| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$42,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 5,913 | CY |
$12.00 |
$16.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 3,821 | CY |
$14.00 |
$16.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$37,639.70 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 462 | LF |
$5.00 |
$10.50 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,512 | LF |
$12.00 |
$11.30 |
| 7 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 94 | CY |
$150.00 |
$105.00 |
| 8 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 12 | CY |
$250.00 |
$300.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 25,378 | SY |
$5.00 |
$4.10 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 7.58 | AC |
$1,500.00 |
$1,225.00 |
| 11 | 241 2832 |
MOWING | 15.16 | AC |
$400.00 |
$355.00 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 3,776 | CY |
$50.00 |
$41.85 |
| 13 | 307(K) 4300 |
STABILIZED SUBGRADE | 20,913 | SY |
$6.50 |
$7.50 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 210 | SY |
$3.00 |
$6.50 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 947 | TON |
$28.00 |
$23.00 |
| 16 | 407(B) 0250 |
TACK COAT | 12,093 | GAL |
$3.75 |
$2.00 |
| 17 | 408 5774 |
PRIME COAT | 4,268 | GAL |
$5.00 |
$3.00 |
| 18 | 409(A) 4242 |
FABRIC REINFORCEMENT | 4,731 | SY |
$2.50 |
$1.50 |
| 19 | 409(A) 4250 |
(SP) POLYPROPYLENE FABRIC REINFORCEMENT | 8,703 | SY |
$3.15 |
$1.25 |
| 20 | 409(B) 4268 |
BITUMINOUS BINDER | 3,359 | GAL |
$3.00 |
$2.25 |
| 21 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 3,961 | TON |
$75.00 |
$74.50 |
| 22 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,750 | TON |
$73.00 |
$63.50 |
| 23 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 2,702 | TON |
$96.00 |
$89.00 |
| 24 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,282 | TON |
$92.00 |
$73.00 |
| 25 | 411(D) 5970 |
SUPERPAVE, TYPE S5(PG 70-28 OK) | 784 | TON |
$100.00 |
$97.65 |
| 26 | 412 5267 |
COLD MILLING PAVEMENT | 23,449 | SY |
$3.25 |
$1.95 |
| 27 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 192 | SY |
$50.00 |
$60.00 |
| 28 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 48 | CY |
$250.00 |
$140.00 |
| 29 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 73 | CY |
$45.00 |
$35.00 |
| 30 | 509(A) 0319 |
CLASS AA CONCRETE | 232 | CY |
$650.00 |
$600.00 |
| 31 | 509(D) 0325 |
CLASS C CONCRETE | 172 | CY |
$290.00 |
$300.00 |
| 32 | 511(A) 0332 |
REINFORCING STEEL | 34,762 | LB |
$1.10 |
$1.00 |
| 33 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 114 | TON |
$45.00 |
$51.50 |
| 34 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 79 | LF |
$18.00 |
$33.00 |
| 35 | 613(A) 4511 |
22" X 13" R.C.PIPE ARCH CLASS A-IV | 46 | LF |
$74.00 |
$115.00 |
| 36 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 484 | LF |
$57.00 |
$58.00 |
| 37 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 66 | LF |
$42.00 |
$67.00 |
| 38 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 338 | LF |
$32.00 |
$55.00 |
| 39 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 268 | LF |
$37.50 |
$55.00 |
| 40 | 613(L) 4506 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 2 | EA |
$1,000.00 |
$1,500.00 |
| 41 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 30 | EA |
$1,100.00 |
$1,750.00 |
| 42 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$2,000.00 |
| 43 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$1,700.00 |
$2,550.00 |
| 44 | 613(M) 7191 |
TYPE AA4 CULVERT END TREATMENT | 4 | EA |
$1,700.00 |
$2,250.00 |
| 45 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 4 | EA |
$2,000.00 |
$2,450.00 |
| 46 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$11,000.00 |
$19,000.00 |
| 47 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 192 | SY |
$15.00 |
$14.50 |
| 48 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 300 | SY |
$8.00 |
$16.50 |
| 49 | 619(C) 0924 |
SAWING PAVEMENT | 11,198 | LF |
$2.00 |
$3.00 |
| 50 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 1,327 | LF |
$6.50 |
$4.75 |
| 51 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 3,936 | LF |
$6.00 |
$5.00 |
| 52 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 9 | EA |
$115.00 |
$104.00 |
| 53 | 629(C) 4960 |
MAILBOX | 9 | EA |
$40.00 |
$51.75 |
| 54 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 9 | EA |
$35.00 |
$10.35 |
| 55 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 5,180 | LF |
$0.2000 |
$0.5000 |
| 56 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 10,446 | LF |
$0.2000 |
$0.4500 |
| 57 | 804(A) 2915 |
STRUCTURAL CONCRETE | 1.04 | CY |
$725.00 |
$510.00 |
| 58 | 804(B) 2916 |
REINFORCING STEEL | 152 | LB |
$2.40 |
$2.05 |
| 59 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 162.67 | SF |
$22.00 |
$20.70 |
| 60 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 21 | SF |
$34.00 |
$25.85 |
| 61 | 851(B) 3219 |
3 1/2"@9.11 GALV.STEEL PIPE POST | 64 | LF |
$24.00 |
$24.80 |
| 62 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 284.5 | LF |
$10.00 |
$10.35 |
| 63 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 64.5 | LF |
$12.00 |
$12.40 |
| 64 | 853 9039 |
DELINEATORS(TYPE 2, CODE 3) | 6 | EA |
$30.00 |
$25.85 |
| 65 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 35,748 | LF |
$0.7500 |
$0.4000 |
| 66 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 88 | LF |
$14.25 |
$10.25 |
| 67 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 75 | SD |
$160.00 |
$103.50 |
| 68 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 20,000 | LF |
$0.7000 |
$0.5000 |
| 69 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,000 | LF |
$1.50 |
$0.2500 |
| 70 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 400 | SD |
$13.00 |
$5.10 |
| 71 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 600 | LF |
$24.25 |
$20.10 |
| 72 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,200 | LF |
$2.75 |
$10.00 |
| 73 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 600 | SD |
$3.75 |
$0.1000 |
| 74 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,150 | SD |
$0.2500 |
$1.05 |
| 75 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,950 | SD |
$1.00 |
$2.10 |
| 76 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 6,750 | SD |
$1.25 |
$0.1500 |
| 77 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,500 | SD |
$1.50 |
$0.3000 |
| 78 | 880(C) 8848 |
WING BARRICADES | 1,200 | SD |
$1.35 |
$0.2500 |
| 79 | 880(D) 8854 |
VERTICAL PANELS | 7,500 | SD |
$0.1500 |
$0.1000 |
| 80 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 6,150 | SD |
$0.1500 |
$1.00 |
| 81 | 880(F) 8878 |
DRUMS | 7,500 | SD |
$0.7500 |
$0.6000 |
| 82 | 880(L) 8920 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BIDDABLE) | 100 | HOUR |
$69.00 |
$69.00 |
| 83 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 300 | SD |
$25.00 |
$15.50 |
| 84 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$20,000.00 |
$45,000.00 |
| 85 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$45,000.00 |
| 86 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$163,000.00 |
$155,000.00 |