 | $7,300,0003 items | Planned | ||
| FY 2033 | 30397(04) J3-0397(004)PM | PittsburgDivision 2 | US-69 | Bridge & Approaches US-69: OVER DANCING RABBIT CREEK, APPROX. 0.2 MI NORTH OF INDIAN NATION TNP | $5,400,0002 items | Planned | ||
| FY 2033 | 30446(08) J3-0446(008)PM | LoganDivision 4 | I-35 | Grade, Drain & Surface I-35: FROM MM 156, EXTEND NORTH 1.00 MILES | $18,900,000 | Planned | ||
| FY 2033 | 31005(04) J3-1005(004)PM | PayneDivision 4 | SH-51 | Widen & Resurface SH-51: WB SH-51 FROM I-35 JUNCTION, EXTEND EAST TO SH-86 JCT; EB FROM SH-86 JCT, EXTEND EAST 4.5 MILES (SHOULDERING AND RESURFACING) | $19,300,0001 items | Planned | ||
| FY 2033 | 31005(05) J3-1005(005)PM | PayneDivision 4 | SH-51 | Widen & Resurface SH-51: EB FROM 8.0 MILES EAST OF I-35, EXTEND EAST 5.50 MILES (SHOULDERING AND RESURFACING) | $15,100,0001 items | Planned | ||
| FY 2033 | 31263(04) J3-1263(004)PM | PottawatomieDivision 3 | SH-39 | Bridge & Approaches SH-39: OVER CHISM CREEK AND TWO UNNAMED CREEKS, FROM 2.0 MILES EAST OF US-177, EAST 0.8 MILE | $9,000,0003 items | Planned | ||
| FY 2033 | 31693(04) J3-1693(004)PM | BeckhamDivision 5 | I-40 | Bridge Rehabilitation I-40: AT US-283 LOCATED 13.4 MILES EAST OF THE SH-30 JCT. | $8,700,0002 items | Planned | ||
| FY 2033 | 31859(04) NHPP-261N(125)PM | PittsburgDivision 2 | US-270 | Bridge Rehabilitation US-270: OVER UPRR RAILROAD IN MCALESTER | $2,500,0001 items | Planned | ||
| FY 2033 | 31860(04) J3-1860(004) | PittsburgDivision 2 | US-270 | Bridge Rehabilitation US-270: OVER A OK RAILROAD & 9TH ST UNDER | $3,000,0002 items | Planned | ||
| FY 2033 | 31861(04) J3-1861(004)PM | PittsburgDivision 2 | US-270 | Bridge Rehabilitation US-270: OVER A OK RAILROAD & 16TH ST UNDER | $4,000,0002 items | Planned | ||
| FY 2033 | 32106(04) J3-2106(004)PM | SequoyahDivision 1 | I-40 | Interchange I-40: ACCESS IMPROVEMENTS AT I-40/US-64 JCT. (MP 325) | $8,200,000 | Planned | ||
| FY 2033 | 33354(04) J3-3354(004)PM | OklahomaDivision 4 | I-44 | Interchange I-44/SH-74/SH-66: INTERCHANGE OPERATIONAL IMPROVEMENTS | $14,000,000 | Planned | ||
| FY 2033 | 33461(04) J3-3461(004)FP | AdairDivision 1 | US-59 | Widen, Resurface & Bridge US-59: FR APPROX 200' N OF SHELL BRANCH CRK, N APPROX 4.8 MI TO WESTVILLE | $15,700,0001 items | Planned | ||
| FY 2033 | 33463(04) J3-3463(004)PM | CherokeeDivision 1 | SH-80 | Widen & Resurface SH-80: FROM JCT SH-251A N. APPROX. .5 MI. | $2,700,000 | Planned | ||
| FY 2033 | 33757(04) J3-3757(004)PM | CarterDivision 7 | US-70 | Grade, Drain & Surface US-70: FROM 0.23 MIS. E. OF BROCK RD. E. APPROX 3.6 MIS. TO JUST E. OF I-35 | $34,100,000 | Planned | ||
| FY 2033 | 33788(10) J3-3788(010)PM | TulsaDivision 8 | I-44 | Grade, Drain & Surface I-44: I-244 TO UNION AVE WP 4 | $26,000,000 | Planned | ||
| FY 2033 | 33819(04) J3-3819(004)PM | NowataDivision 8 | US-169 | Grade, Drain & Surface US-169: FROM 1.9 MI S OF US-60, N TO US-60 | $8,000,000 | Planned | ||
| FY 2033 | 33823(04) J3-3823(004)PM | MayesDivision 8 | SH-82 | Grade, Drain & Surface SH-82: FROM 2.82 MILES NORTH OF SH-20 EXTENDING NORTH TO SH-28 AND SH-28 FROM SH-82 N TO SH-82 S | $18,300,000 | Planned | ||
| FY 2033 | 33839(04) J3-3839(004)PM | TulsaDivision 8 | I-444 | Bridge Rehabilitation I-444: UNDER BOULDER AVE., 1.02 MILES EAST OF I-244 | $2,200,0001 items | Planned | ||
| FY 2033 | 34247(04) J3-4247(004)PM | SeminoleDivision 3 | US-270 | Bridge & Approaches US-270: OVER UNNAMED CREEK, 0.6 MILES SOUTHEAST OF SH-56 | $3,400,0001 items | Planned | ||
| FY 2033 | 34269(04) J3-4269(004)PM | AlfalfaDivision 6 | US-64 | Widen & Resurface US-64: BEGIN APPROX 7.4 MI EAST OF THE JCT SH-8, EXTEND EAST APPROX 6.4 MI TO THE GRANT C/L | $17,200,000 | Planned | ||
| FY 2033 | 34318(04) J3-4318(004)PM | LincolnDivision 3 | SH-66 | Widen, Resurface & Bridge SH-66: FROM SH-102, EAST 4.0 MILES TO US-177 | $14,000,0001 items | Planned | ||
| FY 2033 | 34340(04) J3-4340(004)PM | OkmulgeeDivision 1 | US-75A | Grade,Drain,Bridge & Surface US-75A: UNDER BNSF R.R., 3.45 MI W & 4.51 MI NW OF US-75 JCT. | $7,500,000 | Planned | ||
| FY 2033 | 34374(04) J3-4374(004)PM | CherokeeDivision 1 | SH-100 | Widen, Resurface & Bridge SH-100: FROM 0.75 MI N OF SH-82 JCT., EXTEND E 3.1 MI TO CRS585 RD | $8,000,0001 items | Planned | ||
| FY 2033 | 34946(04) J3-4946(004)PM | PittsburgDivision 2 | SH-31 | Bridge & Approaches SH-31: OVER BLUE CREEK, 13.45 MI EAST OF JCT US-270 | $5,500,0001 items | Planned | ||
| FY 2033 | 34971(04) J3-4971(004)PM | CusterDivision 5 | SH-33 | Bridge & Approaches SH-33: AT UNNAMED CREEK LOCATED 1.4 M EAST OF SH-34. | $2,400,0001 items | Planned | ||
| FY 2033 | 34982(04) J3-4982(004)FP | KingfisherDivision 4 | SH-3 | Widen & Resurface SH-33: FROM 8 MILES EAST OF BLAINE C/L, EXTEND EAST 7.2 MILES TO SH-81 | $22,400,000 | Planned | ||
| FY 2033 | 35009(04) J3-5009(004)PM | ChoctawDivision 2 | US-271 | Bridge & Approaches US-271: OVER THE RED RIVER & CO RD AT THE OK/TX STATELINE | $23,000,0002 items | Planned | ||
| FY 2033 | 35051(04) J3-5051(004)PM | MayesDivision 8 | US-69 | Intersect Modif US-69: AIRPORT RD & MAIN ST | $500,000 | Planned | ||
| FY 2033 | 35170(07) J3-5170(007)PM | GradyDivision 7 | SH-92 | Widen & Resurface SH-92: FROM COUNTY ROAD E1310, EXTEND N. 5.4 MIS. TO SECTION LINE E1260 | $19,300,000 | Planned | ||
| FY 2033 | 35508(04) STP-249B(090)PM | MayesDivision 8 | SH-20 | Safety Improvement SH-20: FROM THE ROGERS C/L EAST 3.3 MILES | $1,100,000 | Planned | ||
| FY 2033 | 35510(07) J3-5510(007)PM | RogersDivision 8 | US-412 | Interchange US-412: AT 4170 RD | $30,900,000 | Planned | ||
| FY 2033 | 35542(04) STP-208C(132)PM | CaddoDivision 7 | SH-58 | Widen, Resurface & Bridge SH-58: FROM 0.65 MIS. SOUTH OF JCT SH-58/SH-19W, EXTEND N. 5.65 MIS. | $19,700,0003 items | Planned | ||
| FY 2033 | 35547(04) J3-5547(004)PM | PawneeDivision 8 | US-64 | Bridge Rehabilitation US-64: AT CAMP CREEK, 3.6 MILES EAST OF SH-18 | $1,400,0001 items | Planned | ||
| FY 2033 | 35548(04) J3-5548(004)PM | PawneeDivision 8 | US-64 | Bridge Rehabilitation US-64: UNDER 296TH W. AVE, 17.5 MILES EAST OF SH-99 | $1,400,0001 items | Planned | ||
| FY 2033 | 35549(04) J3-5549(004)PM | RogersDivision 8 | SH-88 | Bridge Rehabilitation SH-88: AT OOLOGAH DAM SPILLWAY 7.1 MI N JCT SH-20 | $1,400,0001 items | Planned | ||
| FY 2033 | 35567(04) J3-5567(004)PM | Roger MillsDivision 5 | US-283 | Widen, Resurface & Bridge US-283: BEGIN AT SH-33 SOUTH JCT & EXT NORTH 8.0 MILES TO THE NORTH SH-47 JCT. | $22,900,0001 items | Planned | ||
| FY 2033 | 35568(04) J3-5568(004)PM | DeweyDivision 5 | SH-51 | Widen & Resurface SH-51: BEGIN 0.25 MILE EAST OF US-270 & EXT EAST 5.0 MILES. | $13,200,000 | Planned | ||
| FY 2033 | 35597(04) J3-5597(004)PM | Le FloreDivision 2 | SH-83 | Bridge & Approaches SH-83: OVER COWSKIN CREEK, 7.55 MI EAST OF JCT US-59 | $3,000,0001 items | Planned | ||
| FY 2033 | 35600(04) J3-5600(004)PM | LatimerDivision 2 | SH-2 | Bridge Rehabilitation SH-2: OVER FOURCHE MALINE CREEK, 2.3 MI NORTH OF JCT US-270 | $4,000,0001 items | Planned | ||
| FY 2033 | 35660(04) J3-5660(004)PM | LincolnDivision 3 | SH-66 | Widen & Resurface SH-66: BEGIN AT THE JCT OF US-177, EXTEND EAST 7.75 MI. | $3,400,000 | Planned | ||
| FY 2033 | 35700(04) J3-5700(004)PM | CarterDivision 7 | SH-76 | Widen, Resurface & Bridge SH-76: FROM 3.79 MIS. S. OF JCT SH-76/SH-53W, EXTEND N. 3.79 MIS. | $10,800,0002 items | Planned | ||
| FY 2033 | 35736(04) J3-5736(004)PM | BeaverDivision 6 | US-270 | Widen, Resurface & Bridge US-270: FROM THE JCT OF US-64, EXTEND SOUTH 8.00 MI | $24,700,0003 items | Planned | ||
| FY 2033 | 35740(04) J3-5740(004)PM | BeaverDivision 6 | US-270 | Widen, Resurface & Bridge US-270: BEGIN 15.21 MI SOUTH OF JCT US-64, EXTEND SOUTH 4.95 MI TO JCT SH-03 | $10,000,0003 items | Planned | ||
| FY 2033 | 35741(04) J3-5741(004)PM | TexasDivision 6 | SH-136 | Widen, Resurface & Bridge SH-136: BEGIN 4.88 MI NORTH OF JCT US-64, EXTEND NORTH 6.1 MI | $13,800,0001 items | Planned | ||
| FY 2033 | 35759(04) J3-5759(004)PM | LincolnPottawatomieDivision 3 | SH-102 | Widen, Resurface & Bridge SH-102: FROM SH-270, NORTH 4.0 MILES TO US-62 | $16,700,0001 items | Planned | ||
| FY 2033 | 35764(04) J3-5764(004)PM | PottawatomieDivision 3 | SH-9A | Widen & Resurface SH-9A: FROM SH-3E, NORTH 3.5 MILES TO I-40 | $15,000,000 | Planned | ||
| FY 2033 | 35794(04) J3-5794(004)PM | CanadianOklahomaDivision 4 | I-40 | Grade, Drain & Surface I-40: FROM MACARTHUR AVE EXTEND WEST TO MORGAN ROAD (ADD ACCEL/DECEL LANES) | $10,000,0006 items | Planned | ||
| FY 2033 | 35844(04) J3-5844(004)PM | McIntoshDivision 1 | US-266 | Bridge & Approaches US-266: OVER UNNAMED CREEK, 0.7 MI W OF US-69 JCT. | $2,700,0001 items | Planned | ||
| FY 2033 | 35847(04) J3-5847(004)PM | OkmulgeeDivision 1 | US-75 | Pavement Rehabilitation US-75: FROM 1.50 MI N OF SH-56 LOOP, EXTEND N 5.4 MI (NB) | $6,000,000 | Planned | ||
| FY 2033 | 35853(04) J3-5853(004)PM | SequoyahDivision 1 | SH-100 | Widen & Resurface SH-100: FROM APPROX 3.6 MI W OF SH-82, EXTEND EAST TO SH-82 JCT. | $10,000,000 | Planned | ||
| FY 2033 | 36133(04) J3-6133(004)PM | HarmonDivision 5 | US-62 | Widen, Resurface & Bridge US-62: BEGIN 8.17 MILES EAST OF SH-30 AND EXTEND EAST 4.20 MILES. | $8,540,0002 items | Planned | ||
| FY 2033 | 36135(04) J3-6135(004)PM | DeweyDivision 5 | SH-34 | Widen, Resurface & Bridge SH-34: BEGIN AT THE SH-47 JCT AND EXT NORTH 5.0 MILES. | $10,000,0001 items | Planned | ||
| FY 2033 | 36142(04) J3-6142(004)PM | CaddoDivision 5 | I-40 | Bridge & Approaches I-40: SOUTH FRONTAGE ROAD OVER UNNAMED CR, 1.3 MILES E OF THE CUSTER C/L. | $4,600,0001 items | Planned | ||
| FY 2033 | 36145(04) J3-6145(004)PM | WashitaDivision 5 | I-40 | Bridge & Approaches I-40: N FRONTAGE ROAD OVER TURKEY CR, 6.5 MILES EAST OF THE BECKHAM C/L. | $2,200,0001 items | Planned | ||
| FY 2033 | 36146(04) J3-6146(004)PM | WashitaDivision 5 | I-40 | Bridge & Approaches I-40: S FRONTAGE ROAD OVER CLINTON LAKE, 8.1 MILES EAST OF THE BECKHAM C/L. | $2,600,0001 items | Planned | ||
| FY 2033 | 36186(04) J3-6186(004)PM | PottawatomieDivision 3 | US-177 | Bridge & Approaches US-177: OVER LITTLE RIVER, 1.9 MILES NORTH OF SH-59B | $5,000,0001 items | Planned | ||
| FY 2033 | 36187(04) J3-6187(004)PM | GarvinDivision 3 | SH-76 | Bridge & Approaches SH-76: OVER RUSH CREEK, 1.1 MILES NORTH OF STEPHENS COUNTY LINE | $3,000,0001 items | Planned | ||
| FY 2033 | 36236(04) J3-6236(004)PM | MuskogeeDivision 1 | Pavement Rehabilitation I-40: ON AND OFF RAMPS AT SH-100 JCT. | $6,900,000 | Planned | |||
| FY 2033 | 36238(04) J3-6238(004)PM | OkmulgeeDivision 1 | SH-56 | Resurface SH-56: FROM 1.35 MI W OF US-75 EXTEND E 0.43 MI TO ALABAMA ST IN OKMULGEE | $3,000,000 | Planned | ||
| FY 2033 | 36293(04) J3-6293(004)PM | CanadianDivision 4 | US-81 | Intersect Modif US-81: AT THE INTERSECTION OF SH-152 IN UNION CITY | $3,000,000 | Planned | ||
| FY 2033 | 36302(04) J3-6302(004)PM | CanadianDivision 4 | US-81 | Widen & Resurface US-81: FROM JCT OF I-40; EXTEND SOUTH APPROX 5 MILES TO SW 29TH | $5,000,000 | Planned | ||
| FY 2033 | 36321(04) J3-6321(004)PM | TulsaDivision 8 | I-244 | Bridge Rehabilitation I-244:TISDALE EXPY UNDER | $2,000,0001 items | Planned | ||
| FY 2033 | 36369(04) J3-6369(004)PM | RogersDivision 8 | US-412 | Bridge & Approaches US-412: AT 289TH E AVE. APPROX. 4.3 MILES EAST OF I-44 JCT. | $12,000,000 | Planned | ||
| FY 2033 | 38334(04) J3-8334(004)PM | PushmatahaDivision 2 | SH-2 | Bridge Rehabilitation SH-2: OVER TEN MILE CREEK, 4.9 MI NORTH OF JCT SH-3 | $3,100,0001 items | Planned | ||
| FY 2033 | 38342(04) J3-8342(004)PM | McIntoshDivision 1 | I-40 | Pavement Rehabilitation I-40: OKMULGEE/MCINTOSH C/L EXT E 8 MI | $6,000,000 | Planned | ||
| FY 2033 | 38345(04) J3-8345(004)PM | OkmulgeeDivision 1 | Safety Improvement OKMULGEE COUNTY SAFETY IMPROVEMENT | $150,000 | Planned |
1–79 of 79
Lettings: ODOT Contracts and Proposals (letting spreadsheets and item lists). Planned projects: ODOT 8-Year Construction Work Plan (roads and bridges layers on the ODOT open data hub). Years are federal fiscal years; let months are shown only where ODOT lists one. Right of way and utility pieces are left out. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.