| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$36,731.43 |
$8,500.00 |
$35,000.00 |
$23,500.00 |
$26,500.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 189 | CY |
$20.86 |
$27.04 |
$33.59 |
$30.00 |
$18.50 |
$65.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 363 | CY |
$23.44 |
$30.40 |
$32.00 |
$20.00 |
$46.00 |
$85.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 933 | LF |
$4.60 |
$2.74 |
$3.79 |
$3.00 |
$2.85 |
$6.00 |
| 50 | 221(E)2600 |
TEMPORARY SILT DIKE | 14 | LF |
$19.86 |
$31.90 |
$36.00 |
$30.00 |
$15.35 |
$10.00 |
| 60 | 230(A)7200 |
SOLID SLAB SODDING | 1,719 | SY |
$6.52 |
$7.65 |
$8.10 |
$7.00 |
$8.00 |
$8.00 |
| 70 | 310(B)5300 |
SUBGRADE, METHOD B | 334 | SY |
$7.00 |
$10.01 |
$12.00 |
$5.00 |
$14.00 |
$15.00 |
| 80 | 407(B)7300 |
TACK COAT | 161 | GAL |
$5.53 |
$3.30 |
$5.70 |
$5.00 |
$4.00 |
$3.60 |
| 90 | 411(C)1400 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 156 | TON |
$182.50 |
$308.00 |
$305.00 |
$200.00 |
$240.00 |
$336.00 |
| 100 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 46 | TON |
$228.34 |
$308.00 |
$305.00 |
$200.00 |
$276.00 |
$336.00 |
| 110 | 411(H)1900 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 100 | TON |
$214.81 |
$308.00 |
$398.00 |
$100.00 |
$220.00 |
$336.00 |
| 120 | 412 3100 |
COLD MILLING PAVEMENT | 1,677 | SY |
$10.43 |
$20.24 |
$17.96 |
$10.00 |
$17.00 |
$16.50 |
| 130 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 644 | SY |
$16.68 |
$19.38 |
$21.00 |
$10.00 |
$23.00 |
$15.00 |
| 140 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 387.5 | LF |
$6.76 |
$5.50 |
$8.00 |
$10.00 |
$7.50 |
$10.00 |
| 150 | 501(G)1800 |
CLSM BACKFILL | 203.2 | CY |
$237.65 |
$180.71 |
$282.32 |
$150.00 |
$262.00 |
$320.00 |
| 160 | 504(A)5200 |
APPROACH SLAB | 633.6 | SY |
$287.65 |
$231.30 |
$333.20 |
$245.00 |
$305.00 |
$439.00 |
| 170 | 504(B)5300 |
SAW-CUT GROOVING | 1,867 | SY |
$5.66 |
$5.72 |
$6.10 |
$6.00 |
$5.20 |
$65.00 |
| 180 | 504(E)5520 |
42" F-SHAPED PARAPET | 1,638 | LF |
$135.58 |
$121.47 |
$137.28 |
$125.00 |
$128.50 |
$421.00 |
| 190 | 506(A)7200 |
STRUCTURAL STEEL | 410 | LB |
$4.70 |
$35.20 |
$34.00 |
$30.00 |
$33.00 |
$120.00 |
| 200 | 509(A)0210 |
CLASS AA CONCRETE | 753.8 | CY |
$742.94 |
$799.60 |
$842.15 |
$1,100.00 |
$950.00 |
$1,050.00 |
| 210 | 509(D)0510 |
CLASS C CONCRETE | 3.3 | CY |
$1,178.57 |
$1,079.04 |
$1,850.00 |
$1,000.00 |
$992.00 |
$850.00 |
| 220 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 133,000 | LB |
$1.66 |
$1.35 |
$1.63 |
$2.00 |
$1.68 |
$2.20 |
| 230 | 512(A)3200 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$388,951.00 |
$220,166.10 |
$239,515.00 |
$225,000.00 |
$221,000.00 |
$249,620.00 |
| 240 | 512(B)3300 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$38,895.00 |
$8,932.00 |
$14,120.00 |
$5,000.00 |
$9,000.00 |
$10,250.00 |
| 250 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,050 | SY |
$6.18 |
$6.22 |
$6.60 |
$6.00 |
$5.65 |
$12.00 |
| 260 | 517 9110 |
ELASTOMERIC COATING | 747 | SF |
$24.12 |
$19.80 |
$32.00 |
$20.00 |
$19.80 |
$22.00 |
| 270 | 518(B)0300 |
SEALED EXPANSION JOINTS | 149.84 | LF |
$361.41 |
$299.58 |
$381.81 |
$300.00 |
$388.50 |
$85.00 |
| 280 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 50 | LF |
$43.47 |
$44.00 |
$47.00 |
$45.00 |
$44.00 |
$65.00 |
| 290 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 0.4 | GAL |
$121.29 |
$137.50 |
$175.00 |
$130.00 |
$125.00 |
$65.00 |
| 300 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 10.4 | SY |
$1,028.69 |
$770.00 |
$1,170.00 |
$800.00 |
$770.00 |
$910.00 |
| 310 | 523(A)3200 |
SEALER CRACK PREPARATION | 319 | LF |
$5.97 |
$6.60 |
$8.00 |
$7.00 |
$6.00 |
$20.00 |
| 320 | 523(B)3300 |
SEALER RESIN | 3.6 | GAL |
$98.18 |
$198.00 |
$270.00 |
$200.00 |
$180.00 |
$350.00 |
| 330 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 8.5 | SY |
$46.23 |
$44.00 |
$52.00 |
$50.00 |
$44.00 |
$120.00 |
| 340 | 540 8100 |
(PL)REPAIR BRIDGE ITEMS | 1 | LSUM |
$11,138.00 |
$21,909.44 |
$14,770.00 |
$25,000.00 |
$19,800.00 |
$38,500.00 |
| 350 | 540 8104 |
(PL)REPAIR BRIDGE ITEMS | 4 | EA |
$4,830.68 |
$1,205.82 |
$4,707.00 |
$1,000.00 |
$3,476.00 |
$8,500.00 |
| 360 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$50,000.00 |
$155,088.63 |
$158,282.00 |
$370,000.00 |
$300,000.00 |
$42,500.00 |
| 370 | 501(G)1800 |
CLSM BACKFILL | 151.9 | CY |
$250.42 |
$205.50 |
$319.54 |
$150.00 |
$262.00 |
$320.00 |
| 380 | 504(A)5200 |
APPROACH SLAB | 481 | SY |
$291.71 |
$241.05 |
$332.48 |
$245.00 |
$305.00 |
$439.00 |
| 390 | 504(B)5300 |
SAW-CUT GROOVING | 1,492 | SY |
$6.00 |
$5.72 |
$6.25 |
$6.00 |
$5.20 |
$65.00 |
| 400 | 504(E)5520 |
42" F-SHAPED PARAPET | 725.9 | LF |
$144.30 |
$131.23 |
$208.11 |
$125.00 |
$129.50 |
$421.00 |
| 410 | 506(A)7200 |
STRUCTURAL STEEL | 300 | LB |
$4.75 |
$33.24 |
$37.00 |
$30.00 |
$33.00 |
$120.00 |
| 420 | 509(A)0210 |
CLASS AA CONCRETE | 265.5 | CY |
$892.56 |
$1,016.05 |
$1,061.69 |
$1,100.00 |
$950.00 |
$1,050.00 |
| 430 | 509(D)0510 |
CLASS C CONCRETE | 3.3 | CY |
$1,178.57 |
$1,079.04 |
$1,850.00 |
$1,000.00 |
$992.00 |
$850.00 |
| 440 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 79,050 | LB |
$1.76 |
$1.42 |
$1.71 |
$2.00 |
$1.68 |
$2.20 |
| 450 | 512(A)3200 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$310,824.00 |
$175,234.40 |
$193,304.00 |
$190,000.00 |
$176,000.00 |
$211,200.00 |
| 460 | 512(B)3300 |
COLLECTION AND HANDLING OF WASTE | 1 | LSUM |
$31,082.00 |
$8,932.00 |
$12,400.00 |
$5,000.00 |
$9,000.00 |
$9,500.00 |
| 470 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,179 | SY |
$6.38 |
$6.22 |
$6.60 |
$6.00 |
$5.65 |
$12.00 |
| 480 | 517 9110 |
ELASTOMERIC COATING | 760 | SF |
$24.11 |
$19.80 |
$31.00 |
$20.00 |
$19.80 |
$22.00 |
| 490 | 518(B)0300 |
SEALED EXPANSION JOINTS | 123.34 | LF |
$361.41 |
$323.55 |
$316.34 |
$300.00 |
$421.00 |
$85.00 |
| 500 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 40 | LF |
$44.10 |
$44.00 |
$46.00 |
$45.00 |
$44.00 |
$65.00 |
| 510 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 0.4 | GAL |
$121.29 |
$137.50 |
$175.00 |
$130.00 |
$125.00 |
$65.00 |
| 520 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 12.3 | SY |
$1,008.22 |
$770.00 |
$1,169.00 |
$800.00 |
$770.00 |
$910.00 |
| 530 | 523(A)3200 |
SEALER CRACK PREPARATION | 266 | LF |
$6.05 |
$6.60 |
$8.00 |
$7.00 |
$6.00 |
$20.00 |
| 540 | 523(B)3300 |
SEALER RESIN | 2.9 | GAL |
$102.19 |
$198.00 |
$270.00 |
$200.00 |
$180.00 |
$350.00 |
| 550 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 4 | SY |
$46.23 |
$44.00 |
$56.00 |
$50.00 |
$44.00 |
$120.00 |
| 560 | 540 8100 |
(PL)REPAIR BRIDGE ITEMS | 1 | LSUM |
$15,592.00 |
$21,909.44 |
$16,000.00 |
$20,000.00 |
$20,500.00 |
$38,500.00 |
| 570 | 540 8104 |
(PL)REPAIR BRIDGE ITEMS | 13 | EA |
$3,667.47 |
$1,113.07 |
$3,250.00 |
$1,000.00 |
$2,016.00 |
$8,500.00 |
| 580 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$40,000.00 |
$145,117.49 |
$128,750.00 |
$227,970.00 |
$210,000.00 |
$42,500.00 |
| 590 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 3 | EA |
$377.76 |
$247.50 |
$250.00 |
$800.00 |
$247.50 |
$270.00 |
| 600 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 38 | SF |
$41.31 |
$77.00 |
$76.00 |
$100.00 |
$77.00 |
$33.60 |
| 610 | 851(C)2415 |
2" SQUARE TUBE POST | 15 | LF |
$13.39 |
$9.90 |
$9.87 |
$30.00 |
$9.90 |
$30.00 |
| 620 | 856(A)8203 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(4" WIDE) | 892 | LF |
$3.46 |
$0.3600 |
$0.3700 |
$0.7500 |
$0.3700 |
$0.6000 |
| 630 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 37,350 | LF |
$0.9800 |
$0.6700 |
$0.6600 |
$0.8000 |
$0.6700 |
$0.9000 |
| 640 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 7,650 | LF |
$2.24 |
$1.51 |
$1.50 |
$2.30 |
$1.51 |
$2.40 |
| 650 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 50,600 | LF |
$0.3200 |
$0.2400 |
$0.2400 |
$0.3000 |
$0.2500 |
$0.3000 |
| 660 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 45,000 | LF |
$0.2900 |
$0.3300 |
$0.3200 |
$0.1000 |
$0.3300 |
$0.6000 |
| 670 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 577 | EA |
$10.63 |
$11.00 |
$12.00 |
$6.00 |
$11.00 |
$7.20 |
| 680 | 858(A)0232 |
PAVE.MARKERS CLASS A TYPE 2-E | 371 | EA |
$20.27 |
$11.00 |
$12.00 |
$6.00 |
$11.00 |
$7.20 |
| 690 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 660 | SD |
$16.96 |
$9.35 |
$9.40 |
$14.00 |
$9.35 |
$12.00 |
| 700 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 7,107 | LF |
$27.19 |
$24.20 |
$24.10 |
$15.00 |
$35.00 |
$35.00 |
| 710 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 9,352 | LF |
$4.15 |
$2.48 |
$2.42 |
$5.00 |
$3.50 |
$16.00 |
| 720 | 877(D)4500 |
(PL) PORTABLE LONGITUDINAL BARRIER DELINEATOR | 42,240 | SD |
$0.8600 |
$0.0600 |
$0.0700 |
$0.3000 |
$0.0600 |
$6.00 |
| 730 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 330 | SD |
$6.26 |
$1.10 |
$1.08 |
$30.00 |
$1.10 |
$18.00 |
| 740 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,060 | SD |
$0.2900 |
$0.0200 |
$0.0400 |
$0.8000 |
$0.0300 |
$0.9000 |
| 750 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 7,745 | SD |
$0.5000 |
$0.0200 |
$0.0400 |
$0.1000 |
$0.0300 |
$1.80 |
| 760 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,270 | SD |
$0.9300 |
$9.08 |
$9.05 |
$2.25 |
$11.25 |
$2.40 |
| 770 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 6,880 | SD |
$0.7000 |
$0.3300 |
$0.3400 |
$2.00 |
$0.3300 |
$1.80 |
| 780 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 31,835 | SD |
$0.1900 |
$0.0200 |
$0.0300 |
$0.3000 |
$0.0300 |
$0.0200 |
| 785 | 880(E)6616 |
WARNING LIGHTS(TYPE D) | 62,635 | SD |
$0.1500 |
$0.0600 |
$0.0800 |
$0.2000 |
$0.0600 |
$0.1000 |
| 790 | 880(F)6700 |
DRUMS | 62,635 | SD |
$0.1700 |
$0.5200 |
$0.5300 |
$0.2000 |
$0.5200 |
$0.4800 |
| 800 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 660 | SD |
$16.37 |
$8.80 |
$10.00 |
$20.00 |
$8.80 |
$42.00 |
| 810 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 387.5 | LF |
$30.21 |
$22.00 |
$34.00 |
$30.00 |
$22.00 |
$28.80 |
| 820 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 6 | EA |
$3,446.45 |
$3,591.50 |
$3,780.00 |
$3,000.00 |
$3,591.50 |
$3,300.00 |
| 830 | 853 5100 |
DELINEATORS(TYPE 1, CODE 1) | 14 | EA |
$26.81 |
$17.38 |
$19.80 |
$50.00 |
$17.38 |
$33.60 |
| 840 | 871(A)2210 |
(PL) IMPACT ATTENUATOR | 4 | EA |
$35,647.95 |
$25,537.60 |
$29,216.00 |
$20,000.00 |
$27,816.00 |
$28,800.00 |
| 850 | 802(A)0240 |
2" GALV.STEEL ELECT.COND. EXPOSED | 542 | LF |
$45.21 |
$55.00 |
$54.70 |
$55.00 |
$55.00 |
$85.00 |
| 860 | 802(B)0320 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 142 | LF |
$41.16 |
$52.80 |
$54.00 |
$50.00 |
$52.80 |
$62.00 |
| 870 | 803(A)1210 |
PULL BOX(SIZE I) | 4 | EA |
$1,547.16 |
$2,090.00 |
$2,400.00 |
$2,500.00 |
$2,090.00 |
$2,500.00 |
| 880 | 805(D)3504 |
(PL)REMOVE & RESET LIGHT POLE | 2 | EA |
$3,906.10 |
$3,850.00 |
$3,900.00 |
$5,000.00 |
$3,850.00 |
$4,750.00 |
| 890 | 811 9115 |
1/C NO.4 ELECT.COND. | 684 | LF |
$3.78 |
$6.38 |
$6.40 |
$6.00 |
$6.38 |
$12.00 |
| 900 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$13,200.00 |
$14,800.00 |
$15,000.00 |
$17,000.00 |
$24,580.00 |
| 910 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$25,292.05 |
$15,787.20 |
$27,850.00 |
$3,500.00 |
$18,000.00 |
$86,580.00 |
| 920 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$225,682.00 |
$205,498.98 |
$206,500.00 |
$240,000.00 |
$225,000.00 |
$315,850.00 |