| 10 | 201(A)1200 |
CLEARING AND GRUBBING | 1 | LSUM |
$125,000.00 |
$200,000.00 |
$250,000.00 |
$519,000.00 |
$476,664.21 |
$214,500.00 |
$425,000.00 |
$234,187.00 |
| 20 | 202(A)2200 |
UNCLASSIFIED EXCAVATION | 487,404 | CY |
$7.00 |
$5.04 |
$5.26 |
$5.70 |
$4.89 |
$5.50 |
$5.35 |
$5.78 |
| 30 | 202(C)2400 |
ROCK EXCAVATION | 8,247 | CY |
$14.50 |
$22.01 |
$21.55 |
$27.00 |
$52.65 |
$11.00 |
$25.50 |
$30.21 |
| 40 | 202(D)2500 |
UNCLASSIFIED BORROW | 82,046 | CY |
$8.00 |
$6.03 |
$6.50 |
$6.50 |
$5.52 |
$7.50 |
$6.80 |
$6.80 |
| 50 | 205(A)6200 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$100,000.00 |
$175,000.00 |
$192,500.00 |
$169,000.00 |
$201,283.78 |
$130,000.00 |
$165,000.00 |
$170,188.00 |
| 60 | 221(B)2300 |
TEMPORARY SILT FENCE | 33,054 | LF |
$2.50 |
$2.25 |
$2.25 |
$2.50 |
$3.72 |
$2.50 |
$2.50 |
$5.45 |
| 70 | 221(E)2600 |
TEMPORARY SILT DIKE | 2,681 | LF |
$9.50 |
$11.50 |
$11.50 |
$12.50 |
$13.08 |
$13.00 |
$12.90 |
$22.65 |
| 80 | 221(F)2700 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 8 | CY |
$150.00 |
$180.00 |
$250.00 |
$200.00 |
$260.41 |
$200.00 |
$560.00 |
$315.00 |
| 90 | 221(F)2710 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 6 | CY |
$175.00 |
$300.00 |
$250.00 |
$180.00 |
$349.14 |
$400.00 |
$392.00 |
$345.00 |
| 100 | 221(G)2800 |
TEMPORARY FIBER LOG | 17,774 | LF |
$4.00 |
$3.00 |
$3.00 |
$3.25 |
$3.28 |
$3.40 |
$3.35 |
$7.95 |
| 110 | 221(H)2900 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 3 | EA |
$500.00 |
$550.00 |
$2.16 |
$800.00 |
$625.42 |
$600.00 |
$12,140.00 |
$1,085.00 |
| 120 | 229 6100 |
DITCH LINER PROTECTION | 15,052.87 | LF |
$3.00 |
$2.16 |
$2.16 |
$2.50 |
$2.46 |
$3.00 |
$2.40 |
$3.45 |
| 130 | 230(A)7200 |
SOLID SLAB SODDING | 237,827 | SY |
$2.50 |
$2.52 |
$2.52 |
$2.80 |
$2.87 |
$3.00 |
$2.80 |
$3.35 |
| 140 | 232(A)9200 |
SEEDING METHOD A | 2.51 | AC |
$550.00 |
$3,600.00 |
$3,600.00 |
$3,800.00 |
$3,622.83 |
$4,100.00 |
$4,032.00 |
$2,850.00 |
| 150 | 232(B)9300 |
SEEDING METHOD B | 49.13 | AC |
$550.00 |
$2,900.00 |
$2,900.00 |
$3,100.00 |
$2,918.39 |
$3,300.00 |
$3,248.00 |
$3,150.00 |
| 160 | 233(A)0200 |
VEGETATIVE MULCHING | 51.64 | AC |
$750.00 |
$1,500.00 |
$1,500.00 |
$1,600.00 |
$1,509.51 |
$1,700.00 |
$1,680.00 |
$1,915.00 |
| 170 | 241 3100 |
MOWING | 98.26 | AC |
$85.00 |
$250.00 |
$250.00 |
$275.00 |
$251.59 |
$280.00 |
$280.00 |
$340.00 |
| 180 | 242 4101 |
STABILIZED CONSTRUCTION EXIT | 4 | EA |
$2,500.00 |
$11,000.00 |
$1,800.00 |
$2,500.00 |
$7,705.43 |
$4,200.00 |
$3,248.00 |
$3,400.00 |
| 190 | 303(A)1200 |
AGGREGATE BASE TYPE A | 21,626 | CY |
$50.00 |
$65.00 |
$58.14 |
$64.00 |
$57.55 |
$74.00 |
$60.00 |
$78.84 |
| 200 | 307(K)4200 |
STABILIZED SUBGRADE | 119,489 | SY |
$5.00 |
$6.50 |
$5.13 |
$6.00 |
$5.76 |
$6.00 |
$9.35 |
$6.82 |
| 210 | 310(B)5300 |
SUBGRADE, METHOD B | 7,884 | SY |
$4.00 |
$4.00 |
$2.60 |
$1.50 |
$1.56 |
$3.50 |
$1.50 |
$3.12 |
| 220 | 326(C)1100 |
(SP) WOVEN GEOSYNTHETIC REINFORCEMENT FABRIC | 110,942 | SY |
$3.50 |
$3.50 |
$2.77 |
$3.60 |
$4.41 |
$3.00 |
$5.25 |
$3.34 |
| 230 | 402(E)2600 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 16,334 | TON |
$30.00 |
$35.00 |
$29.70 |
$35.00 |
$32.63 |
$42.00 |
$39.60 |
$38.47 |
| 240 | 407(B)7300 |
TACK COAT | 16,784 | GAL |
$3.50 |
$3.50 |
$3.60 |
$4.75 |
$5.32 |
$4.00 |
$3.25 |
$3.25 |
| 250 | 408 8100 |
PRIME COAT | 70,386 | GAL |
$4.50 |
$4.50 |
$3.90 |
$3.75 |
$6.21 |
$5.00 |
$0.1000 |
$5.35 |
| 260 | 411(B)1320 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 8,610 | TON |
$120.00 |
$110.00 |
$108.35 |
$93.00 |
$122.45 |
$122.00 |
$121.50 |
$132.17 |
| 270 | 411(B)1330 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 25,369 | TON |
$110.00 |
$108.00 |
$100.90 |
$92.00 |
$104.19 |
$117.00 |
$119.50 |
$123.63 |
| 280 | 411(C)1420 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 5,743 | TON |
$135.00 |
$115.00 |
$122.75 |
$110.00 |
$133.42 |
$142.00 |
$135.00 |
$159.56 |
| 290 | 411(C)1430 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 9,966 | TON |
$130.00 |
$110.00 |
$112.90 |
$104.00 |
$124.11 |
$132.00 |
$132.50 |
$136.08 |
| 300 | 411(H)1900 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 298 | TON |
$185.00 |
$250.00 |
$370.00 |
$160.00 |
$193.75 |
$235.00 |
$345.00 |
$190.00 |
| 310 | 412 3100 |
COLD MILLING PAVEMENT | 44,342 | SY |
$4.00 |
$2.00 |
$1.50 |
$3.15 |
$2.91 |
$1.50 |
$3.75 |
$6.14 |
| 320 | 501(A)1200 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 86 | CY |
$30.00 |
$45.00 |
$30.00 |
$30.00 |
$22.74 |
$31.00 |
$50.40 |
$35.00 |
| 330 | 504(E)5520 |
42" F-SHAPED PARAPET | 156.8 | LF |
$250.00 |
$225.00 |
$150.00 |
$310.00 |
$200.41 |
$155.00 |
$252.00 |
$225.42 |
| 340 | 509(A)0200 |
CLASS AA CONCRETE | 676.8 | CY |
$500.00 |
$575.00 |
$620.00 |
$787.00 |
$791.34 |
$650.00 |
$644.00 |
$669.20 |
| 350 | 509(D)0500 |
CLASS C CONCRETE | 2,799.09 | CY |
$400.00 |
$375.00 |
$280.00 |
$425.00 |
$397.99 |
$315.00 |
$420.00 |
$378.90 |
| 360 | 511(A)2200 |
REINFORCING STEEL | 89,420 | LB |
$1.25 |
$1.30 |
$1.60 |
$1.45 |
$1.01 |
$1.80 |
$1.45 |
$1.49 |
| 370 | 511(B)2300 |
EPOXY COATED REINFORCING STEEL | 7,180 | LB |
$2.00 |
$1.88 |
$2.50 |
$1.65 |
$2.03 |
$2.80 |
$2.10 |
$2.21 |
| 380 | 514(J)6100 |
TEMPORARY SHEET PILING | 1 | LSUM |
$20,000.00 |
$150,000.00 |
$50,000.00 |
$30,000.00 |
$42,645.18 |
$55,000.00 |
$125,000.00 |
$92,500.00 |
| 390 | 515(A)7200 |
WATER REPELLENT (VISUALLY INSPECTED) | 92 | SY |
$6.00 |
$8.00 |
$8.00 |
$17.00 |
$9.10 |
$9.00 |
$24.60 |
$9.60 |
| 400 | 601(B)1220 |
TYPE I-A PLAIN RIPRAP | 1,101.58 | TON |
$55.00 |
$73.80 |
$100.00 |
$98.00 |
$64.74 |
$78.00 |
$84.30 |
$69.78 |
| 410 | 601(C)1300 |
TYPE I-A FILTER BLANKET | 334.74 | TON |
$45.00 |
$53.65 |
$100.00 |
$108.00 |
$50.20 |
$65.00 |
$61.70 |
$62.00 |
| 420 | 601(I)1700 |
FILTER FABRIC (RIPRAP) | 1,244 | SY |
$10.00 |
$3.96 |
$2.05 |
$5.00 |
$2.84 |
$3.30 |
$11.20 |
$4.30 |
| 430 | 609(B)4370 |
2'-8" COMB.CRB.& GUT.(6" MNTBLE) | 1,284 | LF |
$40.00 |
$32.00 |
$85.00 |
$50.00 |
$76.68 |
$29.00 |
$35.80 |
$56.00 |
| 440 | 611(A)7210 |
MANHOLE (4' DIA.) | 4 | EA |
$2,750.00 |
$3,501.86 |
$1,100.00 |
$5,300.00 |
$3,413.82 |
$3,200.00 |
$3,795.00 |
$3,798.59 |
| 450 | 611(B)7300 |
ADD'L.DEPTH IN MANHOLE (4' DIA.) | 11.32 | VF |
$175.00 |
$267.79 |
$500.00 |
$750.00 |
$238.93 |
$525.00 |
$415.00 |
$291.82 |
| 460 | 611(G)0354 |
INLET (SMD-TYPE 2) | 6 | EA |
$3,000.00 |
$3,325.39 |
$2,000.00 |
$4,500.00 |
$3,246.92 |
$4,400.00 |
$3,520.00 |
$3,624.28 |
| 470 | 611(G)7710 |
INLET CI DES. 1 (STD) | 1 | EA |
$4,000.00 |
$3,804.91 |
$2,250.00 |
$5,800.00 |
$3,630.43 |
$3,400.00 |
$4,050.00 |
$4,801.00 |
| 480 | 611(G)7966 |
INLET GPI TYPE 2 (DES. 10) | 1 | EA |
$3,500.00 |
$5,877.68 |
$4,100.00 |
$7,800.00 |
$5,660.75 |
$6,600.00 |
$6,330.00 |
$6,977.00 |
| 490 | 611(H)0410 |
ADD'L DEPTH IN INLET CI DES. 1 | 1.25 | VF |
$350.00 |
$591.82 |
$750.00 |
$1,000.00 |
$438.06 |
$680.00 |
$639.50 |
$791.00 |
| 500 | 611(H)0474 |
ADD'L DEPTH IN INLET GPI TYPE 2 | 2.71 | VF |
$425.00 |
$774.13 |
$860.00 |
$1,300.00 |
$762.07 |
$1,000.00 |
$891.50 |
$874.00 |
| 510 | 613(A)5208 |
18" R.C.PIPE CLASS III | 1,844.95 | LF |
$85.00 |
$68.32 |
$55.00 |
$97.00 |
$103.71 |
$98.00 |
$78.00 |
$78.32 |
| 520 | 613(A)5216 |
24" R.C.PIPE CLASS III | 211 | LF |
$105.00 |
$89.52 |
$72.75 |
$110.00 |
$116.69 |
$113.00 |
$109.00 |
$96.52 |
| 530 | 613(A)5220 |
30" R.C.PIPE CLASS III | 240 | LF |
$135.00 |
$114.16 |
$103.00 |
$145.00 |
$157.65 |
$130.00 |
$132.50 |
$124.00 |
| 540 | 613(A)5224 |
36" R.C.PIPE CLASS III | 207 | LF |
$175.00 |
$131.19 |
$124.10 |
$230.00 |
$175.97 |
$165.00 |
$174.50 |
$145.00 |
| 550 | 613(A)5264 |
18" R.C.PIPE CLASS IV | 160 | LF |
$135.00 |
$72.12 |
$64.80 |
$128.00 |
$361.76 |
$100.00 |
$84.70 |
$86.12 |
| 560 | 613(A)5314 |
24" R.C.PIPE CLASS V | 513 | LF |
$185.00 |
$102.93 |
$92.75 |
$128.00 |
$61.70 |
$126.00 |
$124.00 |
$116.32 |
| 570 | 613(A)5318 |
36" R.C.PIPE CLASS V | 999 | LF |
$225.00 |
$203.80 |
$204.95 |
$210.00 |
$254.73 |
$226.00 |
$264.50 |
$227.38 |
| 580 | 613(A)5322 |
42" R.C.PIPE CLASS V | 235 | LF |
$300.00 |
$211.74 |
$225.87 |
$280.00 |
$248.64 |
$265.00 |
$277.00 |
$235.00 |
| 590 | 613(A)5350 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 45 | LF |
$165.00 |
$106.59 |
$76.21 |
$150.00 |
$148.15 |
$113.00 |
$98.80 |
$116.59 |
| 600 | 613(B)5508 |
18" CORR. GALV. STEEL PIPE | 546 | LF |
$55.00 |
$44.49 |
$46.00 |
$88.00 |
$76.56 |
$64.00 |
$48.60 |
$50.59 |
| 610 | 613(B)5528 |
36" CORR. GALV. STEEL PIPE | 48 | LF |
$65.00 |
$72.14 |
$70.44 |
$124.00 |
$157.81 |
$87.00 |
$82.60 |
$78.14 |
| 620 | 613(J)6400 |
EDGE DRAIN CONDUIT-PERFORATED | 225 | LF |
$15.00 |
$17.84 |
$25.00 |
$30.00 |
$8.74 |
$16.00 |
$41.25 |
$26.00 |
| 630 | 613(K)6500 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 100 | LF |
$20.00 |
$18.00 |
$25.00 |
$40.00 |
$16.05 |
$16.00 |
$41.00 |
$30.00 |
| 640 | 613(L)6612 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 4 | EA |
$1,500.00 |
$1,041.60 |
$821.66 |
$2,600.00 |
$1,029.71 |
$1,200.00 |
$1,205.00 |
$1,441.00 |
| 650 | 613(L)6708 |
18" PREFAB. CULVERT END SEC., ROUND | 45 | EA |
$1,000.00 |
$1,188.00 |
$904.78 |
$1,300.00 |
$1,138.89 |
$1,300.00 |
$1,205.00 |
$1,488.00 |
| 660 | 613(L)6716 |
24" PREFAB. CULVERT END SEC., ROUND | 14 | EA |
$1,250.00 |
$1,238.84 |
$950.00 |
$1,400.00 |
$1,276.76 |
$1,400.00 |
$1,265.00 |
$1,580.00 |
| 670 | 613(L)6724 |
30" PREFAB. CULVERT END SEC., ROUND | 6 | EA |
$1,500.00 |
$1,953.00 |
$1,598.72 |
$2,100.00 |
$2,103.95 |
$2,200.00 |
$2,075.00 |
$2,400.00 |
| 680 | 613(L)6728 |
36" PREFAB. CULVERT END SEC., ROUND | 9 | EA |
$1,750.00 |
$2,376.00 |
$2,040.36 |
$2,400.00 |
$2,501.65 |
$2,700.00 |
$2,530.00 |
$2,470.00 |
| 690 | 613(L)6732 |
42" PREFAB. CULVERT END SEC., ROUND | 2 | EA |
$2,000.00 |
$3,762.00 |
$3,058.74 |
$3,700.00 |
$3,894.54 |
$4,000.00 |
$3,950.00 |
$4,200.00 |
| 700 | 613(Q)7500 |
OUTLET LATERAL HEADWALL | 1 | EA |
$850.00 |
$254.40 |
$750.00 |
$9,000.00 |
$657.01 |
$800.00 |
$955.00 |
$1,250.00 |
| 710 | 619(A)6200 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$75,000.00 |
$52,424.23 |
$250,000.00 |
$113,000.00 |
$115,694.25 |
$11,000.00 |
$39,750.00 |
$75,600.00 |
| 720 | 619(B)6364 |
REMOVAL OF ASPHALT PAVEMENT | 30,768 | SY |
$4.00 |
$6.06 |
$5.75 |
$7.50 |
$5.13 |
$6.30 |
$11.25 |
$7.50 |
| 730 | 619(B)6396 |
REMOVAL OF GUARDRAIL | 360 | LF |
$4.00 |
$8.50 |
$8.50 |
$9.75 |
$9.67 |
$9.00 |
$9.50 |
$8.00 |
| 740 | 623(A)1200 |
BEAM GUARDRAIL W-BEAM SINGLE | 350 | LF |
$30.00 |
$23.00 |
$23.00 |
$25.00 |
$26.16 |
$25.00 |
$25.80 |
$25.00 |
| 750 | 623(G)1820 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$4,000.00 |
$3,250.00 |
$3,250.00 |
$3,500.00 |
$3,695.66 |
$3,600.00 |
$3,640.00 |
$5,520.00 |
| 760 | 623(I)2050 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$4,000.00 |
$3,180.00 |
$3,180.00 |
$3,500.00 |
$3,616.05 |
$3,500.00 |
$3,565.00 |
$5,520.00 |
| 770 | 624(A)3200 |
FENCE-STYLE WWF | 1,522 | LF |
$5.00 |
$6.15 |
$6.25 |
$6.50 |
$7.11 |
$7.00 |
$7.00 |
$7.00 |
| 780 | 624(C)3405 |
FENCE-STYLE SWF (5 BARBED WIRE) | 31,474 | LF |
$4.50 |
$6.15 |
$6.15 |
$6.75 |
$6.99 |
$7.00 |
$6.90 |
$7.22 |
| 790 | 624(C)3410 |
FENCE-STYLE SWF (6 BARBED WIRE) | 3,369 | LF |
$7.00 |
$6.25 |
$6.20 |
$6.85 |
$7.05 |
$7.00 |
$6.95 |
$7.15 |
| 800 | 619(D)6700 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$42,000.00 |
$55,000.00 |
$55,000.00 |
$73,000.00 |
$30,778.54 |
$55,000.00 |
$61,600.00 |
$58,500.00 |
| 810 | 545 0111 |
(PL)REPLACE BRIDGE ITEM (TYPE A) | 4 | EA |
$2,000.00 |
$3,000.00 |
$20,000.00 |
$3,400.00 |
$6,345.48 |
$16,000.00 |
$3,360.00 |
$4,200.00 |
| 820 | 413(A)4200 |
RUMBLE STRIP-METHOD HMA-CON | 18,113 | LF |
$0.4000 |
$0.1900 |
$0.1900 |
$0.2000 |
$0.2200 |
$0.2200 |
$0.2500 |
$0.2500 |
| 830 | 413(B)4310 |
RUMBLE STRIP-METHOD HMA-CYC | 35,986 | LF |
$0.3500 |
$0.1900 |
$0.1900 |
$0.2000 |
$0.2200 |
$0.2200 |
$0.2500 |
$0.2500 |
| 840 | 805(A)3252 |
(PL)REMOVAL OF EXISTING SIGNS | 21 | EA |
$65.00 |
$175.00 |
$175.00 |
$185.00 |
$199.00 |
$195.00 |
$196.00 |
$210.00 |
| 850 | 805(D)3528 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$225.00 |
$225.00 |
$225.00 |
$250.00 |
$255.85 |
$250.00 |
$252.00 |
$250.00 |
| 860 | 850(A)1200 |
SHEET ALUMINUM SIGNS | 400.2 | SF |
$25.00 |
$51.00 |
$52.00 |
$55.00 |
$57.99 |
$55.00 |
$57.10 |
$55.00 |
| 870 | 851(C)2430 |
2 1/2" SQUARE TUBE POST | 655 | LF |
$15.00 |
$9.00 |
$9.00 |
$10.00 |
$10.23 |
$10.00 |
$10.10 |
$9.85 |
| 880 | 853 5175 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$25.00 |
$15.45 |
$15.45 |
$16.00 |
$17.57 |
$16.00 |
$17.30 |
$16.65 |
| 890 | 856(A)8207 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(6" WIDE) | 117,819 | LF |
$0.5500 |
$0.6400 |
$0.6400 |
$0.7000 |
$0.7300 |
$0.7000 |
$0.7200 |
$0.7100 |
| 900 | 856(A)8219 |
(SP) TRAFFIC STRIPE(PLURAL-COMPONENT)(24" WIDE) | 146 | LF |
$6.25 |
$10.00 |
$10.00 |
$11.00 |
$11.37 |
$11.00 |
$11.20 |
$11.00 |
| 910 | 857(A)9205 |
CONSTRUCTION TRAFFIC STR.(PAINT)(6" WIDE) | 9,929 | LF |
$0.3500 |
$0.5200 |
$0.5200 |
$0.5500 |
$0.5900 |
$0.5500 |
$0.5800 |
$0.5600 |
| 920 | 857(C)9405 |
REMOVABLE PAVEMENT MARKING TAPE(6" WIDE) | 2,235 | LF |
$0.7500 |
$2.44 |
$2.44 |
$2.65 |
$2.77 |
$2.70 |
$2.75 |
$2.61 |
| 930 | 857(F)9700 |
PAVEMENT MRKNG.REMOVAL(TRAF.STRP) | 5,507 | LF |
$0.2500 |
$0.5800 |
$0.5800 |
$0.6500 |
$0.6600 |
$0.6600 |
$0.6500 |
$0.6400 |
| 940 | 871(B)2300 |
CONST.ZONE IMPACT ATTEN. | 1,180 | SD |
$12.50 |
$22.00 |
$22.00 |
$23.00 |
$25.02 |
$24.00 |
$24.60 |
$23.80 |
| 950 | 877(B)4300 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 900 | LF |
$55.00 |
$19.20 |
$19.20 |
$21.00 |
$19.56 |
$21.00 |
$21.50 |
$26.20 |
| 960 | 877(C)4400 |
RELOCATION OF PORT. LONGITUDINAL BARRIER | 2,650 | LF |
$20.00 |
$5.00 |
$5.00 |
$5.25 |
$4.36 |
$5.50 |
$5.60 |
$8.00 |
| 970 | 880(B)6300 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 21,055 | SD |
$0.6000 |
$2.00 |
$2.00 |
$2.10 |
$2.27 |
$2.50 |
$2.25 |
$2.17 |
| 980 | 880(B)6310 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 22,925 | SD |
$0.8500 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0500 |
$0.0300 |
$0.0400 |
| 990 | 880(B)6320 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 15,965 | SD |
$1.50 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0500 |
$0.0300 |
$0.0400 |
| 1,000 | 880(C)6410 |
CONSTRUCTION BARRICADES(TYPE III) | 18,565 | SD |
$1.00 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0200 |
$0.0500 |
$0.0300 |
$0.0400 |
| 1,010 | 880(D)6500 |
VERTICAL PANELS | 6,345 | SD |
$0.1500 |
$1.85 |
$1.85 |
$2.00 |
$2.10 |
$2.50 |
$2.05 |
$1.99 |
| 1,020 | 880(E)6600 |
WARNING LIGHTS(TYPE A) | 47,255 | SD |
$0.1500 |
$0.0200 |
$1.02 |
$0.0200 |
$0.0200 |
$0.0500 |
$0.0300 |
$0.0400 |
| 1,030 | 880(F)6700 |
DRUMS | 3,517 | SD |
$0.3500 |
$5.75 |
$5.75 |
$6.00 |
$6.54 |
$8.00 |
$6.45 |
$6.22 |
| 1,040 | 882(A)8210 |
PORT.CHANGEABLE MESSAGE SIGN | 1,800 | SD |
$20.00 |
$9.00 |
$9.00 |
$10.00 |
$10.23 |
$10.00 |
$10.10 |
$9.86 |
| 1,050 | 642(B)3300 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$135,000.00 |
$120,000.00 |
$275,000.00 |
$103,057.54 |
$120,000.00 |
$132,500.00 |
$119,350.00 |
| 1,060 | 220 1100 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$108,000.00 |
$45,000.00 |
$60,000.00 |
$4,548.50 |
$35,000.00 |
$17,500.00 |
$7,500.00 |
| 1,070 | 640(A)1210 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$33,000.00 |
$25,000.00 |
$135,000.00 |
$35,238.33 |
$40,000.00 |
$56,000.00 |
$37,500.00 |
| 1,080 | 641 2110 |
MOBILIZATION | 1 | LSUM |
$840,000.00 |
$790,000.00 |
|
$833,000.00 |
$824,614.29 |
$849,000.00 |
$899,505.78 |
$792,000.00 |