| 10 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 200 | CY |
$20.00 |
$20.00 |
$1.00 |
$225.00 |
$25.00 |
$45.54 |
| 20 | 202(D)2500 |
UNCLASSIFIED BORROW | 200 | CY |
$28.00 |
$20.00 |
$35.00 |
$40.00 |
$25.00 |
$20.54 |
| 30 | 221(B)2300 |
TEMPORARY SILT FENCE | 628.33 | LF |
$6.00 |
$3.85 |
$6.00 |
$3.45 |
$7.50 |
$3.74 |
| 40 | 230(A)7200 |
SOLID SLAB SODDING | 12,322.39 | SY |
$5.00 |
$3.31 |
$7.00 |
$3.05 |
$6.00 |
$3.27 |
| 50 | 303(A)1200 |
AGGREGATE BASE TYPE A | 162.85 | CY |
$85.00 |
$77.00 |
$90.00 |
$135.00 |
$75.00 |
$205.77 |
| 60 | 325 0100 |
SEPARATOR FABRIC | 100 | SY |
$7.00 |
$1.75 |
$1.00 |
$7.00 |
$4.00 |
$28.13 |
| 70 | 326(B)1300 |
GEOGRID REINFORCEMENT | 100 | SY |
$9.00 |
$2.75 |
$1.00 |
$7.00 |
$10.00 |
$37.77 |
| 80 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 80 | TON |
$60.00 |
$64.00 |
$75.00 |
$75.00 |
$75.00 |
$94.84 |
| 90 | 414(E)5600 |
FULL DEPTH P.C.C. PATCH (PLACEMENT) | 79.51 | SY |
$80.00 |
$135.00 |
$55.00 |
$79.00 |
$250.00 |
$281.03 |
| 100 | 414(G)5800 |
P.C. CONCRETE FOR PAVEMENT | 17.75 | CY |
$295.00 |
$224.00 |
$250.00 |
$500.00 |
$750.00 |
$361.81 |
| 110 | 509(C)0400 |
CLASS A CONCRETE, SMALL STRUCTURES | 24 | CY |
$1,000.00 |
$1,775.00 |
$900.00 |
$2,885.00 |
$1,500.00 |
$5,107.23 |
| 120 | 609(A)4250 |
CONC.CURB(6" MNTBLE-INTEGRAL) | 61.59 | LF |
$25.00 |
$20.00 |
$23.00 |
$50.00 |
$75.00 |
$65.99 |
| 130 | 610(A)5200 |
4" CONCRETE SIDEWALK | 2,319.69 | SY |
$105.00 |
$95.00 |
$79.00 |
$86.50 |
$125.00 |
$132.93 |
| 140 | 610(B)5310 |
6" CONCRETE DRIVEWAY | 779.74 | SY |
$120.00 |
$105.00 |
$90.00 |
$115.00 |
$175.00 |
$167.02 |
| 150 | 610(I)6000 |
TACTILE WARNING DEVICE-NEW | 350 | SF |
$58.00 |
$75.00 |
$60.00 |
$45.00 |
$50.00 |
$74.85 |
| 160 | 612(I)4000 |
WATER METER RESET | 1 | EA |
$1,900.00 |
$4,000.00 |
$750.00 |
$2,500.00 |
$500.00 |
$3,328.52 |
| 170 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$30,000.00 |
$17,000.00 |
$8,500.00 |
$15,000.00 |
$29,449.53 |
| 180 | 619(B)6360 |
REMOVAL OF CONCRETE PAVEMENT | 12.11 | SY |
$18.00 |
$18.00 |
$22.00 |
$20.00 |
$15.00 |
$52.68 |
| 190 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 136.7 | SY |
$18.00 |
$17.00 |
$22.00 |
$20.00 |
$15.00 |
$26.47 |
| 200 | 619(B)6380 |
REMOVAL OF CONCRETE DRIVEWAY | 169.37 | SY |
$18.00 |
$17.00 |
$22.00 |
$15.00 |
$15.00 |
$27.85 |
| 210 | 619(B)6384 |
REMOVAL OF ASPHALT DRIVEWAY | 197.33 | SY |
$18.00 |
$17.00 |
$22.00 |
$15.00 |
$12.50 |
$26.48 |
| 220 | 619(B)6386 |
REMOVAL OF GRAVEL DRIVEWAY | 224.32 | SY |
$12.00 |
$18.00 |
$22.00 |
$5.00 |
$10.00 |
$24.18 |
| 230 | 619(B)6404 |
REMOVAL OF SIDEWALK | 1,185.58 | SY |
$15.00 |
$20.00 |
$22.00 |
$13.40 |
$15.00 |
$23.24 |
| 240 | 622(A)0200 |
PIPE RAILING | 44 | LF |
$175.00 |
$225.00 |
$125.00 |
$190.00 |
$500.00 |
$449.57 |
| 250 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 12 | EA |
$150.00 |
$110.00 |
$200.00 |
$230.00 |
$300.00 |
$106.89 |
| 260 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 37.38 | SF |
$25.00 |
$63.80 |
$50.00 |
$93.00 |
$75.00 |
$62.00 |
| 270 | 851(C)2415 |
2" SQUARE TUBE POST | 84 | LF |
$28.00 |
$13.20 |
$30.00 |
$10.00 |
$25.00 |
$12.83 |
| 280 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 568.84 | LF |
$15.00 |
$19.80 |
$30.00 |
$28.25 |
$25.00 |
$19.24 |
| 290 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,350 | SD |
$1.50 |
$0.5500 |
$2.00 |
$4.15 |
$1.00 |
$0.5300 |
| 300 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,500 | SD |
$1.50 |
$2.48 |
$4.00 |
$0.0700 |
$2.50 |
$2.41 |
| 310 | 880(E)6610 |
WARNING LIGHTS(TYPE C) | 9,400 | SD |
$0.2200 |
$0.1700 |
$0.5000 |
$0.0500 |
$0.2500 |
$0.1600 |
| 320 | 880(F)6700 |
DRUMS | 9,400 | SD |
$0.5000 |
$0.1700 |
$0.8000 |
$0.0500 |
$0.5000 |
$0.1600 |
| 330 | 880(G)6805 |
CHANNELIZER CONES | 9,400 | SD |
$0.5000 |
$0.3300 |
$0.8000 |
$1.25 |
$0.5000 |
$0.3200 |
| 340 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 328 | SD |
$16.00 |
$16.50 |
$26.00 |
$9.30 |
$20.00 |
$16.03 |
| 350 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$16,000.00 |
$10,000.00 |
$13,500.00 |
$10,000.00 |
$15,000.00 |
$8,337.36 |
| 360 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$14,100.00 |
$10,000.00 |
$3,500.00 |
$15,851.47 |
| 370 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$46,900.96 |
$48,000.00 |
$60,000.00 |
$58,000.00 |
$100,000.00 |
$71,793.19 |