| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$9,500.00 |
$7,500.00 |
$9,500.00 |
$20,000.00 |
$8,500.00 |
$11,804.36 |
$40,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,903 | CY |
$12.00 |
$7.00 |
$7.75 |
$4.00 |
$10.00 |
$6.18 |
$20.00 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 565.45 | CY |
$15.00 |
$20.00 |
$12.00 |
$5.00 |
$7.00 |
$9.02 |
$65.00 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$12,000.00 |
$3,000.00 |
$4,600.00 |
$3,100.00 |
$3,500.00 |
$2,718.41 |
$11,200.00 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 614 | LF |
$3.30 |
$2.49 |
$2.75 |
$2.25 |
$3.50 |
$2.50 |
$2.99 |
| 60 | 221(F) 0100 |
TEMPORARY SILT DIKE | 140 | LF |
$8.00 |
$12.50 |
$13.55 |
$12.00 |
$14.50 |
$12.53 |
$12.95 |
| 70 | 230(A) 2806 |
SOLID SLAB SODDING | 2,436.98 | SY |
$5.00 |
$6.95 |
$7.75 |
$6.95 |
$16.95 |
$6.97 |
$4.00 |
| 80 | 232(B) 2814 |
SEEDING METHOD B | 0.5 | AC |
$1,400.00 |
$1,250.00 |
$1,250.00 |
$1,250.00 |
$1,350.00 |
$1,252.96 |
$2,500.00 |
| 90 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.5 | AC |
$600.00 |
$1,250.00 |
$1,250.00 |
$1,250.00 |
$1,350.00 |
$1,252.96 |
$2,500.00 |
| 100 | 241 2832 |
MOWING | 1 | AC |
$400.00 |
$695.00 |
$695.00 |
$695.00 |
$700.00 |
$696.64 |
$2,500.00 |
| 110 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 234.93 | CY |
$75.00 |
$50.00 |
$60.00 |
$49.30 |
$70.80 |
$31.76 |
$66.51 |
| 120 | 307(K) 4300 |
STABILIZED SUBGRADE | 1,148.81 | SY |
$9.00 |
$15.00 |
$9.75 |
$8.80 |
$12.00 |
$7.46 |
$11.50 |
| 130 | 407(B) 0250 |
TACK COAT | 153.63 | GAL |
$5.00 |
$4.00 |
$6.50 |
$3.00 |
$8.75 |
$7.46 |
$5.00 |
| 140 | 408 5774 |
PRIME COAT | 661.47 | GAL |
$6.00 |
$6.50 |
$7.50 |
$6.60 |
$10.80 |
$8.70 |
$5.30 |
| 150 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 315.64 | TON |
$120.00 |
$125.00 |
$140.00 |
$168.00 |
$185.00 |
$167.75 |
$175.00 |
| 160 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 112.72 | TON |
$150.00 |
$150.00 |
$190.00 |
$208.00 |
$195.00 |
$217.45 |
$170.00 |
| 170 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$2,600.00 |
$9,400.00 |
$3,500.00 |
$4,721.74 |
$125,000.00 |
| 180 | 619(B) 4725 |
REMOVAL OF FENCE | 208.17 | LF |
$10.00 |
$10.00 |
$4.85 |
$3.80 |
$6.50 |
$2.00 |
$1.25 |
| 190 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 906.76 | SY |
$14.50 |
$8.00 |
$6.00 |
$2.00 |
$9.61 |
$11.03 |
$15.11 |
| 200 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 400 | LF |
$13.00 |
$2.00 |
$2.25 |
$2.00 |
$4.00 |
$2.00 |
$13.00 |
| 210 | 619(C) 0924 |
SAWING PAVEMENT | 45.06 | LF |
$11.00 |
$10.00 |
$8.00 |
$10.00 |
$12.00 |
$3.51 |
$11.00 |
| 220 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 125 | LF |
$25.00 |
$30.00 |
$32.50 |
$30.00 |
$34.00 |
$30.07 |
$25.00 |
| 230 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,900.00 |
$2,500.00 |
$2,710.00 |
$2,500.00 |
$2,750.00 |
$2,505.91 |
$2,000.00 |
| 240 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$3,000.00 |
$1,500.00 |
$1,625.00 |
$2,600.00 |
$1,750.00 |
$1,503.55 |
$3,000.00 |
| 250 | 624(A) 4281 |
FENCE-STYLE WWF | 169.3 | LF |
$6.00 |
$10.00 |
$38.00 |
$8.50 |
$12.00 |
$25.06 |
$63.90 |
| 260 | 624(E) 4293 |
FENCE-STYLE CLF (6'HIGH, CLASS B) | 61.98 | LF |
$30.00 |
$70.00 |
$135.00 |
$35.00 |
$95.00 |
$50.12 |
$6.00 |
| 270 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 230 | CY |
$26.00 |
$10.00 |
$9.00 |
$56.50 |
$16.00 |
$12.43 |
$70.00 |
| 280 | 501(F) 6352 |
GRANULAR BACKFILL | 108 | CY |
$75.00 |
$50.00 |
$65.00 |
$56.50 |
$116.00 |
$27.24 |
$78.01 |
| 290 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 557.34 | LF |
$250.00 |
$197.00 |
$221.00 |
$200.00 |
$224.55 |
$334.41 |
$350.00 |
| 300 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 398.67 | LF |
$300.00 |
$197.00 |
$229.00 |
$200.00 |
$231.04 |
$333.71 |
$350.00 |
| 310 | 504(B) 1305 |
SAW-CUT GROOVING | 766.8 | SY |
$6.00 |
$4.20 |
$4.50 |
$4.20 |
$5.00 |
$5.22 |
$6.00 |
| 320 | 504(C) 6250 |
SEALED EXPANSION JOINT | 40 | LF |
$300.00 |
$10.00 |
$280.00 |
$265.00 |
$346.40 |
$332.99 |
$400.00 |
| 330 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 562.7 | LF |
$100.00 |
$40.00 |
$79.00 |
$75.00 |
$84.00 |
$88.83 |
$115.13 |
| 340 | 506(A) 1322 |
STRUCTURAL STEEL | 1,590 | LB |
$2.25 |
$1.00 |
$3.75 |
$3.80 |
$4.00 |
$3.57 |
$5.00 |
| 350 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,100.00 |
$959.00 |
$770.00 |
$950.00 |
$900.00 |
$862.48 |
$1,200.00 |
| 360 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$1,200.00 |
$1,000.00 |
$770.00 |
$950.00 |
$850.00 |
$862.48 |
$1,200.00 |
| 370 | 509(A) 1326 |
CLASS AA CONCRETE | 239.1 | CY |
$600.00 |
$400.00 |
$630.00 |
$650.00 |
$645.00 |
$786.45 |
$635.00 |
| 380 | 509(B) 1328 |
CLASS A CONCRETE | 198 | CY |
$575.00 |
$470.00 |
$650.00 |
$700.00 |
$675.00 |
$612.27 |
$575.00 |
| 390 | 511(A) 1332 |
REINFORCING STEEL | 82,930 | LB |
$1.00 |
$1.22 |
$1.22 |
$1.40 |
$1.20 |
$1.15 |
$1.50 |
| 400 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 124 | LF |
$30.00 |
$34.00 |
$49.70 |
$60.00 |
$47.05 |
$64.55 |
$38.00 |
| 410 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 385 | LF |
$45.00 |
$42.00 |
$59.50 |
$45.00 |
$54.20 |
$75.19 |
$55.00 |
| 420 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 124 | LF |
$15.00 |
$8.00 |
$21.30 |
$14.00 |
$14.00 |
$24.05 |
$75.00 |
| 430 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 385 | LF |
$20.00 |
$8.00 |
$25.50 |
$14.00 |
$14.00 |
$23.04 |
$75.00 |
| 440 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 450 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 108 | LF |
$1,000.00 |
$1,000.00 |
$890.00 |
$1,150.00 |
$1,381.84 |
$1,282.88 |
$1,400.00 |
| 460 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$2,500.00 |
$1,600.00 |
$3,000.00 |
$1,400.00 |
$4,500.00 |
$1,603.78 |
$3,200.00 |
| 470 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,400 | TON |
$45.00 |
$37.16 |
$39.30 |
$34.00 |
$47.05 |
$39.03 |
$55.00 |
| 480 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 575 | TON |
$35.00 |
$26.31 |
$30.50 |
$24.00 |
$40.00 |
$27.85 |
$55.00 |
| 490 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 72 | LF |
$33.00 |
$75.00 |
$29.00 |
$18.00 |
$30.00 |
$15.26 |
$33.00 |
| 500 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$25.00 |
$75.00 |
$34.00 |
$22.00 |
$25.00 |
$15.26 |
$25.00 |
| 510 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$61,387.00 |
$15,000.00 |
$45,000.00 |
$153,530.21 |
$46,000.00 |
$73,470.01 |
$145,000.00 |
| 520 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 12 | EA |
$14.30 |
$20.00 |
$22.00 |
$20.00 |
$25.00 |
$20.05 |
$14.00 |
| 530 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 2,060 | LF |
$1.25 |
$65.00 |
$0.7000 |
$0.6500 |
$0.6900 |
$0.6500 |
$2.00 |
| 540 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,520 | SD |
$0.2200 |
$0.2500 |
$0.3000 |
$0.2500 |
$0.2800 |
$0.2500 |
$0.2000 |
| 550 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,260 | SD |
$1.06 |
$1.00 |
$1.05 |
$1.00 |
$1.06 |
$1.00 |
$0.8000 |
| 560 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,080 | SD |
$1.00 |
$1.50 |
$1.60 |
$1.50 |
$1.60 |
$1.50 |
$1.00 |
| 570 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 720 | SD |
$0.1000 |
$2.00 |
$2.10 |
$2.00 |
$2.14 |
$2.00 |
$0.1000 |
| 580 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$6,200.00 |
$5,500.00 |
$7,500.00 |
$7,000.00 |
$8,076.67 |
$10,000.00 |
| 590 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,000.00 |
$5,000.00 |
$2,140.00 |
$3,000.00 |
$1,863.85 |
$5,000.00 |
| 600 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$20,000.00 |
$500.00 |
$5,000.00 |
$12,300.00 |
$10,500.00 |
$4,209.93 |
$15,000.00 |
| 610 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$100,000.00 |
$75,000.00 |
$90,000.00 |
$105,000.00 |
$103,000.00 |
$217,821.45 |
$120,000.00 |