| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$21,500.00 |
$167,000.00 |
$91,361.95 |
$145,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 42,795 | CY |
$13.00 |
$6.10 |
$10.00 |
$5.97 |
$6.25 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 27,715 | CY |
$15.00 |
$7.95 |
$11.00 |
$7.64 |
$13.00 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,000.00 |
$48,930.00 |
$34,421.55 |
$116,555.10 |
$28,000.00 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,015 | LF |
$3.50 |
$2.50 |
$2.20 |
$2.13 |
$2.50 |
| 60 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 14 | EA |
$400.00 |
$395.00 |
$300.00 |
$315.65 |
$155.00 |
| 70 | 221(F) 0100 |
TEMPORARY SILT DIKE | 679 | LF |
$13.00 |
$10.91 |
$10.00 |
$9.53 |
$9.50 |
| 80 | 230(A) 2806 |
SOLID SLAB SODDING | 60,839 | SY |
$4.00 |
$1.96 |
$1.85 |
$1.92 |
$1.85 |
| 90 | 232(A) 2813 |
SEEDING METHOD A | 17 | AC |
$1,500.00 |
$825.00 |
$800.00 |
$850.65 |
$805.00 |
| 100 | 233(A) 2817 |
VEGETATIVE MULCHING | 17 | AC |
$1,500.00 |
$825.00 |
$800.00 |
$850.65 |
$805.00 |
| 110 | 241 2832 |
MOWING | 59 | AC |
$250.00 |
$219.00 |
$190.00 |
$191.53 |
$180.00 |
| 120 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 5,659 | CY |
$60.00 |
$55.31 |
$45.00 |
$58.11 |
$65.00 |
| 130 | 307(B) 4210 |
CEMENT KILN DUST | 1,516 | TON |
$75.00 |
$74.20 |
$87.00 |
$76.35 |
$125.00 |
| 140 | 307(D) 4230 |
LIME | 127 | TON |
$250.00 |
$220.00 |
$225.00 |
$202.08 |
$230.00 |
| 150 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 35,805 | SY |
$4.00 |
$2.20 |
$2.80 |
$2.25 |
$2.50 |
| 160 | 307(G) 4260 |
LIME PRETREATMENT | 7,161 | SY |
$2.00 |
$2.70 |
$2.80 |
$2.70 |
$2.75 |
| 170 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 28,182 | SY |
$4.50 |
$4.30 |
$4.00 |
$4.47 |
$3.30 |
| 180 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,834 | TON |
$25.00 |
$27.34 |
$20.00 |
$28.53 |
$34.00 |
| 190 | 407(B) 0250 |
TACK COAT | 4,138 | GAL |
$3.00 |
$3.35 |
$2.00 |
$2.14 |
$3.30 |
| 200 | 408 5774 |
PRIME COAT | 19,924 | GAL |
$6.00 |
$3.40 |
$0.5000 |
$3.21 |
$3.30 |
| 210 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 4,178 | TON |
$75.00 |
$89.00 |
$60.00 |
$123.59 |
$90.00 |
| 220 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 5,102 | TON |
$70.00 |
$91.46 |
$60.00 |
$113.96 |
$85.00 |
| 230 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 3,656 | TON |
$90.00 |
$85.97 |
$75.00 |
$135.67 |
$98.00 |
| 240 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 16 | CY |
$50.00 |
$55.00 |
$10.00 |
$37.45 |
$20.00 |
| 250 | 509(A) 0319 |
CLASS AA CONCRETE | 55 | CY |
$900.00 |
$450.00 |
$600.00 |
$454.75 |
$675.00 |
| 260 | 509(D) 0325 |
CLASS C CONCRETE | 380 | CY |
$450.00 |
$315.00 |
$325.00 |
$358.45 |
$335.00 |
| 270 | 511(A) 0332 |
REINFORCING STEEL | 7,092 | LB |
$1.20 |
$1.05 |
$1.00 |
$1.23 |
$0.6500 |
| 280 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 56 | LF |
$100.00 |
$71.62 |
$80.00 |
$61.85 |
$65.00 |
| 290 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 56 | LF |
$120.00 |
$89.12 |
$85.00 |
$85.29 |
$75.00 |
| 300 | 613(B) 0688 |
12" CORR. GALV. STEEL PIPE | 122 | LF |
$40.00 |
$35.10 |
$45.00 |
$33.09 |
$36.00 |
| 310 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 144 | LF |
$60.00 |
$38.33 |
$50.00 |
$35.06 |
$40.00 |
| 320 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 252 | LF |
$45.00 |
$44.56 |
$55.00 |
$43.33 |
$50.00 |
| 330 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$680.00 |
$1,173.00 |
$700.00 |
$1,000.45 |
$1,000.00 |
| 340 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$800.00 |
$1,285.00 |
$800.00 |
$1,107.45 |
$1,200.00 |
| 350 | 613(P) 0760 |
18" GALV. STEEL CULVERT END SECTION ROUND | 8 | EA |
$300.00 |
$675.00 |
$200.00 |
$537.73 |
$700.00 |
| 360 | 613(P) 0761 |
24" GALV. STEEL CULVERT END SECTION ROUND | 10 | EA |
$750.00 |
$567.00 |
$205.00 |
$499.69 |
$725.00 |
| 370 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$8,500.00 |
$18,000.00 |
$28,772.30 |
$12,000.00 |
| 380 | 619(B) 0291 |
REMOVAL OF HEADWALL | 2 | EA |
$1,000.00 |
$1,450.00 |
$300.00 |
$1,605.00 |
$1,250.00 |
| 390 | 619(B) 4725 |
REMOVAL OF FENCE | 7,189 | LF |
$2.00 |
$2.15 |
$1.00 |
$1.26 |
$1.75 |
| 400 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 21,054 | SY |
$4.00 |
$9.25 |
$3.25 |
$8.56 |
$5.40 |
| 410 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 616 | LF |
$4.00 |
$4.00 |
$3.00 |
$3.21 |
$4.00 |
| 420 | 619(C) 0924 |
SAWING PAVEMENT | 2,412 | LF |
$6.00 |
$8.00 |
$2.00 |
$6.42 |
$3.75 |
| 430 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 525 | LF |
$20.00 |
$23.00 |
$22.00 |
$84.00 |
$21.50 |
| 440 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,250.00 |
$2,350.00 |
$2,200.00 |
$2,247.00 |
$2,150.00 |
| 450 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,200.00 |
$1,875.00 |
$2,000.00 |
$1,738.75 |
$1,700.00 |
| 460 | 624(B) 4460 |
GATES-STYLE WWF (4.5'HIGH X 10'LONG) | 2 | EA |
$1,000.00 |
$900.00 |
$1,000.00 |
$963.00 |
$950.00 |
| 470 | 624(B) 4462 |
GATES-STYLE WWF (4.5'HIGH X 12'LONG) | 2 | EA |
$1,100.00 |
$925.00 |
$1,100.00 |
$1,070.00 |
$1,025.00 |
| 480 | 624(B) 4464 |
GATES-STYLE WWF (4.5'HIGH X 14'LONG) | 3 | EA |
$1,000.00 |
$1,000.00 |
$1,200.00 |
$1,177.00 |
$1,150.00 |
| 490 | 624(B) 4467 |
GATES-STYLE WWF (4.5'HIGH X 18' LONG) | 2 | EA |
$1,100.00 |
$1,250.00 |
$1,400.00 |
$1,498.00 |
$1,450.00 |
| 500 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 5,978 | LF |
$9.00 |
$6.25 |
$9.00 |
$8.51 |
$8.00 |
| 510 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$40.00 |
$25.00 |
$20.00 |
$32.10 |
$20.00 |
| 520 | 501(G) 6309 |
CLSM BACKFILL | 200 | CY |
$200.00 |
$157.00 |
$150.00 |
$239.50 |
$170.00 |
| 530 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,197 | LF |
$275.00 |
$230.00 |
$250.00 |
$268.37 |
$300.00 |
| 540 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$250.00 |
$276.42 |
$220.00 |
$214.74 |
$220.00 |
| 550 | 504(B) 1305 |
SAW-CUT GROOVING | 1,557.8 | SY |
$6.00 |
$4.65 |
$5.00 |
$5.40 |
$4.10 |
| 560 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 697 | LF |
$115.00 |
$81.00 |
$95.00 |
$84.68 |
$76.00 |
| 570 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$5.00 |
$3.50 |
$9.00 |
$2.06 |
$2.50 |
| 580 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,900.00 |
$475.00 |
$1,500.00 |
$695.01 |
$2,500.00 |
| 590 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,200.00 |
$1,545.40 |
$2,500.00 |
$1,739.87 |
$3,000.00 |
| 600 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$700.00 |
$617.00 |
$400.00 |
$107.00 |
$750.00 |
| 610 | 509(A) 1326 |
CLASS AA CONCRETE | 385.9 | CY |
$700.00 |
$600.00 |
$975.00 |
$731.93 |
$770.00 |
| 620 | 509(B) 1328 |
CLASS A CONCRETE | 154.8 | CY |
$1,000.00 |
$650.00 |
$850.00 |
$731.93 |
$1,100.00 |
| 630 | 511(A) 1332 |
REINFORCING STEEL | 1,000 | LB |
$1.20 |
$1.40 |
$1.00 |
$1.63 |
$1.10 |
| 640 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 156,670 | LB |
$1.50 |
$1.07 |
$2.00 |
$1.26 |
$1.45 |
| 650 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 920 | LF |
$40.00 |
$26.81 |
$30.00 |
$34.34 |
$50.00 |
| 660 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 920 | LF |
$15.00 |
$14.00 |
$15.00 |
$16.05 |
$11.00 |
| 670 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 680 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,271 | SY |
$5.00 |
$4.10 |
$5.00 |
$4.28 |
$4.15 |
| 690 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 164 | LF |
$1,200.00 |
$998.73 |
$975.00 |
$927.39 |
$1,750.00 |
| 700 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,000.00 |
$2,875.00 |
$7,500.00 |
$2,568.00 |
$1,425.00 |
| 710 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$7.00 |
$5.00 |
$5.00 |
$4.28 |
$4.10 |
| 720 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$150.00 |
$275.00 |
$200.00 |
$214.00 |
$205.00 |
| 730 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,730 | TON |
$45.00 |
$41.60 |
$55.00 |
$49.54 |
$47.00 |
| 740 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 330 | TON |
$40.00 |
$32.50 |
$40.00 |
$37.44 |
$35.00 |
| 750 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$35.00 |
$10.00 |
$32.10 |
$31.00 |
| 760 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$27.00 |
$30.00 |
$10.00 |
$32.10 |
$31.00 |
| 770 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$60,000.00 |
$96,000.00 |
$35,000.00 |
$92,876.00 |
$50,000.00 |
| 780 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 12 | EA |
$75.00 |
$57.00 |
$55.00 |
$53.50 |
$51.00 |
| 790 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 49 | SF |
$22.00 |
$24.00 |
$25.00 |
$21.40 |
$20.50 |
| 800 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 68 | LF |
$15.00 |
$12.00 |
$15.00 |
$10.70 |
$10.50 |
| 810 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 22,922 | LF |
$0.9500 |
$0.4200 |
$0.5000 |
$0.4300 |
$0.4200 |
| 820 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 14,210 | LF |
$0.2500 |
$0.1400 |
$0.1500 |
$0.1400 |
$0.1500 |
| 830 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 6,616 | LF |
$0.9500 |
$1.04 |
$1.00 |
$1.07 |
$1.05 |
| 840 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,316 | LF |
$0.5000 |
$1.04 |
$1.00 |
$1.07 |
$1.05 |
| 850 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 380 | SD |
$6.00 |
$5.75 |
$6.00 |
$5.35 |
$5.25 |
| 860 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 300 | LF |
$25.00 |
$50.50 |
$25.00 |
$32.10 |
$80.00 |
| 870 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 300 | LF |
$5.00 |
$4.50 |
$5.00 |
$10.70 |
$7.50 |
| 880 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 2,100 | SD |
$0.4000 |
$0.1100 |
$0.1500 |
$0.1100 |
$0.1000 |
| 890 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,260 | SD |
$0.7500 |
$1.04 |
$1.10 |
$1.07 |
$1.05 |
| 900 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,880 | SD |
$1.50 |
$0.2700 |
$0.3000 |
$0.2700 |
$0.3000 |
| 910 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,120 | SD |
$3.00 |
$1.04 |
$1.10 |
$1.07 |
$1.05 |
| 920 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$3.00 |
$0.2700 |
$0.3000 |
$0.2700 |
$0.3000 |
| 930 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,060 | SD |
$1.00 |
$3.12 |
$3.00 |
$3.21 |
$3.05 |
| 940 | 880(F) 8878 |
DRUMS | 7,280 | SD |
$0.5000 |
$0.2700 |
$0.3000 |
$0.2700 |
$0.3000 |
| 950 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$75,000.00 |
$28,500.00 |
$67,000.00 |
$28,087.50 |
$36,000.00 |
| 960 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$10,000.00 |
$5,350.00 |
$2,500.00 |
| 970 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$12,700.00 |
$7,500.00 |
$5,350.00 |
$15,000.00 |
| 980 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$293,000.00 |
$155,000.00 |
$275,000.00 |
$245,019.56 |
$294,885.75 |