| 10 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 250 | CY |
$20.00 |
$13.56 |
$20.00 |
$45.00 |
| 20 | 202(D)2500 |
UNCLASSIFIED BORROW | 100 | CY |
$29.00 |
$16.95 |
$20.00 |
$75.00 |
| 30 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$3,955.00 |
$5,000.00 |
$5,000.00 |
| 40 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,053 | LF |
$5.00 |
$5.09 |
$4.00 |
$6.95 |
| 50 | 230(A)7200 |
SOLID SLAB SODDING | 1,000 | SY |
$7.00 |
$6.78 |
$6.00 |
$25.00 |
| 60 | 233(A)0200 |
VEGETATIVE MULCHING | 1 | AC |
$1,744.00 |
$4,713.50 |
$2,200.00 |
$2,950.00 |
| 70 | 303(A)1200 |
AGGREGATE BASE TYPE A | 199 | CY |
$95.00 |
$124.00 |
$65.00 |
$120.00 |
| 80 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 20 | TON |
$65.00 |
$62.00 |
$60.00 |
$125.00 |
| 90 | 408 8100 |
PRIME COAT | 188 | GAL |
$9.00 |
$9.00 |
$10.00 |
$8.00 |
| 100 | 411(C)1400 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 280 | TON |
$180.00 |
$232.00 |
$250.00 |
$205.00 |
| 110 | 412 3100 |
COLD MILLING PAVEMENT | 1,787 | SY |
$10.00 |
$5.65 |
$9.00 |
$15.00 |
| 120 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 702 | SY |
$11.00 |
$5.75 |
$15.00 |
$20.00 |
| 130 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 830 | LF |
$7.00 |
$4.50 |
$5.00 |
$4.00 |
| 140 | 619(C)6600 |
SAWING PAVEMENT | 1,053 | LF |
$6.00 |
$4.50 |
$10.00 |
$5.00 |
| 150 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 600 | LF |
$30.00 |
$26.00 |
$30.00 |
$26.00 |
| 160 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$3,936.00 |
$3,000.00 |
$3,800.00 |
$3,000.00 |
| 170 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,447.00 |
$3,000.00 |
$3,800.00 |
$3,000.00 |
| 180 | 411(C)1400 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 53 | TON |
$180.00 |
$500.00 |
$220.00 |
$450.00 |
| 190 | 412 3100 |
COLD MILLING PAVEMENT | 471 | SY |
$10.00 |
$5.65 |
$9.00 |
$25.00 |
| 200 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 250 | CY |
$20.00 |
$13.56 |
$20.00 |
$45.00 |
| 210 | 202(D)2500 |
UNCLASSIFIED BORROW | 100 | CY |
$29.00 |
$16.95 |
$30.00 |
$75.00 |
| 220 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$3,955.00 |
$5,000.00 |
$5,000.00 |
| 230 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,059 | LF |
$5.00 |
$5.09 |
$4.00 |
$6.95 |
| 240 | 230(A)7200 |
SOLID SLAB SODDING | 1,000 | SY |
$7.00 |
$6.78 |
$6.00 |
$25.00 |
| 250 | 233(A)0200 |
VEGETATIVE MULCHING | 1 | AC |
$1,744.00 |
$4,713.50 |
$2,000.00 |
$5,950.00 |
| 260 | 303(A)1200 |
AGGREGATE BASE TYPE A | 199 | CY |
$95.00 |
$124.00 |
$65.00 |
$125.00 |
| 270 | 408 8100 |
PRIME COAT | 188 | GAL |
$9.00 |
$9.00 |
$10.00 |
$8.00 |
| 280 | 411(C)1400 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 273 | TON |
$180.00 |
$232.00 |
$250.00 |
$205.00 |
| 290 | 412 3100 |
COLD MILLING PAVEMENT | 1,721 | SY |
$10.00 |
$5.65 |
$9.00 |
$15.00 |
| 300 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 703 | SY |
$11.00 |
$5.75 |
$15.00 |
$20.00 |
| 310 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 330 | LF |
$7.00 |
$4.50 |
$5.00 |
$4.00 |
| 320 | 619(C)6600 |
SAWING PAVEMENT | 1,053 | LF |
$6.00 |
$4.00 |
$10.00 |
$5.00 |
| 330 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 600 | LF |
$30.00 |
$26.00 |
$30.00 |
$26.00 |
| 340 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$3,936.00 |
$3,000.00 |
$3,800.00 |
$3,000.00 |
| 350 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$3,447.00 |
$3,000.00 |
$3,800.00 |
$3,000.00 |
| 360 | 501(G)1800 |
CLSM BACKFILL | 2 | CY |
$460.00 |
$900.00 |
$400.00 |
$2,500.00 |
| 370 | 502(B)3320 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$80,000.00 |
$7,500.00 |
$65,000.00 |
$10,000.00 |
| 380 | 504(B)5300 |
SAW-CUT GROOVING | 28 | SY |
$11.00 |
$36.61 |
$35.00 |
$32.40 |
| 390 | 504(E)5500 |
CONCRETE PARAPET | 72 | LF |
$200.00 |
$286.77 |
$150.00 |
$400.00 |
| 400 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$2,700.00 |
$1,711.70 |
$2,700.00 |
$2,500.00 |
| 410 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 12 | EA |
$2,800.00 |
$1,711.70 |
$2,700.00 |
$2,500.00 |
| 420 | 509(A)0210 |
CLASS AA CONCRETE | 19.8 | CY |
$1,000.00 |
$1,667.25 |
$2,000.00 |
$6,000.00 |
| 430 | 511 2100 |
MECHANICAL SPLICES | 84 | EA |
$52.00 |
$30.00 |
$50.00 |
$45.00 |
| 440 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 3,860 | LB |
$3.00 |
$3.78 |
$2.00 |
$2.50 |
| 450 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 105 | SY |
$400.00 |
$400.00 |
$350.00 |
$250.00 |
| 460 | 513(C)4400 |
CLASS C BRIDGE DECK REPAIR | 10 | SY |
$530.00 |
$600.00 |
$650.00 |
$525.00 |
| 470 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 124 | SY |
$7.00 |
$6.00 |
$6.00 |
$15.00 |
| 480 | 517 9110 |
ELASTOMERIC COATING | 536 | SF |
$25.00 |
$19.90 |
$30.00 |
$18.00 |
| 490 | 518(B)0300 |
SEALED EXPANSION JOINTS | 70 | LF |
$361.00 |
$305.40 |
$400.00 |
$450.00 |
| 500 | 518(C)0400 |
RAPID CURE JOINT SEALANT | 68 | LF |
$30.00 |
$25.00 |
$50.00 |
$20.00 |
| 510 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 30 | LF |
$45.00 |
$40.00 |
$35.00 |
$30.00 |
| 520 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 2.4 | GAL |
$130.00 |
$130.00 |
$150.00 |
$80.00 |
| 530 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 63 | SY |
$906.00 |
$780.00 |
$1,000.00 |
$875.00 |
| 540 | 523(A)3200 |
SEALER CRACK PREPARATION | 144 | LF |
$7.00 |
$2.25 |
$5.00 |
$1.00 |
| 550 | 523(B)3300 |
SEALER RESIN | 2 | GAL |
$110.00 |
$30.00 |
$125.00 |
$25.00 |
| 560 | 523(C)3400 |
DECK AREA SEALED (FLOODCOATS) | 480 | SY |
$17.00 |
$14.21 |
$20.00 |
$20.00 |
| 570 | 524(A)4200 |
(SP) CARBON FIBER-REINFORCED POLYMER | 365 | SF |
$65.00 |
$34.90 |
$100.00 |
$45.00 |
| 580 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 63 | SY |
$45.00 |
$27.00 |
$60.00 |
$26.00 |
| 590 | 540 8120 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 16 | EA |
$3,000.00 |
$2,453.00 |
$2,500.00 |
$4,000.00 |
| 600 | 540 8136 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 8 | EA |
$1,000.00 |
$540.00 |
$2,500.00 |
$800.00 |
| 610 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$70,000.00 |
$24,184.77 |
$5,000.00 |
$20,000.00 |
| 620 | 501(G)1800 |
CLSM BACKFILL | 2 | CY |
$460.00 |
$1,000.00 |
$400.00 |
$2,500.00 |
| 630 | 502(B)3320 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$80,000.00 |
$9,500.00 |
$65,000.00 |
$25,000.00 |
| 640 | 504(B)5300 |
SAW-CUT GROOVING | 58 | SY |
$11.00 |
$19.21 |
$20.00 |
$17.00 |
| 650 | 504(E)5500 |
CONCRETE PARAPET | 24 | LF |
$200.00 |
$376.87 |
$150.00 |
$350.00 |
| 660 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 26 | EA |
$2,700.00 |
$1,738.01 |
$2,700.00 |
$2,800.00 |
| 670 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 26 | EA |
$2,800.00 |
$1,738.01 |
$2,700.00 |
$2,800.00 |
| 680 | 509(A)0210 |
CLASS AA CONCRETE | 36 | CY |
$1,000.00 |
$1,605.23 |
$2,000.00 |
$6,000.00 |
| 690 | 511 2100 |
MECHANICAL SPLICES | 132 | EA |
$52.00 |
$30.00 |
$50.00 |
$45.00 |
| 700 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 7,320 | LB |
$3.00 |
$3.27 |
$2.00 |
$2.50 |
| 710 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 120 | SY |
$400.00 |
$400.00 |
$350.00 |
$250.00 |
| 720 | 513(C)4400 |
CLASS C BRIDGE DECK REPAIR | 40 | SY |
$530.00 |
$600.00 |
$650.00 |
$525.00 |
| 730 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 324 | SY |
$7.00 |
$6.00 |
$6.00 |
$15.00 |
| 740 | 517 9110 |
ELASTOMERIC COATING | 1,562 | SF |
$25.00 |
$19.90 |
$30.00 |
$18.00 |
| 750 | 518(B)0300 |
SEALED EXPANSION JOINTS | 140.4 | LF |
$361.00 |
$305.40 |
$400.00 |
$450.00 |
| 760 | 518(C)0400 |
RAPID CURE JOINT SEALANT | 91.6 | LF |
$30.00 |
$25.00 |
$50.00 |
$20.00 |
| 770 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 60 | LF |
$45.00 |
$40.00 |
$35.00 |
$25.00 |
| 780 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 4.8 | GAL |
$130.00 |
$130.00 |
$150.00 |
$80.00 |
| 790 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 139 | SY |
$800.00 |
$760.00 |
$1,000.00 |
$875.00 |
| 800 | 523(A)3200 |
SEALER CRACK PREPARATION | 286.6 | LF |
$7.00 |
$2.25 |
$5.00 |
$1.00 |
| 810 | 523(B)3300 |
SEALER RESIN | 3.3 | GAL |
$110.00 |
$30.00 |
$125.00 |
$25.00 |
| 820 | 523(C)3400 |
DECK AREA SEALED (FLOODCOATS) | 1,760 | SY |
$17.00 |
$12.16 |
$20.00 |
$15.00 |
| 830 | 524(A)4200 |
(SP) CARBON FIBER-REINFORCED POLYMER | 345 | SF |
$65.00 |
$34.80 |
$100.00 |
$45.00 |
| 840 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 139 | SY |
$45.00 |
$27.00 |
$60.00 |
$25.00 |
| 850 | 540 8120 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 44 | EA |
$3,000.00 |
$2,515.00 |
$2,500.00 |
$3,000.00 |
| 860 | 540 8136 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 8 | EA |
$1,000.00 |
$790.00 |
$2,500.00 |
$800.00 |
| 870 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$90,000.00 |
$33,709.52 |
$5,000.00 |
$20,000.00 |
| 880 | 502(B)3320 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$80,000.00 |
$7,500.00 |
$65,000.00 |
$15,000.00 |
| 890 | 504(B)5300 |
SAW-CUT GROOVING | 28 | SY |
$11.00 |
$37.00 |
$40.00 |
$32.40 |
| 900 | 504(E)5500 |
CONCRETE PARAPET | 72 | LF |
$200.00 |
$286.77 |
$150.00 |
$400.00 |
| 910 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$2,700.00 |
$2,829.84 |
$2,700.00 |
$3,500.00 |
| 920 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 12 | EA |
$2,800.00 |
$2,829.84 |
$2,700.00 |
$3,500.00 |
| 930 | 509(A)0210 |
CLASS AA CONCRETE | 17.4 | CY |
$1,000.00 |
$1,667.25 |
$2,000.00 |
$6,000.00 |
| 940 | 511 2100 |
MECHANICAL SPLICES | 72 | EA |
$52.00 |
$30.00 |
$50.00 |
$45.00 |
| 950 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 3,780 | LB |
$3.00 |
$3.78 |
$2.00 |
$2.50 |
| 960 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 20 | SY |
$500.00 |
$450.00 |
$350.00 |
$275.00 |
| 970 | 513(C)4400 |
CLASS C BRIDGE DECK REPAIR | 15 | SY |
$530.00 |
$650.00 |
$650.00 |
$525.00 |
| 980 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 124 | SY |
$7.00 |
$6.00 |
$6.00 |
$15.00 |
| 990 | 517 9110 |
ELASTOMERIC COATING | 586 | SF |
$25.00 |
$19.90 |
$30.00 |
$18.00 |
| 1,000 | 518(B)0300 |
SEALED EXPANSION JOINTS | 68 | LF |
$361.00 |
$305.40 |
$400.00 |
$450.00 |
| 1,010 | 518(C)0400 |
RAPID CURE JOINT SEALANT | 66 | LF |
$30.00 |
$25.00 |
$50.00 |
$20.00 |
| 1,020 | 520(A)1200 |
PREPARATION OF CRACKS, ABOVE WATER | 40 | LF |
$45.00 |
$40.00 |
$35.00 |
$30.00 |
| 1,030 | 520(C)1400 |
EPOXY RESIN, ABOVE WATER | 3.2 | GAL |
$130.00 |
$130.00 |
$150.00 |
$80.00 |
| 1,040 | 521(A)2200 |
PNEUMATICALLY PLACED MORTAR | 44 | SY |
$906.00 |
$780.00 |
$1,000.00 |
$875.00 |
| 1,050 | 523(A)3200 |
SEALER CRACK PREPARATION | 140 | LF |
$7.00 |
$2.25 |
$5.00 |
$1.00 |
| 1,060 | 523(B)3300 |
SEALER RESIN | 1.7 | GAL |
$110.00 |
$30.00 |
$125.00 |
$25.00 |
| 1,070 | 523(C)3400 |
DECK AREA SEALED (FLOODCOATS) | 510 | SY |
$17.00 |
$14.21 |
$20.00 |
$20.00 |
| 1,080 | 524(A)4200 |
(SP) CARBON FIBER-REINFORCED POLYMER | 120 | SF |
$65.00 |
$34.80 |
$100.00 |
$55.00 |
| 1,090 | 535 7100 |
CORROSION INHIBITOR(SURFACE APPLIED) | 44 | SY |
$45.00 |
$27.00 |
$60.00 |
$30.00 |
| 1,100 | 540 8120 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 16 | EA |
$3,000.00 |
$2,453.00 |
$2,500.00 |
$3,000.00 |
| 1,110 | 540 8136 |
(PL)REPAIR BRIDGE ITEM (TYPE B) | 8 | EA |
$1,000.00 |
$540.00 |
$2,500.00 |
$800.00 |
| 1,120 | 619(B)6304 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$70,000.00 |
$24,184.77 |
$5,000.00 |
$20,000.00 |
| 1,130 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 360 | SD |
$155.00 |
$250.00 |
$250.00 |
$250.00 |
| 1,140 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 20,232 | LF |
$1.00 |
$0.5000 |
$0.6500 |
$0.5000 |
| 1,150 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 12,900 | LF |
$0.5000 |
$0.1000 |
$0.1500 |
$0.1000 |
| 1,160 | 858(A)0224 |
PAVE.MARKERS CLASS A TYPE 2-C | 532 | EA |
$11.00 |
$3.00 |
$4.00 |
$3.00 |
| 1,170 | 858(A)0228 |
PAVE.MARKERS CLASS A TYPE 2-D | 156 | EA |
$10.00 |
$3.00 |
$4.00 |
$3.00 |
| 1,180 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 840 | SD |
$15.00 |
$5.00 |
$5.00 |
$5.00 |
| 1,190 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,010 | LF |
$30.00 |
$35.00 |
$58.00 |
$35.00 |
| 1,200 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 5,050 | LF |
$5.00 |
$2.50 |
$6.00 |
$8.00 |
| 1,210 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,640 | SD |
$0.3000 |
$1.00 |
$1.00 |
$1.00 |
| 1,220 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,880 | SD |
$0.8000 |
$2.00 |
$2.00 |
$2.00 |
| 1,230 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 8,280 | SD |
$1.00 |
$2.00 |
$2.00 |
$2.00 |
| 1,240 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 720 | SD |
$2.00 |
$2.00 |
$2.00 |
$2.00 |
| 1,250 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 9,720 | SD |
$0.5000 |
$0.0500 |
$0.0500 |
$0.0500 |
| 1,260 | 880(E)6610 |
WARNING LIGHTS(TYPE C) | 3,240 | SD |
$0.1000 |
$0.0500 |
$0.0500 |
$0.0500 |
| 1,270 | 880(F)6700 |
DRUMS | 6,480 | SD |
$0.2000 |
$0.5000 |
$0.5000 |
$0.5000 |
| 1,280 | 880(I)7000 |
FLAGGER | 30 | SD |
$110.00 |
$5.00 |
$5.00 |
$25.00 |
| 1,290 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 804 | SD |
$17.00 |
$15.00 |
$15.00 |
$15.00 |
| 1,300 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 2,312 | LF |
$2.00 |
$1.00 |
$1.25 |
$1.00 |
| 1,310 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 8 | EA |
$365.00 |
$250.00 |
$300.00 |
$250.00 |
| 1,320 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 12 | SF |
$47.00 |
$25.00 |
$30.00 |
$25.00 |
| 1,330 | 851(C)2415 |
2" SQUARE TUBE POST | 44 | LF |
$13.00 |
$10.00 |
$13.00 |
$10.00 |
| 1,340 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 48 | EA |
$25.00 |
$15.00 |
$20.00 |
$15.00 |
| 1,350 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 19,800 | LF |
$1.00 |
$0.5500 |
$0.7000 |
$0.5500 |
| 1,360 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$10,000.00 |
$12,000.00 |
$5,000.00 |
| 1,370 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$145,600.00 |
$195,900.00 |
$146,000.00 |
$324,368.71 |