$1.84Avg low bid / LB
$2.02Avg of all bids
$2.02Avg engineer's estimate
266Jobs · 38,319,130.5 LB
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 34 | 5,999,460 | $2.00 | $2.59 |
| 2020 | 75 | 8,433,635.6 | $1.83 | $1.83 |
| 2019 | 61 | 7,922,290.3 | $1.88 | $2.05 |
| 2018 | 78 | 15,816,393.8 | $1.75 | $1.84 |
| 2017 | 18 | 147,350.8 | $3.80 | $3.35 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Nov 18, 2021 | 210347 | DelawareDivision 8 | 3,170 LB | $5.55 | C-GAWF CONSTRUCTION, INC. |
| Sep 16, 2021 | 210251 | Cirb-230c(045)rb | 9,420 LB | $6.60 | K & R BUILDERS, INC. |
| Sep 16, 2021 | 200324 | Osage, Pawnee | 5,760 LB | $5.00 | BECCO CONTRACTORS, INC. |
| Sep 16, 2021 | 210251 | Cirb-230c(045)rb | 9,420 LB | $6.60 | K & R BUILDERS, INC. |
| Sep 16, 2021 | 210267 | PayneDivision 4 | 510 LB | $10.00 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 210180 | MuskogeeDivision 1 | 1,590 LB | $1.00 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 210200 | BeckhamDivision 5 | 660 LB | $4.50 | SEWELL BROS., INC. |
| Jul 15, 2021 | 190363 | LoveDivision 7 | 1,754,010 LB | $2.00 | C3 Construction, Inc. |
| Jul 15, 2021 | 210201 | BlaineDivision 5 | 590 LB | $4.25 | SEWELL BROS., INC. |
| Jul 15, 2021 | 190363 | LoveDivision 7 | 1,754,010 LB | $2.00 | C3 Construction, Inc. |
| Jul 15, 2021 | 210209 | KayDivision 4 | 6,010 LB | $1.00 | H & H BRIDGE COMPANY |
| Jun 17, 2021 | 210176 | Leflore, Mccurtain | 9,600 LB | $5.00 | HUB Construction, Inc. |
| Jun 17, 2021 | 210185 | NowataDivision 8 | 1,396,200 LB | $1.92 | Frontier Bridge, Inc. |
| Jun 17, 2021 | 210171 | DeweyDivision 5 | 20,640 LB | $2.54 | Frontier Bridge, Inc. |
| May 20, 2021 | 210146 | OklahomaDivision 4 | 600 LB | $10.00 | Built Right Construction, LLC |
| May 20, 2021 | 210155 | PushmatahaDivision 2 | 3,150 LB | $11.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| May 20, 2021 | 210129 | BryanDivision 2 | 1,050 LB | $2.50 | L & N BRIDGE, LLC |
| May 20, 2021 | 210155 | PushmatahaDivision 2 | 3,150 LB | $11.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| May 20, 2021 | 210136 | HughesDivision 3 | 440 LB | $5.00 | C-GAWF CONSTRUCTION, INC. |
| May 20, 2021 | 210158 | TillmanDivision 5 | 1,420 LB | $3.50 | SEWELL BROS., INC. |
| May 20, 2021 | 210140 | McclainDivision 3 | 1,070 LB | $2.65 | Treas Construction Inc |
| May 20, 2021 | 200338 | BeckhamDivision 5 | 1,190 LB | $3.00 | OBC, INC. |
| May 20, 2021 | 210143 | MurrayDivision 7 | 540 LB | $5.50 | OVERLAND CORPORATION |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 1,000 LB | $14.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 1,000 LB | $14.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Mar 18, 2021 | 210078 | KayDivision 4 | 1,220 LB | $3.60 | RRY SERVICES LLC |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 12,420 LB | $7.53 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 200030 | RogersDivision 8 | 365,950 LB | $1.95 | CONCRETE SERVICES CORPORATION |
| Mar 18, 2021 | 210097 | KayDivision 4 | 257,090 LB | $1.72 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Mar 18, 2021 | 210097 | KayDivision 4 | 257,090 LB | $1.72 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Mar 18, 2021 | 210060 | OttawaDivision 8 | 640 LB | $3.35 | Treas Construction Inc |
| Feb 18, 2021 | 210070 | WoodwardDivision 6 | 2,250 LB | $2.95 | BRIDGECO CONTRACTORS, INC. |
| Feb 18, 2021 | 210046 | ComancheDivision 7 | 580 LB | $4.45 | K & R BUILDERS, INC. |
| Feb 18, 2021 | 210048 | CraigDivision 8 | 1,590 LB | $5.00 | CONCRETE SERVICES CORPORATION |
| Feb 18, 2021 | 190362 | LoveDivision 7 | 1,520 LB | $2.81 | C3 Construction, Inc. |
| Feb 18, 2021 | 210055 | MurrayDivision 7 | 1,500 LB | $2.13 | HUB Construction, Inc. |
| Jan 21, 2021 | 210016 | GradyDivision 7 | 105,350 LB | $1.57 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 210007 | BeckhamDivision 5 | 2,500 LB | $2.70 | C3 Construction, Inc. |
| Jan 21, 2021 | 210007 | BeckhamDivision 5 | 2,500 LB | $2.31 | C3 Construction, Inc. |
| Jan 21, 2021 | 210014 | GarfieldDivision 4 | 1,060 LB | $2.61 | K & R BUILDERS, INC. |
| Nov 19, 2020 | 200344 | CaddoDivision 7 | 410 LB | $3.85 | K & R BUILDERS, INC. |
| Nov 19, 2020 | 200348 | CusterDivision 5 | 6,860 LB | $1.74 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200156 | MajorDivision 6 | 6,850 LB | $5.80 | K & R BUILDERS, INC. |
| Nov 19, 2020 | 200352 | Leflore | 27,885.6 LB | $2.05 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Nov 19, 2020 | 200356 | SeminoleDivision 3 | 400 LB | $5.71 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200359 | MccurtainDivision 2 | 2,220 LB | $3.05 | Frontier Bridge, Inc. |
| Oct 15, 2020 | 200323 | OsageDivision 8 | 404,850 LB | $1.56 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200317 | MccurtainDivision 2 | 250 LB | $3.22 | HUB Construction, Inc. |
| Oct 15, 2020 | 200304 | BlaineDivision 5 | 380 LB | $3.00 | K & R BUILDERS, INC. |
| Oct 15, 2020 | 200317 | MccurtainDivision 2 | 570 LB | $3.18 | HUB Construction, Inc. |
| Oct 15, 2020 | 200306 | CanadianDivision 4 | 3,550 LB | $2.49 | Frontier Bridge, Inc. |
| Oct 15, 2020 | 200329 | StephensDivision 7 | 1,050 LB | $2.90 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200321 | OklahomaDivision 4 | 200 LB | $13.00 | Built Right Construction, LLC |
| Oct 15, 2020 | 200310 | GarfieldDivision 4 | 140 LB | $6.75 | HASKELL LEMON CONSTRUCTION CO. |
| Oct 15, 2020 | 200329 | StephensDivision 7 | 1,050 LB | $2.90 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200321 | OklahomaDivision 4 | 200 LB | $13.00 | Built Right Construction, LLC |
| Oct 15, 2020 | 200310 | GarfieldDivision 4 | 120 LB | $7.14 | HASKELL LEMON CONSTRUCTION CO. |
| Oct 15, 2020 | 200322 | OsageDivision 8 | 1,050 LB | $3.50 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200314 | KingfisherDivision 4 | 1,070 LB | $2.75 | K & R BUILDERS, INC. |
| Sep 17, 2020 | 200034 | SequoyahDivision 1 | 877,430 LB | $1.58 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 170,640 LB | $2.24 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200279 | GradyDivision 7 | 5,050 LB | $2.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200279 | GradyDivision 7 | 5,030 LB | $2.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200281 | KiowaDivision 5 | 350 LB | $4.00 | SEWELL BROS., INC. |
| Sep 17, 2020 | 200284 | MajorDivision 6 | 1,060 LB | $2.95 | BRIDGECO CONTRACTORS, INC. |
| Sep 17, 2020 | 200034 | SequoyahDivision 1 | 877,430 LB | $1.68 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 170,640 LB | $2.24 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200278 | DeweyDivision 5 | 350 LB | $4.75 | HASKELL LEMON CONSTRUCTION CO. |
| Aug 20, 2020 | 200264 | Leflore | 99,530 LB | $1.95 | HUB Construction, Inc. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 2,620 LB | $8.14 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200225 | GradyDivision 7 | 820 LB | $3.50 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 2,550 LB | $8.14 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 5,080 LB | $8.14 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200239 | WoodsDivision 6 | 840 LB | $2.50 | K & R BUILDERS, INC. |
| Aug 20, 2020 | 200262 | BeckhamDivision 5 | 380 LB | $3.00 | SEWELL BROS., INC. |
| Jul 23, 2020 | 200244 | CaddoDivision 7 | 2,000 LB | $13.15 | Frontier Bridge, Inc. |
| Jul 23, 2020 | 200249 | CusterDivision 5 | 5,700 LB | $6.85 | SEWELL BROS., INC. |
| Jul 23, 2020 | 200249 | CusterDivision 5 | 6,185 LB | $4.00 | SEWELL BROS., INC. |
| Jul 23, 2020 | 200252 | KayDivision 4 | 190 LB | $10.00 | CONCRETE SERVICES CORPORATION |
| Jul 23, 2020 | 200108 | Love, Marshall | 1,050 LB | $1.15 | OVERLAND CORPORATION |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 966,740 LB | $1.38 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200235 | OklahomaDivision 4 | 5,060 LB | $9.00 | K & R BUILDERS, INC. |
| Jun 18, 2020 | 200237 | StephensDivision 7 | 100 LB | $3.00 | SEWELL BROS., INC. |
| May 14, 2020 | 200190 | Cirb-210d(071)rb | 100 LB | $3.23 | Treas Construction Inc |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 939,630 LB | $1.80 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 5,470 LB | $2.15 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 190120 | Nhppi-4400-(039)pm | 5,000 LB | $10.11 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 190347 | DelawareDivision 8 | 1,220 LB | $3.00 | RRY SERVICES LLC |
| May 14, 2020 | 200192 | ComancheDivision 7 | 670 LB | $2.13 | Frontier Bridge, Inc. |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 3,610 LB | $2.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 190120 | Nhppi-4400-(039)pm | 2,400 LB | $20.66 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 200202 | MuskogeeDivision 1 | 1,220 LB | $2.70 | Treas Construction Inc |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 732,600 LB | $1.90 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 190120 | Nhppi-4400-(039)pm | 2,400 LB | $20.66 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 200212 | StephensDivision 7 | 510 LB | $3.00 | SEWELL BROS., INC. |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 748,140 LB | $1.90 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200214 | Stp-266d(065)ci | 280 LB | $3.25 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| May 14, 2020 | 190377 | WashingtonDivision 8 | 1,100 LB | $3.00 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| May 14, 2020 | 200126 | TulsaDivision 8 | 2,480 LB | $5.32 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 939,720 LB | $1.85 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 190120 | Nhppi-4400-(039)pm | 5,000 LB | $10.11 | SHERWOOD CONSTRUCTION CO., INC. |
| Apr 16, 2020 | 200155 | LincolnDivision 3 | 580 LB | $3.75 | BRIDGECO CONTRACTORS, INC. |
| Apr 16, 2020 | 200148 | DelawareDivision 8 | 18,220 LB | $1.95 | C-GAWF CONSTRUCTION, INC. |
| Apr 16, 2020 | 200149 | DelawareDivision 8 | 1,250 LB | $9.50 | K & R BUILDERS, INC. |
| Apr 16, 2020 | 200165 | OklahomaDivision 4 | 2,280 LB | $9.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Apr 16, 2020 | 200151 | GarfieldDivision 4 | 13,260 LB | $9.50 | BRIDGECO CONTRACTORS, INC. |
| Apr 16, 2020 | 200165 | OklahomaDivision 4 | 3,230 LB | $9.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Apr 16, 2020 | 190163 | SequoyahDivision 1 | 92,040 LB | $2.35 | BRIDGECO CONTRACTORS, INC. |
| Apr 16, 2020 | 200153 | Jefferson | 510 LB | $3.70 | K & R BUILDERS, INC. |
| Apr 16, 2020 | 200065 | HughesDivision 3 | 600 LB | $2.09 | Treas Construction Inc |
| Apr 16, 2020 | 200185 | OklahomaDivision 4 | 793,450 LB | $1.31 | Frontier Bridge, Inc. |
| Apr 16, 2020 | 200153 | Jefferson | 510 LB | $3.70 | K & R BUILDERS, INC. |
| Apr 16, 2020 | 200216 | BlaineDivision 5 | 1,260 LB | $6.00 | K & R BUILDERS, INC. |
| Apr 16, 2020 | 200138 | BeaverDivision 6 | 1,220 LB | $3.20 | K & R BUILDERS, INC. |
| Mar 19, 2020 | 200113 | OkfuskeeDivision 3 | 1,060 LB | $1.00 | H & H BRIDGE COMPANY |
| Mar 19, 2020 | 200123 | SequoyahDivision 1 | 149,630 LB | $1.93 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Mar 19, 2020 | 200101 | CusterDivision 5 | 67,280 LB | $2.10 | HASKELL LEMON CONSTRUCTION CO. |
| Mar 19, 2020 | 200125 | Jackson, Tillman | 5,280 LB | $2.90 | BRIDGECO CONTRACTORS, INC. |
| Mar 19, 2020 | 200102 | GrantDivision 4 | 1,060 LB | $1.00 | H & H BRIDGE COMPANY |
| Mar 19, 2020 | 200125 | Jackson, Tillman | 1,090 LB | $3.10 | BRIDGECO CONTRACTORS, INC. |
| Mar 19, 2020 | 200103 | Sbr-020n(047)sb | 7,027 LB | $5.57 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Mar 19, 2020 | 200032 | SeminoleDivision 3 | 580 LB | $3.00 | RRY SERVICES LLC |
| Feb 20, 2020 | 200090 | CoalDivision 3 | 510 LB | $5.00 | Built Right Construction, LLC |
| Feb 20, 2020 | 200050 | BeckhamDivision 5 | 139,130 LB | $2.04 | Frontier Bridge, Inc. |
| Feb 20, 2020 | 190255 | Pontotoc | 150 LB | $4.10 | BRIDGECO CONTRACTORS, INC. |
| Feb 20, 2020 | 200069 | LincolnDivision 3 | 580 LB | $4.15 | Cowboy Contracting, Inc. |
| Jan 16, 2020 | 200004 | BlaineDivision 5 | 14,328 LB | $4.70 | K & R BUILDERS, INC. |
| Jan 16, 2020 | 200044 | Stp-257b(038)pm | 3,740 LB | $5.41 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200035 | TillmanDivision 5 | 1,350 LB | $3.00 | K & R BUILDERS, INC. |
| Jan 16, 2020 | 200018 | McintoshDivision 1 | 1,100 LB | $2.50 | L & N BRIDGE, LLC |
| Jan 16, 2020 | 190352 | GarvinDivision 3 | 5,000 LB | $5.25 | Silver Star Construction Company, Inc. |
| Jan 16, 2020 | 200044 | Stp-257b(038)pm | 4,680 LB | $5.41 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 190317 | KayDivision 4 | 840 LB | $3.10 | BRIDGECO CONTRACTORS, INC. |
| Jan 16, 2020 | 200035 | TillmanDivision 5 | 1,350 LB | $3.00 | K & R BUILDERS, INC. |
| Jan 16, 2020 | 190207 | CarterDivision 7 | 330 LB | $3.00 | K & R BUILDERS, INC. |
| Jan 16, 2020 | 190352 | GarvinDivision 3 | 5,000 LB | $5.10 | Silver Star Construction Company, Inc. |
| Jan 16, 2020 | 200036 | TulsaDivision 8 | 10,000 LB | $15.00 | PBX Corporation |
| Jan 16, 2020 | 200036 | TulsaDivision 8 | 2,100 LB | $10.00 | PBX Corporation |
| Jan 16, 2020 | 200003 | BlaineDivision 5 | 18,540 LB | $4.56 | K & R BUILDERS, INC. |
| Jan 16, 2020 | 200039 | WoodsDivision 6 | 6,010 LB | $5.10 | RRY SERVICES LLC |
| Nov 14, 2019 | 190373 | Sbr-264b(066)sb | 39,750 LB | $1.80 | L & N BRIDGE, LLC |
| Nov 14, 2019 | 190386 | CoalDivision 3 | 1,070 LB | $3.15 | BRIDGECO CONTRACTORS, INC. |
| Nov 14, 2019 | 190355 | JacksonDivision 5 | 660 LB | $4.00 | SEWELL BROS., INC. |
| Nov 14, 2019 | 190379 | Nhpp-017n(256)pm | 568 LB | $5.15 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 14, 2019 | 190373 | Sbr-264b(066)sb | 51,747 LB | $1.80 | L & N BRIDGE, LLC |
| Nov 14, 2019 | 190387 | LincolnDivision 3 | 510 LB | $4.10 | BRIDGECO CONTRACTORS, INC. |
| Nov 14, 2019 | 190361 | KiowaDivision 5 | 660 LB | $4.00 | SEWELL BROS., INC. |
| Nov 14, 2019 | 190379 | Nhpp-017n(256)pm | 2,665 LB | $2.15 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 14, 2019 | 190375 | StephensDivision 7 | 462 LB | $2.46 | Treas Construction Inc |
| Nov 14, 2019 | 190392 | PayneDivision 4 | 330 LB | $16.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |