| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$30,000.00 |
$50,000.00 |
$325,018.20 |
$500,000.00 |
$450,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 240,359 | CY |
$8.75 |
$9.00 |
$12.00 |
$9.38 |
$17.00 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 6,000 | CY |
$15.00 |
$15.00 |
$12.00 |
$25.00 |
$20.00 |
| 4 | 202(D) 0184 |
UNCLASSIFIED BORROW | 206,733 | CY |
$11.00 |
$12.00 |
$12.00 |
$5.50 |
$17.00 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$70,000.00 |
$100,000.00 |
$127,476.79 |
$85,804.88 |
$712,623.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 9,285 | LF |
$1.50 |
$3.00 |
$1.45 |
$2.71 |
$1.47 |
| 7 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 125 | EA |
$175.00 |
$205.00 |
$155.78 |
$154.66 |
$157.62 |
| 8 | 221(E) 2804 |
TEMPORARY SEDIMENT BASIN | 1 | EA |
$1,000.00 |
$1,000.00 |
$8,431.52 |
$3,879.20 |
$1,065.00 |
| 9 | 221(F) 0100 |
TEMPORARY SILT DIKE | 5,565 | LF |
$6.00 |
$10.00 |
$7.25 |
$9.20 |
$7.34 |
| 10 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 76 | CY |
$90.00 |
$150.00 |
$78.62 |
$156.78 |
$319.50 |
| 11 | 221(K) 0600 |
TEMPORARY FIBER LOG | 15,893 | LF |
$4.00 |
$21.50 |
$5.49 |
$5.14 |
$5.56 |
| 12 | 230(A) 2806 |
SOLID SLAB SODDING | 236,778 | SY |
$1.00 |
$2.00 |
$1.45 |
$1.71 |
$1.47 |
| 13 | 233(A) 2817 |
VEGETATIVE MULCHING | 48.92 | AC |
$240.00 |
$700.00 |
$626.29 |
$738.85 |
$633.68 |
| 14 | 241 2832 |
MOWING | 391.36 | AC |
$48.00 |
$35.00 |
$72.63 |
$85.69 |
$73.49 |
| 15 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 6 | EA |
$3,000.00 |
$3,500.00 |
$1,466.09 |
$2,726.41 |
$2,400.00 |
| 16 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 34,386 | CY |
$55.00 |
$70.00 |
$65.00 |
$64.02 |
$73.00 |
| 17 | 307(K) 4300 |
STABILIZED SUBGRADE | 181,376 | SY |
$4.25 |
$8.00 |
$7.76 |
$4.53 |
$5.50 |
| 18 | 325 5271 |
SEPARATOR FABRIC | 181,376 | SY |
$1.20 |
$2.00 |
$1.28 |
$1.20 |
$1.30 |
| 19 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 10,921 | TON |
$30.00 |
$35.00 |
$38.21 |
$29.72 |
$40.00 |
| 20 | 407(B) 0250 |
TACK COAT | 9,204 | GAL |
$3.00 |
$2.00 |
$2.11 |
$2.48 |
$3.99 |
| 21 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 3,384 | TON |
$72.00 |
$120.00 |
$77.14 |
$91.01 |
$85.50 |
| 22 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 29,919 | TON |
$65.00 |
$95.00 |
$71.96 |
$84.89 |
$67.50 |
| 23 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 2,299 | TON |
$82.00 |
$115.00 |
$91.27 |
$86.71 |
$88.50 |
| 24 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 45,472 | SY |
$10.00 |
$14.00 |
$15.10 |
$19.30 |
$22.00 |
| 25 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 91,873 | SY |
$15.00 |
$18.00 |
$19.38 |
$24.97 |
$30.00 |
| 26 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 38,508 | CY |
$115.00 |
$125.00 |
$137.60 |
$143.75 |
$160.00 |
| 27 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 136 | CY |
$25.00 |
$8.00 |
$32.34 |
$28.32 |
$20.00 |
| 28 | 501(G) 6315 |
CLSM BACKFILL | 2,170 | CY |
$97.00 |
$135.00 |
$126.42 |
$193.90 |
$125.00 |
| 29 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$1,750,000.00 |
$265,000.00 |
$754,254.21 |
$674,696.59 |
$600,000.00 |
| 30 | 504(E) 6190 |
42" F-SHAPED PARAPET | 11,420 | LF |
$85.00 |
$90.00 |
$105.70 |
$140.86 |
$100.00 |
| 31 | 509(A) 0319 |
CLASS AA CONCRETE | 917 | CY |
$400.00 |
$525.00 |
$499.78 |
$632.32 |
$300.00 |
| 32 | 509(B) 0325 |
CLASS A CONCRETE(LONG. BAR. DES. 1-A) | 1,252 | CY |
$360.00 |
$550.00 |
$493.25 |
$250.63 |
$300.00 |
| 33 | 509(D) 0325 |
CLASS C CONCRETE | 614 | CY |
$305.00 |
$350.00 |
$394.72 |
$433.18 |
$255.60 |
| 34 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 156,927 | SF |
$2.15 |
$1.15 |
$1.95 |
$2.30 |
$1.92 |
| 35 | 510(D) 6341 |
MSE RETAINING WALL | 8,132 | SY |
$500.00 |
$750.00 |
$600.00 |
$635.37 |
$707.77 |
| 36 | 511(A) 0332 |
REINFORCING STEEL | 287,197 | LB |
$1.00 |
$1.00 |
$0.5600 |
$1.12 |
$1.00 |
| 37 | 609(A) 0287 |
CONCRETE CURB (4" MNTBLE-INTEGRAL) | 2,976 | LF |
$7.00 |
$10.00 |
$3.23 |
$3.05 |
$9.00 |
| 38 | 609(A) 0380 |
CONCRETE CURB (8" BARRIER-INTEGRAL) | 1,002 | LF |
$11.50 |
$5.00 |
$5.35 |
$3.38 |
$10.00 |
| 39 | 609(B) 1523 |
2'-8" COMB. CURB & GUTTER (4" MNTBLE) | 997 | LF |
$10.00 |
$25.00 |
$31.45 |
$40.35 |
$24.00 |
| 40 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 44 | SY |
$85.00 |
$55.00 |
$75.59 |
$55.88 |
$60.00 |
| 41 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 224 | SY |
$70.00 |
$65.00 |
$58.09 |
$62.08 |
$75.00 |
| 42 | 610(C) 0609 |
6" CONCRETE DIVIDING STRIP | 6,417 | SY |
$45.00 |
$50.00 |
$88.58 |
$73.12 |
$65.00 |
| 43 | 610(I) 4610 |
TACTILE WARNING DEVICE-NEW | 8 | SF |
$35.00 |
$50.00 |
$42.23 |
$124.18 |
$155.00 |
| 44 | 611(A) 2657 |
MANHOLE (4' DIAMETER) | 8 | EA |
$2,500.00 |
$6,000.00 |
$1,768.30 |
$1,769.67 |
$1,900.00 |
| 45 | 611(A) 2658 |
MANHOLE (5' DIAMETER) | 8 | EA |
$3,100.00 |
$7,500.00 |
$2,491.97 |
$2,418.51 |
$2,600.00 |
| 46 | 611(A) 2659 |
MANHOLE (6' DIAMETER) | 15 | EA |
$5,500.00 |
$12,000.00 |
$3,773.14 |
$3,629.62 |
$3,450.00 |
| 47 | 611(B) 2680 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | 10 | VF |
$115.00 |
$200.00 |
$211.27 |
$70.00 |
$135.00 |
| 48 | 611(B) 2681 |
ADD'L.DEPTH IN MANHOLE (5' DIAMETER) | 12 | VF |
$230.00 |
$200.00 |
$282.52 |
$115.00 |
$200.00 |
| 49 | 611(B) 2682 |
ADD'L.DEPTH IN MANHOLE (6' DIAMETER) | 70 | VF |
$515.00 |
$200.00 |
$403.84 |
$200.00 |
$310.00 |
| 50 | 611(G) 4012 |
SPECIAL INLET DRAIN | 47 | EA |
$10,000.00 |
$12,500.00 |
$5,913.76 |
$7,091.48 |
$8,100.00 |
| 51 | 611(G) 5112 |
INLET CI DES. 2 (STD) | 1 | EA |
$4,000.00 |
$2,500.00 |
$2,924.00 |
$3,118.56 |
$3,300.00 |
| 52 | 611(G) 5113 |
INLET CI DES. 2 (B) | 1 | EA |
$4,500.00 |
$3,400.00 |
$3,921.53 |
$4,426.56 |
$5,000.00 |
| 53 | 611(G) 5120 |
INLET CI DES. 3 (STD) | 1 | EA |
$5,750.00 |
$4,600.00 |
$4,606.17 |
$5,401.90 |
$5,300.00 |
| 54 | 611(G) 5121 |
INLET CI DES. 3 (B) | 3 | EA |
$8,000.00 |
$5,500.00 |
$5,520.32 |
$6,744.42 |
$7,000.00 |
| 55 | 611(G) 5122 |
INLET CI DES. 3 (D) | 2 | EA |
$7,500.00 |
$8,000.00 |
$6,614.46 |
$8,059.01 |
$8,600.00 |
| 56 | 611(G) 5123 |
INLET CI DES. 3 (2B) | 2 | EA |
$8,250.00 |
$6,700.00 |
$6,706.30 |
$8,040.88 |
$8,600.00 |
| 57 | 611(G) 5334 |
INLET GPI TYPE 2 (DES. 8) | 2 | EA |
$5,500.00 |
$3,400.00 |
$3,284.24 |
$3,524.14 |
$3,900.00 |
| 58 | 611(G) 5335 |
INLET GPI TYPE 2 (DES. 9) | 1 | EA |
$6,250.00 |
$4,700.00 |
$3,478.31 |
$3,694.88 |
$4,100.00 |
| 59 | 611(G) 5704 |
INLET CDI RCP DES. 1 | 1 | EA |
$4,000.00 |
$2,700.00 |
$1,667.40 |
$1,252.45 |
$1,600.00 |
| 60 | 611(G) 5707 |
INLET CDI RCP DES. 4 | 2 | EA |
$6,000.00 |
$6,700.00 |
$2,656.50 |
$1,619.79 |
$2,275.00 |
| 61 | 611(G) 5708 |
INLET CDI RCP DES. 5 | 1 | EA |
$8,000.00 |
$8,000.00 |
$3,907.18 |
$3,155.77 |
$3,300.00 |
| 62 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 4 | EA |
$3,000.00 |
$3,400.00 |
$2,876.63 |
$2,738.59 |
$2,800.00 |
| 63 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 7 | EA |
$2,500.00 |
$4,700.00 |
$2,458.69 |
$2,382.07 |
$2,400.00 |
| 64 | 611(H) 5325 |
ADD'L DEPTH IN INLET CI DES. 2 | 5 | VF |
$300.00 |
$500.00 |
$438.32 |
$200.00 |
$450.00 |
| 65 | 611(H) 5330 |
ADD'L DEPTH IN INLET CI DES. 3 | 15 | VF |
$350.00 |
$500.00 |
$677.06 |
$320.00 |
$1,250.00 |
| 66 | 611(H) 5375 |
ADD'L DEPTH IN INLET GPI TYPE 2 | 1 | VF |
$500.00 |
$400.00 |
$590.51 |
$275.00 |
$400.00 |
| 67 | 611(H) 5789 |
ADD'L DEPTH IN INLET CDI RCP DES. 1 | 1 | VF |
$200.00 |
$250.00 |
$331.09 |
$130.00 |
$225.00 |
| 68 | 611(H) 5792 |
ADD'L DEPTH IN INLET CDI RCP DES. 4 | 8 | VF |
$300.00 |
$400.00 |
$449.53 |
$215.00 |
$330.00 |
| 69 | 611(H) 5793 |
ADD'L DEPTH IN INLET CDI RCP DES. 5 | 1 | VF |
$400.00 |
$500.00 |
$551.85 |
$275.00 |
$425.00 |
| 70 | 611(L) 0487 |
JUNCTION BOXES | 164 | CF |
$75.00 |
$70.00 |
$58.01 |
$38.18 |
$4.20 |
| 71 | 612(A) 0641 |
MANHOLES ADJUST TO GRADE | 5 | EA |
$800.00 |
$1,000.00 |
$205.23 |
$891.46 |
$540.00 |
| 72 | 612(C) 0645 |
INLET ADJUST TO GRADE | 5 | EA |
$900.00 |
$1,000.00 |
$1,118.11 |
$891.46 |
$910.00 |
| 73 | 612(E) 0647 |
VALVE BOXES ADJUST TO GRADE | 5 | EA |
$250.00 |
$700.00 |
$263.15 |
$449.07 |
$295.00 |
| 74 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 4,280 | LF |
$55.00 |
$96.00 |
$32.21 |
$63.46 |
$35.00 |
| 75 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 3,303 | LF |
$60.00 |
$105.00 |
$54.83 |
$73.67 |
$46.00 |
| 76 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 1,230 | LF |
$80.00 |
$120.00 |
$63.18 |
$118.42 |
$62.00 |
| 77 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 1,483 | LF |
$110.00 |
$136.00 |
$82.44 |
$133.72 |
$77.00 |
| 78 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 4 | LF |
$300.00 |
$198.00 |
$132.91 |
$382.61 |
$216.00 |
| 79 | 613(A) 0586 |
42" R.C.PIPE CLASS IV | 1,062 | LF |
$140.00 |
$196.00 |
$126.79 |
$381.25 |
$114.00 |
| 80 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 134 | LF |
$190.00 |
$196.00 |
$116.07 |
$210.79 |
$110.00 |
| 81 | 613(A) 4511 |
22" X 13" R.C.PIPE ARCH CLASS A-IV | 82 | LF |
$110.00 |
$136.00 |
$58.19 |
$80.34 |
$68.00 |
| 82 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 238 | LF |
$40.00 |
$105.00 |
$63.27 |
$58.93 |
$40.00 |
| 83 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 14,113 | LF |
$10.00 |
$23.50 |
$11.96 |
$5.00 |
$20.00 |
| 84 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 275 | LF |
$13.00 |
$27.00 |
$10.21 |
$12.80 |
$20.00 |
| 85 | 613(L) 4506 |
22" X 13" PREFAB. CULVERT END SEC., ARCH | 1 | EA |
$1,200.00 |
$3,000.00 |
$800.91 |
$582.71 |
$1,100.00 |
| 86 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 1 | EA |
$1,900.00 |
$4,000.00 |
$2,302.01 |
$1,820.98 |
$2,300.00 |
| 87 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$650.00 |
$800.00 |
$801.07 |
$582.71 |
$1,100.00 |
| 88 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 7 | EA |
$900.00 |
$1,200.00 |
$954.59 |
$728.39 |
$1,200.00 |
| 89 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,100.00 |
$1,500.00 |
$1,178.71 |
$874.07 |
$1,400.00 |
| 90 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,500.00 |
$2,200.00 |
$1,850.28 |
$1,456.78 |
$1,900.00 |
| 91 | 613(L) 5736 |
42" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$2,000.00 |
$3,500.00 |
$2,453.41 |
$1,966.66 |
$2,400.00 |
| 92 | 613(L) 5738 |
48" PREFAB. CULVERT END SECTION, ROUND | 3 | EA |
$2,600.00 |
$4,000.00 |
$2,758.72 |
$2,258.01 |
$2,700.00 |
| 93 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 8 | EA |
$825.00 |
$1,200.00 |
$744.41 |
$689.45 |
$850.00 |
| 94 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 6,454 | CY |
$35.00 |
$20.00 |
$64.98 |
$25.00 |
$68.00 |
| 95 | 613(V) 1180 |
TRENCH EXCAVATION | 11,456 | CY |
$5.00 |
$5.00 |
$9.08 |
$1.00 |
$18.00 |
| 96 | 613(W) 4508 |
48" JACKED CONDUIT | 100 | LF |
$900.00 |
$500.00 |
$1,212.71 |
$1,325.44 |
$1,700.00 |
| 97 | 615(H) 0110 |
SANITARY SEWER LINE RELOCATION | 1 | LSUM |
$105,060.00 |
$75,000.00 |
$108,222.20 |
$156,888.99 |
$200,000.00 |
| 98 | 616(O) 2000 |
WATER LINE RELOCATION | 1 | LSUM |
$265,734.00 |
$435,000.00 |
$504,786.05 |
$649,002.57 |
$525,000.00 |
| 99 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$30,000.00 |
$200,000.00 |
$284,741.85 |
$195,869.38 |
$393,000.00 |
| 100 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 24,062 | LF |
$3.00 |
$5.25 |
$3.90 |
$5.41 |
$2.92 |
| 101 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 61,236 | SY |
$4.00 |
$4.50 |
$7.72 |
$9.84 |
$4.11 |
| 102 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 50,146 | SY |
$3.00 |
$2.50 |
$3.44 |
$4.06 |
$7.42 |
| 103 | 619(B) 4792 |
REMOVAL OF SIDEWALK | 40 | SY |
$10.00 |
$9.00 |
$7.72 |
$8.35 |
$15.00 |
| 104 | 619(B) 4915 |
REMOVAL OF CONCRETE MEDIAN BARRIER | 6,455 | LF |
$10.00 |
$10.00 |
$7.86 |
$11.00 |
$18.00 |
| 105 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 1,468 | LF |
$7.00 |
$7.50 |
$9.91 |
$3.77 |
$5.72 |
| 106 | 619(C) 0924 |
SAWING PAVEMENT | 3,124 | LF |
$5.00 |
$4.00 |
$3.85 |
$1.71 |
$7.00 |
| 107 | 627(A) 4317 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 1,227 | LF |
$45.00 |
$65.00 |
$69.87 |
$46.51 |
$65.00 |
| 108 | 627(B) 4410 |
CONCRETE LONGITUDINAL BARRIER END SECTIONS | 7 | EA |
$2,000.00 |
$750.00 |
$1,724.79 |
$439.19 |
$4,400.00 |
| 109 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 143 | LF |
$30.00 |
$30.00 |
$7.81 |
$50.23 |
$54.00 |
| 110 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$20.00 |
$45.00 |
$25.22 |
$15.72 |
$45.00 |
| 111 | 501(G) 6309 |
CLSM BACKFILL | 386.4 | CY |
$131.00 |
$135.00 |
$128.76 |
$197.95 |
$155.00 |
| 112 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$11,000.00 |
$25,000.00 |
$30,532.43 |
$20,982.14 |
$45,000.00 |
| 113 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 1,052.9 | LF |
$205.00 |
$200.00 |
$342.07 |
$333.16 |
$220.00 |
| 114 | 504(A) 1304 |
APPROACH SLAB | 436.4 | SY |
$185.00 |
$165.00 |
$221.49 |
$224.74 |
$220.00 |
| 115 | 504(B) 1305 |
SAW-CUT GROOVING | 1,455.5 | SY |
$4.25 |
$4.00 |
$4.05 |
$4.78 |
$4.10 |
| 116 | 504(C) 6250 |
SEALED EXPANSION JOINT | 51.34 | LF |
$250.00 |
$215.00 |
$273.60 |
$252.29 |
$260.00 |
| 117 | 504(E) 6190 |
42" F-SHAPED PARAPET | 503.7 | LF |
$90.00 |
$90.00 |
$95.00 |
$123.92 |
$140.00 |
| 118 | 506(A) 1322 |
STRUCTURAL STEEL | 1,760 | LB |
$2.90 |
$5.50 |
$2.97 |
$1.76 |
$2.50 |
| 119 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 23 | EA |
$1,800.00 |
$3,500.00 |
$2,130.43 |
$2,076.50 |
$1,900.00 |
| 120 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 10 | EA |
$1,400.00 |
$3,500.00 |
$2,168.42 |
$2,076.50 |
$1,900.00 |
| 121 | 509 6152 |
SPECIAL CONCRETE FINISH | 109 | SY |
$18.50 |
$18.00 |
$86.62 |
$89.41 |
$99.81 |
| 122 | 509(A) 1326 |
CLASS AA CONCRETE | 310.2 | CY |
$625.00 |
$625.00 |
$725.00 |
$747.68 |
$600.00 |
| 123 | 509(B) 1328 |
CLASS A CONCRETE | 272.3 | CY |
$615.00 |
$625.00 |
$625.00 |
$705.79 |
$750.00 |
| 124 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 12,310 | SF |
$2.15 |
$1.15 |
$1.95 |
$2.30 |
$2.04 |
| 125 | 511(A) 1332 |
REINFORCING STEEL | 1,010 | LB |
$1.00 |
$1.00 |
$1.09 |
$1.69 |
$1.02 |
| 126 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 133,420 | LB |
$1.20 |
$1.25 |
$1.11 |
$1.20 |
$1.12 |
| 127 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 69 | LF |
$31.00 |
$23.00 |
$28.78 |
$28.95 |
$35.00 |
| 128 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,071 | LF |
$31.00 |
$29.00 |
$42.13 |
$38.86 |
$40.00 |
| 129 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 69 | LF |
$15.00 |
$27.00 |
$26.50 |
$36.18 |
$40.00 |
| 130 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,071 | LF |
$15.00 |
$27.00 |
$27.91 |
$35.84 |
$40.00 |
| 131 | 514(G) 6310 |
METAL PILE SHOES | 35 | EA |
$117.00 |
$55.00 |
$132.59 |
$138.16 |
$120.00 |
| 132 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 133 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,571 | SY |
$3.00 |
$7.50 |
$4.21 |
$4.97 |
$4.54 |
| 134 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 135 | LF |
$850.00 |
$755.00 |
$617.41 |
$893.76 |
$950.00 |
| 135 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,350.00 |
$5,000.00 |
$1,894.67 |
$1,676.39 |
$1,704.00 |
| 136 | 523(A) 6550 |
SEALER CRACK PREPARATION | 55.1 | LF |
$3.20 |
$4.00 |
$4.21 |
$4.97 |
$4.54 |
| 137 | 523(B) 6560 |
SEALER RESIN | 0.6 | GAL |
$102.00 |
$200.00 |
$210.52 |
$248.36 |
$226.85 |
| 138 | 535 6780 |
ORNAMENTAL MEDALLION | 2 | EA |
$15,000.00 |
$10,000.00 |
$3,893.25 |
$5,186.19 |
$7,500.00 |
| 139 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 133 | LF |
$22.00 |
$22.00 |
$21.55 |
$24.77 |
$30.00 |
| 140 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$28.00 |
$22.00 |
$21.26 |
$11.25 |
$50.00 |
| 141 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 185 | CY |
$20.00 |
$45.00 |
$25.23 |
$15.72 |
$45.00 |
| 142 | 501(G) 6309 |
CLSM BACKFILL | 384.7 | CY |
$131.00 |
$135.00 |
$128.76 |
$197.95 |
$155.00 |
| 143 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 1,474.5 | LF |
$205.00 |
$200.00 |
$342.07 |
$333.15 |
$220.00 |
| 144 | 504(A) 1304 |
APPROACH SLAB | 578.8 | SY |
$185.00 |
$150.00 |
$226.54 |
$240.74 |
$220.00 |
| 145 | 504(B) 1305 |
SAW-CUT GROOVING | 1,956.7 | SY |
$4.25 |
$4.00 |
$4.05 |
$4.78 |
$4.10 |
| 146 | 504(C) 6250 |
SEALED EXPANSION JOINT | 67 | LF |
$250.00 |
$225.00 |
$278.45 |
$248.44 |
$260.00 |
| 147 | 504(E) 6190 |
42" F-SHAPED PARAPET | 463.3 | LF |
$90.00 |
$90.00 |
$95.00 |
$124.09 |
$190.00 |
| 148 | 506(A) 1322 |
STRUCTURAL STEEL | 2,370 | LB |
$2.90 |
$5.50 |
$2.90 |
$1.76 |
$2.50 |
| 149 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 27 | EA |
$1,800.00 |
$3,500.00 |
$2,130.40 |
$2,076.50 |
$1,900.00 |
| 150 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 14 | EA |
$1,400.00 |
$3,500.00 |
$2,168.22 |
$2,076.50 |
$1,900.00 |
| 151 | 509 6152 |
SPECIAL CONCRETE FINISH | 115 | SY |
$18.50 |
$18.00 |
$86.62 |
$89.41 |
$99.81 |
| 152 | 509(A) 1326 |
CLASS AA CONCRETE | 409.3 | CY |
$625.00 |
$625.00 |
$725.00 |
$729.63 |
$600.00 |
| 153 | 509(B) 1328 |
CLASS A CONCRETE | 287.4 | CY |
$615.00 |
$625.00 |
$625.00 |
$768.36 |
$750.00 |
| 154 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 13,126 | SF |
$2.15 |
$1.15 |
$1.95 |
$2.30 |
$2.04 |
| 155 | 511(A) 1332 |
REINFORCING STEEL | 1,830 | LB |
$1.00 |
$1.00 |
$1.09 |
$1.69 |
$1.02 |
| 156 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 164,650 | LB |
$1.20 |
$1.25 |
$1.12 |
$1.20 |
$1.12 |
| 157 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 39 | LF |
$31.00 |
$23.00 |
$29.09 |
$29.33 |
$35.00 |
| 158 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,108 | LF |
$31.00 |
$29.00 |
$37.49 |
$37.70 |
$40.00 |
| 159 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 39 | LF |
$15.00 |
$27.00 |
$25.28 |
$34.14 |
$40.00 |
| 160 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,108 | LF |
$15.00 |
$27.00 |
$27.17 |
$34.66 |
$40.00 |
| 161 | 514(G) 6310 |
METAL PILE SHOES | 33 | EA |
$117.00 |
$55.00 |
$132.95 |
$138.53 |
$120.00 |
| 162 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 163 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,592 | SY |
$3.00 |
$7.50 |
$4.21 |
$4.97 |
$4.54 |
| 164 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 197 | LF |
$850.00 |
$750.00 |
$605.69 |
$870.25 |
$950.00 |
| 165 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,350.00 |
$5,500.00 |
$1,894.67 |
$1,676.39 |
$1,704.00 |
| 166 | 523(A) 6550 |
SEALER CRACK PREPARATION | 67 | LF |
$3.20 |
$5.50 |
$4.21 |
$4.97 |
$4.54 |
| 167 | 523(B) 6560 |
SEALER RESIN | 0.7 | GAL |
$102.00 |
$200.00 |
$210.51 |
$248.36 |
$226.85 |
| 168 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 129 | LF |
$22.00 |
$22.00 |
$21.55 |
$24.77 |
$30.00 |
| 169 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 20 | LF |
$28.00 |
$22.00 |
$21.26 |
$11.25 |
$50.00 |
| 170 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$300,000.00 |
$75,000.00 |
$74,242.68 |
$170,000.00 |
| 171 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 220 | CY |
$20.00 |
$45.00 |
$25.22 |
$15.72 |
$45.00 |
| 172 | 501(G) 6309 |
CLSM BACKFILL | 348.8 | CY |
$131.00 |
$135.00 |
$128.76 |
$197.95 |
$155.00 |
| 173 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$11,000.00 |
$20,000.00 |
$40,709.53 |
$19,988.74 |
$45,000.00 |
| 174 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 1,481.7 | LF |
$205.00 |
$200.00 |
$342.04 |
$333.10 |
$220.00 |
| 175 | 504(A) 1304 |
APPROACH SLAB | 654.2 | SY |
$185.00 |
$150.00 |
$234.40 |
$244.93 |
$220.00 |
| 176 | 504(B) 1305 |
SAW-CUT GROOVING | 1,999.3 | SY |
$4.25 |
$4.00 |
$4.05 |
$4.78 |
$4.10 |
| 177 | 504(C) 6250 |
SEALED EXPANSION JOINT | 68.26 | LF |
$250.00 |
$225.00 |
$278.33 |
$248.21 |
$260.00 |
| 178 | 504(E) 6190 |
42" F-SHAPED PARAPET | 559.7 | LF |
$90.00 |
$90.00 |
$95.00 |
$123.72 |
$110.00 |
| 179 | 506(A) 1322 |
STRUCTURAL STEEL | 2,420 | LB |
$2.90 |
$5.50 |
$2.90 |
$1.76 |
$2.50 |
| 180 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 26 | EA |
$1,800.00 |
$3,500.00 |
$2,130.41 |
$2,076.50 |
$1,900.00 |
| 181 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 14 | EA |
$1,400.00 |
$3,500.00 |
$2,168.22 |
$2,076.50 |
$1,900.00 |
| 182 | 509 6152 |
SPECIAL CONCRETE FINISH | 111 | SY |
$18.50 |
$18.00 |
$86.62 |
$89.41 |
$99.81 |
| 183 | 509(A) 1326 |
CLASS AA CONCRETE | 403.2 | CY |
$625.00 |
$625.00 |
$725.00 |
$739.48 |
$700.00 |
| 184 | 509(B) 1328 |
CLASS A CONCRETE | 310 | CY |
$615.00 |
$625.00 |
$625.00 |
$849.53 |
$750.00 |
| 185 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 14,567 | SF |
$2.15 |
$1.15 |
$1.95 |
$2.30 |
$2.04 |
| 186 | 511(A) 1332 |
REINFORCING STEEL | 1,970 | LB |
$1.00 |
$1.00 |
$1.09 |
$1.69 |
$1.02 |
| 187 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 173,990 | LB |
$1.20 |
$1.25 |
$1.12 |
$1.20 |
$1.12 |
| 188 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 116 | LF |
$31.00 |
$23.00 |
$28.37 |
$29.53 |
$35.00 |
| 189 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,018 | LF |
$31.00 |
$29.00 |
$37.29 |
$37.52 |
$40.00 |
| 190 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 116 | LF |
$15.00 |
$27.00 |
$25.35 |
$29.02 |
$40.00 |
| 191 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,018 | LF |
$15.00 |
$27.00 |
$27.02 |
$34.42 |
$40.00 |
| 192 | 514(G) 6310 |
METAL PILE SHOES | 32 | EA |
$117.00 |
$55.00 |
$132.10 |
$133.75 |
$120.00 |
| 193 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 194 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,807 | SY |
$3.00 |
$7.50 |
$4.21 |
$4.97 |
$4.54 |
| 195 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 191 | LF |
$850.00 |
$750.00 |
$614.90 |
$876.48 |
$950.00 |
| 196 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,350.00 |
$5,500.00 |
$1,894.67 |
$1,676.39 |
$1,704.00 |
| 197 | 523(A) 6550 |
SEALER CRACK PREPARATION | 283.3 | LF |
$3.20 |
$4.00 |
$4.21 |
$4.97 |
$4.54 |
| 198 | 523(B) 6560 |
SEALER RESIN | 2.1 | GAL |
$102.00 |
$200.00 |
$210.52 |
$248.36 |
$226.85 |
| 199 | 535 6780 |
ORNAMENTAL MEDALLION | 2 | EA |
$15,000.00 |
$10,000.00 |
$3,893.25 |
$5,186.19 |
$7,500.00 |
| 200 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 460 | TON |
$50.00 |
$65.00 |
$64.27 |
$49.29 |
$43.00 |
| 201 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 100 | TON |
$41.43 |
$45.00 |
$43.24 |
$35.77 |
$43.00 |
| 202 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 409 | SY |
$3.01 |
$3.00 |
$5.15 |
$1.70 |
$4.50 |
| 203 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 114 | LF |
$22.00 |
$22.00 |
$21.55 |
$24.77 |
$30.00 |
| 204 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$28.00 |
$22.00 |
$21.26 |
$11.25 |
$50.00 |
| 205 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$300,000.00 |
$75,000.00 |
$74,242.68 |
$170,000.00 |
| 206 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 355 | CY |
$20.00 |
$45.00 |
$25.23 |
$15.72 |
$40.00 |
| 207 | 501(G) 6309 |
CLSM BACKFILL | 292.8 | CY |
$131.00 |
$135.00 |
$128.76 |
$197.95 |
$155.00 |
| 208 | 504(A) 1304 |
APPROACH SLAB | 487.5 | SY |
$185.00 |
$150.00 |
$240.52 |
$243.03 |
$220.00 |
| 209 | 504(B) 1305 |
SAW-CUT GROOVING | 1,827.9 | SY |
$4.25 |
$4.00 |
$4.05 |
$4.78 |
$4.10 |
| 210 | 504(C) 6250 |
SEALED EXPANSION JOINT | 114.05 | LF |
$250.00 |
$225.00 |
$277.82 |
$243.24 |
$260.00 |
| 211 | 504(E) 6190 |
42" F-SHAPED PARAPET | 691.7 | LF |
$90.00 |
$90.00 |
$95.00 |
$122.76 |
$140.00 |
| 212 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 741,060 | LB |
$2.35 |
$1.90 |
$2.53 |
$2.41 |
$2.35 |
| 213 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,800.00 |
$3,500.00 |
$2,909.60 |
$2,650.19 |
$2,600.00 |
| 214 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$1,400.00 |
$3,500.00 |
$2,947.52 |
$2,650.19 |
$2,600.00 |
| 215 | 509 6152 |
SPECIAL CONCRETE FINISH | 72 | SY |
$18.50 |
$18.00 |
$86.62 |
$89.41 |
$99.81 |
| 216 | 509(A) 1326 |
CLASS AA CONCRETE | 394.1 | CY |
$625.00 |
$625.00 |
$725.00 |
$835.22 |
$600.00 |
| 217 | 509(B) 1328 |
CLASS A CONCRETE | 320.5 | CY |
$615.00 |
$625.00 |
$625.00 |
$755.04 |
$800.00 |
| 218 | 510(C) 6138 |
SLOPE WALL (5") | 933 | SY |
$120.00 |
$70.00 |
$154.73 |
$141.88 |
$135.00 |
| 219 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 22,536 | SF |
$2.15 |
$1.15 |
$1.95 |
$2.30 |
$2.04 |
| 220 | 511 6306 |
MECHANICAL SPLICES | 100 | EA |
$44.00 |
$35.00 |
$59.52 |
$53.49 |
$39.79 |
| 221 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 192,900 | LB |
$1.20 |
$1.25 |
$1.12 |
$1.20 |
$1.13 |
| 222 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 92 | LF |
$31.00 |
$23.00 |
$30.83 |
$31.09 |
$35.00 |
| 223 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,780 | LF |
$31.00 |
$29.00 |
$36.21 |
$36.43 |
$40.00 |
| 224 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 92 | LF |
$15.00 |
$27.00 |
$23.89 |
$31.76 |
$40.00 |
| 225 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,780 | LF |
$15.00 |
$27.00 |
$24.71 |
$30.75 |
$40.00 |
| 226 | 514(G) 6310 |
METAL PILE SHOES | 42 | EA |
$117.00 |
$55.00 |
$132.71 |
$138.29 |
$120.00 |
| 227 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 228 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,574 | SY |
$3.00 |
$7.50 |
$4.21 |
$4.97 |
$4.54 |
| 229 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 171 | LF |
$925.00 |
$900.00 |
$845.64 |
$1,369.48 |
$1,200.00 |
| 230 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$1,350.00 |
$5,500.00 |
$1,894.66 |
$1,676.39 |
$1,704.00 |
| 231 | 523(A) 6550 |
SEALER CRACK PREPARATION | 120 | LF |
$3.20 |
$4.00 |
$4.21 |
$4.97 |
$4.54 |
| 232 | 523(B) 6560 |
SEALER RESIN | 0.8 | GAL |
$102.00 |
$200.00 |
$210.51 |
$248.36 |
$226.85 |
| 233 | 535 6780 |
ORNAMENTAL MEDALLION | 1 | EA |
$15,000.00 |
$10,000.00 |
$3,893.29 |
$5,186.19 |
$7,500.00 |
| 234 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 256 | LF |
$22.00 |
$22.00 |
$21.55 |
$24.77 |
$30.00 |
| 235 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 156 | LF |
$28.00 |
$22.00 |
$21.27 |
$11.25 |
$30.00 |
| 236 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$400,000.00 |
$75,000.00 |
$127,240.50 |
$270,000.00 |
| 237 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 350 | CY |
$20.00 |
$45.00 |
$25.22 |
$15.72 |
$40.00 |
| 238 | 501(G) 6309 |
CLSM BACKFILL | 439.9 | CY |
$131.00 |
$135.00 |
$128.76 |
$197.95 |
$155.00 |
| 239 | 504(A) 1304 |
APPROACH SLAB | 628.6 | SY |
$185.00 |
$150.00 |
$240.68 |
$250.33 |
$220.00 |
| 240 | 504(B) 1305 |
SAW-CUT GROOVING | 2,285.6 | SY |
$4.25 |
$4.00 |
$4.05 |
$4.78 |
$4.10 |
| 241 | 504(C) 6250 |
SEALED EXPANSION JOINT | 136.34 | LF |
$250.00 |
$225.00 |
$278.40 |
$242.03 |
$260.00 |
| 242 | 504(E) 6190 |
42" F-SHAPED PARAPET | 702.1 | LF |
$90.00 |
$90.00 |
$95.00 |
$127.33 |
$140.00 |
| 243 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 848,150 | LB |
$2.35 |
$1.90 |
$2.53 |
$2.41 |
$2.35 |
| 244 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 7 | EA |
$1,800.00 |
$3,500.00 |
$2,909.61 |
$2,650.19 |
$2,600.00 |
| 245 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 14 | EA |
$1,400.00 |
$3,500.00 |
$2,947.48 |
$2,650.19 |
$2,600.00 |
| 246 | 509 6152 |
SPECIAL CONCRETE FINISH | 66 | SY |
$18.50 |
$18.00 |
$86.62 |
$89.41 |
$99.81 |
| 247 | 509(A) 1326 |
CLASS AA CONCRETE | 462.2 | CY |
$625.00 |
$625.00 |
$775.00 |
$904.22 |
$600.00 |
| 248 | 509(B) 1328 |
CLASS A CONCRETE | 306.3 | CY |
$615.00 |
$625.00 |
$625.00 |
$814.32 |
$750.00 |
| 249 | 510(C) 6138 |
SLOPE WALL (5") | 1,310 | SY |
$120.00 |
$70.00 |
$154.20 |
$147.58 |
$135.00 |
| 250 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 26,478 | SF |
$2.15 |
$1.15 |
$1.95 |
$2.30 |
$2.04 |
| 251 | 511 6306 |
MECHANICAL SPLICES | 1,248 | EA |
$44.00 |
$35.00 |
$38.06 |
$53.49 |
$39.79 |
| 252 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 221,320 | LB |
$1.20 |
$1.25 |
$1.12 |
$1.20 |
$1.12 |
| 253 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 192 | LF |
$31.00 |
$23.00 |
$29.55 |
$29.72 |
$35.00 |
| 254 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,336 | LF |
$31.00 |
$29.00 |
$36.19 |
$38.55 |
$40.00 |
| 255 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 192 | LF |
$15.00 |
$27.00 |
$23.55 |
$31.21 |
$40.00 |
| 256 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,336 | LF |
$15.00 |
$27.00 |
$24.71 |
$30.74 |
$40.00 |
| 257 | 514(G) 6310 |
METAL PILE SHOES | 34 | EA |
$117.00 |
$55.00 |
$136.57 |
$137.35 |
$120.00 |
| 258 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 259 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,727 | SY |
$3.00 |
$7.50 |
$4.21 |
$4.97 |
$4.54 |
| 260 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 150 | LF |
$925.00 |
$900.00 |
$816.38 |
$1,354.32 |
$1,200.00 |
| 261 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$1,350.00 |
$5,500.00 |
$1,894.66 |
$1,676.39 |
$1,704.00 |
| 262 | 523(A) 6550 |
SEALER CRACK PREPARATION | 410 | LF |
$3.20 |
$4.00 |
$4.21 |
$4.97 |
$4.54 |
| 263 | 523(B) 6560 |
SEALER RESIN | 2.6 | GAL |
$102.00 |
$200.00 |
$210.52 |
$248.36 |
$226.85 |
| 264 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 273 | LF |
$22.00 |
$22.00 |
$21.55 |
$24.77 |
$30.00 |
| 265 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 120 | LF |
$28.00 |
$22.00 |
$21.26 |
$11.25 |
$30.00 |
| 266 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$400,000.00 |
$75,000.00 |
$127,240.50 |
$270,000.00 |
| 267 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 595 | CY |
$20.00 |
$45.00 |
$25.23 |
$15.72 |
$40.00 |
| 268 | 501(G) 6309 |
CLSM BACKFILL | 405.8 | CY |
$131.00 |
$135.00 |
$128.76 |
$197.95 |
$155.00 |
| 269 | 504(A) 1304 |
APPROACH SLAB | 645.9 | SY |
$185.00 |
$150.00 |
$227.00 |
$234.54 |
$220.00 |
| 270 | 504(B) 1305 |
SAW-CUT GROOVING | 2,642.6 | SY |
$4.25 |
$4.00 |
$4.05 |
$4.78 |
$4.10 |
| 271 | 504(C) 6250 |
SEALED EXPANSION JOINT | 160.96 | LF |
$250.00 |
$225.00 |
$278.37 |
$241.09 |
$260.00 |
| 272 | 504(E) 6190 |
42" F-SHAPED PARAPET | 679.4 | LF |
$90.00 |
$90.00 |
$95.00 |
$127.43 |
$115.00 |
| 273 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 971,960 | LB |
$2.35 |
$1.90 |
$2.52 |
$2.41 |
$2.35 |
| 274 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 9 | EA |
$1,800.00 |
$3,500.00 |
$2,909.58 |
$2,650.19 |
$2,600.00 |
| 275 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 18 | EA |
$1,400.00 |
$3,500.00 |
$2,947.55 |
$2,650.19 |
$2,600.00 |
| 276 | 509 6152 |
SPECIAL CONCRETE FINISH | 86 | SY |
$18.50 |
$18.00 |
$86.62 |
$89.41 |
$99.81 |
| 277 | 509(A) 1326 |
CLASS AA CONCRETE | 552 | CY |
$625.00 |
$625.00 |
$775.00 |
$841.55 |
$500.00 |
| 278 | 509(B) 1328 |
CLASS A CONCRETE | 536.4 | CY |
$615.00 |
$625.00 |
$625.00 |
$825.31 |
$750.00 |
| 279 | 510(C) 6138 |
SLOPE WALL (5") | 1,351 | SY |
$120.00 |
$70.00 |
$154.24 |
$141.01 |
$135.00 |
| 280 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 31,518 | SF |
$2.15 |
$1.15 |
$1.95 |
$2.30 |
$2.04 |
| 281 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 285,760 | LB |
$1.20 |
$1.25 |
$1.12 |
$1.20 |
$1.13 |
| 282 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 391 | LF |
$31.00 |
$23.00 |
$21.77 |
$29.55 |
$25.00 |
| 283 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,463 | LF |
$31.00 |
$29.00 |
$41.98 |
$39.76 |
$45.00 |
| 284 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 391 | LF |
$15.00 |
$27.00 |
$21.58 |
$27.86 |
$25.00 |
| 285 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,463 | LF |
$15.00 |
$27.00 |
$25.70 |
$32.89 |
$40.00 |
| 286 | 514(G) 6310 |
METAL PILE SHOES | 42 | EA |
$117.00 |
$55.00 |
$127.03 |
$143.62 |
$120.00 |
| 287 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 288 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,161 | SY |
$3.00 |
$7.50 |
$4.21 |
$4.97 |
$4.54 |
| 289 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 140 | LF |
$925.00 |
$900.00 |
$811.64 |
$1,338.90 |
$1,200.00 |
| 290 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$1,350.00 |
$5,500.00 |
$1,894.66 |
$1,676.39 |
$1,704.00 |
| 291 | 523(A) 6550 |
SEALER CRACK PREPARATION | 160 | LF |
$3.20 |
$4.00 |
$4.21 |
$4.97 |
$4.54 |
| 292 | 523(B) 6560 |
SEALER RESIN | 1.1 | GAL |
$102.00 |
$200.00 |
$210.52 |
$248.36 |
$226.85 |
| 293 | 535 6780 |
ORNAMENTAL MEDALLION | 1 | EA |
$15,000.00 |
$10,000.00 |
$3,893.29 |
$5,186.19 |
$7,500.00 |
| 294 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 332 | LF |
$22.00 |
$22.00 |
$21.55 |
$24.77 |
$30.00 |
| 295 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 236 | LF |
$28.00 |
$22.00 |
$21.27 |
$11.25 |
$30.00 |
| 296 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 95 | CY |
$20.00 |
$45.00 |
$15.69 |
$15.72 |
$40.00 |
| 297 | 501(C) 1308 |
SUBSTRUCTURE EXCAVATION ROCK | 92 | CY |
$200.00 |
$75.00 |
$89.87 |
$55.68 |
$135.00 |
| 298 | 501(G) 6309 |
CLSM BACKFILL | 152.7 | CY |
$131.00 |
$135.00 |
$123.81 |
$197.95 |
$155.00 |
| 299 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 549.4 | LF |
$205.00 |
$200.00 |
$342.64 |
$333.38 |
$220.00 |
| 300 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 393.9 | LF |
$235.00 |
$325.00 |
$342.88 |
$330.26 |
$220.00 |
| 301 | 504(A) 1304 |
APPROACH SLAB | 213.4 | SY |
$185.00 |
$150.00 |
$310.05 |
$249.55 |
$270.00 |
| 302 | 504(B) 1305 |
SAW-CUT GROOVING | 824.3 | SY |
$4.25 |
$4.00 |
$4.05 |
$4.78 |
$4.10 |
| 303 | 504(C) 6250 |
SEALED EXPANSION JOINT | 35 | LF |
$250.00 |
$225.00 |
$277.17 |
$259.97 |
$260.00 |
| 304 | 504(E) 6190 |
42" F-SHAPED PARAPET | 603.7 | LF |
$90.00 |
$90.00 |
$95.00 |
$122.97 |
$110.00 |
| 305 | 506(A) 1322 |
STRUCTURAL STEEL | 1,040 | LB |
$2.90 |
$5.50 |
$2.97 |
$1.76 |
$2.50 |
| 306 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$1,800.00 |
$3,500.00 |
$2,406.40 |
$1,764.71 |
$2,100.00 |
| 307 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 8 | EA |
$1,400.00 |
$3,500.00 |
$2,406.54 |
$1,764.71 |
$2,100.00 |
| 308 | 509 6152 |
SPECIAL CONCRETE FINISH | 74 | SY |
$18.50 |
$18.00 |
$86.62 |
$89.41 |
$99.81 |
| 309 | 509(A) 1326 |
CLASS AA CONCRETE | 217.7 | CY |
$625.00 |
$625.00 |
$725.00 |
$747.73 |
$700.00 |
| 310 | 509(B) 1328 |
CLASS A CONCRETE | 205.1 | CY |
$615.00 |
$625.00 |
$500.00 |
$798.59 |
$800.00 |
| 311 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 11,835 | SF |
$2.15 |
$1.15 |
$1.95 |
$2.30 |
$2.04 |
| 312 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 99,300 | LB |
$1.20 |
$1.25 |
$1.11 |
$1.20 |
$1.12 |
| 313 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 144 | LF |
$31.00 |
$23.00 |
$28.37 |
$29.72 |
$35.00 |
| 314 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 487 | LF |
$31.00 |
$29.00 |
$35.81 |
$36.98 |
$45.00 |
| 315 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 144 | LF |
$15.00 |
$27.00 |
$22.03 |
$35.45 |
$35.00 |
| 316 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 487 | LF |
$15.00 |
$27.00 |
$23.39 |
$36.04 |
$35.00 |
| 317 | 514(G) 6310 |
METAL PILE SHOES | 18 | EA |
$117.00 |
$55.00 |
$134.10 |
$135.94 |
$120.00 |
| 318 | 514(K) 6260 |
(PL)PILOT HOLES | 117 | LF |
$100.00 |
$60.00 |
$116.30 |
$149.76 |
$300.00 |
| 319 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 320 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,790 | SY |
$3.00 |
$7.50 |
$4.21 |
$4.97 |
$4.54 |
| 321 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 190 | LF |
$850.00 |
$750.00 |
$772.58 |
$970.43 |
$1,100.00 |
| 322 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,350.00 |
$5,500.00 |
$1,894.67 |
$1,676.39 |
$1,704.00 |
| 323 | 523(A) 6550 |
SEALER CRACK PREPARATION | 35 | LF |
$3.20 |
$4.00 |
$4.21 |
$4.97 |
$4.54 |
| 324 | 523(B) 6560 |
SEALER RESIN | 0.3 | GAL |
$102.00 |
$200.00 |
$210.53 |
$248.36 |
$226.85 |
| 325 | 535 6780 |
ORNAMENTAL MEDALLION | 4 | EA |
$15,000.00 |
$10,000.00 |
$4,070.85 |
$5,186.19 |
$7,500.00 |
| 326 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,000 | TON |
$50.00 |
$55.00 |
$64.83 |
$49.29 |
$53.00 |
| 327 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 165 | TON |
$41.00 |
$40.00 |
$53.30 |
$35.77 |
$43.00 |
| 328 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 688 | SY |
$2.80 |
$3.00 |
$1.47 |
$1.70 |
$4.50 |
| 329 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 70 | LF |
$22.00 |
$22.00 |
$19.98 |
$24.77 |
$30.00 |
| 330 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 80 | LF |
$28.00 |
$22.00 |
$18.97 |
$11.25 |
$50.00 |
| 331 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 595 | CY |
$20.00 |
$45.00 |
$24.28 |
$12.00 |
$40.00 |
| 332 | 501(C) 1308 |
SUBSTRUCTURE EXCAVATION ROCK | 299 | CY |
$200.00 |
$75.00 |
$27.03 |
$50.00 |
$110.00 |
| 333 | 501(G) 6309 |
CLSM BACKFILL | 1,521.6 | CY |
$131.00 |
$135.00 |
$133.62 |
$150.00 |
$140.00 |
| 334 | 504(A) 1304 |
APPROACH SLAB | 213 | SY |
$185.00 |
$150.00 |
$257.54 |
$255.00 |
$300.00 |
| 335 | 504(B) 1305 |
SAW-CUT GROOVING | 1,117.7 | SY |
$4.25 |
$4.00 |
$4.05 |
$3.90 |
$4.10 |
| 336 | 504(C) 6250 |
SEALED EXPANSION JOINT | 87.5 | LF |
$250.00 |
$225.00 |
$287.78 |
$275.00 |
$260.00 |
| 337 | 504(E) 6190 |
42" F-SHAPED PARAPET | 694 | LF |
$90.00 |
$90.00 |
$95.00 |
$95.00 |
$110.00 |
| 338 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 624,550 | LB |
$2.35 |
$1.90 |
$2.52 |
$2.60 |
$2.35 |
| 339 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$1,800.00 |
$3,500.00 |
$4,265.82 |
$4,500.00 |
$3,700.00 |
| 340 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 8 | EA |
$1,400.00 |
$3,500.00 |
$4,225.87 |
$4,500.00 |
$3,700.00 |
| 341 | 509 6152 |
SPECIAL CONCRETE FINISH | 52 | SY |
$18.50 |
$18.00 |
$86.62 |
$80.00 |
$99.81 |
| 342 | 509(A) 1326 |
CLASS AA CONCRETE | 241.2 | CY |
$625.00 |
$625.00 |
$725.00 |
$625.00 |
$700.00 |
| 343 | 509(B) 1328 |
CLASS A CONCRETE | 1,106.9 | CY |
$615.00 |
$625.00 |
$625.00 |
$525.00 |
$750.00 |
| 344 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 21,001 | SF |
$2.15 |
$1.15 |
$1.95 |
$1.90 |
$2.04 |
| 345 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 226,930 | LB |
$1.20 |
$1.00 |
$1.08 |
$1.25 |
$1.14 |
| 346 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,604 | SY |
$3.00 |
$7.50 |
$4.21 |
$4.10 |
$4.54 |
| 347 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 93 | LF |
$850.00 |
$750.00 |
$697.05 |
$1,300.00 |
$1,200.00 |
| 348 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 273 | LF |
$925.00 |
$900.00 |
$889.24 |
$1,200.00 |
$1,200.00 |
| 349 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 6 | EA |
$1,350.00 |
$5,500.00 |
$1,894.67 |
$1,700.00 |
$1,704.00 |
| 350 | 523(A) 6550 |
SEALER CRACK PREPARATION | 90 | LF |
$3.20 |
$4.00 |
$4.21 |
$4.10 |
$4.54 |
| 351 | 523(B) 6560 |
SEALER RESIN | 2.3 | GAL |
$102.00 |
$200.00 |
$210.52 |
$210.00 |
$226.85 |
| 352 | 535 6780 |
ORNAMENTAL MEDALLION | 2 | EA |
$15,000.00 |
$10,000.00 |
$5,236.67 |
$4,500.00 |
$7,500.00 |
| 353 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 223 | LF |
$22.00 |
$22.00 |
$21.59 |
$20.00 |
$30.00 |
| 354 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 102 | LF |
$28.00 |
$22.00 |
$20.27 |
$20.00 |
$50.00 |
| 355 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 1,795 | CY |
$20.00 |
$45.00 |
$24.28 |
$20.00 |
$40.00 |
| 356 | 501(G) 6309 |
CLSM BACKFILL | 200.2 | CY |
$131.00 |
$135.00 |
$133.62 |
$170.00 |
$190.00 |
| 357 | 503(A) 6123 |
PRESTRESSED CONCRETE BEAMS | 2,737.9 | LF |
$280.00 |
$325.00 |
$358.47 |
$425.00 |
$600.00 |
| 358 | 504(A) 1304 |
APPROACH SLAB | 212.7 | SY |
$185.00 |
$150.00 |
$248.38 |
$230.00 |
$270.00 |
| 359 | 504(B) 1305 |
SAW-CUT GROOVING | 5,624.9 | SY |
$4.25 |
$4.00 |
$4.05 |
$3.90 |
$4.10 |
| 360 | 504(C) 6250 |
SEALED EXPANSION JOINT | 226.25 | LF |
$250.00 |
$225.00 |
$287.79 |
$275.00 |
$260.00 |
| 361 | 504(E) 6190 |
42" F-SHAPED PARAPET | 4,030.5 | LF |
$90.00 |
$90.00 |
$95.00 |
$95.00 |
$110.00 |
| 362 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 1,906,460 | LB |
$2.35 |
$3.19 |
$2.78 |
$2.85 |
$2.45 |
| 363 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 45 | EA |
$1,800.00 |
$3,500.00 |
$7,271.27 |
$9,000.00 |
$4,800.00 |
| 364 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 41 | EA |
$1,400.00 |
$3,500.00 |
$7,271.27 |
$9,000.00 |
$4,800.00 |
| 365 | 509 6152 |
SPECIAL CONCRETE FINISH | 195 | SY |
$18.50 |
$18.00 |
$86.62 |
$80.00 |
$99.81 |
| 366 | 509(A) 1326 |
CLASS AA CONCRETE | 1,940.5 | CY |
$700.00 |
$625.00 |
$675.00 |
$600.00 |
$550.00 |
| 367 | 509(B) 1328 |
CLASS A CONCRETE | 2,958.1 | CY |
$690.00 |
$625.00 |
$500.00 |
$745.00 |
$750.00 |
| 368 | 510(C) 6138 |
SLOPE WALL (5") | 124 | SY |
$110.00 |
$70.00 |
$116.53 |
$180.00 |
$300.00 |
| 369 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 81,141 | SF |
$2.15 |
$1.15 |
$1.95 |
$1.90 |
$2.04 |
| 370 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 1,213,700 | LB |
$1.20 |
$1.00 |
$1.14 |
$1.25 |
$1.12 |
| 371 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 207 | LF |
$31.00 |
$23.00 |
$28.37 |
$40.00 |
$35.00 |
| 372 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 455 | LF |
$31.00 |
$29.00 |
$35.81 |
$45.00 |
$40.00 |
| 373 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 207 | LF |
$15.00 |
$27.00 |
$21.18 |
$12.00 |
$35.00 |
| 374 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 455 | LF |
$15.00 |
$27.00 |
$21.94 |
$12.00 |
$35.00 |
| 375 | 514(G) 6310 |
METAL PILE SHOES | 10 | EA |
$117.00 |
$55.00 |
$129.33 |
$175.00 |
$120.00 |
| 376 | 514(K) 6260 |
(PL)PILOT HOLES | 175 | LF |
$100.00 |
$60.00 |
$145.35 |
$125.00 |
$300.00 |
| 377 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 378 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 14,774 | SY |
$3.00 |
$7.50 |
$4.21 |
$4.10 |
$4.54 |
| 379 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 108 | LF |
$800.00 |
$475.00 |
$424.22 |
$750.00 |
$850.00 |
| 380 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 585 | LF |
$850.00 |
$750.00 |
$706.41 |
$1,300.00 |
$1,000.00 |
| 381 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 989 | LF |
$925.00 |
$950.00 |
$909.99 |
$1,500.00 |
$1,200.00 |
| 382 | 516(A) 6105 |
DRILLED SHAFTS 96" DIAMETER | 59 | LF |
$2,000.00 |
$1,200.00 |
$1,481.85 |
$2,400.00 |
$1,800.00 |
| 383 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 20 | EA |
$1,350.00 |
$5,500.00 |
$1,894.66 |
$1,700.00 |
$1,704.00 |
| 384 | 523(A) 6550 |
SEALER CRACK PREPARATION | 450 | LF |
$3.20 |
$4.00 |
$4.21 |
$4.10 |
$4.54 |
| 385 | 523(B) 6560 |
SEALER RESIN | 3 | GAL |
$102.00 |
$200.00 |
$210.52 |
$210.00 |
$226.85 |
| 386 | 535 6780 |
ORNAMENTAL MEDALLION | 34 | EA |
$15,000.00 |
$10,000.00 |
$4,228.56 |
$4,500.00 |
$7,500.00 |
| 387 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 103 | LF |
$22.00 |
$22.00 |
$34.18 |
$20.00 |
$30.00 |
| 388 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 83 | LF |
$28.00 |
$22.00 |
$17.96 |
$20.00 |
$30.00 |
| 389 | 622(A) 4445 |
2" PIPE RAILING | 28 | LF |
$60.00 |
$50.00 |
$146.40 |
$400.00 |
$508.45 |
| 390 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 1,905 | CY |
$20.00 |
$45.00 |
$24.28 |
$20.00 |
$40.00 |
| 391 | 501(G) 6309 |
CLSM BACKFILL | 127.2 | CY |
$131.00 |
$135.00 |
$133.62 |
$170.00 |
$155.00 |
| 392 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$42,000.00 |
$25,000.00 |
$215,646.49 |
$75,000.00 |
$33,500.00 |
| 393 | 503(A) 6123 |
PRESTRESSED CONCRETE BEAMS | 1,445.3 | LF |
$280.00 |
$515.00 |
$358.47 |
$425.00 |
$500.00 |
| 394 | 504(A) 1304 |
APPROACH SLAB | 247.8 | SY |
$185.00 |
$150.00 |
$248.09 |
$230.00 |
$270.00 |
| 395 | 504(B) 1305 |
SAW-CUT GROOVING | 6,370.5 | SY |
$4.25 |
$4.00 |
$4.05 |
$3.90 |
$4.10 |
| 396 | 504(C) 6250 |
SEALED EXPANSION JOINT | 368 | LF |
$250.00 |
$225.00 |
$95.00 |
$275.00 |
$260.00 |
| 397 | 504(E) 6190 |
42" F-SHAPED PARAPET | 3,013.1 | LF |
$90.00 |
$90.00 |
$95.00 |
$95.00 |
$110.00 |
| 398 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 2,102,410 | LB |
$1.90 |
$3.19 |
$2.78 |
$2.85 |
$2.45 |
| 399 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 36 | EA |
$1,800.00 |
$3,500.00 |
$7,271.27 |
$9,000.00 |
$5,100.00 |
| 400 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 47 | EA |
$1,400.00 |
$3,500.00 |
$7,271.27 |
$9,000.00 |
$5,100.00 |
| 401 | 509 6152 |
SPECIAL CONCRETE FINISH | 291 | SY |
$18.50 |
$18.00 |
$86.62 |
$80.00 |
$99.81 |
| 402 | 509(A) 1326 |
CLASS AA CONCRETE | 2,069.7 | CY |
$700.00 |
$625.00 |
$625.00 |
$535.00 |
$550.00 |
| 403 | 509(B) 1328 |
CLASS A CONCRETE | 2,310 | CY |
$690.00 |
$625.00 |
$525.00 |
$720.00 |
$800.00 |
| 404 | 510(C) 6138 |
SLOPE WALL (5") | 1,184 | SY |
$110.00 |
$70.00 |
$116.53 |
$175.00 |
$105.00 |
| 405 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 73,420 | SF |
$2.15 |
$1.15 |
$1.95 |
$1.90 |
$2.04 |
| 406 | 511(A) 1332 |
REINFORCING STEEL | 12,340 | LB |
$1.00 |
$1.00 |
$1.06 |
$1.25 |
$1.02 |
| 407 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 1,184,380 | LB |
$1.20 |
$1.25 |
$1.14 |
$1.25 |
$1.12 |
| 408 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 1,269 | LF |
$31.00 |
$29.00 |
$35.81 |
$45.00 |
$40.00 |
| 409 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 1,269 | LF |
$15.00 |
$27.00 |
$22.69 |
$12.00 |
$35.00 |
| 410 | 514(G) 6310 |
METAL PILE SHOES | 22 | EA |
$117.00 |
$55.00 |
$133.35 |
$175.00 |
$120.00 |
| 411 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 412 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 10,926 | SY |
$3.05 |
$7.50 |
$4.21 |
$4.10 |
$4.54 |
| 413 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 570 | LF |
$850.00 |
$750.00 |
$686.81 |
$1,250.00 |
$1,100.00 |
| 414 | 516(A) 6098 |
DRILLED SHAFTS 72" DIAMETER | 534 | LF |
$925.00 |
$925.00 |
$849.09 |
$1,500.00 |
$1,500.00 |
| 415 | 516(A) 6105 |
DRILLED SHAFTS 96" DIAMETER | 157 | LF |
$2,000.00 |
$1,200.00 |
$1,503.09 |
$2,400.00 |
$1,800.00 |
| 416 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 15 | EA |
$1,350.00 |
$5,500.00 |
$1,894.66 |
$1,700.00 |
$1,704.00 |
| 417 | 523(A) 6550 |
SEALER CRACK PREPARATION | 560.5 | LF |
$3.20 |
$4.00 |
$4.21 |
$4.10 |
$4.54 |
| 418 | 523(B) 6560 |
SEALER RESIN | 4.3 | GAL |
$102.00 |
$200.00 |
$210.52 |
$210.00 |
$226.85 |
| 419 | 535 6780 |
ORNAMENTAL MEDALLION | 27 | EA |
$15,000.00 |
$10,000.00 |
$4,228.56 |
$4,500.00 |
$7,500.00 |
| 420 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 165 | LF |
$22.00 |
$22.00 |
$34.18 |
$20.00 |
$30.00 |
| 421 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$28.00 |
$22.00 |
$17.94 |
$20.00 |
$30.00 |
| 422 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 430 | CY |
$20.00 |
$35.00 |
$24.28 |
$25.00 |
$40.00 |
| 423 | 501(G) 6309 |
CLSM BACKFILL | 76.5 | CY |
$131.00 |
$135.00 |
$133.61 |
$170.00 |
$190.00 |
| 424 | 503(A) 6123 |
PRESTRESSED CONCRETE BEAMS | 114.3 | LF |
$280.00 |
$325.00 |
$358.47 |
$425.00 |
$600.00 |
| 425 | 504(A) 1304 |
APPROACH SLAB | 106.2 | SY |
$185.00 |
$150.00 |
$248.85 |
$230.00 |
$270.00 |
| 426 | 504(B) 1305 |
SAW-CUT GROOVING | 1,533.8 | SY |
$4.25 |
$4.00 |
$4.05 |
$3.90 |
$4.10 |
| 427 | 504(C) 6250 |
SEALED EXPANSION JOINT | 30 | LF |
$250.00 |
$225.00 |
$278.44 |
$275.00 |
$260.00 |
| 428 | 504(E) 6190 |
42" F-SHAPED PARAPET | 1,098.4 | LF |
$90.00 |
$90.00 |
$95.00 |
$105.00 |
$110.00 |
| 429 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 910,280 | LB |
$2.35 |
$3.19 |
$2.74 |
$2.60 |
$2.45 |
| 430 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 4 | EA |
$1,800.00 |
$5,500.00 |
$7,271.27 |
$9,000.00 |
$6,500.00 |
| 431 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 6 | EA |
$1,400.00 |
$5,500.00 |
$7,271.27 |
$9,000.00 |
$6,500.00 |
| 432 | 509 6152 |
SPECIAL CONCRETE FINISH | 43 | SY |
$18.50 |
$18.00 |
$86.62 |
$80.00 |
$99.81 |
| 433 | 509(A) 1326 |
CLASS AA CONCRETE | 460.9 | CY |
$625.00 |
$575.00 |
$625.00 |
$625.00 |
$550.00 |
| 434 | 509(B) 1328 |
CLASS A CONCRETE | 295.1 | CY |
$615.00 |
$525.00 |
$525.00 |
$675.00 |
$1,100.00 |
| 435 | 510(C) 6138 |
SLOPE WALL (5") | 261 | SY |
$110.00 |
$70.00 |
$116.53 |
$165.00 |
$170.00 |
| 436 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 24,177 | SF |
$2.15 |
$1.15 |
$1.95 |
$1.90 |
$2.04 |
| 437 | 511(A) 1332 |
REINFORCING STEEL | 1,650 | LB |
$1.00 |
$1.00 |
$1.06 |
$1.25 |
$1.02 |
| 438 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 228,360 | LB |
$1.20 |
$1.25 |
$1.14 |
$1.25 |
$1.12 |
| 439 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 688 | LF |
$31.00 |
$29.00 |
$35.81 |
$45.00 |
$40.00 |
| 440 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 688 | LF |
$15.00 |
$27.00 |
$22.17 |
$12.00 |
$35.00 |
| 441 | 514(G) 6310 |
METAL PILE SHOES | 11 | EA |
$117.00 |
$55.00 |
$138.15 |
$175.00 |
$120.00 |
| 442 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 443 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,525 | SY |
$3.00 |
$7.50 |
$4.21 |
$4.10 |
$4.54 |
| 444 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 330 | LF |
$850.00 |
$750.00 |
$646.70 |
$750.00 |
$950.00 |
| 445 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 3 | EA |
$1,350.00 |
$5,500.00 |
$1,894.66 |
$1,700.00 |
$1,704.00 |
| 446 | 523(A) 6550 |
SEALER CRACK PREPARATION | 130 | LF |
$3.20 |
$4.00 |
$4.21 |
$4.10 |
$4.54 |
| 447 | 523(B) 6560 |
SEALER RESIN | 0.9 | GAL |
$102.00 |
$200.00 |
$210.52 |
$210.00 |
$226.85 |
| 448 | 535 6780 |
ORNAMENTAL MEDALLION | 6 | EA |
$15,000.00 |
$10,000.00 |
$4,228.57 |
$4,500.00 |
$7,500.00 |
| 449 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 73 | LF |
$22.00 |
$22.00 |
$34.20 |
$20.00 |
$30.00 |
| 450 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$28.00 |
$22.00 |
$17.97 |
$20.00 |
$30.00 |
| 451 | 510(D) 0350 |
(SP)GRAFFITI TREATMENT | 672,000 | SF |
$2.00 |
$1.15 |
$2.00 |
$2.36 |
$1.92 |
| 452 | 512(A) 1323 |
PAINTING EXISTING STRUCTURES | 1 | LSUM |
$1,100,000.00 |
|
|
|
|
| 453 | 509(D) 1331 |
CLASS C CONCRETE | 88 | CY |
$350.00 |
$400.00 |
$368.41 |
$372.28 |
$319.50 |
| 454 | 511(A) 0332 |
REINFORCING STEEL | 3,621 | LB |
$1.00 |
$1.00 |
$1.05 |
$1.21 |
$2.13 |
| 455 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 420 | LF |
$770.00 |
$750.00 |
$736.81 |
$869.24 |
$745.50 |
| 456 | 804(A) 2915 |
STRUCTURAL CONCRETE | 20 | CY |
$650.00 |
$650.00 |
$315.78 |
$372.53 |
$319.50 |
| 457 | 804(B) 2916 |
REINFORCING STEEL | 4,244 | LB |
$1.50 |
$1.00 |
$1.32 |
$1.55 |
$1.33 |
| 458 | 805(A) 8716 |
(PL)REMOVAL OF OVERHEAD SIGN STRUCTURE | 2 | EA |
$2,500.00 |
$2,500.00 |
$6,578.70 |
$7,761.07 |
$6,656.25 |
| 459 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$2,500.00 |
$5,000.00 |
$3,284.09 |
$3,874.33 |
$3,322.80 |
| 460 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 569 | SF |
$20.00 |
$20.00 |
$14.74 |
$17.38 |
$14.91 |
| 461 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 1,747 | SF |
$23.00 |
$25.00 |
$22.10 |
$26.08 |
$22.37 |
| 462 | 850(B) 8114 |
EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 6,200 | SF |
$25.00 |
$25.00 |
$24.21 |
$28.56 |
$24.50 |
| 463 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 321 | LF |
$18.00 |
$28.00 |
$17.89 |
$21.11 |
$18.11 |
| 464 | 851(A) 3207 |
6"@15 GALV.STEEL WIDE FLANGE BEAM POST | 159 | LF |
$35.00 |
$35.00 |
$17.89 |
$21.11 |
$18.11 |
| 465 | 851(A) 3208 |
6"@20 GALV.STEEL WIDE FLANGE BEAM POST | 47 | LF |
$20.00 |
$37.00 |
$23.16 |
$27.32 |
$23.43 |
| 466 | 851(A) 3210 |
8"@31 GALV.STEEL WIDE FLANGE BEAM POST | 168 | LF |
$35.00 |
$51.00 |
$46.31 |
$54.63 |
$46.86 |
| 467 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 30 | LF |
$18.00 |
$18.00 |
$21.05 |
$24.83 |
$21.30 |
| 468 | 851(C) 8324 |
2" SQUARE TUBE POST | 729 | LF |
$9.00 |
$8.50 |
$5.26 |
$6.21 |
$5.33 |
| 469 | 852(D) 0280 |
OVHD.SN.STR., MONOTUBE TYPE B 50' | 1 | EA |
$80,000.00 |
$107,000.00 |
$86,838.80 |
$102,446.05 |
$87,862.50 |
| 470 | 852(D) 0300 |
OVHD.SN.STR., MONOTUBE TYPE B 70' | 1 | EA |
$85,000.00 |
$113,000.00 |
$107,890.63 |
$127,281.45 |
$109,162.50 |
| 471 | 852(D) 0310 |
OVHD.SN.STR., MONOTUBE TYPE B 80' | 2 | EA |
$90,000.00 |
$132,000.00 |
$112,101.00 |
$132,248.54 |
$113,422.50 |
| 472 | 852(D) 0320 |
OVHD.SN.STR., MONOTUBE TYPE B 90' | 1 | EA |
$115,000.00 |
$133,000.00 |
$118,416.54 |
$139,699.17 |
$119,812.50 |
| 473 | 852(E) 0500 |
OVHD.SN.STR., MONOTUBE TYPE C | 4 | EA |
$70,000.00 |
$62,000.00 |
$54,050.58 |
$63,764.91 |
$54,687.75 |
| 474 | 853 9060 |
BARRIER DELINEATORS(TYPE 1, CODE 1) | 465 | EA |
$12.00 |
$92.00 |
$12.63 |
$14.90 |
$12.78 |
| 475 | 853 9063 |
BARRIER DELINEATORS(TYPE 2, CODE 1) | 80 | EA |
$12.00 |
$110.00 |
$13.53 |
$17.38 |
$120.19 |
| 476 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 860 | LF |
$0.5000 |
$1.00 |
$0.7400 |
$2.48 |
$0.7500 |
| 477 | 855(A) 8813 |
TRAFFIC STRIPE(PLASTIC)(6" WIDE) | 450 | LF |
$1.25 |
$1.00 |
$1.05 |
$3.10 |
$1.07 |
| 478 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 795 | LF |
$2.00 |
$1.00 |
$1.58 |
$3.73 |
$1.60 |
| 479 | 855(A) 8818 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 384 | LF |
$4.25 |
$1.00 |
$4.21 |
$6.21 |
$4.26 |
| 480 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 30 | LF |
$9.00 |
$1.00 |
$8.42 |
$12.42 |
$8.52 |
| 481 | 855(A) 8836 |
RECESSED TRAFFIC STRIPE(PLASTIC)(TAPE)(6" WIDE) | 15,368 | LF |
$3.00 |
$0.5500 |
$6.75 |
$3.73 |
$6.83 |
| 482 | 855(A) 8837 |
RECESSED TRAFFIC STRIPE(PLASTIC)(TAPE)(8" WIDE) | 1,248 | LF |
$3.00 |
$0.7000 |
$7.18 |
$6.21 |
$7.26 |
| 483 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 5 | EA |
$110.00 |
$200.00 |
$78.94 |
$155.22 |
$79.88 |
| 484 | 855(B) 8821 |
TRAFFIC STRIPE(PLASTIC)(WORDS) | 1 | EA |
$250.00 |
$250.00 |
$105.26 |
$620.88 |
$106.50 |
| 485 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 686 | LF |
$0.7000 |
$1.00 |
$0.6800 |
$1.24 |
$0.6900 |
| 486 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 18,533 | LF |
$1.75 |
$2.00 |
$3.16 |
$3.73 |
$3.20 |
| 487 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 184 | LF |
$6.00 |
$10.00 |
$15.79 |
$12.42 |
$15.98 |
| 488 | 856(A) 8561 |
RECESSED TRAF STRIPE(MULTI-POLY)(6" W) | 232,826 | LF |
$3.00 |
$0.4000 |
$1.29 |
$1.43 |
$1.31 |
| 489 | 856(A) 8562 |
RECESSED TRAF STRIPE(MULTI-POLY)(8" W) | 40,396 | LF |
$3.00 |
$0.4400 |
$1.73 |
$0.6200 |
$1.75 |
| 490 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 14 | EA |
$250.00 |
$250.00 |
$2,315.70 |
$310.44 |
$2,343.00 |
| 491 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 69 | EA |
$155.00 |
$200.00 |
$73.68 |
$192.47 |
$74.55 |
| 492 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 16 | EA |
$23,000.00 |
$25,000.00 |
$23,283.32 |
$28,560.72 |
$23,557.80 |
| 493 | 871(C) 8709 |
(SP) RELOCATION OF IMPACT ATTENUATOR | 1 | EA |
$500.00 |
$500.00 |
$789.44 |
$1,862.65 |
$798.75 |
| 494 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 370 | LF |
$700.00 |
$400.00 |
$595.77 |
$782.32 |
$745.50 |
| 495 | 610(A) 0602 |
4" CONCRETE SIDEWALK | 168 | SY |
$70.00 |
$55.00 |
$109.47 |
$144.05 |
$106.50 |
| 496 | 802(A) 8310 |
2" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 3,960 | LF |
$35.00 |
$25.00 |
$23.79 |
$31.04 |
$26.63 |
| 497 | 802(B) 8055 |
3/4" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 6,258 | LF |
$14.50 |
$8.00 |
$6.89 |
$17.38 |
$8.52 |
| 498 | 802(B) 8340 |
2" PVC SCH.40 PLASTIC CONDUIT BORED | 1,950 | LF |
$15.00 |
$30.00 |
$27.58 |
$36.01 |
$31.95 |
| 499 | 802(B) 8342 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 31,380 | LF |
$5.00 |
$5.00 |
$5.21 |
$7.45 |
$5.33 |
| 500 | 802(E) 8370 |
JUNCTION BOX(6" X 6" X 4") | 2 | EA |
$1,500.00 |
$800.00 |
$439.46 |
$583.63 |
$852.00 |
| 501 | 803(A) 8065 |
PULL BOX(SIZE I) | 27 | EA |
$400.00 |
$500.00 |
$709.97 |
$937.54 |
$532.50 |
| 502 | 804(A) 2915 |
STRUCTURAL CONCRETE | 55 | CY |
$600.00 |
$700.00 |
$821.02 |
$1,080.34 |
$745.50 |
| 503 | 804(B) 2916 |
REINFORCING STEEL | 9,342 | LB |
$1.50 |
$1.00 |
$2.00 |
$2.61 |
$2.13 |
| 504 | 806(D) 8989 |
40' MTG.HT.HL.PTP.(G.STL.) | 29 | EA |
$2,800.00 |
$1,950.00 |
$2,999.89 |
$3,948.83 |
$2,076.75 |
| 505 | 807 8092 |
BREAKAWAY BASE (DES. B) | 18 | EA |
$550.00 |
$645.00 |
$969.96 |
$1,276.54 |
$686.93 |
| 506 | 809 8091 |
ENHANCEMENT LIGHTING (COMPLETE) | 1 | LSUM |
$20,000.00 |
$35,000.00 |
$77,828.62 |
$153,979.52 |
$37,275.00 |
| 507 | 809(A) 8090 |
ROADWAY LUMINAIRE | 39 | EA |
$1,550.00 |
$1,550.00 |
$1,392.58 |
$1,832.85 |
$1,650.75 |
| 508 | 809(E) 8103 |
HIGH MAST LUMINAIRE | 40 | EA |
$400.00 |
$1,400.00 |
$1,607.31 |
$2,114.73 |
$1,491.00 |
| 509 | 810(A) 3118 |
SERVICE POLE | 2 | EA |
$1,500.00 |
$7,500.00 |
$9,651.21 |
$12,728.14 |
$7,987.50 |
| 510 | 811 8038 |
1/C NO.4 ELECTRICAL CONDUCTOR | 37,290 | LF |
$2.20 |
$3.17 |
$2.00 |
$2.73 |
$2.66 |
| 511 | 811 8040 |
1/C NO.6 ELECTRICAL CONDUCTOR | 830 | LF |
$2.00 |
$2.00 |
$1.89 |
$2.61 |
$1.60 |
| 512 | 811 8042 |
1/C NO.8 ELECTRICAL CONDUCTOR | 415 | LF |
$1.50 |
$2.00 |
$1.84 |
$2.48 |
$2.13 |
| 513 | 811 8044 |
1/C NO.10 ELECTRICAL CONDUCTOR | 37,948 | LF |
$0.9000 |
$1.00 |
$1.53 |
$2.17 |
$0.9100 |
| 514 | 811 8046 |
1/C NO.12 ELECTRICAL CONDUCTOR | 4,095 | LF |
$0.9000 |
$1.00 |
$1.05 |
$1.24 |
$0.8000 |
| 515 | 812 8062 |
125' HIGH MAST POLE(G.STL.) | 3 | EA |
$25,000.00 |
$32,000.00 |
$27,925.25 |
$36,743.99 |
$33,685.95 |
| 516 | 812 8064 |
130' HIGH MAST POLE(G.STL.) | 3 | EA |
$25,000.00 |
$32,000.00 |
$31,672.48 |
$41,673.81 |
$33,952.20 |
| 517 | 812 8068 |
140' HIGH MAST POLE(G.STL.) | 2 | EA |
$30,000.00 |
$32,000.00 |
$37,998.56 |
$49,993.68 |
$34,080.00 |
| 518 | 813 8074 |
HIGH MAST LOWERING DEVICE TYPE I | 8 | EA |
$8,500.00 |
$11,100.00 |
$14,694.18 |
$19,334.37 |
$11,821.50 |
| 519 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 158,844 | LF |
$0.1000 |
$0.2500 |
$0.2700 |
$0.2500 |
$0.2800 |
| 520 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 12,000 | EA |
$0.5000 |
$0.5000 |
$0.5100 |
$0.5000 |
$0.5100 |
| 521 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 6,914 | SD |
$5.00 |
$3.00 |
$6.32 |
$6.21 |
$6.39 |
| 522 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 9,000 | LF |
$24.00 |
$20.00 |
$10.24 |
$16.43 |
$49.17 |
| 523 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 41,550 | LF |
$3.50 |
$5.00 |
$11.32 |
$4.01 |
$4.47 |
| 524 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 28,800 | SD |
$0.1000 |
$0.1500 |
$0.0200 |
$0.4300 |
$0.0200 |
| 525 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 1,566 | SD |
$4.50 |
$5.00 |
$1.05 |
$1.24 |
$1.07 |
| 526 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 82,781 | SD |
$0.1000 |
$0.5000 |
$0.0200 |
$0.2500 |
$0.0200 |
| 527 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 35,833 | SD |
$0.5000 |
$0.5000 |
$0.0200 |
$0.3100 |
$0.0200 |
| 528 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 43,051 | SD |
$0.9000 |
$0.5000 |
$0.5300 |
$4.35 |
$0.5300 |
| 529 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 7,912 | SD |
$0.7500 |
$0.5000 |
$5.26 |
$12.42 |
$5.33 |
| 530 | 880(C) 8848 |
WING BARRICADES | 7,200 | SD |
$0.7500 |
$1.00 |
$0.3200 |
$3.73 |
$0.3200 |
| 531 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 118,522 | SD |
$0.1500 |
$0.2500 |
$0.0200 |
$0.6200 |
$0.0200 |
| 532 | 880(F) 8878 |
DRUMS | 102,082 | SD |
$0.2000 |
$0.2500 |
$1.05 |
$0.8700 |
$1.07 |
| 533 | 880(K) 8908 |
SURVEILLANCE TRAFFIC CONTROL | 900 | SD |
$410.00 |
$450.00 |
$732.11 |
$1,024.46 |
$372.75 |
| 534 | 880(L) 8920 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BIDDABLE) | 18,000 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 535 | 880(M) 8325 |
(PL)SPEED MONITORING DEVICE | 1,800 | SD |
$8.00 |
$10.00 |
$6.32 |
$18.63 |
$6.39 |
| 536 | 882 8370 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | 37,800 | SD |
$5.30 |
$11.00 |
$9.42 |
$6.21 |
$9.53 |
| 537 | 882 8372 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) | 32,400 | SD |
$5.00 |
$6.50 |
$2.88 |
$6.21 |
$2.92 |
| 538 | 882 8374 |
(SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) | 900 | SD |
$15.00 |
$12.00 |
$12.63 |
$18.63 |
$12.78 |
| 539 | 882 8376 |
(SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM | 900 | SD |
$15.00 |
$22.00 |
$10.53 |
$37.25 |
$10.65 |
| 540 | 882 8378 |
(PL)SMART WORK ZONE SYSTEM SETUP | 1 | EA |
$120,000.00 |
$800,000.00 |
$263,147.88 |
$993,416.27 |
$266,250.00 |
| 541 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 7,282 | SD |
$8.00 |
$10.00 |
$6.32 |
$4.97 |
$6.39 |
| 542 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$300,000.00 |
$25,000.00 |
$514,190.95 |
$143,418.26 |
$950,000.00 |
| 543 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$2,500.00 |
$27,762.82 |
$4,000.00 |
$75,000.00 |
| 544 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$30,000.00 |
$49,500.00 |
$65,562.15 |
$20,000.00 |
$75,000.00 |
| 545 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$3,500,000.00 |
|
|
|
|