$37,967.07Avg low bid / LSUM
$36,943.35Avg of all bids
$29,032.21Avg engineer's estimate
354Jobs · 389 LSUM
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 61 | 67 | $41,965.65 | $46,287.79 |
| 2020 | 119 | 129 | $47,003.90 | $42,011.27 |
| 2019 | 95 | 105 | $37,114.49 | $35,140.70 |
| 2018 | 79 | 88 | $22,692.84 | $24,791.34 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Nov 18, 2021 | 210347 | DelawareDivision 8 | 1 LSUM | $25,000.00 | C-GAWF CONSTRUCTION, INC. |
| Oct 14, 2021 | 210273 | EllisDivision 6 | 1 LSUM | $6,700.00 | Lopp Construction, LLC |
| Sep 16, 2021 | 210253 | MayesDivision 8 | 1 LSUM | $8,000.00 | RRY SERVICES LLC |
| Sep 16, 2021 | 210267 | PayneDivision 4 | 1 LSUM | $5,000.00 | H & H BRIDGE COMPANY |
| Sep 16, 2021 | 210179 | MurrayDivision 7 | 1 LSUM | $35,000.00 | Pavers, Inc. |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 1 LSUM | $2,900.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 1 LSUM | $19,900.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 19, 2021 | 210232 | GarfieldDivision 4 | 1 LSUM | $36,100.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Aug 19, 2021 | 210241 | SequoyahDivision 1 | 1 LSUM | $5,250.00 | Treas Construction Inc |
| Jul 15, 2021 | 210211 | LoganDivision 4 | 1 LSUM | $10,500.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jul 15, 2021 | 210180 | MuskogeeDivision 1 | 1 LSUM | $3,000.00 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 190363 | LoveDivision 7 | 1 LSUM | $14,158.75 | C3 Construction, Inc. |
| Jul 15, 2021 | 210215 | OklahomaDivision 4 | 1 LSUM | $4,850.00 | K & R BUILDERS, INC. |
| Jul 15, 2021 | 210216 | OkmulgeeDivision 1 | 1 LSUM | $5,000.00 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 210111 | LincolnDivision 3 | 1 LSUM | $195,000.00 | HASKELL LEMON CONSTRUCTION CO. |
| Jul 15, 2021 | 210209 | KayDivision 4 | 1 LSUM | $3,500.00 | H & H BRIDGE COMPANY |
| Jun 17, 2021 | 210185 | NowataDivision 8 | 1 LSUM | $7,608.98 | Frontier Bridge, Inc. |
| Jun 17, 2021 | 210190 | PushmatahaDivision 2 | 1 LSUM | $20,000.00 | L & N BRIDGE, LLC |
| Jun 17, 2021 | 210195 | TulsaDivision 8 | 1 LSUM | $18,000.00 | Paragon Contractors, LLC |
| Jun 17, 2021 | 210171 | DeweyDivision 5 | 1 LSUM | $10,200.00 | Frontier Bridge, Inc. |
| May 20, 2021 | 210143 | MurrayDivision 7 | 1 LSUM | $120,000.00 | OVERLAND CORPORATION |
| May 20, 2021 | 210133 | EllisDivision 6 | 1 LSUM | $53,000.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210148 | PayneDivision 4 | 1 LSUM | $75,000.00 | BECCO CONTRACTORS, INC. |
| May 20, 2021 | 210139 | McclainDivision 3 | 1 LSUM | $331,400.00 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 200338 | BeckhamDivision 5 | 1 LSUM | $60,000.00 | OBC, INC. |
| May 20, 2021 | 210140 | McclainDivision 3 | 1 LSUM | $33,600.00 | Treas Construction Inc |
| May 20, 2021 | 210082 | McclainDivision 3 | 1 LSUM | $52,917.92 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 1 LSUM | $52,015.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210127 | BlaineDivision 5 | 1 LSUM | $144,200.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 1 LSUM | $96,305.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210129 | BryanDivision 2 | 1 LSUM | $40,000.00 | L & N BRIDGE, LLC |
| Apr 15, 2021 | 210115 | NobleDivision 4 | 1 LSUM | $6,000.00 | SEWELL BROS., INC. |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 1 LSUM | $2,100.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 1 LSUM | $55,000.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210102 | CoalDivision 3 | 1 LSUM | $20,000.00 | L & N BRIDGE, LLC |
| Apr 15, 2021 | 210114 | NobleDivision 4 | 1 LSUM | $47,000.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 1 LSUM | $34,453.61 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 1 LSUM | $623.78 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 1 LSUM | $150,000.00 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210097 | KayDivision 4 | 1 LSUM | $15,000.00 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Mar 18, 2021 | 210078 | KayDivision 4 | 1 LSUM | $4,500.00 | RRY SERVICES LLC |
| Mar 18, 2021 | 210060 | OttawaDivision 8 | 1 LSUM | $80,850.00 | Treas Construction Inc |
| Mar 18, 2021 | 200030 | RogersDivision 8 | 1 LSUM | $10,000.00 | CONCRETE SERVICES CORPORATION |
| Mar 18, 2021 | 210086 | PittsburgDivision 2 | 1 LSUM | $80,000.00 | Robinson Construction, LLC |
| Feb 18, 2021 | 210070 | WoodwardDivision 6 | 1 LSUM | $16,500.00 | BRIDGECO CONTRACTORS, INC. |
| Feb 18, 2021 | 190362 | LoveDivision 7 | 1 LSUM | $4,305.23 | C3 Construction, Inc. |
| Feb 18, 2021 | 210048 | CraigDivision 8 | 1 LSUM | $7,726.77 | CONCRETE SERVICES CORPORATION |
| Feb 18, 2021 | 210055 | MurrayDivision 7 | 1 LSUM | $25,000.00 | HUB Construction, Inc. |
| Feb 18, 2021 | 210061 | PittsburgDivision 2 | 1 LSUM | $10,900.00 | BRIDGECO CONTRACTORS, INC. |
| Feb 18, 2021 | 210045 | ClevelandDivision 3 | 1 LSUM | $145,000.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Feb 18, 2021 | 210062 | Pontotoc | 1 LSUM | $169,990.00 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210046 | ComancheDivision 7 | 1 LSUM | $11,600.00 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 200282 | KiowaDivision 5 | 1 LSUM | $11,392.11 | TOM HUDSON PAVING, INC. |
| Jan 21, 2021 | 210017 | GradyDivision 7 | 1 LSUM | $11,000.00 | Treas Construction Inc |
| Jan 21, 2021 | 210007 | BeckhamDivision 5 | 1 LSUM | $8,625.16 | C3 Construction, Inc. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 1 LSUM | $100,000.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210018 | HarperDivision 6 | 1 LSUM | $68,900.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210008 | CaddoDivision 7 | 1 LSUM | $7,500.00 | Treas Construction Inc |
| Jan 21, 2021 | 210031 | OklahomaDivision 4 | 1 LSUM | $12,000.00 | SCHWARZ PAVING CO., INC. |
| Jan 21, 2021 | 210010 | ClevelandDivision 3 | 1 LSUM | $74,000.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Jan 21, 2021 | 210035 | Pontotoc | 1 LSUM | $54,075.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210014 | GarfieldDivision 4 | 1 LSUM | $8,400.00 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 210003 | WashingtonDivision 8 | 1 LSUM | $2,701.00 | Tri Star Construction Arkansas, LLC |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 1 LSUM | $700.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210016 | GradyDivision 7 | 1 LSUM | $5,750.00 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 210005 | AlfalfaDivision 6 | 1 LSUM | $6,000.00 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 1 LSUM | $50,000.00 | OVERLAND CORPORATION |
| Nov 19, 2020 | 200352 | Leflore | 1 LSUM | $6,700.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Nov 19, 2020 | 200355 | RogersDivision 8 | 1 LSUM | $400,000.00 | EMERY SAPP & SONS, INC. |
| Nov 19, 2020 | 200344 | CaddoDivision 7 | 1 LSUM | $5,600.00 | K & R BUILDERS, INC. |
| Nov 19, 2020 | 200357 | SequoyahDivision 1 | 1 LSUM | $38,800.00 | APAC-CENTRAL, INC. |
| Nov 19, 2020 | 200346 | ClevelandDivision 3 | 1 LSUM | $22,450.00 | Redlands Contracting, LLC |
| Nov 19, 2020 | 200339 | BlaineDivision 5 | 1 LSUM | $100,000.00 | CORNELL CONSTRUCTION COMPANY, INC. |
| Nov 19, 2020 | 200359 | MccurtainDivision 2 | 1 LSUM | $10,300.00 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200348 | CusterDivision 5 | 1 LSUM | $2,856.00 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200349 | GarvinDivision 3 | 1 LSUM | $19,000.00 | Treas Construction Inc |
| Oct 15, 2020 | 200329 | StephensDivision 7 | 1 LSUM | $21,630.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200313 | JohnstonDivision 3 | 1 LSUM | $9,000.00 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200333 | TulsaDivision 8 | 1 LSUM | $7,500.00 | ACTION SAFETY SUPPLY CO., LLC |
| Oct 15, 2020 | 200317 | MccurtainDivision 2 | 1 LSUM | $8,500.00 | HUB Construction, Inc. |
| Oct 15, 2020 | 200297 | WoodsDivision 6 | 1 LSUM | $7,069.65 | HASKELL LEMON CONSTRUCTION CO. |
| Oct 15, 2020 | 200322 | OsageDivision 8 | 1 LSUM | $48,930.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200300 | GarvinDivision 3 | 1 LSUM | $3,360.00 | C-P INTEGRATED SERVICES, INC. |
| Oct 15, 2020 | 200323 | OsageDivision 8 | 1 LSUM | $6,500.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200306 | CanadianDivision 4 | 1 LSUM | $2,060.00 | Frontier Bridge, Inc. |
| Oct 15, 2020 | 200326 | PushmatahaDivision 2 | 1 LSUM | $15,000.00 | L & N BRIDGE, LLC |
| Oct 15, 2020 | 200077 | PottawatomieDivision 3 | 1 LSUM | $125,000.00 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200309 | GarfieldDivision 4 | 1 LSUM | $21,200.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Sep 17, 2020 | 200034 | SequoyahDivision 1 | 1 LSUM | $18,000.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200200 | McintoshDivision 1 | 1 LSUM | $30,000.00 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Sep 17, 2020 | 200295 | TulsaDivision 8 | 1 LSUM | $2,800.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 17, 2020 | 200287 | OklahomaDivision 4 | 1 LSUM | $7,000.00 | Cowboy Contracting, Inc. |
| Sep 17, 2020 | 200290 | OsageDivision 8 | 1 LSUM | $6,500.00 | BRIDGECO CONTRACTORS, INC. |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 1 LSUM | $75,000.00 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 1 LSUM | $72,424.49 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 1 LSUM | $75,000.00 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200292 | PottawatomieDivision 3 | 1 LSUM | $398,000.00 | Silver Star Construction Company, Inc. |
| Sep 17, 2020 | 200279 | GradyDivision 7 | 1 LSUM | $16,000.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200294 | SequoyahDivision 1 | 1 LSUM | $40,000.00 | Rosscon, LLC |
| Aug 20, 2020 | 200239 | WoodsDivision 6 | 1 LSUM | $6,200.00 | K & R BUILDERS, INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 1 LSUM | $27,743.49 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 1 LSUM | $110,973.94 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 1 LSUM | $175,000.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200230 | LoveDivision 7 | 1 LSUM | $6,000.00 | HUB Construction, Inc. |
| Aug 20, 2020 | 200150 | EllisDivision 6 | 1 LSUM | $94,468.00 | J & R SAND COMPANY, INC. |
| Jul 23, 2020 | 200061 | DeweyDivision 5 | 1 LSUM | $150,000.00 | J & R SAND COMPANY, INC. |
| Jul 23, 2020 | 190283 | GarvinDivision 3 | 1 LSUM | $4,500.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Jul 23, 2020 | 200250 | GarvinDivision 3 | 1 LSUM | $2,080.00 | Frontier Bridge, Inc. |
| Jul 23, 2020 | 200108 | Love, Marshall | 1 LSUM | $30,000.00 | OVERLAND CORPORATION |
| Jul 23, 2020 | 200251 | HarmonDivision 5 | 1 LSUM | $52,500.00 | Frontier Bridge, Inc. |
| Jul 23, 2020 | 200252 | KayDivision 4 | 1 LSUM | $1,500.00 | CONCRETE SERVICES CORPORATION |
| Jul 23, 2020 | 200260 | AtokaDivision 2 | 1 LSUM | $150,000.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200261 | Pontotoc | 1 LSUM | $228,375.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200249 | CusterDivision 5 | 1 LSUM | $2,000.00 | SEWELL BROS., INC. |
| Jun 18, 2020 | 200228 | Leflore | 1 LSUM | $25,000.00 | Robinson Construction, LLC |
| Jun 18, 2020 | 200229 | LincolnDivision 3 | 1 LSUM | $7,500.00 | L & N BRIDGE, LLC |
| Jun 18, 2020 | 200242 | StephensDivision 7 | 1 LSUM | $21,742.05 | SCHIRALLI CONSTRUCTION CORP. |
| Jun 18, 2020 | 200232 | Ssp-249c(052)ss | 1 LSUM | $7,500.00 | OCCI, INC. |
| Jun 18, 2020 | 200242 | StephensDivision 7 | 1 LSUM | $12,949.76 | SCHIRALLI CONSTRUCTION CORP. |
| Jun 18, 2020 | 200233 | OklahomaDivision 4 | 1 LSUM | $1,000.00 | RUDY CONSTRUCTION CO. |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 1 LSUM | $116,071.25 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 190120 | Nhppi-4400-(039)pm | 1 LSUM | $6,984.01 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 200022 | OttawaDivision 8 | 1 LSUM | $37,639.70 | APAC-CENTRAL, INC. |
| May 14, 2020 | 190347 | DelawareDivision 8 | 1 LSUM | $8,500.00 | RRY SERVICES LLC |
| May 14, 2020 | 200214 | Stp-266d(065)ci | 1 LSUM | $4,000.00 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 1 LSUM | $14,000.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200201 | MurrayDivision 7 | 1 LSUM | $6,950.00 | Redlands Contracting, LLC |
| May 14, 2020 | 200126 | TulsaDivision 8 | 1 LSUM | $20,814.64 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 200214 | Stp-266d(065)ci | 1 LSUM | $5,000.00 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| May 14, 2020 | 190376 | WashingtonDivision 8 | 1 LSUM | $153,000.00 | Paragon Contractors, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 1 LSUM | $3,550.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200202 | MuskogeeDivision 1 | 1 LSUM | $7,725.00 | Treas Construction Inc |
| May 14, 2020 | 200190 | Cirb-210d(071)rb | 1 LSUM | $1,837.50 | Treas Construction Inc |
| May 14, 2020 | 200203 | MuskogeeDivision 1 | 1 LSUM | $8,426.25 | Treas Construction Inc |
| May 14, 2020 | 190377 | WashingtonDivision 8 | 1 LSUM | $5,000.00 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| May 14, 2020 | 200194 | GarfieldDivision 4 | 1 LSUM | $7,466.00 | HASKELL LEMON CONSTRUCTION CO. |
| May 14, 2020 | 200208 | PittsburgDivision 2 | 1 LSUM | $51,200.00 | DUIT CONSTRUCTION COMPANY, INC. |
| May 14, 2020 | 200197 | JohnstonDivision 3 | 1 LSUM | $10,392.43 | C3 Construction, Inc. |
| May 14, 2020 | 200212 | StephensDivision 7 | 1 LSUM | $10,000.00 | SEWELL BROS., INC. |
| Apr 16, 2020 | 200138 | BeaverDivision 6 | 1 LSUM | $10,417.00 | K & R BUILDERS, INC. |
| Apr 16, 2020 | 200079 | SeminoleDivision 3 | 1 LSUM | $18,810.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Apr 16, 2020 | 200153 | Jefferson | 1 LSUM | $14,000.00 | K & R BUILDERS, INC. |
| Apr 16, 2020 | 200145 | ClevelandDivision 3 | 1 LSUM | $12,600.00 | SAC Services, Inc. |
| Apr 16, 2020 | 200028 | Cirb-264d(069)rb | 1 LSUM | $30,125.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Apr 16, 2020 | 200185 | OklahomaDivision 4 | 1 LSUM | $3,605.00 | Frontier Bridge, Inc. |
| Apr 16, 2020 | 200155 | LincolnDivision 3 | 1 LSUM | $6,500.00 | BRIDGECO CONTRACTORS, INC. |
| Apr 16, 2020 | 200148 | DelawareDivision 8 | 1 LSUM | $2,500.00 | C-GAWF CONSTRUCTION, INC. |
| Apr 16, 2020 | 190163 | SequoyahDivision 1 | 1 LSUM | $6,500.00 | BRIDGECO CONTRACTORS, INC. |
| Apr 16, 2020 | 200065 | HughesDivision 3 | 1 LSUM | $14,935.00 | Treas Construction Inc |
| Apr 16, 2020 | 200028 | Cirb-264d(069)rb | 1 LSUM | $26,125.00 | THE CUMMINS CONSTRUCTION CO., INC. |