$2.46Avg low bid / LF
$2.77Avg of all bids
$3.14Avg engineer's estimate
272Jobs · 1,592,983.26 LF
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 41 | 426,365.42 | $2.02 | $2.48 |
| 2020 | 98 | 710,469.57 | $2.35 | $2.68 |
| 2019 | 76 | 314,262.93 | $3.01 | $2.99 |
| 2018 | 57 | 141,885.34 | $3.16 | $3.49 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Oct 14, 2021 | 210237 | OklahomaDivision 4 | 1,816 LF | $3.00 | SAC Services, Inc. |
| Sep 16, 2021 | 200324 | Osage, Pawnee | 177 LF | $10.00 | BECCO CONTRACTORS, INC. |
| Aug 19, 2021 | 210232 | GarfieldDivision 4 | 96 LF | $12.75 | THE CUMMINS CONSTRUCTION CO., INC. |
| Aug 19, 2021 | 210241 | SequoyahDivision 1 | 80 LF | $12.60 | Treas Construction Inc |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 19,182 LF | $4.50 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jul 15, 2021 | 210215 | OklahomaDivision 4 | 820 LF | $4.00 | K & R BUILDERS, INC. |
| Jul 15, 2021 | 210180 | MuskogeeDivision 1 | 45.06 LF | $10.00 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 210111 | LincolnDivision 3 | 23,778 LF | $1.90 | HASKELL LEMON CONSTRUCTION CO. |
| Jul 15, 2021 | 210211 | LoganDivision 4 | 539.36 LF | $5.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jun 17, 2021 | 210171 | DeweyDivision 5 | 1,207 LF | $5.16 | Frontier Bridge, Inc. |
| Jun 17, 2021 | 210185 | NowataDivision 8 | 68 LF | $11.19 | Frontier Bridge, Inc. |
| Jun 17, 2021 | 210190 | PushmatahaDivision 2 | 1,799 LF | $3.00 | L & N BRIDGE, LLC |
| May 20, 2021 | 210082 | McclainDivision 3 | 300 LF | $2.00 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210139 | McclainDivision 3 | 57,600 LF | $1.40 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 3,180 LF | $3.10 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210129 | BryanDivision 2 | 40,643 LF | $1.25 | L & N BRIDGE, LLC |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 31,640 LF | $2.05 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210130 | BryanDivision 2 | 88 LF | $15.00 | OVERLAND CORPORATION |
| May 20, 2021 | 210148 | PayneDivision 4 | 3,416 LF | $4.00 | BECCO CONTRACTORS, INC. |
| May 20, 2021 | 210133 | EllisDivision 6 | 27,529 LF | $1.85 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210138 | Leflore | 44 LF | $12.00 | JOB CONSTRUCTION CO., INC. |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 312 LF | $5.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 10,110 LF | $2.50 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210100 | CanadianDivision 4 | 200 LF | $5.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210114 | NobleDivision 4 | 75 LF | $1.85 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 700 LF | $2.66 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 200030 | RogersDivision 8 | 48 LF | $10.00 | CONCRETE SERVICES CORPORATION |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 10,859 LF | $2.50 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210073 | CanadianDivision 4 | 1,000 LF | $1.25 | HASKELL LEMON CONSTRUCTION CO. |
| Mar 18, 2021 | 210077 | GarvinDivision 3 | 8,091 LF | $1.93 | IHC Scott, INC. |
| Mar 18, 2021 | 210060 | OttawaDivision 8 | 1,688 LF | $7.35 | Treas Construction Inc |
| Feb 18, 2021 | 210062 | Pontotoc | 16,930 LF | $2.60 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210067 | RogersDivision 8 | 19,578 LF | $2.50 | C3 Construction, Inc. |
| Feb 18, 2021 | 210055 | MurrayDivision 7 | 3,286 LF | $3.50 | HUB Construction, Inc. |
| Feb 18, 2021 | 210057 | NobleDivision 4 | 200 LF | $1.00 | HASKELL LEMON CONSTRUCTION CO. |
| Jan 21, 2021 | 210025 | KingfisherDivision 4 | 69,046 LF | $0.9300 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210030 | McclainDivision 3 | 2,540 LF | $1.41 | IHC Scott, INC. |
| Jan 21, 2021 | 210031 | OklahomaDivision 4 | 5,799 LF | $3.50 | SCHWARZ PAVING CO., INC. |
| Jan 21, 2021 | 210003 | WashingtonDivision 8 | 212 LF | $6.70 | Tri Star Construction Arkansas, LLC |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 586 LF | $5.50 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210018 | HarperDivision 6 | 48,835 LF | $1.95 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210024 | KayDivision 4 | 10,000 LF | $4.00 | Evans & Associates Construction Co., Inc. |
| Jan 21, 2021 | 200282 | KiowaDivision 5 | 2,223 LF | $4.72 | TOM HUDSON PAVING, INC. |
| Nov 19, 2020 | 200350 | GradyDivision 7 | 803 LF | $3.00 | RUDY CONSTRUCTION CO. |
| Nov 19, 2020 | 200352 | Leflore | 1,300 LF | $4.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Nov 19, 2020 | 200337 | AtokaDivision 2 | 303 LF | $9.00 | Built Right Construction, LLC |
| Nov 19, 2020 | 200357 | SequoyahDivision 1 | 66 LF | $11.00 | APAC-CENTRAL, INC. |
| Nov 19, 2020 | 200345 | ClevelandDivision 3 | 829 LF | $3.00 | SAC Services, Inc. |
| Nov 19, 2020 | 200349 | GarvinDivision 3 | 2,957 LF | $5.00 | Treas Construction Inc |
| Oct 15, 2020 | 200329 | StephensDivision 7 | 671 LF | $12.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200322 | OsageDivision 8 | 2,412 LF | $8.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200199 | LoganDivision 4 | 3,356 LF | $2.40 | C-P INTEGRATED SERVICES, INC. |
| Oct 15, 2020 | 200306 | CanadianDivision 4 | 850 LF | $4.12 | Frontier Bridge, Inc. |
| Oct 15, 2020 | 200333 | TulsaDivision 8 | 940 LF | $7.00 | ACTION SAFETY SUPPLY CO., LLC |
| Oct 15, 2020 | 200323 | OsageDivision 8 | 80 LF | $14.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200309 | GarfieldDivision 4 | 120 LF | $12.75 | THE CUMMINS CONSTRUCTION CO., INC. |
| Oct 15, 2020 | 200315 | MajorDivision 6 | 167.5 LF | $10.60 | THE CUMMINS CONSTRUCTION CO., INC. |
| Oct 15, 2020 | 200077 | PottawatomieDivision 3 | 576 LF | $3.75 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200326 | PushmatahaDivision 2 | 3,100 LF | $4.00 | L & N BRIDGE, LLC |
| Oct 15, 2020 | 200317 | MccurtainDivision 2 | 48 LF | $8.00 | HUB Construction, Inc. |
| Oct 15, 2020 | 200328 | SeminoleDivision 3 | 4,719 LF | $3.00 | SAC Services, Inc. |
| Oct 15, 2020 | 200320 | OklahomaDivision 4 | 689 LF | $3.00 | SAC Services, Inc. |
| Oct 15, 2020 | 200297 | WoodsDivision 6 | 425 LF | $6.44 | HASKELL LEMON CONSTRUCTION CO. |
| Sep 17, 2020 | 200287 | OklahomaDivision 4 | 277 LF | $6.00 | Cowboy Contracting, Inc. |
| Sep 17, 2020 | 200290 | OsageDivision 8 | 48 LF | $10.00 | BRIDGECO CONTRACTORS, INC. |
| Sep 17, 2020 | 200200 | McintoshDivision 1 | 69,046 LF | $2.50 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 11,159 LF | $4.27 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200292 | PottawatomieDivision 3 | 16,455 LF | $2.05 | Silver Star Construction Company, Inc. |
| Sep 17, 2020 | 200279 | GradyDivision 7 | 1,277 LF | $3.50 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200294 | SequoyahDivision 1 | 875 LF | $3.00 | Rosscon, LLC |
| Sep 17, 2020 | 200034 | SequoyahDivision 1 | 4,654 LF | $3.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Aug 20, 2020 | 200239 | WoodsDivision 6 | 44 LF | $9.00 | K & R BUILDERS, INC. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 388.65 LF | $5.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200230 | LoveDivision 7 | 48 LF | $10.00 | HUB Construction, Inc. |
| Aug 20, 2020 | 200163 | OkfuskeeDivision 3 | 2,236 LF | $8.30 | HASKELL LEMON CONSTRUCTION CO. |
| Aug 20, 2020 | 200150 | EllisDivision 6 | 148 LF | $2.00 | J & R SAND COMPANY, INC. |
| Jul 23, 2020 | 200250 | GarvinDivision 3 | 922 LF | $3.12 | Frontier Bridge, Inc. |
| Jul 23, 2020 | 200108 | Love, Marshall | 4,544 LF | $3.00 | OVERLAND CORPORATION |
| Jul 23, 2020 | 200260 | AtokaDivision 2 | 18,860 LF | $3.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200261 | Pontotoc | 49,937 LF | $1.55 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200244 | CaddoDivision 7 | 50 LF | $3.15 | Frontier Bridge, Inc. |
| Jul 23, 2020 | 200247 | ClevelandDivision 3 | 253 LF | $5.00 | CGC, LLC. |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 6,637 LF | $5.32 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200229 | LincolnDivision 3 | 204 LF | $4.00 | L & N BRIDGE, LLC |
| Jun 18, 2020 | 200232 | Ssp-249c(052)ss | 541 LF | $4.00 | OCCI, INC. |
| Jun 18, 2020 | 200233 | OklahomaDivision 4 | 81 LF | $5.00 | RUDY CONSTRUCTION CO. |
| Jun 18, 2020 | 200221 | AtokaDivision 2 | 1,236 LF | $3.89 | HUB Construction, Inc. |
| Jun 18, 2020 | 200235 | OklahomaDivision 4 | 20 LF | $35.00 | K & R BUILDERS, INC. |
| May 14, 2020 | 200022 | OttawaDivision 8 | 11,198 LF | $3.00 | APAC-CENTRAL, INC. |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 971 LF | $5.20 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200191 | ChoctawDivision 2 | 44 LF | $5.00 | Rosscon, LLC |
| May 14, 2020 | 200207 | PittsburgDivision 2 | 44 LF | $11.00 | APAC-CENTRAL, INC. |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 3,495 LF | $3.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200193 | EllisDivision 6 | 102 LF | $2.00 | J & R SAND COMPANY, INC. |
| May 14, 2020 | 200194 | GarfieldDivision 4 | 49 LF | $11.00 | HASKELL LEMON CONSTRUCTION CO. |
| May 14, 2020 | 200198 | KiowaDivision 5 | 52 LF | $14.49 | TOM HUDSON PAVING, INC. |
| May 14, 2020 | 200126 | TulsaDivision 8 | 1,953 LF | $4.90 | SHERWOOD CONSTRUCTION CO., INC. |
| Apr 16, 2020 | 200152 | HaskellDivision 1 | 862 LF | $9.99 | C-GAWF CONSTRUCTION, INC. |
| Apr 16, 2020 | 190163 | SequoyahDivision 1 | 817 LF | $12.00 | BRIDGECO CONTRACTORS, INC. |
| Apr 16, 2020 | 200008 | CreekDivision 8 | 192 LF | $6.00 | LOGOS CONSTRUCTION CO., LLC |
| Apr 16, 2020 | 200157 | MarshallDivision 2 | 55,300 LF | $1.20 | OVERLAND CORPORATION |
| Apr 16, 2020 | 200145 | ClevelandDivision 3 | 30 LF | $7.00 | SAC Services, Inc. |
| Apr 16, 2020 | 200162 | NobleDivision 4 | 5,000 LF | $6.00 | Evans & Associates Construction Co., Inc. |
| Apr 16, 2020 | 200146 | CreekDivision 8 | 1,086 LF | $5.00 | CONCRETE SERVICES CORPORATION |
| Apr 16, 2020 | 200075 | OklahomaDivision 4 | 999 LF | $5.00 | SAC Services, Inc. |
| Apr 16, 2020 | 200148 | DelawareDivision 8 | 1,110 LF | $5.55 | C-GAWF CONSTRUCTION, INC. |
| Apr 16, 2020 | 200216 | BlaineDivision 5 | 347 LF | $10.00 | K & R BUILDERS, INC. |
| Apr 16, 2020 | 200165 | OklahomaDivision 4 | 964 LF | $3.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Apr 16, 2020 | 200079 | SeminoleDivision 3 | 8,850 LF | $3.70 | THE CUMMINS CONSTRUCTION CO., INC. |
| Apr 16, 2020 | 200175 | WagonerDivision 1 | 2,591 LF | $2.65 | APAC-CENTRAL, INC. |
| Mar 19, 2020 | 200133 | HaskellDivision 1 | 800 LF | $5.06 | C3 Construction, Inc. |
| Mar 19, 2020 | 200109 | MajorDivision 6 | 44 LF | $8.50 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Mar 19, 2020 | 200110 | McintoshDivision 1 | 36,152 LF | $1.10 | Robinson Construction, LLC |
| Mar 19, 2020 | 200032 | SeminoleDivision 3 | 118 LF | $5.00 | RRY SERVICES LLC |
| Mar 19, 2020 | 200125 | Jackson, Tillman | 2,794 LF | $10.00 | BRIDGECO CONTRACTORS, INC. |
| Mar 19, 2020 | 190198 | KayDivision 4 | 2,125 LF | $6.00 | Evans & Associates Construction Co., Inc. |
| Mar 19, 2020 | 200103 | Sbr-020n(047)sb | 1,006 LF | $3.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Feb 20, 2020 | 200083 | Stp-270c(037)ci | 148 LF | $4.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200062 | EllisDivision 6 | 45,758 LF | $2.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200050 | BeckhamDivision 5 | 950 LF | $6.58 | Frontier Bridge, Inc. |
| Feb 20, 2020 | 200183 | Stp-170c(127)pm | 120 LF | $4.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200083 | Stp-270c(037)ci | 50 LF | $4.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200067 | KayDivision 4 | 20,000 LF | $5.51 | Evans & Associates Construction Co., Inc. |
| Feb 20, 2020 | 200050 | BeckhamDivision 5 | 1,277 LF | $3.34 | Frontier Bridge, Inc. |
| Feb 20, 2020 | 200086 | TulsaDivision 8 | 22,408.42 LF | $3.00 | Ellsworth Construction, LLC |
| Feb 20, 2020 | 200050 | BeckhamDivision 5 | 1,585 LF | $4.42 | Frontier Bridge, Inc. |
| Feb 20, 2020 | 200089 | CimarronDivision 6 | 150 LF | $3.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200057 | ClevelandDivision 3 | 170 LF | $4.20 | Silver Star Construction Company, Inc. |
| Feb 20, 2020 | 190350 | Stp-224b(059)ss | 70,990 LF | $0.5000 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Feb 20, 2020 | 190255 | Pontotoc | 80 LF | $14.00 | BRIDGECO CONTRACTORS, INC. |
| Feb 20, 2020 | 200058 | CoalDivision 3 | 181 LF | $10.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Feb 20, 2020 | 190350 | Stp-224b(059)ss | 42,730 LF | $0.5000 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Feb 20, 2020 | 200047 | AtokaDivision 2 | 337 LF | $3.51 | C3 Construction, Inc. |
| Jan 16, 2020 | 200036 | TulsaDivision 8 | 1,010 LF | $5.00 | PBX Corporation |
| Jan 16, 2020 | 200044 | Stp-257b(038)pm | 3,462 LF | $3.95 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 190317 | KayDivision 4 | 180 LF | $14.00 | BRIDGECO CONTRACTORS, INC. |
| Jan 16, 2020 | 200023 | OttawaDivision 8 | 9,388 LF | $3.00 | APAC-CENTRAL, INC. |
| Jan 16, 2020 | 190356 | KayDivision 4 | 37,159 LF | $1.95 | Evans & Associates Construction Co., Inc. |
| Jan 16, 2020 | 200044 | Stp-257b(038)pm | 4,092 LF | $6.58 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200015 | Ssr-242b(074)sr | 1,050 LF | $8.80 | HASKELL LEMON CONSTRUCTION CO. |
| Jan 16, 2020 | 200045 | JohnstonDivision 3 | 21,197 LF | $2.43 | C3 Construction, Inc. |
| Jan 16, 2020 | 200017 | MccurtainDivision 2 | 6,050 LF | $4.15 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200001 | AlfalfaDivision 6 | 16,080 LF | $5.90 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200092 | TulsaDivision 8 | 2,050 LF | $2.65 | APAC-CENTRAL, INC. |
| Jan 16, 2020 | 200046 | McclainDivision 3 | 44,153 LF | $0.7900 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200020 | NobleDivision 4 | 100 LF | $6.00 | Evans & Associates Construction Co., Inc. |
| Jan 16, 2020 | 190370 | PittsburgDivision 2 | 3,813 LF | $2.09 | DUIT CONSTRUCTION COMPANY, INC. |
| Jan 16, 2020 | 200001 | AlfalfaDivision 6 | 304 LF | $11.50 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 14, 2019 | 190373 | Sbr-264b(066)sb | 1,125 LF | $1.50 | L & N BRIDGE, LLC |
| Nov 14, 2019 | 190351 | GarfieldDivision 4 | 304 LF | $6.00 | LOGOS CONSTRUCTION CO., LLC |