$210.32Avg low bid / AC
$203.37Avg of all bids
$119.07Avg engineer's estimate
210Jobs · 8,502.71 AC
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 41 | 1,616.39 | $200.52 | $183.82 |
| 2020 | 62 | 3,095.88 | $234.20 | $208.79 |
| 2019 | 56 | 2,068.52 | $229.31 | $290.50 |
| 2018 | 51 | 1,721.92 | $153.75 | $146.89 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Nov 18, 2021 | 210347 | DelawareDivision 8 | 8.76 AC | $425.00 | C-GAWF CONSTRUCTION, INC. |
| Sep 16, 2021 | 200324 | Osage, Pawnee | 0.78 AC | $1,250.00 | BECCO CONTRACTORS, INC. |
| Sep 16, 2021 | 210179 | MurrayDivision 7 | 13.76 AC | $2,100.00 | Pavers, Inc. |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 6.1 AC | $212.93 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jul 15, 2021 | 210216 | OkmulgeeDivision 1 | 9.24 AC | $299.00 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 210111 | LincolnDivision 3 | 95.6 AC | $255.00 | HASKELL LEMON CONSTRUCTION CO. |
| Jul 15, 2021 | 210180 | MuskogeeDivision 1 | 1 AC | $695.00 | H & H BRIDGE COMPANY |
| Jun 17, 2021 | 210171 | DeweyDivision 5 | 30.68 AC | $102.00 | Frontier Bridge, Inc. |
| Jun 17, 2021 | 210185 | NowataDivision 8 | 7 AC | $418.95 | Frontier Bridge, Inc. |
| Jun 17, 2021 | 210190 | PushmatahaDivision 2 | 17.9 AC | $195.00 | L & N BRIDGE, LLC |
| May 20, 2021 | 210133 | EllisDivision 6 | 36 AC | $154.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210139 | McclainDivision 3 | 117.2 AC | $85.00 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 35.2 AC | $95.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 92.1 AC | $95.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 200338 | BeckhamDivision 5 | 30.4 AC | $69.23 | OBC, INC. |
| May 20, 2021 | 210082 | McclainDivision 3 | 8 AC | $73.00 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210148 | PayneDivision 4 | 64.25 AC | $400.00 | BECCO CONTRACTORS, INC. |
| May 20, 2021 | 210129 | BryanDivision 2 | 110 AC | $140.00 | L & N BRIDGE, LLC |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 25.66 AC | $80.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 40 AC | $243.27 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 200030 | RogersDivision 8 | 2 AC | $500.00 | CONCRETE SERVICES CORPORATION |
| Mar 18, 2021 | 210097 | KayDivision 4 | 5 AC | $395.00 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 140.48 AC | $70.00 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210060 | OttawaDivision 8 | 36.67 AC | $257.25 | Treas Construction Inc |
| Mar 18, 2021 | 210086 | PittsburgDivision 2 | 44 AC | $155.25 | Robinson Construction, LLC |
| Feb 18, 2021 | 210062 | Pontotoc | 56.6 AC | $239.50 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210045 | ClevelandDivision 3 | 143 AC | $100.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Feb 18, 2021 | 210070 | WoodwardDivision 6 | 16.48 AC | $75.00 | BRIDGECO CONTRACTORS, INC. |
| Feb 18, 2021 | 210046 | ComancheDivision 7 | 5.26 AC | $150.00 | K & R BUILDERS, INC. |
| Feb 18, 2021 | 190362 | LoveDivision 7 | 1 AC | $2,048.06 | C3 Construction, Inc. |
| Feb 18, 2021 | 210055 | MurrayDivision 7 | 29 AC | $150.00 | HUB Construction, Inc. |
| Feb 18, 2021 | 210061 | PittsburgDivision 2 | 3.62 AC | $345.00 | BRIDGECO CONTRACTORS, INC. |
| Jan 21, 2021 | 210035 | Pontotoc | 30 AC | $256.50 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 26 AC | $300.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210008 | CaddoDivision 7 | 8 AC | $119.00 | Treas Construction Inc |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 36 AC | $300.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210010 | ClevelandDivision 3 | 71.05 AC | $300.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 14 AC | $300.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210018 | HarperDivision 6 | 35.28 AC | $413.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210003 | WashingtonDivision 8 | 0.42 AC | $685.00 | Tri Star Construction Arkansas, LLC |
| Jan 21, 2021 | 210025 | KingfisherDivision 4 | 129.68 AC | $221.45 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210004 | RogersDivision 8 | 15 AC | $200.00 | BECCO CONTRACTORS, INC. |
| Jan 21, 2021 | 210031 | OklahomaDivision 4 | 2 AC | $600.00 | SCHWARZ PAVING CO., INC. |
| Jan 21, 2021 | 210007 | BeckhamDivision 5 | 16.22 AC | $94.39 | C3 Construction, Inc. |
| Nov 19, 2020 | 200355 | RogersDivision 8 | 123.58 AC | $130.00 | EMERY SAPP & SONS, INC. |
| Nov 19, 2020 | 200357 | SequoyahDivision 1 | 36.2 AC | $540.00 | APAC-CENTRAL, INC. |
| Nov 19, 2020 | 200358 | Custer, Washita | 78.53 AC | $69.29 | Caswell Contracting, Inc. |
| Nov 19, 2020 | 200348 | CusterDivision 5 | 17.83 AC | $204.00 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200349 | GarvinDivision 3 | 13.88 AC | $85.00 | Treas Construction Inc |
| Nov 19, 2020 | 200339 | BlaineDivision 5 | 87.32 AC | $60.00 | CORNELL CONSTRUCTION COMPANY, INC. |
| Oct 15, 2020 | 200077 | PottawatomieDivision 3 | 81 AC | $75.00 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200326 | PushmatahaDivision 2 | 6.6 AC | $500.00 | L & N BRIDGE, LLC |
| Oct 15, 2020 | 200297 | WoodsDivision 6 | 1.36 AC | $648.00 | HASKELL LEMON CONSTRUCTION CO. |
| Oct 15, 2020 | 200329 | StephensDivision 7 | 28 AC | $152.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200317 | MccurtainDivision 2 | 4.61 AC | $200.00 | HUB Construction, Inc. |
| Oct 15, 2020 | 200322 | OsageDivision 8 | 59 AC | $219.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200323 | OsageDivision 8 | 3 AC | $550.00 | BRIDGECO CONTRACTORS, INC. |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 27 AC | $316.36 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200292 | PottawatomieDivision 3 | 138 AC | $133.00 | Silver Star Construction Company, Inc. |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 94 AC | $300.00 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200034 | SequoyahDivision 1 | 4 AC | $400.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 50 AC | $300.00 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200290 | OsageDivision 8 | 7 AC | $475.00 | BRIDGECO CONTRACTORS, INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 6.92 AC | $248.49 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 35.8 AC | $248.49 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200108 | Love, Marshall | 18.06 AC | $100.00 | OVERLAND CORPORATION |
| Jul 23, 2020 | 200061 | DeweyDivision 5 | 360 AC | $160.00 | J & R SAND COMPANY, INC. |
| Jul 23, 2020 | 200252 | KayDivision 4 | 45.15 AC | $115.00 | CONCRETE SERVICES CORPORATION |
| Jul 23, 2020 | 200260 | AtokaDivision 2 | 48.2 AC | $500.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200261 | Pontotoc | 98 AC | $507.50 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 50 AC | $114.81 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200224 | GradyDivision 7 | 62 AC | $90.32 | Eldridge Fencing, Inc. |
| Jun 18, 2020 | 200228 | Leflore | 1 AC | $1,890.00 | Robinson Construction, LLC |
| Jun 18, 2020 | 200229 | LincolnDivision 3 | 3.96 AC | $225.00 | L & N BRIDGE, LLC |
| Jun 18, 2020 | 200232 | Ssp-249c(052)ss | 0.5 AC | $2,000.00 | OCCI, INC. |
| May 14, 2020 | 200212 | StephensDivision 7 | 2.95 AC | $100.00 | SEWELL BROS., INC. |
| May 14, 2020 | 200022 | OttawaDivision 8 | 15.16 AC | $355.00 | APAC-CENTRAL, INC. |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 10.42 AC | $310.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 4 AC | $310.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200201 | MurrayDivision 7 | 5.21 AC | $520.00 | Redlands Contracting, LLC |
| May 14, 2020 | 200208 | PittsburgDivision 2 | 40 AC | $190.00 | DUIT CONSTRUCTION COMPANY, INC. |
| Apr 16, 2020 | 190163 | SequoyahDivision 1 | 0.3 AC | $1,850.00 | BRIDGECO CONTRACTORS, INC. |
| Apr 16, 2020 | 200148 | DelawareDivision 8 | 3.69 AC | $20.00 | C-GAWF CONSTRUCTION, INC. |
| Apr 16, 2020 | 200185 | OklahomaDivision 4 | 4.16 AC | $82.40 | Frontier Bridge, Inc. |
| Apr 16, 2020 | 200152 | HaskellDivision 1 | 0.5 AC | $100.00 | C-GAWF CONSTRUCTION, INC. |
| Apr 16, 2020 | 200008 | CreekDivision 8 | 0.26 AC | $2,094.00 | LOGOS CONSTRUCTION CO., LLC |
| Apr 16, 2020 | 200157 | MarshallDivision 2 | 65 AC | $200.00 | OVERLAND CORPORATION |
| Apr 16, 2020 | 200065 | HughesDivision 3 | 6 AC | $309.00 | Treas Construction Inc |
| Apr 16, 2020 | 200175 | WagonerDivision 1 | 83 AC | $150.00 | APAC-CENTRAL, INC. |
| Mar 19, 2020 | 200136 | MajorDivision 6 | 0.45 AC | $1,062.50 | Frontier Bridge, Inc. |
| Mar 19, 2020 | 200032 | SeminoleDivision 3 | 1.26 AC | $200.00 | RRY SERVICES LLC |
| Mar 19, 2020 | 200110 | McintoshDivision 1 | 20.16 AC | $350.00 | Robinson Construction, LLC |
| Mar 19, 2020 | 200125 | Jackson, Tillman | 28 AC | $313.00 | BRIDGECO CONTRACTORS, INC. |
| Mar 19, 2020 | 200132 | CusterDivision 5 | 17 AC | $435.00 | SEWELL BROS., INC. |
| Feb 20, 2020 | 200050 | BeckhamDivision 5 | 2 AC | $540.00 | Frontier Bridge, Inc. |
| Feb 20, 2020 | 200183 | Stp-170c(127)pm | 150.26 AC | $450.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200057 | ClevelandDivision 3 | 116 AC | $53.00 | Silver Star Construction Company, Inc. |
| Feb 20, 2020 | 200183 | Stp-170c(127)pm | 70 AC | $450.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 190350 | Stp-224b(059)ss | 134 AC | $194.00 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Feb 20, 2020 | 200062 | EllisDivision 6 | 134.16 AC | $125.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 190350 | Stp-224b(059)ss | 134.69 AC | $194.00 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Feb 20, 2020 | 200047 | AtokaDivision 2 | 3.27 AC | $462.77 | C3 Construction, Inc. |
| Jan 16, 2020 | 200044 | Stp-257b(038)pm | 16 AC | $394.92 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200092 | TulsaDivision 8 | 68 AC | $180.00 | APAC-CENTRAL, INC. |
| Jan 16, 2020 | 190356 | KayDivision 4 | 78 AC | $100.00 | Evans & Associates Construction Co., Inc. |
| Jan 16, 2020 | 200044 | Stp-257b(038)pm | 18 AC | $394.92 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200001 | AlfalfaDivision 6 | 44.38 AC | $225.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200044 | Stp-257b(038)pm | 68 AC | $394.92 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 190214 | LoveDivision 7 | 2.68 AC | $165.00 | Silver Star Construction Company, Inc. |
| Jan 16, 2020 | 200044 | Stp-257b(038)pm | 18 AC | $394.92 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200035 | TillmanDivision 5 | 5 AC | $350.00 | K & R BUILDERS, INC. |
| Jan 16, 2020 | 200009 | CusterDivision 5 | 134.82 AC | $550.00 | SEWELL BROS., INC. |
| Jan 16, 2020 | 190352 | GarvinDivision 3 | 0.2 AC | $1,045.00 | Silver Star Construction Company, Inc. |
| Jan 16, 2020 | 200036 | TulsaDivision 8 | 0.4 AC | $1,900.00 | PBX Corporation |
| Nov 14, 2019 | 190386 | CoalDivision 3 | 0.8 AC | $1,350.00 | BRIDGECO CONTRACTORS, INC. |
| Nov 14, 2019 | 190379 | Nhpp-017n(256)pm | 153.68 AC | $149.35 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 14, 2019 | 190354 | GreerDivision 5 | 28.86 AC | $130.00 | Frontier Bridge, Inc. |
| Nov 14, 2019 | 190389 | TulsaDivision 8 | 5 AC | $110.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Nov 14, 2019 | 190340 | BlaineDivision 5 | 4.9 AC | $725.00 | BRIDGECO CONTRACTORS, INC. |
| Nov 14, 2019 | 190379 | Nhpp-017n(256)pm | 160.56 AC | $149.35 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 14, 2019 | 190390 | GradyDivision 7 | 24.08 AC | $60.00 | ACTION SAFETY SUPPLY CO., LLC |
| Nov 14, 2019 | 190341 | CaddoDivision 7 | 2.24 AC | $160.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Nov 14, 2019 | 190383 | CimarronDivision 6 | 1 AC | $105.68 | IHC Scott, INC. |
| Nov 14, 2019 | 190369 | PittsburgDivision 2 | 3.2 AC | $940.64 | C3 Construction, Inc. |
| Nov 14, 2019 | 190384 | MajorDivision 6 | 0.68 AC | $1,900.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Nov 14, 2019 | 190375 | StephensDivision 7 | 21 AC | $69.55 | Treas Construction Inc |
| Oct 17, 2019 | 190335 | TulsaDivision 8 | 4.94 AC | $995.00 | Tri Star Construction Arkansas, LLC |
| Oct 17, 2019 | 190275 | Atoka, Bryan | 7 AC | $452.63 | DUIT CONSTRUCTION COMPANY, INC. |
| Oct 17, 2019 | 190264 | Stp-264c(063)pm | 0.36 AC | $100.00 | HUB Construction, Inc. |
| Oct 17, 2019 | 190380 | BeckhamDivision 5 | 7.5 AC | $210.00 | Frontier Bridge, Inc. |
| Oct 17, 2019 | 180304 | SeminoleDivision 3 | 26 AC | $100.00 | OVERLAND CORPORATION |
| Oct 17, 2019 | 190312 | CanadianDivision 4 | 21.4 AC | $122.48 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 190331 | TulsaDivision 8 | 4.36 AC | $823.46 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 190264 | Stp-264c(063)pm | 6.7 AC | $100.00 | HUB Construction, Inc. |
| Sep 19, 2019 | 190216 | McclainDivision 3 | 20.46 AC | $104.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 19, 2019 | 190224 | OklahomaDivision 4 | 0.56 AC | $1,065.00 | Silver Star Construction Company, Inc. |
| Sep 19, 2019 | 190278 | CusterDivision 5 | 70.64 AC | $520.00 | CASWELL CONSTRUCTION, INC. |
| Sep 19, 2019 | 190285 | GradyDivision 7 | 25 AC | $60.00 | ACTION SAFETY SUPPLY CO., LLC |
| Aug 22, 2019 | 190238 | BlaineDivision 5 | 56 AC | $435.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Aug 22, 2019 | 190250 | OklahomaDivision 4 | 1.4 AC | $110.00 | Wyatt Contracting |
| Aug 22, 2019 | 190271 | TulsaDivision 8 | 10 AC | $400.00 | Paragon Contractors, LLC |
| Jul 25, 2019 | 190265 | BeckhamDivision 5 | 8 AC | $179.00 | CASWELL CONSTRUCTION, INC. |
| Jul 25, 2019 | 190226 | OkmulgeeDivision 1 | 8.62 AC | $41.23 | C-GAWF CONSTRUCTION, INC. |
| Jul 25, 2019 | 190269 | Roger MillsDivision 5 | 8 AC | $605.00 | SEWELL BROS., INC. |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 195 AC | $532.50 | DUIT CONSTRUCTION COMPANY, INC. |
| Jul 25, 2019 | 190270 | AlfalfaDivision 6 | 168 AC | $300.00 | Venture Corporation dba VCO Paving |
| Jul 25, 2019 | 190215 | MarshallDivision 2 | 17.2 AC | $300.00 | OVERLAND CORPORATION |
| Jun 20, 2019 | 190137 | TulsaDivision 8 | 4.95 AC | $600.00 | Paragon Contractors, LLC |
| Jun 20, 2019 | 190142 | Jefferson | 69 AC | $160.00 | OVERLAND CORPORATION |
| Jun 20, 2019 | 190149 | CusterDivision 5 | 20 AC | $208.65 | Treas Construction Inc |