13Let jobs
$160,415,733Total low bids
$148,174,005Total estimates
+8.3%Low bids vs estimates
May 2026 results
Bid tabs (Excel) ExcelCSV| Let date | Contract | County / District | Project | Estimate | Low bid | Low bidder | % vs est. | Bidders |
|---|---|---|---|---|---|---|---|---|
| May 14, 2026 | 230338HEB-MC-65D | Comanche, Cotton Division 7 |
Pavement Reconstruction- No Added LanesOTA ACCESS HE BAILEY TURNPIKE (I-44) · Pavement Reconstruction- No Added Lanes | $58,377,789 | $57,221,639 | DUIT CONSTRUCTION COMPANY, INC. | -2.0% | 3 |
| May 14, 2026 | 260129NHPP-017N(311)FP | Blaine, Dewey Division 5 |
Grade, Drain, And SurfaceUS-270 · Grade, Drain, And Surface | — | $22,211,964 | CORNELL CONSTRUCTION COMPANY, INC. | 5 | |
| May 14, 2026 | 260130STP-108C(099)PM | Caddo, Grady Division 7 |
Grade, Drain, And SurfaceUS-277 · Grade, Drain, And Surface | $18,732,862 | $18,294,646 | OVERLAND CORPORATION | -2.3% | 7 |
| May 14, 2026 | 260163STP-262N(103)UR | Pontotoc |
Intersection Modification And Traffic SignalSH-99 (MISSISSIPPI AVE) · Intersection Modification And Traffic Signal | $5,429,772 | $6,098,944 | SAC Services, Inc. | +12.3% | 7 |
| May 14, 2026 | 260128STP-204B(066)PM | Beaver Division 6 |
Intersection ModificationUS-83 · Intersection Modification | $4,311,405 | $5,187,757 | Redlands Contracting, LLC | +20.3% | 2 |
| May 14, 2026 | 260166MC-260B(118)MD | Payne Division 4 |
Resurface (Asphalt)SH-33 · Resurface (Asphalt) | $3,810,861 | $3,236,396 | Atlas Paving Company | -15.1% | 8 |
| May 14, 2026 | 260133NHPP-017N(319)PM | Texas Division 6 |
Joint Seal/RepairSH-3 · Joint Seal/Repair | $357,850 | $320,089 | B & B CONSTRUCTION SERVICE J.T., INC. | -10.6% | 6 |
| May 7, 2026 | 260124NHPP-013N(249)PM | Bryan Division 2 |
Bridge And ApproachesUS-69 · Bridge And Approaches | $21,907,548 | $18,992,382 | Built Right Construction, LLC | -13.3% | 7 |
| May 7, 2026 | 260113STP-130C(066)PM | Harper Division 6 |
Grade, Drain, Surface And BridgeUS-183 · Grade, Drain, Surface And Bridge | $17,347,679 | $14,981,901 | THE CUMMINS CONSTRUCTION CO., INC. | -13.6% | 4 |
| May 7, 2026 | 260114STP-205C(121)PM | Beckham Division 5 |
Widen, Resurface And BridgeSH-152 · Widen, Resurface And Bridge | $14,889,228 | $11,155,419 | Caswell Contracting, Inc. | -25.1% | 8 |
| May 7, 2026 | 260123STP-205B(143)3P | Beckham, Washita Division 5 |
Resurface (Asphalt)SH-6 · Resurface (Asphalt) | $1,385,004 | $1,285,808 | CORNELL CONSTRUCTION COMPANY, INC. | -7.2% | 4 |
| May 7, 2026 | 260127TAP-252C(149)TP | Noble Division 4 |
Sidewalk And Pedestrian ImprovementsUS-64 · Sidewalk And Pedestrian Improvements | $985,845 | $796,213 | RUDY CONSTRUCTION CO. | -19.2% | 6 |
| May 7, 2026 | 260141TAP-220D(122)TP | Custer Division 5 |
Pedestrian And Bike ImprovementsCITY STREETS (N MISSOURI ST, W ROH ST, W ORIENT ST) · Pedestrian And Bike Improvements | $638,163 | $632,575 | Redlands Contracting, LLC | -0.9% | 5 |
1–13 of 13
Source: ODOT bid tabulations for each letting on Contracts and Proposals, read from ODOT's published bid tab reports, including the engineer's estimate. Bid Potato loads new lettings as ODOT posts them and backfills the last two years. Confirm against ODOT's official tabulations.