| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$10,000.00 |
$48,000.00 |
$640,000.00 |
$40,000.00 |
$75,000.00 |
$30,700.00 |
$103,000.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 21,236 | CY |
$13.00 |
$6.00 |
$13.84 |
$10.78 |
$12.00 |
$20.00 |
$10.70 |
$12.15 |
| 30 | 202(D)2500 |
UNCLASSIFIED BORROW | 1,000 | CY |
$22.00 |
$15.00 |
$4.00 |
$23.47 |
$23.00 |
$13.00 |
$23.00 |
$19.75 |
| 40 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$50,000.00 |
$10,000.00 |
$34,000.00 |
$41,361.47 |
$50,000.00 |
$75,000.00 |
$30,584.00 |
$25,500.00 |
| 50 | 221(B)2300 |
TEMPORARY SILT FENCE | 4,760 | LF |
$4.00 |
$3.25 |
$3.25 |
$3.27 |
$4.58 |
$2.80 |
$2.75 |
$7.40 |
| 60 | 221(C)2400 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$450.00 |
$500.00 |
$847.00 |
$475.85 |
$1,049.03 |
$1,000.00 |
$400.00 |
$1,600.00 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 112 | LF |
$21.00 |
$10.00 |
$24.00 |
$9.52 |
$19.01 |
$18.00 |
$8.00 |
$26.00 |
| 80 | 230(A)7200 |
SOLID SLAB SODDING | 32,676 | SY |
$4.00 |
$3.35 |
$3.81 |
$3.39 |
$7.30 |
$2.95 |
$2.85 |
$7.75 |
| 90 | 233(A)0200 |
VEGETATIVE MULCHING | 7 | AC |
$1,600.00 |
$1,100.00 |
$1,850.00 |
$1,070.66 |
$4,148.18 |
$905.00 |
$900.00 |
$4,415.00 |
| 100 | 241 3100 |
MOWING | 14 | AC |
$435.00 |
$500.00 |
$270.00 |
$475.85 |
$4,148.18 |
$405.00 |
$400.00 |
$3,850.00 |
| 110 | 242 4101 |
STABILIZED CONSTRUCTION EXIT | 2 | EA |
$6,000.00 |
$4,000.00 |
$4,000.00 |
$6,251.53 |
$6,300.00 |
$6,500.00 |
$5,900.00 |
$6,620.00 |
| 120 | 303(A)1200 |
AGGREGATE BASE TYPE A | 10,812 | CY |
$80.00 |
$50.00 |
$76.00 |
$64.15 |
$75.00 |
$72.25 |
$68.00 |
$82.75 |
| 130 | 326(C)1100 |
(SP) WOVEN GEOSYNTHETIC REINFORCEMENT FABRIC | 33,026 | SY |
$5.00 |
$4.00 |
$6.28 |
$3.57 |
$6.00 |
$3.55 |
$5.78 |
$8.00 |
| 140 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 5,614 | TON |
$45.00 |
$40.00 |
$39.09 |
$33.66 |
$45.00 |
$31.50 |
$41.00 |
$46.75 |
| 150 | 407(B)7300 |
TACK COAT | 1,654 | GAL |
$5.00 |
$5.00 |
$4.40 |
$4.55 |
$3.73 |
$4.10 |
$4.00 |
$4.00 |
| 160 | 408 8100 |
PRIME COAT | 6,079 | GAL |
$5.50 |
$5.00 |
$4.95 |
$5.86 |
$4.90 |
$5.00 |
$4.60 |
$6.75 |
| 170 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,952 | TON |
$135.00 |
$112.00 |
$142.24 |
$143.94 |
$128.87 |
$110.00 |
$102.45 |
$136.25 |
| 175 | 411(C)1400 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 600 | TON |
$250.00 |
$215.00 |
$210.82 |
$187.96 |
$168.27 |
$210.00 |
$195.20 |
$177.80 |
| 180 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 84 | TON |
$250.00 |
$300.00 |
$313.00 |
$285.51 |
$255.60 |
$300.00 |
$284.65 |
$270.00 |
| 185 | 412 3100 |
COLD MILLING PAVEMENT | 423 | SY |
$6.00 |
$50.00 |
$44.08 |
$27.09 |
$34.08 |
$50.00 |
$39.88 |
$43.50 |
| 190 | 414(A)5200 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 8,678 | SY |
$30.00 |
$20.00 |
$30.46 |
$21.76 |
$28.00 |
$17.75 |
$46.00 |
$32.00 |
| 200 | 414(B)5300 |
DOWEL JOINTED P.C.C.PAVT.(PLACEMENT) | 23,728 | SY |
$28.00 |
$25.00 |
$40.51 |
$26.49 |
$38.00 |
$22.50 |
$50.00 |
$43.10 |
| 210 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 9,261 | CY |
$250.00 |
$260.00 |
$304.56 |
$272.78 |
$236.00 |
$310.00 |
$400.00 |
$328.00 |
| 220 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 16 | CY |
$50.00 |
$25.00 |
$56.00 |
$21.51 |
$33.55 |
$50.00 |
$60.00 |
$36.00 |
| 230 | 509(A)0200 |
CLASS AA CONCRETE | 17.7 | CY |
$1,200.00 |
$1,000.00 |
$745.00 |
$1,539.69 |
$846.68 |
$850.00 |
$1,500.00 |
$910.00 |
| 240 | 509(D)0500 |
CLASS C CONCRETE | 10 | CY |
$600.00 |
$700.00 |
$360.00 |
$786.70 |
$727.61 |
$950.00 |
$750.00 |
$782.00 |
| 250 | 511(A)2200 |
REINFORCING STEEL | 2,930 | LB |
$2.15 |
$2.00 |
$2.34 |
$1.32 |
$1.55 |
$4.50 |
$2.00 |
$1.65 |
| 260 | 609(A)4270 |
CONC.CURB(8" BARRIER-INTEGRAL) | 2,217 | LF |
$15.00 |
$32.00 |
$18.00 |
$8.73 |
$15.98 |
$20.50 |
$25.00 |
$27.00 |
| 270 | 610(C)5400 |
4" CONCRETE DIVIDING STRIP | 7,261 | SY |
$79.00 |
$70.00 |
$74.39 |
$44.34 |
$55.91 |
$60.00 |
$60.00 |
$62.50 |
| 280 | 611(G)0354 |
INLET (SMD-TYPE 2) | 2 | EA |
$5,300.00 |
$3,500.00 |
$6,493.00 |
$6,325.23 |
$5,846.27 |
$5,000.00 |
$6,000.00 |
$4,060.00 |
| 290 | 611(G)0362 |
INLET (SMD-TYPE 2B) | 1 | EA |
$6,500.00 |
$4,000.00 |
$7,343.00 |
$6,900.22 |
$6,290.50 |
$5,000.00 |
$6,500.00 |
$8,545.00 |
| 300 | 611(G)7754 |
INLET CI DES. 2 (STD) | 1 | EA |
$7,500.00 |
$5,200.00 |
$7,999.00 |
$8,472.74 |
$6,809.63 |
$7,000.00 |
$8,000.00 |
$6,045.00 |
| 310 | 611(H)0400 |
ADDITIONAL DEPTH IN INLET | 8.02 | VF |
$270.00 |
$600.00 |
$716.42 |
$659.52 |
$519.28 |
$475.00 |
$783.45 |
$860.00 |
| 320 | 613(A)5208 |
18" R.C.PIPE CLASS III | 90 | LF |
$115.00 |
$100.00 |
$74.28 |
$83.71 |
$91.06 |
$125.00 |
$85.50 |
$71.50 |
| 330 | 613(A)5216 |
24" R.C.PIPE CLASS III | 132 | LF |
$125.00 |
$100.00 |
$111.64 |
$86.51 |
$125.67 |
$100.00 |
$118.00 |
$87.50 |
| 340 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 100 | LF |
$65.00 |
$100.00 |
$46.00 |
$61.40 |
$72.42 |
$50.00 |
$68.00 |
$62.00 |
| 350 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 1 | EA |
$1,000.00 |
$1,500.00 |
$2,400.00 |
$1,746.80 |
$2,236.50 |
$2,500.00 |
$2,100.00 |
$1,700.00 |
| 360 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$1,800.00 |
$1,500.00 |
$2,600.00 |
$1,797.18 |
$2,438.85 |
$2,500.00 |
$2,290.00 |
$1,725.00 |
| 370 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$44,000.00 |
$8,144.64 |
$40,000.00 |
$50,000.00 |
$19,600.00 |
$8,650.00 |
| 380 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 10,244.68 | SY |
$15.00 |
$10.00 |
$10.86 |
$13.09 |
$15.00 |
$11.00 |
$9.70 |
$13.25 |
| 390 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 4,335 | SY |
$9.50 |
$15.00 |
$9.10 |
$10.39 |
$10.00 |
$12.50 |
$7.60 |
$16.00 |
| 400 | 619(B)6376 |
REMOVAL OF CONC.PAV.W/ASPH.OVERLAY | 10,943 | SY |
$18.00 |
$10.00 |
$11.55 |
$13.09 |
$15.00 |
$14.00 |
$10.20 |
$17.75 |
| 410 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 1,696 | LF |
$7.00 |
$10.00 |
$5.00 |
$5.65 |
$5.06 |
$7.50 |
$4.95 |
$5.50 |
| 420 | 619(B)6400 |
REMOVAL OF CURB | 4,074 | LF |
$9.00 |
$5.00 |
$6.37 |
$6.30 |
$6.23 |
$10.00 |
$5.85 |
$7.00 |
| 430 | 619(B)6460 |
REMOVAL OF 4" CONCRETE DIVIDING STRIP | 609 | SY |
$12.00 |
$5.00 |
$8.00 |
$6.27 |
$10.00 |
$15.00 |
$6.50 |
$11.45 |
| 440 | 619(C)6600 |
SAWING PAVEMENT | 748 | LF |
$6.50 |
$15.00 |
$7.00 |
$9.64 |
$9.05 |
$30.00 |
$8.50 |
$4.50 |
| 450 | 623 1100 |
(PL)GUARDRAIL CURBING | 8 | EA |
$1,725.00 |
$750.00 |
$1,385.42 |
$2,803.66 |
$1,065.00 |
$1,750.00 |
$1,500.00 |
$2,220.00 |
| 460 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,687.5 | LF |
$35.00 |
$31.00 |
$28.25 |
$31.23 |
$27.96 |
$28.00 |
$26.25 |
$29.36 |
| 470 | 623(F)1764 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,800.00 |
$1,500.00 |
$3,250.00 |
$1,189.63 |
$1,065.00 |
$1,100.00 |
$1,000.00 |
$1,120.00 |
| 480 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 6 | EA |
$4,600.00 |
$4,600.00 |
$4,300.00 |
$3,568.88 |
$3,195.00 |
$3,250.00 |
$3,000.00 |
$3,355.00 |
| 490 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$4,000.00 |
$5,000.00 |
$4,275.00 |
$3,420.17 |
$3,061.88 |
$3,250.00 |
$2,875.00 |
$3,215.00 |
| 500 | 624(E)3625 |
FENCE-STYLE CLF (6'HIGH, CLASS B) | 720 | LF |
$60.00 |
$50.00 |
$51.00 |
$53.53 |
$47.93 |
$50.00 |
$60.00 |
$50.00 |
| 505 | 642 3100 |
GPS SURVEY EQUIPMENT | 1 | LSUM |
$45,000.00 |
$65,000.00 |
$49,500.00 |
$104,096.93 |
$40,000.00 |
$65,000.00 |
$77,000.00 |
$107,000.00 |
| 510 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$30.00 |
$25.00 |
$32.00 |
$39.05 |
$30.00 |
$45.00 |
$12.00 |
$51.00 |
| 520 | 501(G)1800 |
CLSM BACKFILL | 180 | CY |
$260.00 |
$275.00 |
$280.77 |
$229.51 |
$288.00 |
$310.00 |
$250.00 |
$236.00 |
| 530 | 504(A)5200 |
APPROACH SLAB | 307.8 | SY |
$310.00 |
$320.00 |
$332.42 |
$305.93 |
$325.00 |
$350.00 |
$375.00 |
$283.00 |
| 540 | 504(B)5300 |
SAW-CUT GROOVING | 1,194.4 | SY |
$7.00 |
$8.00 |
$5.70 |
$5.71 |
$5.11 |
$5.10 |
$4.80 |
$5.50 |
| 550 | 504(E)5520 |
42" F-SHAPED PARAPET | 861 | LF |
$150.00 |
$110.00 |
$232.20 |
$101.18 |
$170.00 |
$135.00 |
$170.00 |
$147.00 |
| 560 | 506(A)7200 |
STRUCTURAL STEEL | 210,110 | LB |
$3.00 |
$2.30 |
$3.09 |
$2.62 |
$3.10 |
$3.25 |
$3.50 |
$4.80 |
| 570 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 5 | EA |
$3,000.00 |
$2,500.00 |
$2,640.37 |
$2,354.10 |
$3,600.00 |
$4,500.00 |
$3,125.00 |
$3,220.00 |
| 580 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 20 | EA |
$3,000.00 |
$2,500.00 |
$2,306.84 |
$2,003.21 |
$3,600.00 |
$4,250.00 |
$2,750.00 |
$2,955.00 |
| 590 | 509(A)0210 |
CLASS AA CONCRETE | 261.6 | CY |
$1,100.00 |
$1,100.00 |
$1,022.93 |
$1,096.14 |
$1,200.00 |
$1,225.00 |
$1,200.00 |
$1,299.00 |
| 600 | 509(B)0320 |
CLASS A CONCRETE | 204.7 | CY |
$1,000.00 |
$1,200.00 |
$1,096.03 |
$1,075.86 |
$1,200.00 |
$1,250.00 |
$1,100.00 |
$1,686.00 |
| 610 | 509(D)0510 |
CLASS C CONCRETE | 5 | CY |
$900.00 |
$700.00 |
$960.00 |
$841.68 |
$1,900.00 |
$1,350.00 |
$1,300.00 |
$1,510.00 |
| 620 | 510(C)1450 |
SLOPE WALL (5") | 1,157 | SY |
$150.00 |
$120.00 |
$143.70 |
$140.88 |
$214.00 |
$155.00 |
$175.00 |
$148.20 |
| 630 | 511(A)2210 |
REINFORCING STEEL | 1,420 | LB |
$1.85 |
$3.00 |
$2.96 |
$1.34 |
$2.00 |
$2.00 |
$2.00 |
$1.65 |
| 640 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 135,280 | LB |
$1.85 |
$1.50 |
$1.58 |
$1.57 |
$2.00 |
$2.00 |
$2.40 |
$1.67 |
| 650 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 210 | SY |
$350.00 |
$350.00 |
$270.00 |
$109.98 |
$362.10 |
$375.00 |
$350.00 |
$350.00 |
| 660 | 513(C)4400 |
CLASS C BRIDGE DECK REPAIR | 40 | SY |
$650.00 |
$650.00 |
$430.00 |
$324.69 |
$639.00 |
$675.00 |
$650.00 |
$1,015.00 |
| 670 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 166 | LF |
$65.00 |
$55.00 |
$56.55 |
$58.80 |
$58.00 |
$85.00 |
$50.00 |
$60.00 |
| 680 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 543 | LF |
$60.00 |
$69.00 |
$60.17 |
$78.78 |
$68.00 |
$100.00 |
$59.00 |
$70.00 |
| 690 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 166 | LF |
$25.00 |
$50.00 |
$28.00 |
$51.09 |
$20.00 |
$16.00 |
$21.00 |
$164.00 |
| 700 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 543 | LF |
$25.00 |
$50.00 |
$31.00 |
$48.04 |
$20.00 |
$16.00 |
$25.20 |
$62.00 |
| 710 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 720 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 628 | SY |
$7.00 |
$5.00 |
$6.70 |
$6.54 |
$5.86 |
$5.80 |
$5.50 |
$6.10 |
| 730 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 180 | LF |
$1,250.00 |
$900.00 |
$1,514.69 |
$1,123.83 |
$1,200.00 |
$1,500.00 |
$1,500.00 |
$1,035.00 |
| 740 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,500.00 |
$2,500.00 |
$3,400.00 |
$5,353.31 |
$2,023.50 |
$2,500.00 |
$1,900.00 |
$2,295.00 |
| 750 | 517 9110 |
ELASTOMERIC COATING | 1,092 | SF |
$25.00 |
$25.00 |
$26.00 |
$21.18 |
$18.64 |
$25.00 |
$20.00 |
$19.75 |
| 760 | 518(B)0300 |
SEALED EXPANSION JOINTS | 79.5 | LF |
$450.00 |
$300.00 |
$302.84 |
$286.31 |
$250.00 |
$350.00 |
$300.00 |
$325.00 |
| 770 | 523(A)3200 |
SEALER CRACK PREPARATION | 251 | LF |
$6.00 |
$4.00 |
$8.00 |
$5.95 |
$5.33 |
$5.25 |
$5.00 |
$5.60 |
| 780 | 523(B)3300 |
SEALER RESIN | 2.8 | GAL |
$100.00 |
$125.00 |
$235.00 |
$214.13 |
$191.70 |
$190.00 |
$180.00 |
$200.00 |
| 790 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 216 | LF |
$40.00 |
$25.00 |
$35.00 |
$11.40 |
$37.00 |
$37.97 |
$40.00 |
$76.50 |
| 800 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 221 | LF |
$35.00 |
$25.00 |
$30.00 |
$15.58 |
$52.00 |
$26.26 |
$30.00 |
$50.00 |
| 810 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$150,000.00 |
$180,000.00 |
$210,000.00 |
$127,577.03 |
$200,000.00 |
$300,000.00 |
$165,000.00 |
$288,000.00 |
| 820 | 624(E)3610 |
FENCE-STYLE CLF (5'HIGH, CLASS A) | 206 | LF |
$60.00 |
$45.00 |
$42.00 |
$41.64 |
$37.28 |
$40.00 |
$60.00 |
$46.25 |
| 830 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 230 | CY |
$30.00 |
$25.00 |
$26.00 |
$31.55 |
$30.00 |
$45.00 |
$12.00 |
$40.25 |
| 840 | 501(G)1800 |
CLSM BACKFILL | 320 | CY |
$240.00 |
$275.00 |
$286.79 |
$233.79 |
$288.00 |
$310.00 |
$250.00 |
$253.00 |
| 850 | 504(A)5200 |
APPROACH SLAB | 413.4 | SY |
$300.00 |
$320.00 |
$361.39 |
$293.32 |
$325.00 |
$335.00 |
$375.00 |
$280.00 |
| 860 | 504(B)5300 |
SAW-CUT GROOVING | 1,585.4 | SY |
$7.00 |
$8.00 |
$5.40 |
$5.71 |
$5.11 |
$5.10 |
$4.80 |
$5.50 |
| 870 | 504(E)5520 |
42" F-SHAPED PARAPET | 631.4 | LF |
$150.00 |
$110.00 |
$163.90 |
$97.06 |
$190.00 |
$105.00 |
$170.00 |
$147.00 |
| 880 | 506(A)7200 |
STRUCTURAL STEEL | 452,150 | LB |
$3.00 |
$2.30 |
$2.94 |
$2.53 |
$3.10 |
$3.25 |
$3.50 |
$3.62 |
| 890 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$3,000.00 |
$2,500.00 |
$2,705.50 |
$2,353.03 |
$3,600.00 |
$4,500.00 |
$3,215.00 |
$3,220.00 |
| 900 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 12 | EA |
$3,000.00 |
$2,500.00 |
$2,675.05 |
$2,409.48 |
$3,600.00 |
$4,250.00 |
$2,750.00 |
$2,955.00 |
| 910 | 509(A)0210 |
CLASS AA CONCRETE | 333 | CY |
$1,100.00 |
$1,100.00 |
$950.10 |
$1,021.57 |
$1,200.00 |
$1,225.00 |
$1,200.00 |
$1,106.00 |
| 920 | 509(B)0320 |
CLASS A CONCRETE | 188.7 | CY |
$1,000.00 |
$1,200.00 |
$939.98 |
$968.22 |
$1,200.00 |
$1,250.00 |
$1,100.00 |
$1,590.00 |
| 930 | 509(D)0510 |
CLASS C CONCRETE | 4.9 | CY |
$900.00 |
$700.00 |
$940.00 |
$847.83 |
$1,900.00 |
$1,350.00 |
$1,300.00 |
$1,510.00 |
| 940 | 510(C)1450 |
SLOPE WALL (5") | 1,231 | SY |
$150.00 |
$120.00 |
$141.60 |
$128.50 |
$214.00 |
$155.00 |
$175.00 |
$148.20 |
| 950 | 511(A)2210 |
REINFORCING STEEL | 580 | LB |
$1.85 |
$2.00 |
$3.27 |
$1.34 |
$2.00 |
$2.00 |
$2.00 |
$1.95 |
| 960 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 140,160 | LB |
$1.85 |
$1.75 |
$1.54 |
$1.54 |
$2.00 |
$2.00 |
$2.40 |
$1.67 |
| 970 | 513(B)4300 |
CLASS B BRIDGE DECK REPAIR | 215 | SY |
$350.00 |
$350.00 |
$270.00 |
$109.87 |
$362.10 |
$375.00 |
$350.00 |
$350.00 |
| 980 | 513(C)4400 |
CLASS C BRIDGE DECK REPAIR | 45 | SY |
$650.00 |
$650.00 |
$430.00 |
$302.09 |
$639.00 |
$635.00 |
$650.00 |
$1,015.00 |
| 990 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 190 | LF |
$60.00 |
$55.00 |
$55.40 |
$65.18 |
$58.00 |
$85.00 |
$46.00 |
$60.00 |
| 1,000 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 968 | LF |
$60.00 |
$69.00 |
$62.02 |
$75.86 |
$68.00 |
$100.00 |
$58.00 |
$70.00 |
| 1,010 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 190 | LF |
$25.00 |
$50.00 |
$25.00 |
$53.56 |
$20.00 |
$18.00 |
$19.00 |
$133.75 |
| 1,020 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 968 | LF |
$25.00 |
$50.00 |
$31.00 |
$36.57 |
$20.00 |
$16.00 |
$25.00 |
$51.00 |
| 1,030 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 1,040 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 435 | SY |
$7.00 |
$6.00 |
$6.05 |
$6.54 |
$5.86 |
$5.80 |
$5.50 |
$6.10 |
| 1,050 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 96 | LF |
$1,250.00 |
$900.00 |
$1,490.24 |
$1,181.98 |
$1,300.00 |
$1,500.00 |
$1,300.00 |
$1,104.00 |
| 1,060 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,500.00 |
$2,500.00 |
$3,500.00 |
$5,353.31 |
$2,023.50 |
$2,500.00 |
$1,900.00 |
$2,295.00 |
| 1,070 | 517 9110 |
ELASTOMERIC COATING | 1,017 | SF |
$25.00 |
$25.00 |
$24.00 |
$21.18 |
$18.64 |
$25.00 |
$20.00 |
$19.75 |
| 1,080 | 518(B)0300 |
SEALED EXPANSION JOINTS | 52 | LF |
$450.00 |
$300.00 |
$301.15 |
$286.31 |
$250.00 |
$350.00 |
$300.00 |
$325.00 |
| 1,090 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 262 | LF |
$40.00 |
$25.00 |
$35.00 |
$23.15 |
$37.00 |
$32.00 |
$40.00 |
$76.50 |
| 1,100 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 241 | LF |
$35.00 |
$25.00 |
$30.00 |
$24.47 |
$52.00 |
$28.00 |
$30.00 |
$50.00 |
| 1,110 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$150,000.00 |
$10,000.00 |
$223,500.00 |
$89,003.56 |
$250,000.00 |
$180,000.00 |
$95,000.00 |
$274,300.00 |
| 1,120 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$30.00 |
$25.00 |
$30.00 |
$32.71 |
$30.00 |
$45.00 |
$12.00 |
$42.00 |
| 1,130 | 501(G)1800 |
CLSM BACKFILL | 263 | CY |
$250.00 |
$275.00 |
$281.00 |
$233.79 |
$288.00 |
$310.00 |
$250.00 |
$258.00 |
| 1,140 | 504(A)5200 |
APPROACH SLAB | 412.2 | SY |
$300.00 |
$320.00 |
$360.51 |
$291.97 |
$325.00 |
$350.00 |
$375.00 |
$255.00 |
| 1,150 | 504(B)5300 |
SAW-CUT GROOVING | 1,601 | SY |
$7.00 |
$8.00 |
$5.38 |
$5.71 |
$5.11 |
$5.10 |
$4.80 |
$5.50 |
| 1,160 | 504(E)5520 |
42" F-SHAPED PARAPET | 862.4 | LF |
$150.00 |
$110.00 |
$231.51 |
$101.24 |
$170.00 |
$130.00 |
$170.00 |
$147.00 |
| 1,170 | 506(A)7200 |
STRUCTURAL STEEL | 292,950 | LB |
$3.00 |
$2.30 |
$2.92 |
$2.68 |
$3.10 |
$3.25 |
$3.50 |
$4.35 |
| 1,180 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 7 | EA |
$3,000.00 |
$2,500.00 |
$2,675.94 |
$2,313.73 |
$3,600.00 |
$4,500.00 |
$3,125.00 |
$3,220.00 |
| 1,190 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 28 | EA |
$3,000.00 |
$2,500.00 |
$2,143.86 |
$1,834.57 |
$3,600.00 |
$3,500.00 |
$2,750.00 |
$2,955.00 |
| 1,200 | 509(A)0210 |
CLASS AA CONCRETE | 339 | CY |
$1,100.00 |
$1,100.00 |
$978.00 |
$1,039.96 |
$1,200.00 |
$1,200.00 |
$1,200.00 |
$1,198.00 |
| 1,210 | 509(B)0320 |
CLASS A CONCRETE | 275.4 | CY |
$1,000.00 |
$1,200.00 |
$1,060.27 |
$846.56 |
$1,200.00 |
$1,250.00 |
$1,100.00 |
$1,632.00 |
| 1,220 | 509(D)0510 |
CLASS C CONCRETE | 11 | CY |
$900.00 |
$700.00 |
$668.00 |
$743.75 |
$1,900.00 |
$1,350.00 |
$1,300.00 |
$1,510.00 |
| 1,230 | 510(C)1450 |
SLOPE WALL (5") | 1,334 | SY |
$150.00 |
$120.00 |
$140.80 |
$126.30 |
$214.00 |
$155.00 |
$175.00 |
$148.20 |
| 1,240 | 511(A)2210 |
REINFORCING STEEL | 2,020 | LB |
$1.85 |
$2.00 |
$2.97 |
$1.34 |
$2.00 |
$2.00 |
$2.00 |
$1.65 |
| 1,250 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 162,740 | LB |
$1.85 |
$1.75 |
$1.56 |
$1.54 |
$2.00 |
$2.00 |
$2.40 |
$1.67 |
| 1,260 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 194 | LF |
$60.00 |
$55.00 |
$55.40 |
$53.82 |
$58.00 |
$85.00 |
$46.50 |
$60.00 |
| 1,270 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 819 | LF |
$60.00 |
$69.00 |
$60.40 |
$68.86 |
$68.00 |
$100.00 |
$59.00 |
$70.00 |
| 1,280 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 194 | LF |
$25.00 |
$50.00 |
$25.00 |
$49.91 |
$20.00 |
$15.00 |
$20.00 |
$131.25 |
| 1,290 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 819 | LF |
$25.00 |
$50.00 |
$29.00 |
$37.77 |
$20.00 |
$16.00 |
$25.00 |
$51.00 |
| 1,300 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 1,310 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 740 | SY |
$7.00 |
$6.00 |
$6.40 |
$6.54 |
$5.86 |
$5.80 |
$5.50 |
$6.10 |
| 1,320 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 297 | LF |
$1,250.00 |
$800.00 |
$1,305.92 |
$1,181.55 |
$1,100.00 |
$1,500.00 |
$1,400.00 |
$841.00 |
| 1,330 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$3,500.00 |
$2,500.00 |
$3,450.00 |
$5,353.31 |
$2,023.50 |
$2,500.00 |
$1,900.00 |
$2,295.00 |
| 1,340 | 517 9110 |
ELASTOMERIC COATING | 1,734 | SF |
$25.00 |
$25.00 |
$24.00 |
$21.18 |
$18.64 |
$25.00 |
$20.00 |
$19.75 |
| 1,350 | 518(B)0300 |
SEALED EXPANSION JOINTS | 104 | LF |
$450.00 |
$300.00 |
$281.92 |
$286.30 |
$250.00 |
$350.00 |
$300.00 |
$325.00 |
| 1,360 | 523(A)3200 |
SEALER CRACK PREPARATION | 324 | LF |
$6.00 |
$5.00 |
$9.20 |
$5.95 |
$5.33 |
$5.25 |
$5.00 |
$5.60 |
| 1,370 | 523(B)3300 |
SEALER RESIN | 3.6 | GAL |
$100.00 |
$125.00 |
$245.00 |
$214.13 |
$191.70 |
$190.00 |
$180.00 |
$200.00 |
| 1,380 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 258 | LF |
$40.00 |
$25.00 |
$33.00 |
$23.15 |
$37.00 |
$32.00 |
$40.00 |
$76.50 |
| 1,390 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 189 | LF |
$35.00 |
$25.00 |
$30.00 |
$24.47 |
$52.00 |
$28.00 |
$30.00 |
$50.00 |
| 1,400 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$150,000.00 |
$180,000.00 |
$165,000.00 |
|
$200,000.00 |
$300,000.00 |
$165,000.00 |
$273,500.00 |
| 1,410 | 624(E)3610 |
FENCE-STYLE CLF (5'HIGH, CLASS A) | 206 | LF |
$60.00 |
$45.00 |
$42.00 |
$41.64 |
$37.28 |
$40.00 |
$60.00 |
$46.25 |
| 1,420 | 501(B)1300 |
SUBSTRUCTURE EXCAVATION COMMON | 235 | CY |
$30.00 |
$25.00 |
$24.00 |
$31.00 |
$30.00 |
$45.00 |
$12.00 |
$40.00 |
| 1,430 | 501(G)1800 |
CLSM BACKFILL | 314 | CY |
$250.00 |
$275.00 |
$286.70 |
$230.72 |
$288.00 |
$310.00 |
$250.00 |
$253.00 |
| 1,440 | 504(A)5200 |
APPROACH SLAB | 413.4 | SY |
$310.00 |
$320.00 |
$361.39 |
$292.07 |
$325.00 |
$350.00 |
$375.00 |
$280.00 |
| 1,450 | 504(B)5300 |
SAW-CUT GROOVING | 1,585.4 | SY |
$7.00 |
$8.00 |
$5.40 |
$5.71 |
$5.11 |
$5.10 |
$4.80 |
$5.50 |
| 1,460 | 504(E)5520 |
42" F-SHAPED PARAPET | 631.4 | LF |
$150.00 |
$110.00 |
$163.90 |
$97.06 |
$190.00 |
$110.00 |
$170.00 |
$147.00 |
| 1,470 | 506(A)7200 |
STRUCTURAL STEEL | 452,150 | LB |
$3.00 |
$2.30 |
$2.90 |
$2.60 |
$3.10 |
$3.25 |
$3.50 |
$3.55 |
| 1,480 | 507(A)8200 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$3,000.00 |
$2,500.00 |
$2,675.05 |
$2,324.80 |
$3,600.00 |
$4,000.00 |
$3,125.00 |
$3,220.00 |
| 1,490 | 507(B)8300 |
STAINLESS STEEL EXP. BEARING ASSEMBLY | 12 | EA |
$3,000.00 |
$2,500.00 |
$2,705.05 |
$2,353.03 |
$3,600.00 |
$3,500.00 |
$2,750.00 |
$2,955.00 |
| 1,500 | 509(A)0210 |
CLASS AA CONCRETE | 333 | CY |
$1,100.00 |
$1,100.00 |
$950.10 |
$1,459.70 |
$1,200.00 |
$1,200.00 |
$1,200.00 |
$1,121.00 |
| 1,510 | 509(B)0320 |
CLASS A CONCRETE | 185.5 | CY |
$1,000.00 |
$1,200.00 |
$940.00 |
$988.06 |
$1,200.00 |
$1,250.00 |
$1,100.00 |
$1,618.00 |
| 1,520 | 509(D)0510 |
CLASS C CONCRETE | 5 | CY |
$900.00 |
$700.00 |
$930.00 |
$859.96 |
$1,900.00 |
$1,350.00 |
$1,300.00 |
$1,510.00 |
| 1,530 | 510(C)1450 |
SLOPE WALL (5") | 1,243 | SY |
$150.00 |
$120.00 |
$144.50 |
$154.41 |
$214.00 |
$155.00 |
$175.00 |
$148.20 |
| 1,540 | 511(A)2210 |
REINFORCING STEEL | 580 | LB |
$1.90 |
$2.00 |
$3.27 |
$1.34 |
$2.00 |
$2.00 |
$2.00 |
$1.95 |
| 1,550 | 511(B)2310 |
EPOXY COATED REINFORCING STEEL | 139,130 | LB |
$1.85 |
$1.75 |
$1.55 |
$1.54 |
$2.00 |
$2.00 |
$2.40 |
$1.67 |
| 1,560 | 514(A)5210 |
PILES, FURNISHED (HP 10X42) | 176 | LF |
$60.00 |
$55.00 |
$56.40 |
$53.81 |
$58.00 |
$85.00 |
$46.50 |
$60.00 |
| 1,570 | 514(A)5220 |
PILES, FURNISHED (HP 12X53) | 875 | LF |
$60.00 |
$69.00 |
$64.05 |
$70.22 |
$68.00 |
$100.00 |
$60.50 |
$70.00 |
| 1,580 | 514(B)5310 |
PILES, DRIVEN (HP 10X42) | 176 | LF |
$25.00 |
$50.00 |
$26.00 |
$67.50 |
$20.00 |
$15.00 |
$20.00 |
$143.00 |
| 1,590 | 514(B)5320 |
PILES, DRIVEN (HP 12X53) | 875 | LF |
$25.00 |
$50.00 |
$29.00 |
$40.51 |
$20.00 |
$16.00 |
$26.00 |
$55.00 |
| 1,600 | 514(L)6300 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
$500.00 |
| 1,610 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 433 | SY |
$6.00 |
$6.00 |
$6.05 |
$6.54 |
$5.86 |
$5.80 |
$5.50 |
$6.10 |
| 1,620 | 516(A)8240 |
DRILLED SHAFTS 60" DIAMETER | 81 | LF |
$1,250.00 |
$1,000.00 |
$1,498.60 |
$1,185.38 |
$1,400.00 |
$1,500.00 |
$1,300.00 |
$1,216.00 |
| 1,630 | 516(C)8400 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,500.00 |
$2,500.00 |
$3,500.00 |
$5,353.31 |
$2,023.50 |
$2,500.00 |
$1,900.00 |
$2,295.00 |
| 1,640 | 517 9110 |
ELASTOMERIC COATING | 990 | SF |
$25.00 |
$25.00 |
$26.00 |
$21.18 |
$18.64 |
$25.00 |
$20.00 |
$19.75 |
| 1,650 | 518(B)0300 |
SEALED EXPANSION JOINTS | 52 | LF |
$450.00 |
$300.00 |
$301.60 |
$286.31 |
$250.00 |
$350.00 |
$300.00 |
$325.00 |
| 1,660 | 613(H)6205 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 258 | LF |
$40.00 |
$25.00 |
$33.00 |
$23.15 |
$37.00 |
$32.00 |
$40.00 |
$76.50 |
| 1,670 | 613(I)6310 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 144 | LF |
$35.00 |
$25.00 |
$30.00 |
$24.48 |
$52.00 |
$28.00 |
$30.00 |
$50.00 |
| 1,680 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$150,000.00 |
$10,000.00 |
$155,000.00 |
|
$250,000.00 |
$180,000.00 |
$95,000.00 |
$274,300.00 |
| 1,690 | 804(A)2200 |
STRUCTURAL CONCRETE | 3.68 | CY |
$1,200.00 |
$350.00 |
$598.00 |
$654.29 |
$585.75 |
$600.00 |
$550.00 |
$620.00 |
| 1,700 | 804(B)2300 |
REINFORCING STEEL | 648 | LB |
$3.25 |
$2.00 |
$2.25 |
$2.38 |
$2.13 |
$2.25 |
$2.00 |
$2.25 |
| 1,710 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 26 | EA |
$120.00 |
$250.00 |
$163.00 |
$178.44 |
$159.75 |
$200.00 |
$150.00 |
$170.00 |
| 1,720 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 5 | EA |
$330.00 |
$2,700.00 |
$605.00 |
$654.29 |
$585.75 |
$600.00 |
$550.00 |
$620.00 |
| 1,730 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 498 | SF |
$40.00 |
$55.00 |
$35.05 |
$38.07 |
$34.08 |
$33.50 |
$32.00 |
$36.00 |
| 1,740 | 850(B)1310 |
EXTRUDED ALUMINUM PANEL SIGNS | 174 | SF |
$50.00 |
$43.00 |
$43.80 |
$47.59 |
$42.60 |
$42.50 |
$40.00 |
$44.75 |
| 1,750 | 851(A)2200 |
4"@13 GALV.STL.WD.FLANGE BM.POST | 83.5 | LF |
$50.00 |
$50.00 |
$38.10 |
$41.64 |
$37.28 |
$36.75 |
$35.00 |
$40.00 |
| 1,760 | 851(A)2210 |
6"@20 GALV.STL.WD.FLANGE BM.POST | 35.5 | LF |
$55.00 |
$70.00 |
$43.80 |
$47.59 |
$42.60 |
$42.00 |
$40.00 |
$45.00 |
| 1,770 | 851(C)2420 |
2 1/4" SQUARE TUBE POST | 253.5 | LF |
$14.00 |
$10.00 |
$10.70 |
$11.90 |
$10.65 |
$10.50 |
$10.00 |
$12.00 |
| 1,780 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 13 | LF |
$14.00 |
$15.00 |
$10.70 |
$11.90 |
$10.65 |
$11.50 |
$10.00 |
$12.00 |
| 1,790 | 853 5130 |
DELINEATORS(TYPE 1, CODE 1, FLEXIBLE) | 8 | EA |
$80.00 |
$90.00 |
$107.00 |
$118.96 |
$106.50 |
$105.00 |
$100.00 |
$112.00 |
| 1,800 | 853 5170 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 50 | EA |
$30.00 |
$19.00 |
$22.00 |
$23.79 |
$21.30 |
$25.00 |
$20.00 |
$22.50 |
| 1,810 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 28,245 | LF |
$1.10 |
$0.8000 |
$1.35 |
$1.37 |
$1.22 |
$1.25 |
$1.15 |
$1.30 |
| 1,820 | 856(A)8215 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(12" WIDE) | 490 | LF |
$4.00 |
$3.50 |
$4.05 |
$4.46 |
$3.99 |
$4.00 |
$3.75 |
$4.20 |
| 1,830 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 45 | LF |
$15.00 |
$12.00 |
$21.90 |
$23.79 |
$21.30 |
$21.00 |
$20.00 |
$22.50 |
| 1,840 | 856(B)8307 |
(SP) TRAFFIC STRIPE(PLURAL-COMP)(ARROWS) | 3 | EA |
$270.00 |
$500.00 |
$270.00 |
$297.41 |
$266.25 |
$265.00 |
$250.00 |
$280.00 |
| 1,850 | 509(A)0200 |
CLASS AA CONCRETE | 20 | CY |
$1,200.00 |
$2,000.00 |
$950.00 |
$1,011.18 |
$905.25 |
$1,200.00 |
$850.00 |
$950.00 |
| 1,860 | 619(B)6432 |
REMOVAL OF CABLE BARRIER | 3,212 | LF |
$16.00 |
$19.00 |
$5.40 |
$5.95 |
$5.33 |
$15.00 |
$5.00 |
$8.15 |
| 1,870 | 628 7100 |
INSTALLATION OF CABLE BARRIER SYSTEM | 3,212 | LF |
$35.00 |
$42.00 |
$27.13 |
$29.74 |
$26.63 |
$30.00 |
$25.00 |
$28.00 |
| 1,880 | 628(C)7400 |
END ANCHORS | 4 | EA |
$6,200.00 |
$6,000.00 |
$11,500.00 |
$12,491.06 |
$11,182.50 |
$12,500.00 |
$10,500.00 |
$11,725.00 |
| 1,890 | 802(B)0324 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 1,463 | LF |
$18.00 |
$17.00 |
$21.70 |
$17.84 |
$18.11 |
$21.00 |
$20.00 |
$19.00 |
| 1,900 | 803(A)1210 |
PULL BOX(SIZE I) | 13 | EA |
$2,200.00 |
$2,500.00 |
$3,000.00 |
$2,551.75 |
$1,661.40 |
$3,000.00 |
$2,500.00 |
$1,735.00 |
| 1,910 | 804(A)2200 |
STRUCTURAL CONCRETE | 19.68 | CY |
$1,200.00 |
$1,200.00 |
$1,650.00 |
$1,190.81 |
$1,459.05 |
$1,575.00 |
$1,500.00 |
$1,530.00 |
| 1,920 | 804(B)2300 |
REINFORCING STEEL | 3,408 | LB |
$4.00 |
$3.50 |
$3.34 |
$3.51 |
$2.77 |
$3.25 |
$3.00 |
$2.90 |
| 1,930 | 805(D)3500 |
(PL)REMOVE & RESET TRAF.SIG.EQUIPMENT | 1 | LSUM |
$10,000.00 |
$20,000.00 |
$27,500.00 |
$20,675.68 |
$21,300.00 |
$30,000.00 |
$25,000.00 |
$22,200.00 |
| 1,940 | 805(D)3504 |
(PL)REMOVE & RESET LIGHT POLE | 12 | EA |
$5,000.00 |
$2,200.00 |
$1,700.00 |
$2,165.12 |
$1,863.75 |
$2,000.00 |
$1,500.00 |
$1,945.00 |
| 1,950 | 104 3250 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 150 | DAY |
$1,400.00 |
$1,400.00 |
$1,400.00 |
$1,400.00 |
$1,400.00 |
$1,400.00 |
$1,400.00 |
$1,400.00 |
| 1,960 | 823 6100 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 30 | SD |
$165.00 |
$450.00 |
$218.00 |
$237.93 |
$213.00 |
$210.00 |
$200.00 |
$353.50 |
| 1,970 | 857(A)9200 |
CONSTRUCTION TRAFFIC STR.(PAINT)(4" WIDE) | 41,400 | LF |
$0.4000 |
$0.5000 |
$0.2700 |
$0.2700 |
$0.2400 |
$0.2500 |
$0.2300 |
$0.2600 |
| 1,980 | 857(C)9400 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 15,000 | LF |
$1.80 |
$2.30 |
$1.61 |
$1.78 |
$1.60 |
$1.60 |
$1.50 |
$1.68 |
| 1,990 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 56,715 | LF |
$0.4000 |
$0.5500 |
$0.2200 |
$0.2100 |
$0.1900 |
$0.2000 |
$0.1800 |
$0.2000 |
| 2,000 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 80 | SD |
$18.00 |
$60.00 |
$27.10 |
$29.74 |
$26.63 |
$26.25 |
$25.00 |
$721.40 |
| 2,010 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 5,162.5 | LF |
$30.00 |
$35.00 |
$41.00 |
$45.80 |
$50.00 |
$27.50 |
$93.50 |
$68.00 |
| 2,020 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 4,375 | LF |
$6.50 |
$5.20 |
$6.70 |
$5.95 |
$9.00 |
$4.55 |
$7.00 |
$8.84 |
| 2,030 | 880(A)6220 |
ARROW DISPLAY(TYPE C) | 1,000 | SD |
$10.00 |
$1.00 |
$8.70 |
$9.52 |
$9.00 |
$8.50 |
$8.00 |
$14.15 |
| 2,040 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 24,746 | SD |
$0.5000 |
$0.6000 |
$0.2700 |
$0.3000 |
$0.2700 |
$0.2700 |
$0.2500 |
$0.4500 |
| 2,050 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 22,750 | SD |
$0.6500 |
$0.0200 |
$0.2300 |
$0.2400 |
$0.2100 |
$0.2200 |
$0.2000 |
$0.3500 |
| 2,060 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 16,194 | SD |
$1.00 |
$0.6000 |
$0.5400 |
$0.5900 |
$0.6000 |
$0.5500 |
$0.5000 |
$0.9000 |
| 2,070 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 12,620 | SD |
$1.00 |
$6.00 |
$1.62 |
$1.78 |
$1.75 |
$1.60 |
$1.50 |
$2.65 |
| 2,080 | 880(E)6607 |
WARNING LIGHTS(TYPE B) | 37,414 | SD |
$0.3500 |
$1.00 |
$0.2800 |
$0.3000 |
$0.2700 |
$0.2700 |
$0.2500 |
$0.4500 |
| 2,090 | 880(F)6700 |
DRUMS | 71,750 | SD |
$0.4000 |
$0.0200 |
$0.1200 |
$0.1200 |
$0.1100 |
$0.1100 |
$0.1000 |
$0.2000 |
| 2,100 | 880(G)6805 |
CHANNELIZER CONES | 10,940 | SD |
$0.5000 |
$0.1500 |
$1.12 |
$1.19 |
$3.00 |
$1.05 |
$1.00 |
$1.80 |
| 2,110 | 880(L)7310 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BID) | 2,500 | HOUR |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
$77.00 |
| 2,120 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,548 | SD |
$16.00 |
$8.00 |
$19.80 |
$21.41 |
$19.17 |
$18.25 |
$18.00 |
$31.85 |
| 2,130 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$100,000.00 |
$72,000.00 |
$69,400.00 |
$63,832.21 |
$149,600.00 |
$75,000.00 |
$56,000.00 |
$362,000.00 |
| 2,140 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$3,500.00 |
$12,500.00 |
$5,948.12 |
$35,000.00 |
$20,000.00 |
$8,000.00 |
$41,200.00 |
| 2,150 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$25,000.00 |
$35,000.00 |
$43,300.00 |
$17,130.60 |
$19,900.00 |
$83,500.00 |
$35,000.00 |
$135,500.00 |
| 2,160 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$940,000.00 |
$514,000.00 |
$915,000.00 |
$988,000.00 |
$994,000.00 |
|
$985,000.00 |
|