| 10 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$38,325.00 |
$40,000.00 |
| 20 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 4,862 | CY |
$10.00 |
$12.60 |
$15.00 |
| 30 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,485 | CY |
$15.00 |
$14.70 |
$15.00 |
| 40 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$5,250.00 |
$25,000.00 |
| 50 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$3.50 |
$2.10 |
$4.00 |
| 60 | 221(F) 0100 |
TEMPORARY SILT DIKE | 168 | LF |
$15.00 |
$15.75 |
$15.00 |
| 70 | 230(A) 2806 |
SOLID SLAB SODDING | 11,165 | SY |
$4.00 |
$3.15 |
$4.50 |
| 80 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.3 | AC |
$2,000.00 |
$1,155.00 |
$200.00 |
| 90 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,114 | CY |
$65.00 |
$49.61 |
$58.00 |
| 100 | 307(K) 4300 |
STABILIZED SUBGRADE | 5,391 | SY |
$7.00 |
$15.75 |
$8.00 |
| 110 | 325 5271 |
SEPARATOR FABRIC | 5,699 | SY |
$2.50 |
$6.50 |
$4.00 |
| 120 | 326(B) 0100 |
GEOGRID REINFORCEMENT | 809 | SY |
$5.00 |
$5.96 |
$6.00 |
| 130 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 704 | TON |
$25.00 |
$33.60 |
$45.00 |
| 140 | 407(B) 0250 |
TACK COAT | 1,951 | GAL |
$4.00 |
$2.21 |
$3.00 |
| 150 | 408 5774 |
PRIME COAT | 3,935 | GAL |
$4.00 |
$2.31 |
$3.00 |
| 160 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,888 | TON |
$85.00 |
$101.07 |
$105.00 |
| 170 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 914 | TON |
$95.00 |
$117.23 |
$120.00 |
| 180 | 509(D) 0325 |
CLASS C CONCRETE | 78 | CY |
$400.00 |
$360.15 |
$600.00 |
| 190 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 50 | LF |
$50.00 |
$58.80 |
$70.00 |
| 200 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 44 | LF |
$45.00 |
$70.35 |
$55.00 |
| 210 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 123 | LF |
$70.00 |
$89.25 |
$70.00 |
| 220 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$2,500.00 |
$1,995.00 |
$2,500.00 |
| 230 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 1 | EA |
$2,200.00 |
$2,520.00 |
$3,500.00 |
| 240 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$15,000.00 |
$7,875.00 |
$12,000.00 |
| 250 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 6,188 | SY |
$3.00 |
$6.77 |
$5.00 |
| 260 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 615 | LF |
$5.00 |
$3.15 |
$5.00 |
| 270 | 619(C) 0924 |
SAWING PAVEMENT | 80 | LF |
$5.00 |
$12.60 |
$15.00 |
| 280 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 1,287 | LF |
$6.50 |
$6.56 |
$8.00 |
| 290 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 107 | LF |
$7.50 |
$7.88 |
$15.00 |
| 300 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,266 | CY |
$10.00 |
$12.60 |
$30.00 |
| 310 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 480 | CY |
$22.00 |
$36.75 |
$24.00 |
| 320 | 509(A) 1326 |
CLASS AA CONCRETE | 551.4 | CY |
$650.00 |
$673.10 |
$600.00 |
| 330 | 511 6306 |
MECHANICAL SPLICES | 224 | EA |
$45.00 |
$46.31 |
$35.00 |
| 340 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 104,130 | LB |
$1.25 |
$1.54 |
$1.35 |
| 350 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$18,417.78 |
$20,000.00 |
| 360 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 14,400 | LF |
$0.2500 |
$0.2100 |
$0.2600 |
| 370 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 800 | LF |
$1.40 |
$1.05 |
$2.50 |
| 380 | 857(E) 8890 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 500 | EA |
$1.10 |
$2.10 |
$1.50 |
| 390 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 400 | LF |
$1.50 |
$0.5300 |
$7.25 |
| 400 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 240 | SD |
$8.00 |
$5.25 |
$5.00 |
| 410 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,755 | LF |
$25.00 |
$19.95 |
$15.00 |
| 420 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,225 | LF |
$4.50 |
$4.20 |
$2.00 |
| 430 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,240 | SD |
$0.7000 |
$0.5300 |
$0.2000 |
| 440 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,360 | SD |
$1.00 |
$0.7900 |
$0.2000 |
| 450 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,360 | SD |
$1.50 |
$2.10 |
$3.00 |
| 460 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 480 | SD |
$1.00 |
$1.05 |
$6.00 |
| 470 | 880(C) 8848 |
WING BARRICADES | 400 | SD |
$1.50 |
$0.1100 |
$0.0200 |
| 480 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 1,800 | SD |
$0.3000 |
$0.2600 |
$0.5000 |
| 490 | 880(F) 8878 |
DRUMS | 1,680 | SD |
$0.3000 |
$0.2600 |
$1.20 |
| 500 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 228 | SD |
$10.00 |
$13.13 |
$14.00 |
| 510 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | EA |
$40.00 |
$52.50 |
$600.00 |
| 520 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 4 | EA |
$220.00 |
$131.25 |
$500.00 |
| 530 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 6 | SF |
$22.00 |
$31.50 |
$100.00 |
| 540 | 851(C) 8324 |
2" SQUARE TUBE POST | 28 | LF |
$9.00 |
$14.70 |
$20.00 |
| 550 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 3,411 | LF |
$1.00 |
$1.45 |
$2.50 |
| 560 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$15,225.00 |
$20,000.00 |
| 570 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,625.00 |
$3,500.00 |
| 580 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$90,000.00 |
$98,712.00 |
$115,000.00 |