$587.43Avg low bid / CY
$632.30Avg of all bids
$634.11Avg engineer's estimate
420Jobs · 230,713.42 CY
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 54 | 34,675.96 | $581.26 | $591.86 |
| 2020 | 122 | 56,071.66 | $619.14 | $635.05 |
| 2019 | 104 | 57,943.98 | $568.74 | $613.95 |
| 2018 | 112 | 71,430 | $578.48 | $658.68 |
| 2017 | 28 | 10,591.82 | $602.37 | $651.04 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Nov 18, 2021 | 210347 | DelawareDivision 8 | 689.4 CY | $1,250.00 | C-GAWF CONSTRUCTION, INC. |
| Oct 14, 2021 | 210273 | EllisDivision 6 | 623 CY | $406.50 | Lopp Construction, LLC |
| Sep 16, 2021 | 210253 | MayesDivision 8 | 482 CY | $525.00 | RRY SERVICES LLC |
| Sep 16, 2021 | 210267 | PayneDivision 4 | 75.4 CY | $650.00 | H & H BRIDGE COMPANY |
| Sep 16, 2021 | 200324 | Osage, Pawnee | 1,544 CY | $1,100.00 | BECCO CONTRACTORS, INC. |
| Aug 19, 2021 | 210241 | SequoyahDivision 1 | 551.4 CY | $673.10 | Treas Construction Inc |
| Jul 15, 2021 | 210200 | BeckhamDivision 5 | 67.1 CY | $600.00 | SEWELL BROS., INC. |
| Jul 15, 2021 | 210201 | BlaineDivision 5 | 79.6 CY | $600.00 | SEWELL BROS., INC. |
| Jul 15, 2021 | 190363 | LoveDivision 7 | 1,073.1 CY | $628.07 | C3 Construction, Inc. |
| Jul 15, 2021 | 210209 | KayDivision 4 | 47.5 CY | $500.00 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 210180 | MuskogeeDivision 1 | 239.1 CY | $400.00 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 190363 | LoveDivision 7 | 1,073 CY | $748.62 | C3 Construction, Inc. |
| Jul 15, 2021 | 210215 | OklahomaDivision 4 | 244.7 CY | $827.00 | K & R BUILDERS, INC. |
| Jul 15, 2021 | 210216 | OkmulgeeDivision 1 | 419 CY | $400.00 | H & H BRIDGE COMPANY |
| Jun 17, 2021 | 210190 | PushmatahaDivision 2 | 327.7 CY | $725.00 | L & N BRIDGE, LLC |
| Jun 17, 2021 | 210172 | DeweyDivision 5 | 476.2 CY | $369.50 | Wyatt Contracting |
| Jun 17, 2021 | 210174 | GrantDivision 4 | 4.68 CY | $4,760.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jun 17, 2021 | 210176 | Leflore, Mccurtain | 82 CY | $966.00 | HUB Construction, Inc. |
| Jun 17, 2021 | 210185 | NowataDivision 8 | 729.9 CY | $668.84 | Frontier Bridge, Inc. |
| Jun 17, 2021 | 210171 | DeweyDivision 5 | 2,793.2 CY | $508.38 | Frontier Bridge, Inc. |
| May 20, 2021 | 210129 | BryanDivision 2 | 673.3 CY | $600.00 | L & N BRIDGE, LLC |
| May 20, 2021 | 210143 | MurrayDivision 7 | 297 CY | $688.00 | OVERLAND CORPORATION |
| May 20, 2021 | 210129 | BryanDivision 2 | 274.6 CY | $800.00 | L & N BRIDGE, LLC |
| May 20, 2021 | 210143 | MurrayDivision 7 | 78.4 CY | $905.30 | OVERLAND CORPORATION |
| May 20, 2021 | 210133 | EllisDivision 6 | 277.8 CY | $540.60 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 200338 | BeckhamDivision 5 | 576.3 CY | $450.00 | OBC, INC. |
| May 20, 2021 | 210143 | MurrayDivision 7 | 190.1 CY | $577.50 | OVERLAND CORPORATION |
| May 20, 2021 | 210133 | EllisDivision 6 | 146.4 CY | $540.60 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 200338 | BeckhamDivision 5 | 309.3 CY | $670.00 | OBC, INC. |
| May 20, 2021 | 210158 | TillmanDivision 5 | 114.4 CY | $575.00 | SEWELL BROS., INC. |
| May 20, 2021 | 210140 | McclainDivision 3 | 293.3 CY | $685.63 | Treas Construction Inc |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 490.7 CY | $540.75 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210082 | McclainDivision 3 | 1,091.8 CY | $364.00 | Silver Star Construction Company, Inc. |
| Apr 15, 2021 | 210102 | CoalDivision 3 | 245 CY | $820.00 | L & N BRIDGE, LLC |
| Apr 15, 2021 | 210115 | NobleDivision 4 | 603.28 CY | $375.00 | SEWELL BROS., INC. |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 8 CY | $1,700.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 8 CY | $1,700.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 2,695 CY | $313.00 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210097 | KayDivision 4 | 258.6 CY | $1,010.00 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Mar 18, 2021 | 210060 | OttawaDivision 8 | 289.8 CY | $946.99 | Treas Construction Inc |
| Mar 18, 2021 | 210086 | PittsburgDivision 2 | 1,282.3 CY | $419.75 | Robinson Construction, LLC |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 799.7 CY | $340.00 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 1,207 CY | $697.49 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 210075 | CarterDivision 7 | 8.2 CY | $2,350.00 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 500 CY | $1,019.75 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 210075 | CarterDivision 7 | 6.7 CY | $3,000.00 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 18.5 CY | $2,357.86 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 200030 | RogersDivision 8 | 311.8 CY | $500.00 | CONCRETE SERVICES CORPORATION |
| Mar 18, 2021 | 210078 | KayDivision 4 | 197.7 CY | $550.00 | RRY SERVICES LLC |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 270.1 CY | $435.00 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210097 | KayDivision 4 | 258.6 CY | $1,010.00 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Feb 18, 2021 | 210061 | PittsburgDivision 2 | 247.9 CY | $760.00 | BRIDGECO CONTRACTORS, INC. |
| Feb 18, 2021 | 190362 | LoveDivision 7 | 294.2 CY | $857.42 | C3 Construction, Inc. |
| Feb 18, 2021 | 210045 | ClevelandDivision 3 | 1,375 CY | $330.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Feb 18, 2021 | 210068 | TexasDivision 6 | 252.6 CY | $699.23 | CONCRETE SERVICES CORPORATION |
| Feb 18, 2021 | 210046 | ComancheDivision 7 | 62.4 CY | $640.00 | K & R BUILDERS, INC. |
| Feb 18, 2021 | 210070 | WoodwardDivision 6 | 525.6 CY | $570.00 | BRIDGECO CONTRACTORS, INC. |
| Feb 18, 2021 | 210048 | CraigDivision 8 | 188.5 CY | $646.25 | CONCRETE SERVICES CORPORATION |
| Feb 18, 2021 | 210055 | MurrayDivision 7 | 300.6 CY | $650.00 | HUB Construction, Inc. |
| Jan 21, 2021 | 210008 | CaddoDivision 7 | 841 CY | $436.64 | Treas Construction Inc |
| Jan 21, 2021 | 210003 | WashingtonDivision 8 | 4 CY | $1,001.00 | Tri Star Construction Arkansas, LLC |
| Jan 21, 2021 | 210025 | KingfisherDivision 4 | 820.2 CY | $383.15 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210014 | GarfieldDivision 4 | 124.5 CY | $580.00 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 210005 | AlfalfaDivision 6 | 245.68 CY | $475.00 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 210016 | GradyDivision 7 | 107.8 CY | $605.00 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 210005 | AlfalfaDivision 6 | 450.62 CY | $470.00 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 210017 | GradyDivision 7 | 190.9 CY | $576.90 | Treas Construction Inc |
| Jan 21, 2021 | 210007 | BeckhamDivision 5 | 1,356.7 CY | $611.41 | C3 Construction, Inc. |
| Jan 21, 2021 | 210025 | KingfisherDivision 4 | 166 CY | $434.65 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210007 | BeckhamDivision 5 | 1,356.7 CY | $584.15 | C3 Construction, Inc. |
| Jan 21, 2021 | 210025 | KingfisherDivision 4 | 361.4 CY | $420.25 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 19, 2020 | 200357 | SequoyahDivision 1 | 6 CY | $945.00 | APAC-CENTRAL, INC. |
| Nov 19, 2020 | 200348 | CusterDivision 5 | 2,026.1 CY | $409.62 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200359 | MccurtainDivision 2 | 567.6 CY | $673.44 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200156 | MajorDivision 6 | 53.4 CY | $675.00 | K & R BUILDERS, INC. |
| Nov 19, 2020 | 200349 | GarvinDivision 3 | 908.2 CY | $428.47 | Treas Construction Inc |
| Nov 19, 2020 | 200352 | Leflore | 44.1 CY | $885.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Nov 19, 2020 | 200355 | RogersDivision 8 | 1,262.9 CY | $516.00 | EMERY SAPP & SONS, INC. |
| Nov 19, 2020 | 200344 | CaddoDivision 7 | 106 CY | $599.00 | K & R BUILDERS, INC. |
| Nov 19, 2020 | 200356 | SeminoleDivision 3 | 998.8 CY | $639.94 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200347 | CreekDivision 8 | 175.5 CY | $825.00 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| Oct 15, 2020 | 200077 | PottawatomieDivision 3 | 1,051.8 CY | $390.00 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200329 | StephensDivision 7 | 199.2 CY | $640.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200310 | GarfieldDivision 4 | 32.8 CY | $2,425.07 | HASKELL LEMON CONSTRUCTION CO. |
| Oct 15, 2020 | 200325 | PawneeDivision 8 | 24.8 CY | $950.00 | CONCRETE SERVICES CORPORATION |
| Oct 15, 2020 | 200317 | MccurtainDivision 2 | 115.9 CY | $825.00 | HUB Construction, Inc. |
| Oct 15, 2020 | 200310 | GarfieldDivision 4 | 18.9 CY | $3,116.71 | HASKELL LEMON CONSTRUCTION CO. |
| Oct 15, 2020 | 200329 | StephensDivision 7 | 199.2 CY | $640.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200325 | PawneeDivision 8 | 17 CY | $950.00 | CONCRETE SERVICES CORPORATION |
| Oct 15, 2020 | 200321 | OklahomaDivision 4 | 8.7 CY | $1,000.00 | Built Right Construction, LLC |
| Oct 15, 2020 | 200312 | GreerDivision 5 | 214.11 CY | $475.00 | K & R BUILDERS, INC. |
| Oct 15, 2020 | 200325 | PawneeDivision 8 | 5.8 CY | $1,800.00 | CONCRETE SERVICES CORPORATION |
| Oct 15, 2020 | 200322 | OsageDivision 8 | 385.9 CY | $600.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200314 | KingfisherDivision 4 | 123.3 CY | $590.00 | K & R BUILDERS, INC. |
| Oct 15, 2020 | 200326 | PushmatahaDivision 2 | 184.5 CY | $750.00 | L & N BRIDGE, LLC |
| Oct 15, 2020 | 200304 | BlaineDivision 5 | 67.1 CY | $635.00 | K & R BUILDERS, INC. |
| Oct 15, 2020 | 200323 | OsageDivision 8 | 381.6 CY | $650.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200316 | Grady, Mcclain | 207 CY | $577.98 | Treas Construction Inc |
| Oct 15, 2020 | 200077 | PottawatomieDivision 3 | 1,263.1 CY | $370.00 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200326 | PushmatahaDivision 2 | 546.7 CY | $600.00 | L & N BRIDGE, LLC |
| Oct 15, 2020 | 200306 | CanadianDivision 4 | 811.7 CY | $570.34 | Frontier Bridge, Inc. |
| Oct 15, 2020 | 200317 | MccurtainDivision 2 | 138.9 CY | $825.00 | HUB Construction, Inc. |
| Sep 17, 2020 | 200034 | SequoyahDivision 1 | 573.4 CY | $560.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 221.9 CY | $819.15 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200280 | JacksonDivision 5 | 233.5 CY | $500.00 | SEWELL BROS., INC. |
| Sep 17, 2020 | 200034 | SequoyahDivision 1 | 573.4 CY | $550.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 221.9 CY | $819.15 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200281 | KiowaDivision 5 | 75.6 CY | $700.00 | SEWELL BROS., INC. |
| Sep 17, 2020 | 200293 | Hughes, Mcclain, Pontotoc, Seminole | 0.9 CY | $5,000.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Sep 17, 2020 | 200284 | MajorDivision 6 | 106.9 CY | $650.00 | BRIDGECO CONTRACTORS, INC. |
| Sep 17, 2020 | 200278 | DeweyDivision 5 | 69.4 CY | $614.00 | HASKELL LEMON CONSTRUCTION CO. |
| Sep 17, 2020 | 200289 | OklahomaDivision 4 | 5 CY | $1,000.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Sep 17, 2020 | 200279 | GradyDivision 7 | 1,582.4 CY | $575.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200290 | OsageDivision 8 | 793.5 CY | $450.00 | BRIDGECO CONTRACTORS, INC. |
| Sep 17, 2020 | 200279 | GradyDivision 7 | 1,582 CY | $575.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 585.2 CY | $785.42 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 187.31 CY | $450.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200262 | BeckhamDivision 5 | 70.6 CY | $625.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 380.5 CY | $785.42 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 203.58 CY | $450.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200264 | Leflore | 158.6 CY | $650.00 | HUB Construction, Inc. |
| Aug 20, 2020 | 200239 | WoodsDivision 6 | 120.4 CY | $685.00 | K & R BUILDERS, INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 448.3 CY | $785.42 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200225 | GradyDivision 7 | 144.2 CY | $600.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 258.4 CY | $450.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200265 | LoganDivision 4 | 1,000.6 CY | $324.16 | Wyatt Contracting |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 35.43 CY | $450.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200225 | GradyDivision 7 | 372.95 CY | $500.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 632.8 CY | $785.42 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 123.73 CY | $450.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 588 CY | $785.42 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 57.88 CY | $450.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200230 | LoveDivision 7 | 220 CY | $450.00 | HUB Construction, Inc. |
| Jul 23, 2020 | 200249 | CusterDivision 5 | 268 CY | $800.00 | SEWELL BROS., INC. |
| Jul 23, 2020 | 200250 | GarvinDivision 3 | 648.3 CY | $648.76 | Frontier Bridge, Inc. |
| Jul 23, 2020 | 200061 | DeweyDivision 5 | 2,403.8 CY | $362.86 | J & R SAND COMPANY, INC. |
| Jul 23, 2020 | 200108 | Love, Marshall | 385.9 CY | $800.00 | OVERLAND CORPORATION |
| Jul 23, 2020 | 200251 | HarmonDivision 5 | 99 CY | $676.59 | Frontier Bridge, Inc. |
| Jul 23, 2020 | 200244 | CaddoDivision 7 | 230 CY | $762.70 | Frontier Bridge, Inc. |
| Jul 23, 2020 | 200260 | AtokaDivision 2 | 626 CY | $450.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200248 | Cotton | 168 CY | $550.00 | SEWELL BROS., INC. |
| Jul 23, 2020 | 200260 | AtokaDivision 2 | 479 CY | $450.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200249 | CusterDivision 5 | 217 CY | $800.00 | SEWELL BROS., INC. |
| Jun 18, 2020 | 200221 | AtokaDivision 2 | 43.6 CY | $1,500.00 | HUB Construction, Inc. |
| Jun 18, 2020 | 200237 | StephensDivision 7 | 85.5 CY | $600.00 | SEWELL BROS., INC. |
| Jun 18, 2020 | 200231 | MarshallDivision 2 | 6 CY | $2,200.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 1,029.9 CY | $589.17 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200232 | Ssp-249c(052)ss | 160 CY | $1,500.00 | OCCI, INC. |
| Jun 18, 2020 | 200232 | Ssp-249c(052)ss | 12.3 CY | $1,600.00 | OCCI, INC. |
| Jun 18, 2020 | 200232 | Ssp-249c(052)ss | 11.2 CY | $1,829.90 | OCCI, INC. |