161BidsJan 21, 2016 to Oct 15, 2026
24Wins (low bidder)
14.9%Win rate
$134,441,671Total won
Competitor scorecard
Last 5 years in Oklahoma12.0%Win rate9 of 75 bids
+6.7%Average bid vs estimate
-1.5%Winning bids vs estimate
+14.8%Over the low bid when they loseAverage field: 5.5 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| Haskell Lemon Group, LLC | 45 | 21 | 24 | 47% |
| Silver Star Construction Company, Inc. | 43 | 18 | 25 | 42% |
| THE CUMMINS CONSTRUCTION CO., INC. | 25 | 12 | 13 | 48% |
| Ellsworth Construction, LLC | 22 | 11 | 11 | 50% |
| OVERLAND CORPORATION | 21 | 9 | 12 | 43% |
| RUDY CONSTRUCTION CO. | 18 | 9 | 9 | 50% |
| Atlas Paving Company | 14 | 6 | 8 | 43% |
| HASKELL LEMON CONSTRUCTION CO. | 14 | 7 | 7 | 50% |
| SAC Services, Inc. | 12 | 2 | 10 | 17% |
| Redlands Contracting, LLC | 11 | 4 | 7 | 36% |
| Let date | Contract | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Oct 15, 2026 | 260280 | Intersection ModificationLogan · Division 4 | 3 of 6 | $2,139,161 | $1,976,881BRIDGECO CONTRACTORS, INC. | +8.2% |
| Oct 15, 2026 | 260281 | Widen, Resurface, And BridgePottawatomie · Division 3 | 4 of 8 | $5,963,798 | $5,840,000Haskell Lemon Group, LLC | +2.1% |
| Sep 10, 2026 | 260207 | Pedestrian Improvements (Sidewalks)Canadian · Division 4 | 7 of 8 | $1,587,926 | $1,197,184Redlands Contracting, LLC | +32.6% |
| Sep 10, 2026 | 260111 | Resurface (Asphalt)Oklahoma · Division 4 | 2 of 5 | $2,208,056 | $2,047,175Haskell Lemon Group, LLC | +7.9% |
| Aug 20, 2026 | 260131 | Oklahoma · Division 4 | 1 of 6 | $3,848,460 | $3,848,460 | Won |
| Aug 13, 2026 | 260188 | Oklahoma · Division 4 | 5 of 9 | $1,038,641 | $969,383Silver Star Construction Co… | +7.1% |
| Aug 13, 2026 | 260190 | Pottawatomie · Division 3 | 3 of 5 | $2,684,851 | $2,374,847Haskell Lemon Group, LLC | +13.1% |
| Jul 16, 2026 | 260175 | InterchangeLincoln · Division 3 | 2 of 3 | $35,510,013 | $29,917,572SHERWOOD CONSTRUCTION CO., … | +18.7% |
| Jun 18, 2026 | 260144 | Grade, Drain, Bridge, And SurfaceCleveland · Division 3 | 2 of 4 | $36,298,879 | $33,388,900Haskell Lemon Group, LLC | +8.7% |
| Jun 11, 2026 | 260148 | Resurface (Asphalt)Mcclain · Division 3 | 3 of 8 | $664,929 | $646,795Silver Star Construction Co… | +2.8% |
| May 14, 2026 | 260129 | Grade, Drain, And SurfaceBlaine, Dewey · Division 5 | 2 of 5 | $23,420,284 | $22,211,964CORNELL CONSTRUCTION COMPAN… | +5.4% |
| May 14, 2026 | 260130 | Grade, Drain, And SurfaceCaddo, Grady · Division 7 | 3 of 7 | $19,217,244 | $18,294,646OVERLAND CORPORATION | +5.0% |
| May 14, 2026 | 260166 | Resurface (Asphalt)Payne · Division 4 | 4 of 8 | $3,745,268 | $3,236,396Atlas Paving Company | +15.7% |
| Apr 16, 2026 | 260098 | Shoulder And Guardrail ReconstructionPayne · Division 4 | 1 of 6 | $5,424,066 | $5,424,066 | Won |
| Apr 16, 2026 | 260103 | Resurface (Asphalt)Cleveland · Division 3 | 3 of 4 | $2,578,743 | $2,472,669Silver Star Construction Co… | +4.3% |
| Apr 16, 2026 | 260119 | Resurface (Asphalt)Grady · Division 7 | 7 of 9 | $1,216,307 | $992,308SCHWARZ PAVING CO., INC. | +22.6% |
| Apr 16, 2026 | 260135 | Resurface (Asphalt)Cleveland · Division 3 | 2 of 3 | $3,024,562 | $2,997,041Silver Star Construction Co… | +0.9% |
| Apr 16, 2026 | 260138 | Resurface (Asphalt)Grady · Division 7 | 5 of 7 | $4,212,570 | $3,685,275First Water Contracting, LLC | +14.3% |
| Apr 16, 2026 | 260140 | Resurface (Asphalt)Logan · Division 4 | 2 of 4 | $773,708 | $642,865Atlas Paving Company | +20.4% |
| Apr 9, 2026 | 260117 | Resurface (Asphalt)Noble · Division 4 | 2 of 3 | $2,908,488 | $2,467,395Evans & Associates Construc… | +17.9% |
| Apr 9, 2026 | 260090 | Pedestrian Improvements (Sidewalks)Payne · Division 4 | 8 of 11 | $1,341,512 | $897,421SAC Services, Inc. | +49.5% |
| Apr 9, 2026 | 260118 | Resurface (Asphalt)Payne · Division 4 | 4 of 7 | $3,772,706 | $3,267,000BECCO CONTRACTORS, INC. | +15.5% |
| Mar 19, 2026 | 260062 | Resurface (Asphalt)Canadian · Division 4 | 3 of 3 | $27,849,938 | $21,475,000Haskell Lemon Group, LLC | +29.7% |
| Mar 12, 2026 | 250323 | Resurface (Asphalt)Cleveland · Division 3 | 3 of 4 | $7,351,508 | $5,844,595Haskell Lemon Group, LLC | +25.8% |
| Mar 12, 2026 | 260056 | Resurface (Asphalt)Grady · Division 7 | 8 of 9 | $1,184,529 | $1,034,652Silver Star Construction Co… | +14.5% |
| Mar 12, 2026 | 260058 | Pavement Rehabilitation (Asphalt)Kingfisher · Division 4 | 4 of 6 | $2,075,575 | $1,933,965Haskell Lemon Group, LLC | +7.3% |
| Feb 19, 2026 | 250348 | Pedestrian And Bike ImprovementsKingfisher · Division 4 | 6 of 9 | $1,203,039 | $969,755Redlands Contracting, LLC | +24.1% |
| Feb 19, 2026 | 250327 | Pedestrian And Bike ImprovementsOklahoma · Division 4 | 8 of 8 | $5,295,815 | $4,349,919Built Right Construction, L… | +21.7% |
| Feb 12, 2026 | 260034 | Widen And Resurface (Asphalt)Logan, Payne · Division 4 | 3 of 5 | $4,498,374 | $4,169,900Haskell Lemon Group, LLC | +7.9% |
| Feb 12, 2026 | 250329 | Pedestrian And Bike ImprovementsOklahoma · Division 4 | 1 of 9 | $1,511,694 | $1,511,694 | Won |
| Jan 22, 2026 | 260018 | Pavement Rehabilitation (Asphalt)Creek · Division 8 | 1 of 3 | $7,794,612 | $7,794,612 | Won |
| Jan 22, 2026 | 260020 | Resurface (Asphalt)Canadian · Division 4 | 3 of 5 | $642,608 | $615,146Ellsworth Construction, LLC | +4.5% |
| Jan 22, 2026 | 250344 | Pedestrian And Bike ImprovementsPayne · Division 4 | 7 of 10 | $645,398 | $514,254Redlands Contracting, LLC | +25.5% |
| Jan 15, 2026 | 260002 | Resurface (Asphalt)Canadian · Division 4 | 4 of 4 | $3,300,783 | $3,116,596SCHWARZ PAVING CO., INC. | +5.9% |
| Jan 15, 2026 | 260005 | Resurface (Asphalt)Caddo, Grady · Division 7 | 5 of 6 | $712,351 | $599,392Silver Star Construction Co… | +18.8% |
| Jan 15, 2026 | 250273 | Widen And ResurfaceKingfisher · Division 4 | 4 of 5 | $30,966,806 | $30,566,508Silver Star Construction Co… | +1.3% |
| Jan 15, 2026 | 260013 | Resurface (Asphalt)Pottawatomie · Division 3 | 3 of 5 | $2,365,206 | $2,156,529Haskell Lemon Group, LLC | +9.7% |
| Nov 20, 2025 | 250273 | Widen And ResurfaceKingfisher · Division 4 | 4 of 5 | $30,966,806 | $30,566,508Silver Star Construction Co… | +1.3% |
| Oct 16, 2025 | 250305 | Pedestrian, Bike, And Safety ImprovementsOklahoma · Division 4 | 3 of 7 | $9,793,581 | $9,494,972RUDY CONSTRUCTION CO. | +3.1% |
| Sep 18, 2025 | 250201 | Pedestrian And Roadway Improvements (Sidewalks)Oklahoma · Division 4 | 4 of 5 | $4,085,768 | $3,128,887SAC Services, Inc. | +30.6% |
| Jun 19, 2025 | 250065 | Resurface (Asphalt)Canadian · Division 4 | 3 of 6 | $1,286,243 | $1,229,694Ellsworth Construction, LLC | +4.6% |
| Jun 19, 2025 | 250173 | Widen, Resurface, And BridgeLincoln · Division 3 | 3 of 7 | $21,953,003 | $21,173,363THE CUMMINS CONSTRUCTION CO… | +3.7% |
| May 15, 2025 | 250068 | Resurface (Asphalt)Cleveland · Division 3 | 1 of 4 | $2,970,005 | $2,970,005 | Won |
| May 15, 2025 | 250090 | Resurface (Asphalt)Pottawatomie · Division 3 | 4 of 6 | $3,455,863 | $3,036,761THE CUMMINS CONSTRUCTION CO… | +13.8% |
| May 8, 2025 | 250140 | Pedestrian And Bike Improvements (Trail And Sidewalks)Cleveland · Division 3 | 6 of 11 | $1,557,828 | $1,012,694PARATHON CONSTRUCTION, LLC | +53.8% |
| May 8, 2025 | 250127 | Resurface (Asphalt)Grady · Division 7 | 6 of 9 | $1,885,127 | $1,499,346Silver Star Construction Co… | +25.7% |
| May 8, 2025 | 250130 | Resurface (Asphalt)Mcclain · Division 3 | 6 of 7 | $2,508,349 | $2,245,376Ellsworth Construction, LLC | +11.7% |
| Mar 20, 2025 | 250115 | Resurface (Asphalt)Seminole · Division 3 | 5 of 5 | $2,535,147 | $2,195,069THE CUMMINS CONSTRUCTION CO… | +15.5% |
| Mar 20, 2025 | 250089 | Resurface (Asphalt)Payne · Division 4 | 4 of 6 | $2,721,942 | $2,137,000BECCO CONTRACTORS, INC. | +27.4% |
| Mar 13, 2025 | 250116 | Resurface (Asphalt)Seminole · Division 3 | 5 of 7 | $3,494,186 | $3,148,062Silver Star Construction Co… | +11.0% |
| Feb 13, 2025 | 250059 | Resurface (Asphalt)Mcclain · Division 3 | 3 of 7 | $1,850,831 | $1,746,223Silver Star Construction Co… | +6.0% |
| Jan 9, 2025 | 250010 | Emergency ReliefKingfisher · Division 4 | 5 of 6 | $724,386 | $599,241K & R BUILDERS, INC. | +20.9% |
| Jan 9, 2025 | 250018 | Resurface (Asphalt)Payne · Division 4 | 5 of 9 | $2,358,143 | $2,015,791Evans & Associates Construc… | +17.0% |
| Jan 9, 2025 | 250019 | Resurface (Asphalt)Pottawatomie · Division 3 | 2 of 6 | $1,133,925 | $1,131,261OVERLAND CORPORATION | +0.2% |
| Jan 9, 2025 | 250030 | Resurface (Asphalt)Noble · Division 4 | 2 of 4 | $3,044,725 | $2,587,033Evans & Associates Construc… | +17.7% |
| Oct 17, 2024 | 240203 | Grade, Drain, And SurfaceMcclain · Division 3 | 3 of 5 | $23,514,101 | $21,900,900Haskell Lemon Group, LLC | +7.4% |
| Oct 10, 2024 | 240235 | Grade, Drain, Surface, And BridgeLogan · Division 4 | 6 of 6 | $4,980,334 | $4,499,023Treas Construction Inc | +10.7% |
| Oct 10, 2024 | 230059 | Widen, Resurface, And BridgeKingfisher, Logan · Division 4 | 4 of 4 | $21,236,189 | $18,249,670Haskell Lemon Group, LLC | +16.4% |
| Feb 16, 2023 | 210118 | RESURFACE (ASPHALT ) I-40: FROM 1.9 MILES EAST OF THE JOHN KILPATRICK TURNPIKE INTERCHANGE, EXTEND EAST IN OKLAHOMA CITY . PROJECT LENGTH = 3.16 MILESCanadian, Oklahoma · | 2 of 2 | $6,752,095 | $6,203,784HASKELL LEMON CONSTRUCTION … | +8.8% |
| Nov 17, 2022 | 220373 | OKLAHOMA WIDEN, RESURFACE , BRIDGE, GRADE, DRAIN, AND SURFACE SH-66: FROM 4.0 MILES EAST OF I -35, EXTEND NORTHEAST IN EDMOND AND ARCADIA . PROJECT LENGTH = 8.054 MILESStp-155c(610)pm · | 1 of 2 | $30,961,330 | $30,961,330 | Won |
| Oct 20, 2022 | 220192 | GRADE, DRAIN, SURFACE , AND BRIDGE US-77: FROM 6.4 MILES NORTH OF THE SH -39 JUNCTION, EXTEND NORTHWEST NEAR NOBLE . PROJECT LENGTH = 3.370 MILESCleveland · Division 3 | 3 of 3 | $25,555,344 | $22,992,675Silver Star Construction Co… | +11.1% |
| Jul 14, 2022 | 220203 | INTERSECTION MODIFICATION COUNTY ROAD (BRITTON ROAD ): AT THE INTERSECTION OF LUTHER ROAD NEAR JONES. PROJECT LENGTH = 0.170 MILEOklahoma · Division 4 | 3 of 3 | $543,569 | $495,252RUDY CONSTRUCTION CO. | +9.8% |
| Jul 14, 2022 | 220215 | RESURFACE (ASPHALT ) SH-37: FROM THE US -62 JUNCTION, EXTEND EAST IN OKLAHOMA CITY . PROJECT LENGTH = 4.56 MILESCleveland · Division 3 | 3 of 5 | $2,054,968 | $1,825,731HASKELL LEMON CONSTRUCTION … | +12.6% |
| Jul 14, 2022 | 220230 | RESURFACE (UTBWC) SH-51: FROM 0.07 MILES EAST OF FAIRGROUNDS ROAD, EXTEND EAST NEAR STILLWATER . PROJECT LENGTH = 4.220 MILESPayne · Division 4 | 1 of 2 | $1,979,981 | $1,979,981 | Won |
| Jul 14, 2022 | 220122 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-19: FROM 12.9 MILES SOUTHEAST OF THE US -81 JUNCTION, EXTEND SOUTHEAST NEAR BRADLEY. PROJECT LENGTH = 4.058 MILESGrady · Division 7 | 3 of 3 | $20,027,446 | $16,288,480THE CUMMINS CONSTRUCTION CO… | +23.0% |
| May 19, 2022 | 220163 | GRADE, DRAIN, AND SURFACE SH-39: FROM 2.9 MILES WEST OF THE SH -76 JUNCTION, EXTEND EAST NEAR DIBBLE . PROJECT LENGTH = 2.75 MILESGrady, Mcclain · | 3 of 4 | $13,205,457 | $10,679,999Silver Star Construction Co… | +23.6% |
| May 19, 2022 | 220167 | RESURFACE (ASPHALT ) SH-74: FROM THE SH -33 JUNCTION, EXTEND NORTH NEAR CRESCENT . PROJECT LENGTH = 5.240 MILESLogan · Division 4 | 1 of 2 | $2,949,141 | $2,949,141 | Won |
| May 19, 2022 | 220174 | RESURFACE (ASPHALT ) I-35:FROM 0.4 MILES NORTH OF SH-66, EXTEND NORTH IN EDMOND . PROJECT LENGTH = 4.680 MILESOklahoma · Division 4 | 1 of 2 | $2,320,478 | $2,320,478 | Won |
| May 19, 2022 | 220175 | RESURFACE (ASPHALT ) I-40: FROM 3.5 MILES SOUTHEAST OF THE I -35 INTERCHANGE, EXTEND EAST IN MIDWEST CITY . PROJECT LENGTH = 3.650 MILESOklahoma · Division 4 | 2 of 3 | $4,288,886 | $4,061,475Silver Star Construction Co… | +5.6% |
| Mar 17, 2022 | 220090 | RESURFACE (ASPHALT ) US-81: FROM 1.4 MILES SOUTH OF THE SH -37E JUNCTION, EXTEND NORTH NEAR MINCO . PROJECT LENGTH = 4.90 MILESGrady · Division 7 | 2 of 4 | $2,543,678 | $2,393,737THE CUMMINS CONSTRUCTION CO… | +6.3% |
| Mar 17, 2022 | 220097 | RESURFACE (ASPHALT ) US-177: FROM 8.02 MILES NORTH OF SH -66 JUNCTION, EXTEND NORTH IN CARNEY . PROJECT LENGTH = 4.87 MILESLincoln · Division 3 | 4 of 4 | $882,880 | $740,445HASKELL LEMON CONSTRUCTION … | +19.2% |
| Jan 20, 2022 | 220022 | RESURFACE (ASPHALT ) SH-37: FROM 0.01 MILES EAST OF GREGORY ROAD , EXTEND EAST IN TUTTLE . PROJECT LENGTH = 3.00 MILEGrady · Division 7 | 4 of 6 | $1,571,377 | $1,499,797HASKELL LEMON CONSTRUCTION … | +4.8% |
| Jan 20, 2022 | 220034 | NOBLE RESURFACE (ASPHALT ) US-77: FROM THE SH -15E JUNCTION, EXTEND NORTH NEAR BILLINGS . PROJECT LENGTH = 8.95 MILESSsr-252c(090)sr · | 3 of 3 | $3,779,229 | $2,744,369Evans & Associates Construc… | +37.7% |
| Jan 20, 2022 | 220040 | RESURFACE (ASPHALT ) US-177: FROM I-40, EXTEND NORTH NEAR SHAWNEE . PROJECT LENGTH = 0.680 MILEPottawatomie · Division 3 | 2 of 5 | $408,743 | $362,294H & G Paving Contractors In… | +12.8% |
| Jan 20, 2022 | 220044 | GRADE, DRAIN, SURFACE , AND BRIDGE CITY STREET (EAST RENO AVENUE ): FROM MIDWEST BOULEVARD , EXTEND EAST IN MIDWEST CITY . PROJECT LENGTH = 1.214 MILESOklahoma · Division 4 | 3 of 3 | $3,558,345 | $2,707,535SAC Services, Inc. | +31.4% |
| Nov 18, 2021 | 210323 | GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (NS-341/KICKAPOO STREET): FROM THE US -62 JUNCTION, EXTEND SOUTH NEAR MEEKER. PROJECT LENGTH = 3.004 MILESLincoln · Division 3 | 1 of 3 | $3,769,612 | $3,769,612 | Won |
| Aug 10, 2021 | 210221 | GRADE, DRAIN, AND SURFACE CITY STREET (SARA ROAD ): FROM THE SH -152 JUNCTION, EXTEND NORTH TO SW 29TH STREET IN OKLAHOMA CITY AND MUSTANG . PROJECT LENGTH = 2.940 MILESCanadian · Division 4 | 5 of 5 | $23,954,903 | $19,391,245ALLEN CONTRACTING, INC./SHE… | +23.5% |
| Jul 15, 2021 | 210111 | WIDEN AND RESURFACE SH-66: FROM THE OKLAHOMA COUNTY LINE , EXTEND EAST NEAR WELLSTON . PROJECT LENGTH = 2.848 MILESLincoln · Division 3 | 4 of 4 | $8,038,416 | $6,999,820HASKELL LEMON CONSTRUCTION … | +14.8% |
| Jul 15, 2021 | 210211 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (COLTRANE ROAD /NS-312): FROM WATERLOO ROAD , EXTEND NORTH NEAR EDMOND . PROJECT LENGTH = 0.996 MILELogan · Division 4 | 2 of 4 | $3,755,669 | $3,170,376ALLEN CONTRACTING, INC./SHE… | +18.5% |
| Jul 15, 2021 | 210219 | RESURFACE (ASPHALT ) SH-4: FROM 0.53 MILES NORTH OF I -44 (H.E. BAILEY TURNPIKE ), EXTEND NORTH NEAR BRIDGE CREEK . PROJECT LENGTH = 4.690 MILESGrady · Division 7 | 5 of 7 | $1,683,497 | $1,292,057HASKELL LEMON CONSTRUCTION … | +30.3% |
| Jun 17, 2021 | 210177 | WIDEN AND RESURFACE SH-33: FROM 0.2 MILES WEST OF THE SH -74F JUNCTION, EXTEND EAST AND NORTHEAST NEAR CIMARRON CITY . PROJECT LENGTH = 3.806 MILESKingfisher, Logan · | 1 of 4 | $9,958,102 | $9,958,102 | Won |
| Jun 17, 2021 | 210178 | RESURFACE (ASPHALT ) I-44: FROM 0.29 MILES SOUTH OF THE SH-37 JUNCTION, EXTEND NORTH IN NEWCASTLE. PROJECT LENGTH = 6.090 MILESCleveland, Mcclain · | 3 of 4 | $1,910,059 | $1,631,040Silver Star Construction Co… | +17.1% |
| May 20, 2021 | 210082 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-59: FROM 5.6 MILES SOUTH OF THE SH -39 JUNCTION, EXTEND NORTH NEAR CRINER . PROJECT LENGTH = 0.857 MILEMcclain · Division 3 | 9 of 9 | $4,039,636 | $3,455,100Silver Star Construction Co… | +16.9% |
| May 20, 2021 | 210139 | WIDEN AND RESURFACE SH-76: FROM 3.4 MILES NORTH OF THE SH -19 JUNCTION, EXTEND NORTH NEAR LINDSAY . PROJECT LENGTH = 4.886 MILESMcclain · Division 3 | 2 of 4 | $9,125,572 | $8,956,200Silver Star Construction Co… | +1.9% |
| May 20, 2021 | 210140 | GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (NW 180TH STREET/EW-141): FROM THE SH-59 JUNCTION, EXTEND WEST NEAR CRINER . PROJECT LENGTH = 2.277 MILESMcclain · Division 3 | 6 of 6 | $5,796,578 | $5,018,860Treas Construction Inc | +15.5% |
| May 20, 2021 | 210153 | POTTAWATOMIE RESURFACE (ASPHALT ) SH-9A: FROM THE SH -59 JUNCTION, EXTEND NORTH NEAR MAUD . PROJECT LENGTH = 10.22 MILESStp-263c(075)3p · | 4 of 4 | $2,375,426 | $1,978,832HASKELL LEMON CONSTRUCTION … | +20.0% |
| May 20, 2021 | 210156 | RESURFACE (ASPHALT ) SH-56: FROM 0.8 MILES SOUTH OF THE SH -99A JUNCTION, EXTEND NORTH IN CROMWELL . PROJECT LENGTH = 4.990 MILESSeminole · Division 3 | 4 of 4 | $1,441,932 | $1,225,445Rosscon, LLC | +17.7% |
| Apr 15, 2021 | 210100 | RESURFACE (ASPHALT ) US-81: FROM 0.6 MILES NORTH OF THE I -40 BUSINESS JUNCTION, EXTEND NORTH IN EL RENO . PROJECT LENGTH = 4.790 MILESCanadian · Division 4 | 1 of 5 | $2,009,101 | $2,009,101 | Won |
| Apr 15, 2021 | 210107 | RESURFACE (ASPHALT ) SH-19: FROM THE GRADY COUNTY LINE , EXTEND EAST NEAR LINDSAY . PROJECT LENGTH = 2.400 MILESGarvin · Division 3 | 1 of 6 | $450,042 | $450,042 | Won |
| Apr 15, 2021 | 210114 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (NS-327): FROM 2.5 MILES SOUTH OF US-412, EXTEND NORTH NEAR RED ROCK . PROJECT LENGTH = 3.489 MILESNoble · Division 4 | 1 of 5 | $3,818,322 | $3,818,322 | Won |
| Apr 15, 2021 | 210117 | OKLAHOMA GRADE, DRAIN, SURFACE , AND BRIDGE REHABILITATION SH-152: FROM 0.4 MILES EAST OF JOHN KILPATRICK TURNPIKE , EXTEND EAST IN OKLAHOMA CITY. PROJECT LENGTH = 3.641 MILESNhpp-255n(535)pm · | 1 of 4 | $7,177,335 | $7,177,335 | Won |
| Mar 18, 2021 | 210072 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-9: FROM 2.4 MILES SOUTH OF THE SH -146 JUNCTION, EXTEND SOUTHEAST NEAR FORT COBB . PROJECT LENGTH = 6.022 MILESCaddo · Division 7 | 3 of 5 | $21,282,480 | $20,973,714OVERLAND CORPORATION | +1.5% |
| Mar 18, 2021 | 210073 | PAVEMENT REHABILITATION (ASPHALT ) US-281 SPUR: FROM THE US -281 JUNCTION, EXTEND SOUTHEAST NEAR GEARY . PROJECT LENGTH = 4.210 MILESCanadian · Division 4 | 2 of 2 | $1,304,051 | $1,079,999HASKELL LEMON CONSTRUCTION … | +20.7% |
| Mar 18, 2021 | 210081 | LINCOLN RESURFACE (ASPHALT ) SH-18: FROM THE US -62 JUNCTION, EXTEND NORTH NEAR MEEKER AND CHANDLER . PROJECT LENGTH = 13.26 MILESStp-241c(071)3p · | 4 of 7 | $3,182,966 | $2,998,726HASKELL LEMON CONSTRUCTION … | +6.1% |
| Feb 18, 2021 | 210045 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-9: FROM 72ND AVENUE , EXTEND EAST IN NORMAN . PROJECT LENGTH = 3.042 MILESCleveland · Division 3 | 1 of 3 | $15,770,949 | $15,770,949 | Won |
| Feb 18, 2021 | 210052 | RESURFACE (ASPHALT ) SH-102: FROM 2.0 MILES NORTH OF THE SH -62 JUNCTION, EXTEND NORTH NEAR WELLSTON . PROJECT LENGTH = 7.000 MILESLincoln · Division 3 | 3 of 4 | $894,689 | $864,776H & G Paving Contractors In… | +3.5% |
| Feb 18, 2021 | 210057 | RESURFACE (ASPHALT ) I-35: FROM 0.35 MILES SOUTH OF US-77, EXTEND NORTH NEAR PERRY . PROJECT LENGTH = 7.230 MILESNoble · Division 4 | 2 of 4 | $4,219,541 | $3,798,615HASKELL LEMON CONSTRUCTION … | +11.1% |
| Jan 21, 2021 | 210010 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (156TH AVENUE S .E./NS-325): FROM MAGUIRE ROAD, EXTEND NORTH NEAR ETOWAH . PROJECT LENGTH = 3.742 MILESCleveland · Division 3 | 1 of 4 | $4,208,830 | $4,208,830 | Won |
| Jan 21, 2021 | 210025 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-51: FROM THE US -81 JUNCTION, EXTEND EAST NEAR HENNESSEY . PROJECT LENGTH = 6.984 MILESKingfisher · Division 4 | 2 of 3 | $12,816,420 | $12,515,005THE CUMMINS CONSTRUCTION CO… | +2.4% |
| Jan 21, 2021 | 210031 | GRADE, DRAIN, WIDEN, RESURFACE , AND TRAFFIC SIGNALS CITY STREET (MACARTHUR BOULEVARD ): FROM NW 34TH STREET, EXTEND NORTH IN THE CITY OF WARR ACRES. PROJECT LENGTH = 0.927 MILESOklahoma · Division 4 | 2 of 5 | $6,224,873 | $6,207,409SCHWARZ PAVING CO., INC. | +0.3% |
| Oct 15, 2020 | 200077 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-39: FROM 3.0 MILES EAST OF THE SH -102 JUNCTION, EXTEND EAST NEAR ASHER . PROJECT LENGTH = 2.880 MILESPottawatomie · Division 3 | 2 of 6 | $7,437,938 | $6,927,007OVERLAND CORPORATION | +7.4% |
| Oct 15, 2020 | 200199 | PEDESTRIAN IMPROVEMENTS (SIDEWALKS ) CITY STREETS (DIVISION ST/NOBLE AVE ): DIVISION ST, FROM INDUSTRIAL RD EXT N . NOBLE AVE , FROM DIVISION ST EXT E . PROJECT LENGTH = 1.730 MILESLogan · Division 4 | 5 of 9 | $1,179,588 | $872,704C-P INTEGRATED SERVICES, IN… | +35.2% |
| Oct 15, 2020 | 200320 | PEDESTRIAN IMPROVEMENTS (SIDEWALKS ) CITY STREETS (SHARTEL AVENUE ): FROM NW 10TH STREET, EXTEND SOUTH IN OKLAHOMA CITY . PROJECT LENGTH = 0.161 MILEOklahoma · Division 4 | 5 of 7 | $245,765 | $161,328SAC Services, Inc. | +52.3% |
| Sep 17, 2020 | 200292 | WIDEN AND RESURFACE SH-102: FROM THE SH -9 JUNCTION, EXTEND NORTH NEAR TECUMSEH . PROJECT LENGTH = 3.096 MILESPottawatomie · Division 3 | 3 of 7 | $11,650,857 | $10,665,800Silver Star Construction Co… | +9.2% |
| Aug 20, 2020 | 200225 | GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROADS (NINNEKAH RD/EW-142/EW-142.5 (DELL ST)/NS-284): AT MULTIPLE LOCATIONS IN NINNEKAH. PROJECT LENGTH = 5.158 MILESGrady · Division 7 | 3 of 6 | $11,220,108 | $9,911,422SEWELL BROS., INC. | +13.2% |
| Mar 19, 2020 | 200027 | RESURFACE (ASPHALT ) COUNTY ROAD (FAIRGROUNDS / NS-337): FROM THE SH -51 JUNCTION, EXTEND SOUTH NEAR STILLWATER . PROJECT LENGTH = 4.930 MILESPayne · Division 4 | 2 of 3 | $1,112,421 | $907,376Atlas Paving Company | +22.6% |
| Mar 19, 2020 | 200099 | RESURFACE (ASPHALT ) SH-3: FROM 4.0 MILES SOUTHEAST OF US -81, EXTEND SOUTHEAST NEAR OKARCHE. PROJECT LENGTH = 3.35 MILESCanadian · Division 4 | 2 of 4 | $4,190,285 | $3,794,837Atlas Paving Company | +10.4% |
| Mar 19, 2020 | 200121 | POTTAWATOMIE, SEMINOLE RESURFACE (ASPHALT AND UTBWC ) I-40: FROM THE SH -18 JUNCTION, EXTEND EAST NEAR SHAWNEE . PROJECT LENGTH = 14.050 MILESNhppi-4000(096)3p · | 2 of 2 | $6,944,696 | $5,924,420HASKELL LEMON CONSTRUCTION … | +17.2% |
| Feb 20, 2020 | 200057 | GRADE, DRAIN, AND SURFACE US -77: FROM 1.0 MILE NORTH OF THE SH -39 JUNCTION, EXTEND NORTH IN LEXINGTON . PROJECT LENGTH = 3.315 MILESCleveland · Division 3 | 2 of 5 | $12,922,938 | $11,580,500Silver Star Construction Co… | +11.6% |
| Feb 20, 2020 | 200071 | PAVEMENT REHABILITATION (ASPHALT ) SH-74: FROM 1.28 MILES NORTH OF THE SH -74F JUNCTION, EXTEND NORTH NEAR CEDAR VALLEY . PROJECT LENGTH = 3.780 MILESLogan · Division 4 | 1 of 2 | $1,344,425 | $1,344,425 | Won |
| Feb 20, 2020 | 200078 | RESURFACE (ASPHALT ) SH-39: FROM THE CLEVELAND COUNTY LINE , EXTEND EAST NEAR EASON. PROJECT LENGTH = 6.640 MILESPottawatomie · Division 3 | 3 of 3 | $1,921,769 | $1,577,900Silver Star Construction Co… | +21.8% |
| Jan 16, 2020 | 200015 | LOGAN RESURFACE (ASPHALT ) US-77/SH-33: US-77, FROM 0.05 MI S OF INDUSTRIAL AVE EXT N . SH-33, FROM 0.16 MI WEST OF 19TH ST EXT EAST IN GUTHRIE . PROJECT LENGTH = 3.210 MILESSsr-242b(074)sr · | 2 of 3 | $2,472,263 | $2,425,000HASKELL LEMON CONSTRUCTION … | +1.9% |
| Oct 17, 2019 | 190319 | RESURFACE (ASPHALT ) SH-74: FROM 0.64 MILES SOUTH OF WATERLOO ROAD , EXTEND NORTH NEAR EDMOND. PROJECT LENGTH = 6.920 MILESLogan, Oklahoma · | 1 of 2 | $1,803,497 | $1,803,497 | Won |
| Sep 19, 2019 | 190225 | RESURFACE (ASPHALT ) I-40: FROM THE I -35 INTERCHANGE, EXTEND SOUTHEAST IN DEL CITY . PROJECT LENGTH = 2.64 MILESOklahoma · Division 4 | 1 of 3 | $1,419,438 | $1,419,438 | Won |
| Aug 22, 2019 | 190238 | GRADE, DRAIN, AND SURFACE SH -3: FROM 1.0 MILE EAST OF THE US -270 JUNCTION, EXTEND EAST IN WATONGA . PROJECT LENGTH = 4.109 MILESBlaine · Division 5 | 3 of 3 | $11,125,680 | $9,866,476THE CUMMINS CONSTRUCTION CO… | +12.8% |
| Jun 20, 2019 | 190156 | WIDEN, RESURFACE , AND SIDEWALKS CITY STREET (SE 29TH STREET): FROM MIDWEST BOULEVARD , EXTEND EAST IN MIDWEST CITY . PROJECT LENGTH = 1.01 MILESOklahoma · Division 4 | 4 of 5 | $4,779,050 | $4,389,620SCHWARZ PAVING CO., INC. | +8.9% |
| Jun 20, 2019 | 190199 | RESURFACE (A.C. AND P.C.) US-62: FROM THE SH -99 JUNCTION, EXTEND EAST IN PRAGUE . PROJECT LENGTH = 3.60 MILESLincoln · Division 3 | 5 of 5 | $3,077,294 | $2,027,247EMERY SAPP & SONS, INC. | +51.8% |
| May 16, 2019 | 190013 | GRADE, DRAIN, SURFACE , AND BRIDGE I-35/CNTY RD (LADD RD): I-35, FROM 3.3 MI SE OF SH-74, EXT N . CNTY RD (LADD RD), FROM 0.2 MI W OF I-35, EXT E IN GOLDSBY . PROJECT LENGTH = 0.980 MILEMcclain · Division 3 | 3 of 3 | $10,621,847 | $9,029,100Silver Star Construction Co… | +17.6% |
| May 16, 2019 | 190183 | RESURFACE (A.C. AND P.C.) CITY STREET (DOUGLAS BOULEVARD ): FROM SE 4TH STREET, EXTEND NORTH IN THE CITY OF MIDWEST CITY . PROJECT LENGTH = 1.240 MILESOklahoma · Division 4 | 3 of 4 | $3,069,738 | $2,567,608ALLEN CONTRACTING, INC./SHE… | +19.6% |
| Apr 18, 2019 | 180333 | RESURFACE (ASPHALT ) SH-3: FROM SH-74 EXTEND NORTHWEST , IN OKLAHOMA CITY . PROJECT LENGTH = 6.860 MILESCanadian, Oklahoma · | 3 of 3 | $6,801,875 | $6,076,769HASKELL LEMON CONSTRUCTION … | +11.9% |
| Apr 18, 2019 | 180355 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-37: FROM 0.7 MILES EAST OF THE US -81 JUNCTION, EXTEND EAST NEAR MINCO . PROJECT LENGTH = 3.929 MILESGrady · Division 7 | 4 of 5 | $12,821,353 | $11,770,835THE CUMMINS CONSTRUCTION CO… | +8.9% |
| Apr 18, 2019 | 190187 | RESURFACE (ASPHALT ) SH-9: FROM 0.2 MILES EAST OF THE SH -102 JUNCTION, EXTEND EAST NEAR TECUMSEH . PROJECT LENGTH = 5.50 MILESPottawatomie · Division 3 | 5 of 5 | $619,835 | $469,148Rosscon, LLC | +32.1% |
| Mar 14, 2019 | 190107 | RESURFACE (ASPHALT ) US-281: FROM 0.01 MILES WEST OF THE SH -152 JUNCTION, EXTEND WEST NEAR BINGER . PROJECT LENGTH = 4.10 MILESCaddo · Division 7 | 3 of 3 | $2,170,439 | $1,961,516THE CUMMINS CONSTRUCTION CO… | +10.7% |
| Mar 14, 2019 | 190114 | RESURFACE (ASPHALT ) US-62: FROM 1.0 MILE EAST OF THE CADDO COUNTY LINE , EXTEND EAST NEAR CHICKASHA. PROJECT LENGTH = 6.49 MILESGrady · Division 7 | 2 of 5 | $2,093,939 | $2,018,070HASKELL LEMON CONSTRUCTION … | +3.8% |
| Feb 14, 2019 | 190014 | RESURFACE (ASPHALT ) COUNTY ROAD (EW-136/230TH STREET): FROM EASTERN ROAD, EXTEND EAST THEN SOUTH ON BRYANT AVENUE (NS-311 ) NEAR WASHINGTON . PROJECT LENGTH = 3.617 MILESMcclain · Division 3 | 2 of 4 | $1,009,809 | $935,098HASKELL LEMON CONSTRUCTION … | +8.0% |
| Feb 14, 2019 | 190084 | RESURFACE (ASPHALT ) SH-37: FROM THE GRADY COUNTY LINE , EXTEND EAST NEAR NEWCASTLE. PROJECT LENGTH = 4.03 MILESMcclain · Division 3 | 2 of 3 | $1,268,069 | $1,209,913HASKELL LEMON CONSTRUCTION … | +4.8% |
| Jan 17, 2019 | 180242 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (COLTRANE ROAD ): FROM SIMPSON ROAD, EXTEND NORTH NEAR EDMOND . PROJECT LENGTH = 1.991 MILESLogan · Division 4 | 4 of 4 | $3,791,236 | $3,156,262HASKELL LEMON CONSTRUCTION … | +20.1% |
| Jan 17, 2019 | 190008 | RESURFACE (ASPHALT ) SH-74D: FROM THE SH -74 JUNCTION, EXTEND WEST NEAR LOVELL . PROJECT LENGTH = 2.687 MILESLogan · Division 4 | 2 of 2 | $402,900 | $391,000HASKELL LEMON CONSTRUCTION … | +3.0% |
| Oct 18, 2018 | 180321 | RESURFACE (ASPHALT ) SH-3: FROM THE SH -4 JUNCTION, EXTEND NORTHWEST NEAR PIEDMONT . PROJECT LENGTH = 6.12 MILESCanadian · Division 4 | 2 of 4 | $4,728,983 | $4,253,279THE CUMMINS CONSTRUCTION CO… | +11.2% |
| May 17, 2018 | 180200 | RESURFACE (ASPHALT ) SH-74: FROM THE SH -24 JUNCTION, EXTEND NORTH NEAR GOLDSBY . PROJECT LENGTH = 5.00 MILESMcclain · Division 3 | 2 of 5 | $627,262 | $611,658MARKWELL PAVING COMPANY, IN… | +2.6% |
| May 17, 2018 | 180199 | RESURFACE (ASPHALT ) SH-105: FROM THE LINCOLN COUNTY LINE , EXTEND WEST NEAR MERIDIAN. PROJECT LENGTH = 7.840 MILESLogan · Division 4 | 2 of 3 | $1,622,400 | $1,492,000HASKELL LEMON CONSTRUCTION … | +8.7% |
| Apr 19, 2018 | 180157 | RESURFACE (UTBWC) SH-77H: FROM THE US -77 JUNCTION, EXTEND NORTH NEAR NORMAN . PROJECT LENGTH = 8.00 MILESCleveland · Division 3 | 2 of 4 | $1,413,548 | $1,108,945MARKWELL PAVING COMPANY, IN… | +27.5% |
| Mar 15, 2018 | 180135 | RESURFACE (ASPHALT ) I-35: FROM 4.2 MILES NORTHWEST OF SH -74, EXTEND NORTHWEST NEAR PURCELL. PROJECT LENGTH = 4.850 MILESMcclain · Division 3 | 3 of 5 | $1,355,744 | $1,241,140Silver Star Construction Co… | +9.2% |
| Mar 15, 2018 | 180137 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (EW-58/CR 310): FROM THE SH -86 JUNCTION, EXTEND EAST NEAR PERRY . PROJECT LENGTH = 2.01 MILESNoble · Division 4 | 2 of 5 | $1,905,116 | $1,590,475Evans & Associates Construc… | +19.8% |
| Feb 15, 2018 | 180087 | RESURFACE (ASPHALT ) US-62: FROM 3.0 MILES EAST OF THE CADDO COUNTY LINE , EXTEND EAST NEAR CHICKASHA . PROJECT LENGTH = 4.49 MILESGrady · Division 7 | 3 of 4 | $1,110,941 | $947,764MARKWELL PAVING COMPANY, IN… | +17.2% |
| Jan 18, 2018 | 170263 | GRADE, DRAIN, SURFACE , AND EROSION US-62: FROM 1.0 MILE WEST OF US -177 INTERSECTION, EXTEND EAST NEAR JACKTOWN . PROJECT LENGTH = 0.426 MILELincoln · Division 3 | 4 of 7 | $1,984,712 | $1,514,040T. McDonald Construction, I… | +31.1% |
| Jan 18, 2018 | 180013 | RESURFACE (ASPHALT ) US-62: FROM THE US -177 JUNCTION, EXTEND EAST NEAR MEEKER . PROJECT LENGTH = 6.510 MILESLincoln · Division 3 | 5 of 5 | $1,095,922 | $838,030MARKWELL PAVING COMPANY, IN… | +30.8% |
| Jan 18, 2018 | 180042 | RESURFACE (ASPHALT ) SH-39: FROM THE US -77 JUNCTION, EXTEND EAST IN LEXINGTON . PROJECT LENGTH = 2.07 MILESCleveland · Division 3 | 4 of 5 | $277,043 | $224,231MARKWELL PAVING COMPANY, IN… | +23.6% |
| Jan 18, 2018 | 180067 | RESURFACE (ASPHALT ) US-270: FROM THE I -40 JUNCTION, EXTEND SOUTHEAST NEAR SHAWNEE . PROJECT LENGTH = 2.600 MILESPottawatomie · Division 3 | 3 of 3 | $1,196,004 | $983,804HASKELL LEMON CONSTRUCTION … | +21.6% |
| Nov 16, 2017 | 170368 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (NS-274/CALUMET ROAD ): FROM 0.2 MILES SOUTH OF THE I -40 INTERSECTION, EXTEND SOUTH NEAR EL RENO . PROJECT LENGTH = 4.336 MILESCanadian · Division 4 | 5 of 5 | $4,547,710 | $4,378,549HASKELL LEMON CONSTRUCTION … | +3.9% |
| Nov 16, 2017 | 170377 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-74: FROM 0.2 MILES NORTH OF NW 164TH STREET, EXTEND NORTH IN OKLAHOMA CITY . PROJECT LENGTH = 4.237 MILESOklahoma · Division 4 | 1 of 5 | $20,998,216 | $20,998,216 | Won |
| Aug 17, 2017 | 170259 | RESURFACE (ASPHALT ) US-62: FROM THE CADDO COUNTY LINE , EXTEND EAST NEAR CHICKASHA. PROJECT LENGTH = 3.000 MILESGrady · Division 7 | 4 of 4 | $1,195,770 | $753,206T & G CONSTRUCTION, INC. | +58.8% |
| May 18, 2017 | 170179 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (COLTRANE ROAD ): FROM 1.0 MILE NORTH OF THE OKLAHOMA COUNTY LINE EXTEND NORTH NEAR EDMOND . PROJECT LENGTH = 2.083 MILESLogan · Division 4 | 3 of 3 | $4,225,228 | $3,779,649SCHWARZ PAVING CO., INC. | +11.8% |
| May 18, 2017 | 170180 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (WAYNE RD /HOPPING AVE ): FROM THE US -71 JCT, EXT. EAST ON WAYNE RD THEN SOUTH ON HOPPING AVE NEAR WAYNE. PROJECT LENGTH = 5.15 MILESMcclain · Division 3 | 5 of 6 | $3,468,949 | $3,195,501MARKWELL PAVING COMPANY, IN… | +8.6% |
| Mar 16, 2017 | 170122 | RESURFACE (ASPHALT ) SH-19: FROM 0.6 MILES WEST OF I -35, EXTEND EAST IN PAULS VALLEY . PROJECT LENGTH = 2.84 MILESGarvin · Division 3 | 6 of 6 | $1,239,148 | $1,013,104MARKWELL PAVING COMPANY, IN… | +22.3% |
| Mar 16, 2017 | 170139 | POTTAWATOMIE RESURFACE (ASPHALT ) SH-9A: FROM SH-9, EXTEND NORTH IN EARLSBORO . PROJECT LENGTH = 8.650 MILESStpy-263c(043)3p · | 3 of 5 | $1,426,437 | $1,322,627MARKWELL PAVING COMPANY, IN… | +7.8% |
| Feb 16, 2017 | 170035 | WIDEN, RESURFACE , AND BRIDGE SH-66: FROM THE LINCOLN COUNTY LINE , EXTEND WEST IN LUTHER. PROJECT LENGTH = 2.286 MILESOklahoma · Division 4 | 2 of 3 | $4,573,560 | $4,046,765HASKELL LEMON CONSTRUCTION … | +13.0% |
| Feb 16, 2017 | 170068 | RESURFACE (ASPHALT ) US-77: FROM SH-9, EXTEND NORTH THEN WEST AND NORTHWEST IN THE CITY OF NORMAN . PROJECT LENGTH = 9.72 MILESCleveland · Division 3 | 2 of 4 | $1,435,090 | $1,279,020HASKELL LEMON CONSTRUCTION … | +12.2% |
| Feb 16, 2017 | 170080 | RESURFACE (ASPHALT ) SH-37: FROM FRISCOE ROAD 3.0 MILES WEST OF SH -4, EXTEND EAST IN TUTTLE. PROJECT LENGTH = 6.00 MILESGrady · Division 7 | 4 of 7 | $2,244,183 | $2,022,644Silver Star Construction Co… | +11.0% |
| Feb 16, 2017 | 170087 | RESURFACE (ASPHALT ) COUNTY ROAD (SIMPSON ROAD/EW-86): FROM COLTRANE ROAD (NS-312), EXTEND WEST NEAR GUTHRIE . PROJECT LENGTH = 1.491 MILESLogan · Division 4 | 1 of 4 | $543,196 | $543,196 | Won |
| Feb 16, 2017 | 170088 | RESURFACE (ASPHALT ) SH-74C: FROM 5.41 MILES EAST OF SH -74, EXTEND SOUTHEAST NEAR CRESCENT. PROJECT LENGTH = 6.180 MILESLogan · Division 4 | 1 of 4 | $790,816 | $790,816 | Won |
| Jan 19, 2017 | 170034 | RESURFACE (ASPHALT ) SH-164: FROM THE GARFIELD COUNTY LINE , EXTEND EAST NEAR LUCIEN . PROJECT LENGTH = 5.020 MILESNoble · Division 4 | 2 of 4 | $1,052,400 | $915,057Evans & Associates Construc… | +15.0% |
| Jun 16, 2016 | 160227 | RESURFACE (ASPHALT ) SH-39: FROM 75 FEET WEST OF THE SH -59 SOUTH JUNCTION, EXTEND EAST NEAR PURCELL . PROJECT LENGTH = 5.86 MILESMcclain · Division 3 | 5 of 5 | $799,245 | $643,576MARKWELL PAVING COMPANY, IN… | +24.2% |
| Apr 21, 2016 | 160086 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-39: FROM 3.6 MILES EAST OF US -62, EXTEND EAST NEAR CHICKASHA. PROJECT LENGTH = 2.973 MILESGrady · Division 7 | 5 of 5 | $9,811,027 | $8,867,757Munoz Construction, Inc. | +10.6% |
| Mar 17, 2016 | 160099 | RESURFACE (ASPHALT ) SH-76: FROM 6.74 MILES NORTH OF THE GARVIN COUNTY LINE , EXTEND NORTH NEAR DIBBLE . PROJECT LENGTH = 7.050 MILESMcclain · Division 3 | 2 of 4 | $1,999,991 | $1,761,985MARKWELL PAVING COMPANY, IN… | +13.5% |
| Mar 17, 2016 | 160139 | RESURFACE (ASPHALT ) SH-66: FROM THE SH -18 JUNCTION, EXTEND EAST IN CHANDLER . PROJECT LENGTH = 3.470 MILESLincoln · Division 3 | 5 of 5 | $1,418,722 | $870,234THE QUAPAW COMPANY | +63.0% |
| Mar 17, 2016 | 160141 | LINCOLN RESURFACE (ASPHALT ) US-62: FROM 0.2 MILES EAST OF SH -18, EXTEND EAST NEAR MEEKER . PROJECT LENGTH = 9.800 MILESStp-241c(036)3p · | 2 of 4 | $1,981,357 | $1,772,794THE QUAPAW COMPANY | +11.8% |
| Mar 17, 2016 | 160142 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-76: FROM 0.1 MILES SOUTH OF SH-74B, EXTEND NORTH NEAR BLANCHARD . PROJECT LENGTH = 2.162 MILESMcclain · Division 3 | 5 of 8 | $7,081,453 | $6,557,901Munoz Construction, Inc. | +8.0% |
| Feb 18, 2016 | 160079 | GRADE, DRAIN, AND SURFACE COUNTY ROAD (BANNER RD/NS-289): FROM RENO AVENUE , EXTEND NORTH NEAR EL RENO . PROJECT LENGTH = 0.596 MILECanadian · Division 4 | 5 of 5 | $1,568,000 | $1,231,014SCHWARZ PAVING CO., INC. | +27.4% |
| Feb 18, 2016 | 160104 | RESURFACE (UTBWC) SH-270: FROM 0.4 MILES SOUTHEAST OF US -62, EXTEND SOUTH NEAR HARRAH. PROJECT LENGTH = 3.690 MILESOklahoma · Division 4 | 1 of 3 | $620,025 | $620,025 | Won |
| Jan 21, 2016 | 160052 | RESURFACE (ASPHALT ) CITY STREET (NORTH ROCKWELL AVENUE ): FROM WEST RENO AVENUE , EXTEND NORTH . PROJECT LENGTH = 1.032 MILESOklahoma · Division 4 | 4 of 6 | $820,193 | $704,479Atlas Paving Company | +16.4% |