| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$13,068.64 |
$14,500.00 |
$25,000.00 |
$16,474.50 |
$12,500.00 |
$71,449.83 |
$15,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 2,240 | CY |
$15.00 |
$10.37 |
$18.50 |
$13.50 |
$16.80 |
$20.00 |
$14.42 |
$25.00 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 387 | CY |
$23.00 |
$27.97 |
$22.00 |
$30.75 |
$22.36 |
$24.50 |
$0.1000 |
$26.00 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$10,905.98 |
$12,500.00 |
$15,000.00 |
$15,332.63 |
$12,950.00 |
$6,531.19 |
$12,000.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 1,115 | LF |
$6.00 |
$4.65 |
$7.00 |
$2.40 |
$6.30 |
$4.30 |
$6.20 |
$3.00 |
| 60 | 221(E)2600 |
TEMPORARY SILT DIKE | 49 | LF |
$20.00 |
$24.16 |
$27.00 |
$14.85 |
$26.25 |
$22.00 |
$17.93 |
$17.00 |
| 70 | 230(A)7200 |
SOLID SLAB SODDING | 7,739 | SY |
$5.00 |
$3.68 |
$5.05 |
$3.35 |
$4.73 |
$3.66 |
$3.52 |
$4.00 |
| 80 | 232(B)9300 |
SEEDING METHOD B | 2 | AC |
$1,700.00 |
$1,690.86 |
$3,050.00 |
$4,605.00 |
$3,150.00 |
$1,400.00 |
$1,403.76 |
$5,000.00 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 2 | AC |
$1,655.00 |
$1,660.67 |
$3,050.00 |
$1,535.00 |
$3,150.00 |
$800.00 |
$1,378.70 |
$2,000.00 |
| 100 | 241 3100 |
MOWING | 3 | AC |
$500.00 |
$966.21 |
$450.00 |
$770.00 |
$1,050.00 |
$400.00 |
$802.15 |
$950.00 |
| 110 | 303(A)1200 |
AGGREGATE BASE TYPE A | 510 | CY |
$100.00 |
$75.91 |
$81.60 |
$75.00 |
$70.98 |
$80.00 |
$62.53 |
$75.00 |
| 120 | 307(K)4200 |
STABILIZED SUBGRADE | 4,842 | SY |
$12.00 |
$7.04 |
$13.96 |
$7.00 |
$12.60 |
$13.40 |
$7.63 |
$15.00 |
| 140 | 325 0100 |
SEPARATOR FABRIC | 2,554 | SY |
$3.10 |
$1.90 |
$2.82 |
$2.50 |
$1.64 |
$3.74 |
$1.54 |
$4.00 |
| 150 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 331 | TON |
$55.00 |
$36.29 |
$40.82 |
$38.50 |
$42.84 |
$42.75 |
$36.12 |
$42.00 |
| 160 | 407(B)7300 |
TACK COAT | 739 | GAL |
$5.00 |
$6.80 |
$5.97 |
$5.50 |
$3.15 |
$3.00 |
$6.20 |
$3.75 |
| 170 | 408 8100 |
PRIME COAT | 1,021 | GAL |
$8.00 |
$9.27 |
$7.82 |
$7.35 |
$6.30 |
$6.00 |
$8.45 |
$7.00 |
| 180 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,159 | TON |
$150.00 |
$166.43 |
$152.25 |
$141.50 |
$162.75 |
$160.00 |
$158.99 |
$170.00 |
| 190 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 326 | TON |
$175.00 |
$276.85 |
$247.56 |
$235.00 |
$189.00 |
$182.50 |
$264.48 |
$202.00 |
| 200 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 598 | SY |
$50.00 |
$23.16 |
$30.43 |
$35.75 |
$26.25 |
$28.00 |
$32.33 |
$35.00 |
| 210 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 1,296 | SY |
$50.00 |
$27.47 |
$36.44 |
$21.00 |
$36.75 |
$40.00 |
$38.74 |
$45.00 |
| 220 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 500 | CY |
$250.00 |
$236.73 |
$216.19 |
$245.00 |
$210.00 |
$225.00 |
$299.68 |
$250.00 |
| 230 | 613(B)5504 |
15" CORR. GALV. STEEL PIPE | 372 | LF |
$50.00 |
$46.26 |
$44.10 |
$52.25 |
$42.49 |
$48.00 |
$34.05 |
$60.00 |
| 240 | 613(L)6704 |
15" PREFAB. CULVERT END SEC., ROUND | 4 | EA |
$805.00 |
$893.31 |
$397.15 |
$500.00 |
$283.50 |
$355.00 |
$309.61 |
$400.00 |
| 250 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$5,888.28 |
$9,500.00 |
$5,500.00 |
$6,300.00 |
$7,500.00 |
$3,652.24 |
$7,000.00 |
| 260 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 655 | SY |
$16.60 |
$12.89 |
$12.76 |
$9.50 |
$19.43 |
$20.00 |
$8.19 |
$15.50 |
| 270 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 1,889 | SY |
$12.00 |
$8.24 |
$10.81 |
$6.95 |
$17.33 |
$10.00 |
$7.87 |
$12.00 |
| 280 | 619(B)6376 |
REMOVAL OF CONC.PAV.W/ASPH.OVERLAY | 724 | SY |
$25.00 |
$12.62 |
$13.20 |
$12.50 |
$20.48 |
$20.00 |
$16.01 |
$10.00 |
| 290 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 738 | LF |
$7.00 |
$7.13 |
$4.00 |
$4.50 |
$3.43 |
$3.30 |
$3.46 |
$6.50 |
| 300 | 619(B)6400 |
REMOVAL OF CURB | 86 | LF |
$15.00 |
$7.91 |
$24.00 |
$6.75 |
$6.30 |
$20.00 |
$3.23 |
$20.00 |
| 310 | 619(C)6600 |
SAWING PAVEMENT | 598 | LF |
$7.00 |
$7.53 |
$8.00 |
$6.00 |
$8.40 |
$6.00 |
$2.50 |
$8.00 |
| 320 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 638 | LF |
$30.00 |
$30.19 |
$29.00 |
$27.50 |
$29.76 |
$28.60 |
$29.99 |
$27.00 |
| 330 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 3 | EA |
$4,000.00 |
$2,717.46 |
$3,800.00 |
$3,450.00 |
$3,776.85 |
$3,630.00 |
$3,807.43 |
$4,100.00 |
| 340 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 3 | EA |
$3,500.00 |
$2,415.52 |
$3,800.00 |
$4,650.00 |
$3,776.85 |
$3,630.00 |
$3,807.43 |
$4,200.00 |
| 350 | 853 5170 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 14 | EA |
$30.00 |
$30.19 |
$28.50 |
$27.00 |
$28.61 |
$27.50 |
$28.84 |
$20.00 |
| 360 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$25.00 |
$14.13 |
$29.00 |
$32.50 |
$14.44 |
$16.75 |
$20.73 |
$25.00 |
| 370 | 501(G)1800 |
CLSM BACKFILL | 236 | CY |
$350.00 |
$190.59 |
$243.88 |
$195.00 |
$164.44 |
$220.00 |
$290.09 |
$400.00 |
| 380 | 503(A)4240 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,445 | LF |
$350.00 |
$372.20 |
$348.61 |
$425.00 |
$319.25 |
$362.50 |
$348.16 |
$375.00 |
| 390 | 504(A)5200 |
APPROACH SLAB | 273.4 | SY |
$350.00 |
$312.39 |
$335.41 |
$320.00 |
$255.50 |
$331.00 |
$345.32 |
$350.00 |
| 400 | 504(B)5300 |
SAW-CUT GROOVING | 1,484.8 | SY |
$6.00 |
$6.28 |
$5.80 |
$5.35 |
$5.46 |
$5.72 |
$6.00 |
$7.50 |
| 410 | 504(E)5520 |
42" F-SHAPED PARAPET | 703.3 | LF |
$155.00 |
$152.69 |
$141.88 |
$94.50 |
$108.93 |
$138.00 |
$108.17 |
$135.00 |
| 420 | 506(A)7200 |
STRUCTURAL STEEL | 1,530 | LB |
$8.00 |
$2.34 |
$4.70 |
$2.25 |
$2.79 |
$4.20 |
$5.08 |
$10.00 |
| 430 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$3,000.00 |
$2,609.29 |
$3,160.00 |
$3,500.00 |
$2,601.74 |
$2,600.00 |
$2,863.69 |
$3,000.00 |
| 440 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 20 | EA |
$3,000.00 |
$2,485.02 |
$2,990.00 |
$3,500.00 |
$2,565.05 |
$2,583.00 |
$2,842.18 |
$3,000.00 |
| 450 | 509(A)0210 |
CLASS AA CONCRETE | 336 | CY |
$1,000.00 |
$808.83 |
$853.50 |
$1,000.00 |
$866.36 |
$1,057.00 |
$981.48 |
$1,200.00 |
| 460 | 509(B)0320 |
CLASS A CONCRETE | 235.4 | CY |
$1,100.00 |
$806.42 |
$830.00 |
$950.00 |
$769.31 |
$1,046.50 |
$848.43 |
$1,400.00 |
| 470 | 509(D)0510 |
CLASS C CONCRETE | 6 | CY |
$800.00 |
$656.79 |
$1,250.00 |
$905.00 |
$675.55 |
$830.00 |
$1,082.45 |
$700.00 |
| 480 | 511(A)2210 |
REINFORCING STEEL | 510 | LB |
$1.75 |
$1.28 |
$3.00 |
$1.55 |
$3.02 |
$1.82 |
$1.95 |
$3.00 |
| 490 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 144,000 | LB |
$2.00 |
$1.51 |
$1.47 |
$1.70 |
$1.45 |
$1.65 |
$1.69 |
$2.75 |
| 500 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 236 | LF |
$50.00 |
$46.16 |
$47.29 |
$65.00 |
$64.72 |
$55.20 |
$47.25 |
$60.00 |
| 510 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 1,221 | LF |
$55.00 |
$58.62 |
$55.86 |
$75.00 |
$68.61 |
$60.00 |
$57.98 |
$65.00 |
| 520 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 236 | LF |
$25.00 |
$40.37 |
$25.00 |
$8.25 |
$15.60 |
$13.80 |
$53.71 |
$50.00 |
| 530 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 1,221 | LF |
$25.00 |
$29.14 |
$24.00 |
$12.00 |
$10.31 |
$15.00 |
$55.87 |
$50.00 |
| 540 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 550 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,351 | SY |
$6.00 |
$6.64 |
$6.10 |
$5.65 |
$5.78 |
$6.05 |
$6.35 |
$5.00 |
| 560 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 248 | LF |
$1,300.00 |
$1,027.48 |
$1,129.45 |
$1,100.00 |
$1,442.63 |
$1,109.00 |
$1,151.39 |
$850.00 |
| 570 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,000.00 |
$2,294.74 |
$3,750.00 |
$5,000.00 |
$3,329.45 |
$3,500.00 |
$2,192.15 |
$2,500.00 |
| 580 | 517 9110 |
ELASTOMERIC COATING | 1,110 | SF |
$30.00 |
$19.32 |
$23.00 |
$18.50 |
$11.53 |
$17.60 |
$18.46 |
$30.00 |
| 590 | 518(B)0300 |
SEALED EXPANSION JOINTS | 41 | LF |
$450.00 |
$307.58 |
$298.12 |
$275.00 |
$229.99 |
$355.00 |
$271.92 |
$400.00 |
| 600 | 523(A)3200 |
SEALER CRACK PREPARATION | 38 | LF |
$5.00 |
$9.66 |
$9.00 |
$8.25 |
$8.40 |
$8.80 |
$9.23 |
$5.00 |
| 610 | 523(B)3300 |
SEALER RESIN | 0.5 | GAL |
$150.00 |
$265.70 |
$325.00 |
$225.10 |
$231.00 |
$242.00 |
$253.83 |
$150.00 |
| 620 | 601(B)1230 |
TYPE I-A PLAIN RIPRAP | 1,380 | TON |
$75.00 |
$63.97 |
$64.60 |
$67.50 |
$59.37 |
$68.13 |
$62.99 |
$100.00 |
| 630 | 601(C)1310 |
TYPE I-A FILTER BLANKET | 260 | TON |
$65.00 |
$46.23 |
$52.00 |
$42.50 |
$39.49 |
$46.00 |
$63.82 |
$100.00 |
| 640 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 82 | LF |
$40.00 |
$23.24 |
$35.00 |
$30.25 |
$22.01 |
$52.00 |
$37.84 |
$30.00 |
| 650 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 44 | LF |
$40.00 |
$24.39 |
$30.00 |
$30.00 |
$50.91 |
$54.00 |
$34.39 |
$50.00 |
| 660 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$150,000.00 |
$105,400.16 |
$120,000.00 |
$80,000.00 |
$305,311.28 |
$150,000.00 |
$147,649.09 |
$25,000.00 |
| 670 | 623 1100 |
(PL)GUARDRAIL CURBING | 1 | EA |
$2,000.00 |
$2,083.63 |
$4,150.00 |
$1,250.00 |
$1,878.99 |
$3,200.00 |
$1,217.70 |
$1,000.00 |
| 680 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 5,000 | LF |
$0.6000 |
$0.5700 |
$0.7200 |
$0.6700 |
$0.7500 |
$0.7200 |
$0.7500 |
$0.7500 |
| 690 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 2,300 | LF |
$0.9000 |
$0.7900 |
$0.4300 |
$0.4100 |
$0.4600 |
$0.4400 |
$0.4600 |
$1.80 |
| 700 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 360 | SD |
$18.00 |
$14.49 |
$5.60 |
$5.15 |
$5.72 |
$5.50 |
$5.77 |
$10.00 |
| 710 | 876(A)3210 |
(PL)TRUCK MOUNTED ATTENUATOR | 20 | SD |
$40.00 |
$36.23 |
$54.00 |
$51.25 |
$57.23 |
$55.00 |
$57.69 |
$100.00 |
| 720 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,300 | LF |
$30.00 |
$30.19 |
$29.00 |
$17.50 |
$18.53 |
$25.00 |
$21.06 |
$23.00 |
| 730 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 1,300 | LF |
$7.00 |
$7.25 |
$7.00 |
$1.50 |
$4.49 |
$6.25 |
$9.07 |
$2.50 |
| 740 | 878(B)5300 |
MODULAR GLARE SCREEN (TEMPORARY) | 23,400 | SD |
$0.2500 |
$0.5400 |
$0.2400 |
$0.2500 |
$0.2300 |
$0.2200 |
$0.2300 |
$0.0100 |
| 750 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 420 | SD |
$6.00 |
$9.66 |
$1.09 |
$1.05 |
$1.14 |
$1.10 |
$1.15 |
$1.00 |
| 760 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,050 | SD |
$0.5000 |
$0.3000 |
$0.0700 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.0200 |
| 770 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 4,070 | SD |
$1.00 |
$0.4800 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.0200 |
| 780 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 3,310 | SD |
$1.50 |
$1.81 |
$5.10 |
$4.90 |
$5.44 |
$9.50 |
$5.48 |
$6.50 |
| 790 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 4,320 | SD |
$1.00 |
$0.9100 |
$0.0800 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.0200 |
| 800 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 6,250 | SD |
$0.5000 |
$0.1800 |
$0.5400 |
$0.5500 |
$0.5800 |
$0.5500 |
$0.5800 |
$2.70 |
| 810 | 880(F)6700 |
DRUMS | 20,480 | SD |
$0.2500 |
$0.2400 |
$0.0600 |
$0.0500 |
$0.0500 |
$0.0600 |
$0.0600 |
$0.0200 |
| 820 | 880(G)6805 |
CHANNELIZER CONES | 4,180 | SD |
$0.6500 |
$1.21 |
$0.2800 |
$0.3000 |
$0.2800 |
$0.2800 |
$0.2900 |
$0.0200 |
| 830 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 550 | SD |
$25.00 |
$15.70 |
$5.70 |
$5.15 |
$5.72 |
$5.50 |
$5.77 |
$8.00 |
| 840 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 8 | EA |
$350.00 |
$150.97 |
$380.00 |
$500.00 |
$400.58 |
$385.00 |
$403.82 |
$300.00 |
| 850 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 21 | SF |
$50.00 |
$79.71 |
$49.00 |
$47.50 |
$51.50 |
$49.50 |
$51.92 |
$85.00 |
| 860 | 851(C)2415 |
2" SQUARE TUBE POST | 28 | LF |
$15.00 |
$12.38 |
$11.00 |
$10.25 |
$11.45 |
$11.00 |
$11.54 |
$12.00 |
| 870 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 4,250 | LF |
$2.25 |
$1.49 |
$1.60 |
$1.55 |
$1.72 |
$1.65 |
$1.73 |
$4.00 |
| 880 | 856(A)8211 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(8" WIDE) | 200 | LF |
$1.75 |
$3.62 |
$3.27 |
$3.10 |
$3.43 |
$3.30 |
$3.46 |
$5.00 |
| 890 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 100 | LF |
$17.50 |
$20.53 |
$12.00 |
$10.25 |
$11.45 |
$11.00 |
$11.54 |
$28.00 |
| 900 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$12,135.32 |
$12,600.00 |
$11,500.00 |
$11,025.00 |
$13,500.00 |
$24,950.79 |
$15,000.00 |
| 910 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$3,623.27 |
$4,000.00 |
$9,500.00 |
$2,625.00 |
$7,000.00 |
$4,615.07 |
$3,500.00 |
| 920 | 641 2100 |
MOBILIZATION | 1 | LSUM |
$208,000.00 |
$158,087.47 |
$190,000.00 |
$200,000.00 |
$239,504.64 |
$190,000.00 |
$194,374.38 |
$235,000.00 |