$10.04Avg low bid / LF
$10.67Avg of all bids
$9.06Avg engineer's estimate
695Jobs · 519,027 LF
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 64 | 61,889 | $11.96 | $11.58 |
| 2020 | 142 | 106,534 | $11.12 | $11.97 |
| 2019 | 123 | 90,037 | $11.97 | $14.05 |
| 2018 | 125 | 82,115 | $10.23 | $11.14 |
| 2017 | 150 | 116,970 | $7.79 | $8.38 |
| 2016 | 91 | 61,482 | $7.42 | $8.05 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Nov 18, 2021 | 210347 | DelawareDivision 8 | 518 LF | $20.00 | C-GAWF CONSTRUCTION, INC. |
| Nov 18, 2021 | 210347 | DelawareDivision 8 | 100 LF | $20.00 | C-GAWF CONSTRUCTION, INC. |
| Oct 14, 2021 | 210237 | OklahomaDivision 4 | 20 LF | $21.00 | SAC Services, Inc. |
| Oct 14, 2021 | 210273 | EllisDivision 6 | 168 LF | $14.88 | Lopp Construction, LLC |
| Sep 16, 2021 | 210179 | MurrayDivision 7 | 175 LF | $8.00 | Pavers, Inc. |
| Sep 16, 2021 | 210251 | Cirb-230c(045)rb | 238 LF | $11.00 | K & R BUILDERS, INC. |
| Sep 16, 2021 | 210251 | Cirb-230c(045)rb | 272 LF | $10.50 | K & R BUILDERS, INC. |
| Sep 16, 2021 | 210253 | MayesDivision 8 | 140 LF | $9.20 | RRY SERVICES LLC |
| Sep 16, 2021 | 210267 | PayneDivision 4 | 140 LF | $13.00 | H & H BRIDGE COMPANY |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 182 LF | $19.16 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 19, 2021 | 210232 | GarfieldDivision 4 | 112 LF | $9.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Aug 19, 2021 | 210241 | SequoyahDivision 1 | 168 LF | $15.75 | Treas Construction Inc |
| Jul 15, 2021 | 210211 | LoganDivision 4 | 40 LF | $18.50 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jul 15, 2021 | 210215 | OklahomaDivision 4 | 70 LF | $8.00 | K & R BUILDERS, INC. |
| Jul 15, 2021 | 210180 | MuskogeeDivision 1 | 140 LF | $12.50 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 210216 | OkmulgeeDivision 1 | 140 LF | $12.50 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 210200 | BeckhamDivision 5 | 700 LF | $11.50 | SEWELL BROS., INC. |
| Jul 15, 2021 | 210111 | LincolnDivision 3 | 1,624 LF | $8.85 | HASKELL LEMON CONSTRUCTION CO. |
| Jul 15, 2021 | 190363 | LoveDivision 7 | 380 LF | $14.05 | C3 Construction, Inc. |
| Jul 15, 2021 | 210201 | BlaineDivision 5 | 200 LF | $16.00 | SEWELL BROS., INC. |
| Jul 15, 2021 | 210209 | KayDivision 4 | 224 LF | $8.50 | H & H BRIDGE COMPANY |
| Jun 17, 2021 | 210171 | DeweyDivision 5 | 462 LF | $8.73 | Frontier Bridge, Inc. |
| Jun 17, 2021 | 210172 | DeweyDivision 5 | 200 LF | $13.14 | Wyatt Contracting |
| Jun 17, 2021 | 210176 | Leflore, Mccurtain | 150 LF | $10.00 | HUB Construction, Inc. |
| May 20, 2021 | 210139 | McclainDivision 3 | 2,240 LF | $5.20 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210140 | McclainDivision 3 | 3,528 LF | $6.28 | Treas Construction Inc |
| May 20, 2021 | 210127 | BlaineDivision 5 | 1,836 LF | $19.90 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210158 | TillmanDivision 5 | 200 LF | $20.50 | SEWELL BROS., INC. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 420 LF | $12.40 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210129 | BryanDivision 2 | 2,331 LF | $6.98 | L & N BRIDGE, LLC |
| May 20, 2021 | 210082 | McclainDivision 3 | 266 LF | $10.30 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 783 LF | $12.40 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210133 | EllisDivision 6 | 1,260 LF | $16.85 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210143 | MurrayDivision 7 | 4,095 LF | $7.80 | OVERLAND CORPORATION |
| May 20, 2021 | 200338 | BeckhamDivision 5 | 259 LF | $7.10 | OBC, INC. |
| May 20, 2021 | 210136 | HughesDivision 3 | 1,694 LF | $25.00 | C-GAWF CONSTRUCTION, INC. |
| May 20, 2021 | 210148 | PayneDivision 4 | 1,260 LF | $13.00 | BECCO CONTRACTORS, INC. |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 210 LF | $7.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210102 | CoalDivision 3 | 2,410 LF | $14.00 | L & N BRIDGE, LLC |
| Apr 15, 2021 | 210114 | NobleDivision 4 | 931 LF | $20.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210115 | NobleDivision 4 | 224 LF | $16.00 | SEWELL BROS., INC. |
| Mar 18, 2021 | 210097 | KayDivision 4 | 28 LF | $18.50 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 3,150 LF | $5.85 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210078 | KayDivision 4 | 336 LF | $14.50 | RRY SERVICES LLC |
| Mar 18, 2021 | 210060 | OttawaDivision 8 | 658 LF | $13.12 | Treas Construction Inc |
| Mar 18, 2021 | 200030 | RogersDivision 8 | 36 LF | $20.00 | CONCRETE SERVICES CORPORATION |
| Mar 18, 2021 | 210086 | PittsburgDivision 2 | 1,090 LF | $7.92 | Robinson Construction, LLC |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 2,058 LF | $9.24 | SHERWOOD CONSTRUCTION CO., INC. |
| Feb 18, 2021 | 210070 | WoodwardDivision 6 | 210 LF | $22.00 | BRIDGECO CONTRACTORS, INC. |
| Feb 18, 2021 | 210048 | CraigDivision 8 | 308 LF | $12.95 | CONCRETE SERVICES CORPORATION |
| Feb 18, 2021 | 210055 | MurrayDivision 7 | 406 LF | $10.00 | HUB Construction, Inc. |
| Feb 18, 2021 | 190362 | LoveDivision 7 | 168 LF | $19.46 | C3 Construction, Inc. |
| Feb 18, 2021 | 210061 | PittsburgDivision 2 | 14 LF | $37.00 | BRIDGECO CONTRACTORS, INC. |
| Feb 18, 2021 | 210045 | ClevelandDivision 3 | 6,951 LF | $12.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Feb 18, 2021 | 210062 | Pontotoc | 840 LF | $18.90 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210046 | ComancheDivision 7 | 336 LF | $6.00 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 210004 | RogersDivision 8 | 1,308 LF | $5.00 | BECCO CONTRACTORS, INC. |
| Jan 21, 2021 | 210017 | GradyDivision 7 | 378 LF | $9.22 | Treas Construction Inc |
| Jan 21, 2021 | 210005 | AlfalfaDivision 6 | 392 LF | $5.50 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 372 LF | $14.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210018 | HarperDivision 6 | 4,109 LF | $18.95 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210008 | CaddoDivision 7 | 336 LF | $8.88 | Treas Construction Inc |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 940 LF | $14.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210025 | KingfisherDivision 4 | 3,016 LF | $13.40 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210010 | ClevelandDivision 3 | 2,581 LF | $14.25 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 539 LF | $14.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210014 | GarfieldDivision 4 | 392 LF | $5.70 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 315 LF | $14.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210003 | WashingtonDivision 8 | 28 LF | $10.90 | Tri Star Construction Arkansas, LLC |
| Jan 21, 2021 | 210016 | GradyDivision 7 | 84 LF | $10.15 | K & R BUILDERS, INC. |
| Nov 19, 2020 | 200339 | BlaineDivision 5 | 1,904 LF | $12.00 | CORNELL CONSTRUCTION COMPANY, INC. |
| Nov 19, 2020 | 200357 | SequoyahDivision 1 | 448 LF | $12.95 | APAC-CENTRAL, INC. |
| Nov 19, 2020 | 200346 | ClevelandDivision 3 | 91 LF | $10.95 | Redlands Contracting, LLC |
| Nov 19, 2020 | 200358 | Custer, Washita | 1,404 LF | $9.10 | Caswell Contracting, Inc. |
| Nov 19, 2020 | 200347 | CreekDivision 8 | 28 LF | $14.00 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| Nov 19, 2020 | 200359 | MccurtainDivision 2 | 50 LF | $12.36 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200349 | GarvinDivision 3 | 147 LF | $6.85 | Treas Construction Inc |
| Nov 19, 2020 | 200156 | MajorDivision 6 | 504 LF | $5.00 | K & R BUILDERS, INC. |
| Nov 19, 2020 | 200352 | Leflore | 140 LF | $14.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Nov 19, 2020 | 200355 | RogersDivision 8 | 2,555 LF | $8.35 | EMERY SAPP & SONS, INC. |
| Nov 19, 2020 | 200344 | CaddoDivision 7 | 301 LF | $7.60 | K & R BUILDERS, INC. |
| Oct 15, 2020 | 200304 | BlaineDivision 5 | 200 LF | $8.45 | K & R BUILDERS, INC. |
| Oct 15, 2020 | 200323 | OsageDivision 8 | 84 LF | $15.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200314 | KingfisherDivision 4 | 364 LF | $7.15 | K & R BUILDERS, INC. |
| Oct 15, 2020 | 200306 | CanadianDivision 4 | 50 LF | $19.52 | Frontier Bridge, Inc. |
| Oct 15, 2020 | 200326 | PushmatahaDivision 2 | 63 LF | $10.00 | L & N BRIDGE, LLC |
| Oct 15, 2020 | 200077 | PottawatomieDivision 3 | 9,359 LF | $8.80 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200315 | MajorDivision 6 | 91 LF | $16.95 | THE CUMMINS CONSTRUCTION CO., INC. |
| Oct 15, 2020 | 200309 | GarfieldDivision 4 | 231 LF | $10.10 | THE CUMMINS CONSTRUCTION CO., INC. |
| Oct 15, 2020 | 200329 | StephensDivision 7 | 84 LF | $10.30 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200316 | Grady, Mcclain | 434 LF | $13.00 | Treas Construction Inc |
| Oct 15, 2020 | 200310 | GarfieldDivision 4 | 30 LF | $31.11 | HASKELL LEMON CONSTRUCTION CO. |
| Oct 15, 2020 | 200333 | TulsaDivision 8 | 308 LF | $7.95 | ACTION SAFETY SUPPLY CO., LLC |
| Oct 15, 2020 | 200317 | MccurtainDivision 2 | 192 LF | $7.00 | HUB Construction, Inc. |
| Oct 15, 2020 | 200312 | GreerDivision 5 | 200 LF | $7.70 | K & R BUILDERS, INC. |
| Oct 15, 2020 | 200303 | BeaverDivision 6 | 150 LF | $21.85 | J & R SAND COMPANY, INC. |
| Oct 15, 2020 | 200322 | OsageDivision 8 | 679 LF | $10.91 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200313 | JohnstonDivision 3 | 68 LF | $19.00 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 1,008 LF | $15.41 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200280 | JacksonDivision 5 | 460 LF | $11.00 | SEWELL BROS., INC. |
| Sep 17, 2020 | 200292 | PottawatomieDivision 3 | 868 LF | $8.50 | Silver Star Construction Company, Inc. |
| Sep 17, 2020 | 200281 | KiowaDivision 5 | 350 LF | $14.00 | SEWELL BROS., INC. |
| Sep 17, 2020 | 200088 | TulsaDivision 8 | 140 LF | $7.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 469 LF | $14.95 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200294 | SequoyahDivision 1 | 608 LF | $15.00 | Rosscon, LLC |
| Sep 17, 2020 | 200284 | MajorDivision 6 | 140 LF | $15.11 | BRIDGECO CONTRACTORS, INC. |
| Sep 17, 2020 | 200200 | McintoshDivision 1 | 8,817 LF | $5.25 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 1,330 LF | $14.95 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200295 | TulsaDivision 8 | 64 LF | $8.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 17, 2020 | 200287 | OklahomaDivision 4 | 42 LF | $11.00 | Cowboy Contracting, Inc. |
| Sep 17, 2020 | 200174 | TulsaDivision 8 | 600 LF | $6.75 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 17, 2020 | 200278 | DeweyDivision 5 | 500 LF | $8.80 | HASKELL LEMON CONSTRUCTION CO. |
| Sep 17, 2020 | 200290 | OsageDivision 8 | 42 LF | $22.50 | BRIDGECO CONTRACTORS, INC. |
| Sep 17, 2020 | 200034 | SequoyahDivision 1 | 24 LF | $16.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200279 | GradyDivision 7 | 390 LF | $12.50 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 2,184 LF | $8.74 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 100 LF | $8.74 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200262 | BeckhamDivision 5 | 500 LF | $11.75 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 5,160 LF | $5.40 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200264 | Leflore | 260 LF | $16.00 | HUB Construction, Inc. |
| Aug 20, 2020 | 200239 | WoodsDivision 6 | 224 LF | $7.45 | K & R BUILDERS, INC. |
| Aug 20, 2020 | 200265 | LoganDivision 4 | 315 LF | $12.60 | Wyatt Contracting |
| Aug 20, 2020 | 200150 | EllisDivision 6 | 518 LF | $10.98 | J & R SAND COMPANY, INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 336 LF | $8.74 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200225 | GradyDivision 7 | 756 LF | $8.00 | SEWELL BROS., INC. |
| Jul 23, 2020 | 200261 | Pontotoc | 2,611 LF | $12.20 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200248 | Cotton | 70 LF | $22.00 | SEWELL BROS., INC. |
| Jul 23, 2020 | 200108 | Love, Marshall | 266 LF | $20.00 | OVERLAND CORPORATION |
| Jul 23, 2020 | 200061 | DeweyDivision 5 | 3,794 LF | $16.98 | J & R SAND COMPANY, INC. |
| Jul 23, 2020 | 200249 | CusterDivision 5 | 160 LF | $10.50 | SEWELL BROS., INC. |
| Jul 23, 2020 | 200250 | GarvinDivision 3 | 40 LF | $31.08 | Frontier Bridge, Inc. |
| Jul 23, 2020 | 200251 | HarmonDivision 5 | 2,110 LF | $13.43 | Frontier Bridge, Inc. |
| Jul 23, 2020 | 200260 | AtokaDivision 2 | 2,520 LF | $12.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200229 | LincolnDivision 3 | 56 LF | $7.99 | L & N BRIDGE, LLC |
| Jun 18, 2020 | 200232 | Ssp-249c(052)ss | 37 LF | $30.00 | OCCI, INC. |
| Jun 18, 2020 | 200237 | StephensDivision 7 | 300 LF | $9.75 | SEWELL BROS., INC. |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 1,582 LF | $8.41 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200242 | StephensDivision 7 | 300 LF | $14.18 | SCHIRALLI CONSTRUCTION CORP. |
| May 14, 2020 | 200192 | ComancheDivision 7 | 250 LF | $10.40 | Frontier Bridge, Inc. |
| May 14, 2020 | 200214 | Stp-266d(065)ci | 64 LF | $15.00 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| May 14, 2020 | 200203 | MuskogeeDivision 1 | 252 LF | $16.85 | Treas Construction Inc |
| May 14, 2020 | 190377 | WashingtonDivision 8 | 108 LF | $15.00 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| May 14, 2020 | 200193 | EllisDivision 6 | 427 LF | $12.50 | J & R SAND COMPANY, INC. |
| May 14, 2020 | 190120 | Nhppi-4400-(039)pm | 130 LF | $13.53 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 200208 | PittsburgDivision 2 | 1,320 LF | $11.00 | DUIT CONSTRUCTION COMPANY, INC. |
| May 14, 2020 | 200197 | JohnstonDivision 3 | 600 LF | $7.61 | C3 Construction, Inc. |
| May 14, 2020 | 200187 | BlaineDivision 5 | 40 LF | $42.57 | Wyatt Contracting |
| May 14, 2020 | 200126 | TulsaDivision 8 | 200 LF | $20.97 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 200212 | StephensDivision 7 | 252 LF | $7.50 | SEWELL BROS., INC. |
| May 14, 2020 | 200190 | Cirb-210d(071)rb | 200 LF | $10.50 | Treas Construction Inc |