$1.78Avg low bid / LB
$1.79Avg of all bids
$1.61Avg engineer's estimate
114Jobs · 863,650.44 LB
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 21 | 128,567.5 | $2.04 | $1.98 |
| 2020 | 28 | 207,226.7 | $2.18 | $2.19 |
| 2019 | 38 | 434,197.54 | $1.45 | $1.53 |
| 2018 | 27 | 93,658.7 | $2.06 | $1.86 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Oct 14, 2021 | 210282 | Canadian, Creek, Oklahoma, Tulsa, Wagoner | 9,247.1 LB | $2.00 | Midstate Traffic Control, Inc. |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 6,244 LB | $2.29 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 5,624 LB | $2.29 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 17,324 LB | $2.11 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jun 17, 2021 | 210166 | ClevelandDivision 3 | 3,382.2 LB | $2.00 | Midstate Traffic Control, Inc. |
| Jun 17, 2021 | 210195 | TulsaDivision 8 | 2,855 LB | $2.10 | Paragon Contractors, LLC |
| May 20, 2021 | 210133 | EllisDivision 6 | 474 LB | $2.15 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 6,770.6 LB | $2.10 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210148 | PayneDivision 4 | 576 LB | $3.00 | BECCO CONTRACTORS, INC. |
| May 20, 2021 | 210042 | TulsaDivision 8 | 568 LB | $3.00 | TRAFFIC & LIGHTING SYSTEMS, LLC |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 2,244 LB | $2.50 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 15,400 LB | $0.4200 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210077 | GarvinDivision 3 | 4,380 LB | $2.07 | IHC Scott, INC. |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 21,064 LB | $2.62 | SHERWOOD CONSTRUCTION CO., INC. |
| Feb 18, 2021 | 210045 | ClevelandDivision 3 | 320 LB | $2.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Feb 18, 2021 | 190362 | LoveDivision 7 | 562 LB | $0.8000 | C3 Construction, Inc. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 5,396 LB | $3.25 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210031 | OklahomaDivision 4 | 8,520 LB | $2.00 | SCHWARZ PAVING CO., INC. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 1,040 LB | $2.10 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210031 | OklahomaDivision 4 | 6,839 LB | $2.00 | SCHWARZ PAVING CO., INC. |
| Jan 21, 2021 | 210003 | WashingtonDivision 8 | 670.4 LB | $3.00 | Tri Star Construction Arkansas, LLC |
| Jan 21, 2021 | 210035 | Pontotoc | 4,095.2 LB | $1.95 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210007 | BeckhamDivision 5 | 260 LB | $1.57 | C3 Construction, Inc. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 516 LB | $3.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210035 | Pontotoc | 1,150 LB | $2.10 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210018 | HarperDivision 6 | 318 LB | $2.10 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 390 LB | $2.10 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210030 | McclainDivision 3 | 2,338 LB | $2.07 | IHC Scott, INC. |
| Nov 19, 2020 | 200348 | CusterDivision 5 | 2,272 LB | $2.02 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200345 | ClevelandDivision 3 | 3,944.4 LB | $2.05 | SAC Services, Inc. |
| Nov 19, 2020 | 200337 | AtokaDivision 2 | 1,798 LB | $2.25 | Built Right Construction, LLC |
| Nov 19, 2020 | 200346 | ClevelandDivision 3 | 1,707.8 LB | $2.10 | Redlands Contracting, LLC |
| Nov 19, 2020 | 200346 | ClevelandDivision 3 | 7,610 LB | $1.90 | Redlands Contracting, LLC |
| Nov 19, 2020 | 200346 | ClevelandDivision 3 | 7,100 LB | $2.10 | Redlands Contracting, LLC |
| Oct 15, 2020 | 200334 | TulsaDivision 8 | 5,566 LB | $1.75 | TRAFFIC & LIGHTING SYSTEMS, LLC |
| Oct 15, 2020 | 200334 | TulsaDivision 8 | 26,530 LB | $1.65 | TRAFFIC & LIGHTING SYSTEMS, LLC |
| Sep 17, 2020 | 200088 | TulsaDivision 8 | 2,600 LB | $2.45 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 1,583 LB | $1.94 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200174 | TulsaDivision 8 | 378 LB | $4.75 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 18,868 LB | $2.33 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200295 | TulsaDivision 8 | 5,990 LB | $4.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 13,042 LB | $2.55 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200163 | OkfuskeeDivision 3 | 130 LB | $2.70 | HASKELL LEMON CONSTRUCTION CO. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 8,954 LB | $2.10 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 6,248 LB | $2.55 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200298 | TulsaDivision 8 | 1,817 LB | $1.85 | CROSSLAND HEAVY CONTRACTORS INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 3,180 LB | $2.55 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200247 | ClevelandDivision 3 | 3,741.8 LB | $1.70 | CGC, LLC. |
| Jun 18, 2020 | 200238 | WagonerDivision 1 | 2,681.6 LB | $1.55 | TRAFFIC & LIGHTING SYSTEMS, LLC |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 7,812.6 LB | $1.44 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 1,612 LB | $2.30 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200228 | Leflore | 2,011.2 LB | $2.16 | Robinson Construction, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 602 LB | $1.90 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 14,144 LB | $2.30 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 5,076.4 LB | $2.25 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 9,940 LB | $2.50 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 190120 | Nhppi-4400-(039)pm | 3,000 LB | $1.78 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 3,196 LB | $2.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200126 | TulsaDivision 8 | 2,942 LB | $2.10 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 5,894.4 LB | $2.25 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200022 | OttawaDivision 8 | 152 LB | $2.05 | APAC-CENTRAL, INC. |
| Apr 16, 2020 | 200075 | OklahomaDivision 4 | 1,041.6 LB | $3.00 | SAC Services, Inc. |
| Apr 16, 2020 | 200079 | SeminoleDivision 3 | 1,248 LB | $1.40 | THE CUMMINS CONSTRUCTION CO., INC. |
| Mar 19, 2020 | 200085 | TulsaDivision 8 | 4,313 LB | $2.50 | CROSSLAND HEAVY CONTRACTORS INC. |
| Mar 19, 2020 | 200132 | CusterDivision 5 | 1,704 LB | $2.50 | SEWELL BROS., INC. |
| Feb 20, 2020 | 200050 | BeckhamDivision 5 | 72 LB | $2.16 | Frontier Bridge, Inc. |
| Feb 20, 2020 | 200050 | BeckhamDivision 5 | 1,420 LB | $1.92 | Frontier Bridge, Inc. |
| Jan 16, 2020 | 200045 | JohnstonDivision 3 | 9,185.6 LB | $2.43 | C3 Construction, Inc. |
| Jan 16, 2020 | 200092 | TulsaDivision 8 | 1,390.8 LB | $2.05 | APAC-CENTRAL, INC. |
| Jan 16, 2020 | 200092 | TulsaDivision 8 | 1,319.5 LB | $2.00 | APAC-CENTRAL, INC. |
| Jan 16, 2020 | 200001 | AlfalfaDivision 6 | 3,408 LB | $2.50 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 14, 2019 | 190109 | CanadianDivision 4 | 144 LB | $2.05 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Nov 14, 2019 | 190383 | CimarronDivision 6 | 6,480 LB | $2.85 | IHC Scott, INC. |
| Nov 14, 2019 | 190389 | TulsaDivision 8 | 2,855.2 LB | $2.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Oct 17, 2019 | 190312 | CanadianDivision 4 | 128 LB | $2.45 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 190331 | TulsaDivision 8 | 6,248 LB | $2.40 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 190312 | CanadianDivision 4 | 5,964 LB | $2.26 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 190315 | GrantDivision 4 | 160 LB | $3.31 | Evans & Associates Construction Co., Inc. |
| Oct 17, 2019 | 190380 | BeckhamDivision 5 | 48 LB | $2.63 | Frontier Bridge, Inc. |
| Oct 17, 2019 | 190320 | Carter, Love, Murray | 92,037 LB | $1.30 | ACTION SAFETY SUPPLY CO., LLC |
| Oct 17, 2019 | 190325 | OklahomaDivision 4 | 2,406 LB | $2.00 | Midstate Traffic Control, Inc. |
| Oct 17, 2019 | 190294 | Kay, Noble, Oklahoma | 1,560 LB | $1.89 | ACTION SAFETY SUPPLY CO., LLC |
| Oct 17, 2019 | 190331 | TulsaDivision 8 | 2,176 LB | $2.40 | SHERWOOD CONSTRUCTION CO., INC. |
| Sep 19, 2019 | 190278 | CusterDivision 5 | 4,594 LB | $1.50 | CASWELL CONSTRUCTION, INC. |
| Sep 19, 2019 | 190216 | McclainDivision 3 | 2,132 LB | $1.41 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 19, 2019 | 180071 | TulsaDivision 8 | 3,916 LB | $2.00 | ACTION SAFETY SUPPLY CO., LLC |
| Sep 19, 2019 | 190216 | McclainDivision 3 | 2,187 LB | $1.96 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 22, 2019 | 190262 | TulsaDivision 8 | 100,956 LB | $1.00 | BECCO CONTRACTORS, INC. |
| Aug 22, 2019 | 190271 | TulsaDivision 8 | 1,846 LB | $2.80 | Paragon Contractors, LLC |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 62,972.34 LB | $1.33 | DUIT CONSTRUCTION COMPANY, INC. |
| Jul 25, 2019 | 190270 | AlfalfaDivision 6 | 192 LB | $2.00 | Venture Corporation dba VCO Paving |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 6,480 LB | $2.34 | DUIT CONSTRUCTION COMPANY, INC. |
| Jul 25, 2019 | 190124 | OklahomaDivision 4 | 4,636 LB | $2.00 | TRAFFIC SIGNALS, INC. |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 10,066 LB | $1.33 | DUIT CONSTRUCTION COMPANY, INC. |
| Jun 20, 2019 | 190195 | Stp-214b(069)ag | 840 LB | $1.59 | Silver Star Construction Company, Inc. |
| Jun 20, 2019 | 190195 | Stp-214b(069)ag | 1,056 LB | $1.60 | Silver Star Construction Company, Inc. |
| Jun 20, 2019 | 190016 | McintoshDivision 1 | 332 LB | $3.20 | OBC, INC. |
| Jun 20, 2019 | 190195 | Stp-214b(069)ag | 1,021.1 LB | $2.30 | Silver Star Construction Company, Inc. |
| Jun 20, 2019 | 190156 | OklahomaDivision 4 | 1,024 LB | $2.25 | SCHWARZ PAVING CO., INC. |
| Jun 20, 2019 | 190137 | TulsaDivision 8 | 3,562 LB | $1.35 | Paragon Contractors, LLC |
| Jun 20, 2019 | 190182 | OkfuskeeDivision 3 | 1,158 LB | $2.10 | HASKELL LEMON CONSTRUCTION CO. |
| Jun 20, 2019 | 190159 | OklahomaDivision 4 | 720 LB | $2.00 | TRAFFIC SIGNALS, INC. |
| May 16, 2019 | 190174 | ClevelandDivision 3 | 3,562 LB | $1.50 | CROSSLAND HEAVY CONTRACTORS INC. |
| May 16, 2019 | 190013 | McclainDivision 3 | 80 LB | $2.15 | Silver Star Construction Company, Inc. |
| May 16, 2019 | 190174 | ClevelandDivision 3 | 3,692 LB | $1.50 | CROSSLAND HEAVY CONTRACTORS INC. |
| May 16, 2019 | 190178 | KingfisherDivision 4 | 3,388.4 LB | $1.38 | SCHIRALLI CONSTRUCTION CORP. |
| May 16, 2019 | 190183 | OklahomaDivision 4 | 130.2 LB | $3.26 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| May 16, 2019 | 190130 | Stp-259b(034)ss | 3,475 LB | $1.88 | Bridges, Inc. DBA Scudder Bridge Co. |
| Apr 18, 2019 | 190161 | RogersDivision 8 | 632 LB | $2.00 | BECCO CONTRACTORS, INC. |
| Apr 18, 2019 | 190155 | OklahomaDivision 4 | 89 LB | $2.40 | CGC, LLC. |
| Apr 18, 2019 | 190099 | TulsaDivision 8 | 2,000 LB | $2.30 | Tri Star Construction Arkansas, LLC |
| Apr 18, 2019 | 180235 | BryanDivision 2 | 212 LB | $2.00 | L & N BRIDGE, LLC |
| Mar 14, 2019 | 190133 | RogersDivision 8 | 906 LB | $2.19 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 14, 2019 | 190133 | RogersDivision 8 | 8,955.9 LB | $2.40 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 14, 2019 | 190133 | RogersDivision 8 | 9,870 LB | $2.19 | SHERWOOD CONSTRUCTION CO., INC. |
| Feb 14, 2019 | 190100 | Stp-205b(076)pm | 5,727.4 LB | $1.34 | Frontier Bridge, Inc. |
| Feb 14, 2019 | 190100 | Stp-205b(076)pm | 38,544 LB | $1.34 | Frontier Bridge, Inc. |
| Feb 14, 2019 | 190100 | Stp-205b(076)pm | 5,112 LB | $1.33 | Frontier Bridge, Inc. |
| Feb 14, 2019 | 190100 | Stp-205b(076)pm | 7,932 LB | $2.14 | Frontier Bridge, Inc. |
| Jan 17, 2019 | 190044 | GrantDivision 4 | 24 LB | $2.55 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 17, 2019 | 190051 | Ssp-250n(018)pm | 1,632 LB | $2.60 | Pavers, Inc. |
| Jan 17, 2019 | 190019 | OklahomaDivision 4 | 4,775 LB | $1.50 | CROSSLAND HEAVY CONTRACTORS INC. |
| Jan 17, 2019 | 190019 | OklahomaDivision 4 | 3,562 LB | $1.50 | CROSSLAND HEAVY CONTRACTORS INC. |
| Nov 15, 2018 | 180359 | OklahomaDivision 4 | 4,244 LB | $1.00 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Nov 15, 2018 | 180359 | OklahomaDivision 4 | 9,342 LB | $1.00 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Nov 15, 2018 | 180363 | TulsaDivision 8 | 4,096 LB | $1.75 | TRAFFIC & LIGHTING SYSTEMS, LLC |
| Oct 18, 2018 | 180203 | MarshallDivision 2 | 348 LB | $2.00 | JENSEN CONSTRUCTION COMPANY |
| Sep 20, 2018 | 180307 | Ssp-272n(206)pm | 3,800 LB | $2.00 | BECCO CONTRACTORS, INC. |
| Sep 20, 2018 | 180280 | CraigDivision 8 | 3,432 LB | $2.20 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 20, 2018 | 180281 | CreekDivision 8 | 96 LB | $5.50 | BECCO CONTRACTORS, INC. |
| Sep 20, 2018 | 180288 | Hsipg-240n(068)ad | 4,438.7 LB | $1.50 | JOB CONSTRUCTION CO., INC. |
| Sep 20, 2018 | 180259 | CanadianDivision 4 | 312 LB | $2.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 20, 2018 | 180307 | Ssp-272n(206)pm | 2,360 LB | $2.00 | BECCO CONTRACTORS, INC. |
| Aug 16, 2018 | 180266 | OklahomaDivision 4 | 1,364.8 LB | $1.55 | TRAFFIC SIGNALS, INC. |
| Aug 16, 2018 | 180263 | GarvinDivision 3 | 5,624 LB | $1.74 | Allen Contracting, Inc. |
| Jul 19, 2018 | 180241 | KingfisherDivision 4 | 256 LB | $2.12 | Shell Construction Company, Inc. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 4,640 LB | $1.50 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 21,028 LB | $2.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 1,264 LB | $1.50 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 14, 2018 | 180229 | Nhppi-4440-(007)pm | 10,500 LB | $2.30 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 14, 2018 | 180230 | WashingtonDivision 8 | 256 LB | $2.00 | Keystone Services, Inc. |
| Jun 14, 2018 | 180127 | ClevelandDivision 3 | 11,766 LB | $1.65 | Silver Star Construction Company, Inc. |
| May 17, 2018 | 180197 | KiowaDivision 5 | 2,015 LB | $3.00 | SEWELL BROS., INC. |
| May 17, 2018 | 180132 | GarfieldDivision 4 | 3,692 LB | $1.90 | Bridges, Inc. DBA Scudder Bridge Co. |
| May 17, 2018 | 180193 | CreekDivision 8 | 284 LB | $2.25 | Cimarron Construction Company, LLC |
| Apr 19, 2018 | 180105 | OklahomaDivision 4 | 1,341 LB | $1.25 | Midstate Traffic Control, Inc. |
| Apr 19, 2018 | 180106 | OklahomaDivision 4 | 1,341 LB | $1.25 | Midstate Traffic Control, Inc. |
| Apr 19, 2018 | 180170 | McclainDivision 3 | 1,340 LB | $1.30 | Midstate Traffic Control, Inc. |
| Mar 15, 2018 | 180139 | OklahomaDivision 4 | 1,390 LB | $7.47 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 15, 2018 | 180139 | OklahomaDivision 4 | 5,022 LB | $3.77 | SHERWOOD CONSTRUCTION CO., INC. |