| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$90,000.00 |
$38,000.00 |
$125,000.00 |
$225,000.00 |
$24,750.00 |
$15,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 84,031 | CY |
$6.50 |
$6.80 |
$6.00 |
$7.75 |
$6.50 |
$6.30 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 180,376 | CY |
$8.30 |
$7.25 |
$7.00 |
$8.10 |
$5.80 |
$7.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$75,000.00 |
$80,000.00 |
$125,000.00 |
$150,000.00 |
$90,750.00 |
$45,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,077 | LF |
$2.00 |
$1.30 |
$1.21 |
$1.15 |
$1.20 |
$1.30 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,043 | LF |
$8.00 |
$6.30 |
$6.83 |
$6.50 |
$6.80 |
$7.00 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 8,359 | LF |
$2.00 |
$2.40 |
$2.45 |
$2.35 |
$2.50 |
$2.60 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 225,623 | SY |
$1.50 |
$1.10 |
$1.11 |
$1.05 |
$1.10 |
$1.20 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 46 | AC |
$300.00 |
$150.00 |
$110.00 |
$104.00 |
$110.00 |
$115.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 46 | AC |
$250.00 |
$450.00 |
$435.00 |
$415.00 |
$438.00 |
$460.00 |
| 11 | 241 2832 |
MOWING | 92 | AC |
$85.00 |
$70.00 |
$70.00 |
$65.00 |
$71.50 |
$75.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 77,575 | SY |
$9.00 |
$3.75 |
$6.50 |
$4.10 |
$5.80 |
$5.20 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 3,045 | TON |
$22.00 |
$29.00 |
$29.00 |
$35.50 |
$66.00 |
$30.00 |
| 14 | 407(B) 0250 |
TACK COAT | 16,709 | GAL |
$3.50 |
$3.00 |
$1.65 |
$2.50 |
$3.90 |
$3.00 |
| 15 | 408 5774 |
PRIME COAT | 29,605 | GAL |
$4.50 |
$3.25 |
$2.20 |
$2.65 |
$6.50 |
$4.50 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 39,567 | TON |
$65.00 |
$62.00 |
$58.85 |
$53.75 |
$61.00 |
$60.30 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 8,611 | TON |
$80.00 |
$69.00 |
$66.73 |
$60.70 |
$70.50 |
$73.30 |
| 18 | 412 5267 |
COLD MILLING PAVEMENT | 5,133 | SY |
$2.00 |
$1.50 |
$1.10 |
$3.50 |
$5.20 |
$2.50 |
| 19 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 193 | CY |
$250.00 |
$15.00 |
$15.00 |
$10.60 |
$38.50 |
$40.00 |
| 20 | 509(A) 0319 |
CLASS AA CONCRETE | 548 | CY |
$400.00 |
$265.00 |
$450.00 |
$360.00 |
$330.00 |
$335.00 |
| 21 | 509(D) 0325 |
CLASS C CONCRETE | 1,069 | CY |
$275.00 |
$205.00 |
$230.00 |
$220.00 |
$231.00 |
$223.00 |
| 22 | 511(A) 0332 |
REINFORCING STEEL | 78,952 | LB |
$1.00 |
$0.9000 |
$0.7500 |
$0.8000 |
$1.10 |
$1.15 |
| 23 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 598 | TON |
$45.00 |
$40.00 |
$40.00 |
$47.20 |
$49.50 |
$50.00 |
| 24 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 19 | TON |
$50.00 |
$35.00 |
$31.00 |
$57.80 |
$49.50 |
$40.00 |
| 25 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 53 | LF |
$50.00 |
$40.00 |
$40.00 |
$88.70 |
$66.50 |
$55.00 |
| 26 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 69 | LF |
$80.00 |
$100.00 |
$80.00 |
$113.40 |
$115.00 |
$80.00 |
| 27 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 1,348 | LF |
$30.00 |
$22.00 |
$22.00 |
$38.10 |
$26.00 |
$44.00 |
| 28 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 1,264 | LF |
$60.00 |
$28.00 |
$28.00 |
$42.20 |
$33.00 |
$47.00 |
| 29 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 66 | LF |
$65.00 |
$34.00 |
$35.00 |
$67.40 |
$41.50 |
$48.00 |
| 30 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 408 | LF |
$75.00 |
$42.00 |
$42.00 |
$51.90 |
$57.00 |
$50.00 |
| 31 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 748 | LF |
$50.00 |
$23.00 |
$23.00 |
$37.50 |
$26.00 |
$41.00 |
| 32 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 256 | LF |
$60.00 |
$30.00 |
$30.00 |
$40.60 |
$27.50 |
$57.00 |
| 33 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 500 | LF |
$12.00 |
$40.00 |
$15.00 |
$8.35 |
$16.50 |
$25.00 |
| 34 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$12.00 |
$40.00 |
$15.00 |
$8.35 |
$16.50 |
$20.00 |
| 35 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$650.00 |
$1,200.00 |
$1,000.00 |
$1,415.00 |
$1,120.00 |
$1,200.00 |
| 36 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 20 | EA |
$850.00 |
$800.00 |
$1,120.00 |
$904.00 |
$990.00 |
$980.00 |
| 37 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 15 | EA |
$1,100.00 |
$900.00 |
$1,110.00 |
$864.00 |
$990.00 |
$1,070.00 |
| 38 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 1 | EA |
$1,400.00 |
$1,200.00 |
$1,350.00 |
$1,600.00 |
$1,320.00 |
$1,300.00 |
| 39 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 3 | EA |
$1,800.00 |
$1,100.00 |
$1,685.00 |
$1,270.00 |
$1,650.00 |
$1,600.00 |
| 40 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 20 | EA |
$1,500.00 |
$1,200.00 |
$1,385.00 |
$1,355.00 |
$1,210.00 |
$1,300.00 |
| 41 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 15 | EA |
$1,700.00 |
$1,300.00 |
$1,540.00 |
$1,325.00 |
$1,320.00 |
$1,560.00 |
| 42 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 3 | EA |
$2,100.00 |
$1,500.00 |
$1,975.00 |
$1,510.00 |
$1,650.00 |
$2,230.00 |
| 43 | 613(M) 7199 |
TYPE D6 CULVERT END TREATMENT | 3 | EA |
$1,800.00 |
$2,000.00 |
$2,025.00 |
$1,500.00 |
$1,980.00 |
$2,180.00 |
| 44 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$50,000.00 |
$18,000.00 |
$20,000.00 |
$162,000.00 |
$23,650.00 |
$60,000.00 |
| 45 | 619(B) 0291 |
REMOVAL OF HEADWALL | 5 | EA |
$300.00 |
$500.00 |
$500.00 |
$4,000.00 |
$990.00 |
$1,050.00 |
| 46 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 47,219 | SY |
$2.75 |
$3.00 |
$2.20 |
$3.50 |
$4.80 |
$4.35 |
| 47 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,421 | LF |
$5.00 |
$3.00 |
$2.00 |
$3.90 |
$4.70 |
$3.00 |
| 48 | 619(C) 0924 |
SAWING PAVEMENT | 297 | LF |
$3.00 |
$5.00 |
$5.00 |
$0.8000 |
$11.00 |
$3.00 |
| 49 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,513 | LF |
$25.00 |
$17.00 |
$20.00 |
$18.00 |
$18.50 |
$16.00 |
| 50 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 3 | EA |
$1,500.00 |
$1,000.00 |
$1,100.00 |
$992.00 |
$1,040.00 |
$420.00 |
| 51 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 7 | EA |
$2,600.00 |
$2,200.00 |
$2,400.00 |
$2,250.00 |
$2,370.00 |
$2,265.00 |
| 52 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$2,200.00 |
$2,200.00 |
$2,400.00 |
$2,195.00 |
$2,310.00 |
$1,970.00 |
| 53 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 12,987 | LF |
$4.00 |
$7.50 |
$7.70 |
$3.20 |
$8.70 |
$3.50 |
| 54 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 21 | EA |
$80.00 |
$135.00 |
$130.00 |
$130.00 |
$138.00 |
$145.00 |
| 55 | 629(C) 4960 |
MAILBOX | 21 | EA |
$50.00 |
$30.00 |
$32.00 |
$31.30 |
$33.00 |
$35.00 |
| 56 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 21 | EA |
$50.00 |
$27.00 |
$27.00 |
$26.10 |
$27.50 |
$30.00 |
| 57 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 20 | EA |
$10.00 |
$15.00 |
$13.00 |
$12.50 |
$13.00 |
$20.00 |
| 58 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 3,928 | CY |
$10.00 |
$10.00 |
$6.00 |
$6.60 |
$5.00 |
$3.50 |
| 59 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 256 | CY |
$25.00 |
$15.00 |
$15.00 |
$15.40 |
$15.50 |
$40.00 |
| 60 | 509(A) 1326 |
CLASS AA CONCRETE | 649.8 | CY |
$450.00 |
$350.00 |
$400.00 |
$313.00 |
$441.00 |
$280.00 |
| 61 | 511(A) 1332 |
REINFORCING STEEL | 115,500 | LB |
$0.9000 |
$0.8500 |
$0.7500 |
$0.8200 |
$0.9000 |
$1.15 |
| 62 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$1,000.00 |
$2,700.00 |
$6,290.00 |
$900.00 |
| 63 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 1,080 | TON |
$50.00 |
$40.00 |
$40.00 |
$48.20 |
$52.50 |
$50.00 |
| 64 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$20,000.00 |
$15,000.00 |
$35,000.00 |
$21,000.00 |
$15,000.00 |
| 65 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 320 | CY |
$10.00 |
$10.00 |
$6.00 |
$23.50 |
$11.00 |
$12.00 |
| 66 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 160 | CY |
$25.00 |
$15.00 |
$15.00 |
$24.50 |
$17.50 |
$29.00 |
| 67 | 501(G) 6309 |
CLSM BACKFILL | 160 | CY |
$250.00 |
$180.00 |
$140.00 |
$153.50 |
$157.00 |
$200.00 |
| 68 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 398 | LF |
$200.00 |
$190.00 |
$183.00 |
$189.00 |
$176.00 |
$203.00 |
| 69 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 299 | LF |
$230.00 |
$210.00 |
$185.00 |
$189.00 |
$186.00 |
$210.00 |
| 70 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$300.00 |
$180.00 |
$200.00 |
$177.00 |
$207.00 |
$215.00 |
| 71 | 504(B) 1305 |
SAW-CUT GROOVING | 1,051.7 | SY |
$5.00 |
$4.50 |
$4.85 |
$4.50 |
$4.60 |
$5.00 |
| 72 | 504(C) 6250 |
SEALED EXPANSION JOINT | 43.2 | LF |
$350.00 |
$350.00 |
$260.00 |
$194.00 |
$311.00 |
$348.00 |
| 73 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 473.4 | LF |
$95.00 |
$70.00 |
$85.00 |
$78.00 |
$116.00 |
$128.00 |
| 74 | 506(A) 1322 |
STRUCTURAL STEEL | 1,350 | LB |
$3.00 |
$2.50 |
$2.50 |
$4.50 |
$4.90 |
$4.50 |
| 75 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$2,000.00 |
$2,000.00 |
$1,200.00 |
$1,305.00 |
$1,910.00 |
$2,830.00 |
| 76 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,000.00 |
$2,000.00 |
$1,230.00 |
$1,188.00 |
$1,930.00 |
$2,470.00 |
| 77 | 509(A) 1326 |
CLASS AA CONCRETE | 205 | CY |
$650.00 |
$560.00 |
$550.00 |
$470.00 |
$518.00 |
$895.00 |
| 78 | 509(B) 1328 |
CLASS A CONCRETE | 140.6 | CY |
$650.00 |
$560.00 |
$550.00 |
$256.00 |
$586.00 |
$960.00 |
| 79 | 509(D) 1331 |
CLASS C CONCRETE | 20 | CY |
$350.00 |
$300.00 |
$500.00 |
$282.00 |
$483.00 |
$950.00 |
| 80 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 68,010 | LB |
$1.10 |
$1.10 |
$1.00 |
$0.8000 |
$1.30 |
$1.25 |
| 81 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 120 | LF |
$40.00 |
$29.00 |
$25.00 |
$29.50 |
$49.00 |
$32.00 |
| 82 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 392 | LF |
$50.00 |
$35.00 |
$30.00 |
$33.30 |
$49.50 |
$40.00 |
| 83 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 120 | LF |
$20.00 |
$15.00 |
$15.00 |
$51.40 |
$36.50 |
$18.00 |
| 84 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 392 | LF |
$20.00 |
$15.00 |
$15.00 |
$54.50 |
$21.00 |
$20.00 |
| 85 | 514(K) 6260 |
(PL)PILOT HOLES | 462 | LF |
$100.00 |
$85.00 |
$100.00 |
$102.00 |
$92.50 |
$200.00 |
| 86 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 87 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 836 | SY |
$5.00 |
$4.50 |
$3.50 |
$4.20 |
$3.30 |
$4.00 |
| 88 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 112 | LF |
$700.00 |
$900.00 |
$700.00 |
$670.00 |
$788.00 |
$905.00 |
| 89 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$5,000.00 |
$10,000.00 |
$1,750.00 |
$16,000.00 |
$1,590.00 |
$1,945.00 |
| 90 | 523(A) 6550 |
SEALER CRACK PREPARATION | 40.8 | LF |
$5.00 |
$3.00 |
$5.00 |
$4.50 |
$4.40 |
$5.00 |
| 91 | 523(B) 6560 |
SEALER RESIN | 0.5 | GAL |
$150.00 |
$150.00 |
$200.00 |
$1,400.00 |
$330.00 |
$370.00 |
| 92 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$1,000.00 |
$10,000.00 |
$6,290.00 |
$4,000.00 |
| 93 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,120 | TON |
$50.00 |
$40.00 |
$40.00 |
$48.00 |
$51.50 |
$47.00 |
| 94 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 270 | TON |
$40.00 |
$40.00 |
$31.00 |
$42.00 |
$42.50 |
$40.00 |
| 95 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$50.00 |
$25.00 |
$14.60 |
$57.50 |
$25.00 |
| 96 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 90 | LF |
$30.00 |
$50.00 |
$25.00 |
$14.60 |
$27.00 |
$15.00 |
| 97 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$22,000.00 |
$5,000.00 |
$25,000.00 |
$20,250.00 |
$108,000.00 |
| 98 | 501(G) 6309 |
CLSM BACKFILL | 60 | CY |
$250.00 |
$180.00 |
$200.00 |
$144.00 |
$218.00 |
$209.00 |
| 99 | 504(A) 1304 |
APPROACH SLAB | 181.6 | SY |
$300.00 |
$180.00 |
$250.00 |
$163.00 |
$325.00 |
$225.00 |
| 100 | 504(B) 1305 |
SAW-CUT GROOVING | 172.2 | SY |
$5.00 |
$5.00 |
$4.85 |
$4.35 |
$4.60 |
$5.00 |
| 101 | 504(E) 1381 |
CONCRETE PARAPET | 78.8 | LF |
$120.00 |
$80.00 |
$100.00 |
$187.00 |
$177.00 |
$150.00 |
| 102 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 36 | SY |
$5.00 |
$5.00 |
$3.50 |
$4.18 |
$3.30 |
$4.00 |
| 103 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$10,000.00 |
$16,000.00 |
$5,000.00 |
$35,000.00 |
$9,580.00 |
$56,000.00 |
| 104 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 200 | SD |
$25.00 |
$168.00 |
$167.00 |
$172.26 |
$181.00 |
$185.00 |
| 105 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 28,000 | LF |
$0.2000 |
$0.2000 |
$0.1700 |
$0.1600 |
$0.1500 |
$0.2000 |
| 106 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 2,000 | EA |
$0.5500 |
$0.5500 |
$0.5300 |
$0.5400 |
$0.5500 |
$0.6000 |
| 107 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 8,000 | LF |
$0.4000 |
$0.8800 |
$0.8700 |
$0.8900 |
$0.9500 |
$1.00 |
| 108 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 1,740 | SD |
$6.20 |
$4.25 |
$4.10 |
$4.20 |
$4.40 |
$5.00 |
| 109 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 290 | SD |
$38.00 |
$4.25 |
$4.10 |
$4.20 |
$4.40 |
$5.00 |
| 110 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 400 | LF |
$20.00 |
$38.00 |
$40.00 |
$39.50 |
$41.50 |
$42.00 |
| 111 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,700 | LF |
$7.00 |
$1.60 |
$1.65 |
$1.60 |
$1.70 |
$2.00 |
| 112 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 31,610 | SD |
$0.2500 |
$0.0300 |
$0.0300 |
$0.0200 |
$0.0500 |
$0.0200 |
| 113 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 15,950 | SD |
$0.5000 |
$0.5500 |
$0.5200 |
$0.5200 |
$0.5500 |
$0.6000 |
| 114 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 10,150 | SD |
$1.30 |
$2.10 |
$2.05 |
$2.09 |
$2.20 |
$2.30 |
| 115 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 17,400 | SD |
$0.6000 |
$0.0300 |
$0.0300 |
$0.0200 |
$0.0500 |
$0.0200 |
| 116 | 880(C) 8848 |
WING BARRICADES | 1,160 | SD |
$1.25 |
$0.4000 |
$0.3700 |
$0.3700 |
$0.4000 |
$0.4000 |
| 117 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 33,060 | SD |
$0.3000 |
$0.3800 |
$0.3700 |
$0.3700 |
$0.4000 |
$0.4000 |
| 118 | 880(F) 8878 |
DRUMS | 24,650 | SD |
$0.2000 |
$0.0300 |
$0.0300 |
$0.0200 |
$0.0500 |
$0.0200 |
| 119 | 880(G) 8890 |
CHANNELIZER CONES | 47,270 | SD |
$0.2500 |
$0.5500 |
$0.5100 |
$0.5200 |
$0.5500 |
$0.5500 |
| 120 | 880(I) 8902 |
FLAGGER | 90 | SD |
$61.90 |
$100.00 |
$125.00 |
$235.00 |
$500.00 |
$770.00 |
| 121 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,216 | SD |
$16.00 |
$4.25 |
$4.10 |
$4.20 |
$4.40 |
$5.00 |
| 122 | 413(B) 4862 |
RUMBLE STRIP-METHOD HMA-CYC GROUP | 8 | EAGP |
$300.00 |
$750.00 |
$750.00 |
$915.00 |
$0.1000 |
$840.00 |
| 123 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 34,500 | LF |
$0.2500 |
$0.1000 |
$0.1600 |
$0.1600 |
$0.1000 |
$0.1000 |
| 124 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 15 | EA |
$30.00 |
$67.00 |
$67.00 |
$70.00 |
$71.50 |
$75.00 |
| 125 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$550.00 |
$255.00 |
$275.00 |
$261.00 |
$275.00 |
$300.00 |
| 126 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 104.77 | SF |
$24.00 |
$38.00 |
$37.00 |
$38.00 |
$39.50 |
$40.00 |
| 127 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 325 | LF |
$10.00 |
$10.00 |
$9.20 |
$9.40 |
$9.90 |
$10.00 |
| 128 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 52,500 | LF |
$0.3000 |
$0.3800 |
$0.3700 |
$0.3700 |
$0.4000 |
$0.4000 |
| 129 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 120 | LF |
$3.15 |
$1.05 |
$1.10 |
$1.05 |
$1.10 |
$1.10 |
| 130 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$140,000.00 |
$65,000.00 |
$65,000.00 |
$80,000.00 |
$101,200.00 |
$107,000.00 |
| 131 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$5,000.00 |
$5,000.00 |
$20,000.00 |
$1,000.00 |
$15,000.00 |
| 132 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$12,000.00 |
$20,000.00 |
$7,000.00 |
$25,000.00 |
$49,500.00 |
$12,000.00 |
| 133 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$437,000.00 |
$275,000.00 |
$425,000.00 |
$434,919.64 |
$323,499.86 |
$500,000.00 |