| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$18,000.00 |
$15,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 13,674 | CY |
$8.40 |
$7.70 |
$7.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 10,391 | CY |
$10.00 |
$8.80 |
$9.25 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$38,176.00 |
$20,000.00 |
| 5 | 210 0121 |
OBLITERATING ABANDONED ROAD | 1,000 | LF |
$5.00 |
$25.00 |
$6.25 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,900 | LF |
$2.10 |
$3.29 |
$3.30 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 560 | LF |
$9.40 |
$19.80 |
$19.80 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 48,314 | SY |
$1.80 |
$3.25 |
$3.55 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 9.97 | AC |
$560.50 |
$2,150.00 |
$1,950.00 |
| 10 | 307(A) 4200 |
FLY ASH | 1,012 | TON |
$90.00 |
$102.82 |
$107.00 |
| 11 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 20,053 | SY |
$2.60 |
$3.78 |
$4.00 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 319 | TON |
$50.00 |
$38.74 |
$38.00 |
| 13 | 407(B) 0250 |
TACK COAT | 1,800 | GAL |
$3.30 |
$4.55 |
$4.67 |
| 14 | 408 5774 |
PRIME COAT | 6,720 | GAL |
$3.40 |
$4.80 |
$4.95 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 6,267 | TON |
$78.00 |
$96.72 |
$104.95 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,043 | TON |
$88.30 |
$118.72 |
$126.80 |
| 17 | 509(A) 0319 |
CLASS AA CONCRETE | 93.4 | CY |
$550.00 |
$545.00 |
$675.00 |
| 18 | 509(B) 0321 |
CLASS A CONCRETE | 64.56 | CY |
$550.00 |
$435.00 |
$712.50 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$352.60 |
$325.00 |
$350.00 |
| 20 | 511(A) 0332 |
REINFORCING STEEL | 11,238 | LB |
$1.15 |
$1.12 |
$1.15 |
| 21 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 1,630 | TON |
$45.00 |
$44.50 |
$44.30 |
| 22 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 545 | TON |
$41.30 |
$40.00 |
$36.00 |
| 23 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 72 | LF |
$100.50 |
$92.50 |
$115.00 |
| 24 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 64 | LF |
$112.90 |
$110.80 |
$145.00 |
| 25 | 613(A) 4497 |
36" X 22" R.C.PIPE ARCH CLASS A-III | 48 | LF |
$113.90 |
$115.68 |
$140.00 |
| 26 | 613(A) 4500 |
58" X 36" R.C.PIPE ARCH CLASS A-III | 112 | LF |
$210.00 |
$218.16 |
$227.00 |
| 27 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 190 | LF |
$80.50 |
$97.07 |
$58.00 |
| 28 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 202 | LF |
$32.40 |
$28.44 |
$30.00 |
| 29 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 60 | LF |
$43.70 |
$40.50 |
$42.00 |
| 30 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$18,500.00 |
$14,500.00 |
$18,500.00 |
| 31 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 6,688 | SY |
$5.00 |
$6.75 |
$6.75 |
| 32 | 619(C) 0924 |
SAWING PAVEMENT | 180 | LF |
$4.80 |
$14.00 |
$8.00 |
| 33 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 4 | EA |
$129.30 |
$150.00 |
$170.00 |
| 34 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$22.50 |
$14.00 |
$12.25 |
| 35 | 501(G) 6309 |
CLSM BACKFILL | 72 | CY |
$222.60 |
$207.89 |
$177.50 |
| 36 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 357 | LF |
$220.00 |
$209.89 |
$215.00 |
| 37 | 504(B) 1305 |
SAW-CUT GROOVING | 294 | SY |
$8.10 |
$8.25 |
$7.92 |
| 38 | 504(C) 6250 |
SEALED EXPANSION JOINT | 58.34 | LF |
$251.60 |
$294.99 |
$330.00 |
| 39 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 296 | LF |
$81.40 |
$82.00 |
$84.50 |
| 40 | 506(A) 1322 |
STRUCTURAL STEEL | 840 | LB |
$2.90 |
$3.10 |
$3.00 |
| 41 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 9 | EA |
$536.90 |
$826.80 |
$860.00 |
| 42 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 9 | EA |
$863.40 |
$826.80 |
$860.00 |
| 43 | 509(A) 1326 |
CLASS AA CONCRETE | 96.4 | CY |
$700.00 |
$675.00 |
$707.50 |
| 44 | 509(B) 1328 |
CLASS A CONCRETE | 90 | CY |
$714.50 |
$700.00 |
$717.50 |
| 45 | 511(A) 1332 |
REINFORCING STEEL | 38,070 | LB |
$1.00 |
$1.10 |
$1.02 |
| 46 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 228 | LF |
$30.30 |
$29.75 |
$33.60 |
| 47 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 520 | LF |
$39.60 |
$32.26 |
$37.10 |
| 48 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 228 | LF |
$21.90 |
$16.00 |
$14.40 |
| 49 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 520 | LF |
$16.80 |
$14.00 |
$15.90 |
| 50 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 51 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 180 | LF |
$600.00 |
$769.23 |
$600.00 |
| 52 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,120 | TON |
$47.60 |
$44.50 |
$44.00 |
| 53 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 374 | TON |
$39.20 |
$41.00 |
$36.00 |
| 54 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$23.60 |
$30.00 |
$38.00 |
| 55 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$18.80 |
$30.00 |
$35.00 |
| 56 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$8,000.00 |
$32,500.00 |
$11,000.00 |
| 57 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$16.70 |
$24.64 |
$24.20 |
| 58 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,844.10 |
$1,650.00 |
$1,375.00 |
| 59 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,254.50 |
$2,950.00 |
$2,860.00 |
| 60 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 116 | CY |
$28.30 |
$30.00 |
$14.00 |
| 61 | 509(A) 1326 |
CLASS AA CONCRETE | 325.2 | CY |
$578.10 |
$525.00 |
$625.00 |
| 62 | 511(A) 1332 |
REINFORCING STEEL | 51,878 | LB |
$1.00 |
$1.08 |
$1.02 |
| 63 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 84 | TON |
$47.60 |
$44.50 |
$49.00 |
| 64 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 28 | TON |
$39.20 |
$41.00 |
$41.00 |
| 65 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$8,000.00 |
$32,500.00 |
$9,000.00 |
| 66 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 21.79 | SF |
$25.50 |
$56.00 |
$55.00 |
| 67 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 27,764 | LF |
$0.5000 |
$0.4900 |
$0.4900 |
| 68 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$8,000.00 |
$8,500.00 |
$11,000.00 |
| 69 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$23,716.00 |
$25,000.00 |
| 70 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$4,500.00 |
$13,500.00 |
| 71 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$135,000.00 |
$158,400.00 |
$143,000.00 |