| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$6,250.00 |
$50,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 794 | CY |
$8.00 |
$14.00 |
$10.38 |
$20.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 981 | CY |
$15.35 |
$16.00 |
$14.00 |
$30.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$6,000.00 |
$6,500.00 |
$5,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 892 | LF |
$2.00 |
$4.00 |
$4.28 |
$3.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 42 | LF |
$10.00 |
$30.00 |
$31.78 |
$8.00 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 27 | CY |
$150.00 |
$160.00 |
$165.00 |
$150.00 |
| 8 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 18 | CY |
$100.00 |
$160.00 |
$110.00 |
$105.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 4,840 | SY |
$2.50 |
$4.00 |
$4.67 |
$5.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.63 | AC |
$300.00 |
$1,000.00 |
$2,750.00 |
$4,675.00 |
| 11 | 241 2832 |
MOWING | 1.26 | AC |
$100.00 |
$200.00 |
$275.00 |
$650.00 |
| 12 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 443 | CY |
$55.00 |
$75.00 |
$74.50 |
$50.00 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 177 | TON |
$45.00 |
$45.00 |
$40.00 |
$50.00 |
| 14 | 407(B) 0250 |
TACK COAT | 191 | GAL |
$3.50 |
$4.00 |
$4.40 |
$4.50 |
| 15 | 408 5774 |
PRIME COAT | 1,014 | GAL |
$3.00 |
$6.00 |
$6.60 |
$8.50 |
| 16 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 337 | TON |
$70.00 |
$96.00 |
$102.35 |
$106.00 |
| 17 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 163 | TON |
$80.00 |
$112.00 |
$118.45 |
$120.00 |
| 18 | 509(B) 0321 |
CLASS A CONCRETE | 10 | CY |
$600.00 |
$300.00 |
$750.00 |
$800.00 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 26 | CY |
$400.00 |
$300.00 |
$375.00 |
$650.00 |
| 20 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 32 | LF |
$100.00 |
$120.00 |
$128.00 |
$65.00 |
| 21 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,200.00 |
$1,035.00 |
$1,450.00 |
$1,500.00 |
| 22 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$5,500.00 |
$5,250.00 |
$30,000.00 |
| 23 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,174 | SY |
$4.00 |
$9.00 |
$7.00 |
$11.50 |
| 24 | 619(C) 0924 |
SAWING PAVEMENT | 118 | LF |
$5.00 |
$5.00 |
$11.00 |
$15.00 |
| 25 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 250 | LF |
$20.00 |
$20.00 |
$22.00 |
$40.00 |
| 26 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,250.00 |
$1,250.00 |
$1,375.00 |
$2,000.00 |
| 27 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$5,000.00 |
$1,500.00 |
$1,650.00 |
$2,500.00 |
| 28 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 212 | CY |
$25.00 |
$15.00 |
$11.00 |
$25.00 |
| 29 | 501(F) 6352 |
GRANULAR BACKFILL | 168 | CY |
$50.00 |
$85.00 |
$75.00 |
$90.00 |
| 30 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 209 | LF |
$225.00 |
$230.00 |
$245.00 |
$215.00 |
| 31 | 504(B) 1305 |
SAW-CUT GROOVING | 181.1 | SY |
$5.00 |
$21.00 |
$16.40 |
$19.00 |
| 32 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 234.5 | LF |
$75.00 |
$90.00 |
$89.50 |
$85.00 |
| 33 | 506(A) 1322 |
STRUCTURAL STEEL | 580 | LB |
$2.00 |
$3.00 |
$4.25 |
$3.00 |
| 34 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,500.00 |
$1,100.00 |
$1,100.00 |
$650.00 |
| 35 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$1,500.00 |
$1,100.00 |
$1,100.00 |
$650.00 |
| 36 | 509(A) 1326 |
CLASS AA CONCRETE | 58.8 | CY |
$600.00 |
$775.00 |
$750.00 |
$850.00 |
| 37 | 509(B) 1328 |
CLASS A CONCRETE | 129.2 | CY |
$600.00 |
$625.00 |
$750.00 |
$800.00 |
| 38 | 511(A) 1332 |
REINFORCING STEEL | 32,730 | LB |
$1.00 |
$1.10 |
$1.01 |
$1.41 |
| 39 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 170.66 | LF |
$35.00 |
$45.00 |
$35.00 |
$40.00 |
| 40 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 326 | LF |
$40.00 |
$55.00 |
$42.00 |
$40.00 |
| 41 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 170.66 | LF |
$20.00 |
$10.00 |
$15.00 |
$25.00 |
| 42 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 326 | LF |
$20.00 |
$10.00 |
$18.00 |
$25.00 |
| 43 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 44 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 800 | TON |
$45.00 |
$55.00 |
$52.00 |
$60.00 |
| 45 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 100 | TON |
$35.00 |
$50.00 |
$39.50 |
$80.00 |
| 46 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$30.00 |
$35.00 |
$30.00 |
$45.00 |
| 47 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$25.00 |
$35.00 |
$30.00 |
$45.00 |
| 48 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$10,000.00 |
$15,000.00 |
$28,000.00 |
| 49 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 7.46 | SF |
$30.00 |
$20.00 |
$22.00 |
$30.00 |
| 50 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 13 | LF |
$16.00 |
$10.00 |
$11.00 |
$25.00 |
| 51 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 12 | EA |
$20.00 |
$20.00 |
$22.00 |
$25.00 |
| 52 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 2,426 | LF |
$0.8000 |
$0.5500 |
$0.5500 |
$2.00 |
| 53 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 15 | LF |
$25.00 |
$85.00 |
$82.50 |
$9.00 |
| 54 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$3,000.00 |
$4,000.00 |
$6,500.00 |
| 55 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$5,100.00 |
$5,000.00 |
$9,500.00 |
| 56 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,375.00 |
$3,000.00 |
$6,000.00 |
| 57 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$57,000.00 |
$58,500.00 |
$50,000.00 |