168BidsJan 18, 2018 to Sep 15, 2022
18Wins (low bidder)
10.7%Win rate
$20,435,395Total won
Competitor scorecard
Last 5 years in Oklahoma19.0%Win rate4 of 21 bids
+10.8%Average bid vs estimate
+3.3%Winning bids vs estimate
+20.2%Over the low bid when they loseAverage field: 5.9 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| K & R BUILDERS, INC. | 19 | 6 | 13 | 32% |
| SEWELL BROS., INC. | 9 | 2 | 7 | 22% |
| BRIDGECO CONTRACTORS, INC. | 9 | 7 | 2 | 78% |
| Treas Construction Inc | 8 | 3 | 5 | 38% |
| Built Right Construction, LLC | 8 | 6 | 2 | 75% |
| Wyatt Contracting | 7 | 4 | 3 | 57% |
| HASKELL LEMON CONSTRUCTION CO. | 7 | 6 | 1 | 86% |
| Central Bridge Company | 5 | 2 | 3 | 40% |
| Cowboy Contracting, Inc. | 5 | 2 | 3 | 40% |
| Frontier Bridge, Inc. | 4 | 3 | 1 | 75% |
| Let date | Contract | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Sep 15, 2022 | 220190 | BRIDGE AND APPROACHES COUNTY ROAD (EW-26): OVER WEST CLAY CREEK , 0.2 MILES WEST OF THE SH -8 JUNCTION NEAR CARMEN. PROJECT LENGTH = 0.284 MILEAlfalfa · Division 6 | 1 of 5 | $1,163,271 | $1,163,271 | Won |
| Sep 15, 2022 | 220282 | BRIDGE AND APPROACHES COUNTY ROAD (EW-113): OVER WEST ELK CREEK , 1.4 MILES WEST OF THE SH -6 JUNCTION NEAR ELK CITY. PROJECT LENGTH = 0.161 MILEBeckham · Division 5 | 2 of 3 | $1,033,214 | $1,011,261SEWELL BROS., INC. | +2.2% |
| Sep 15, 2022 | 220289 | BRIDGE AND APPROACHES COUNTY ROAD (EW-159): OVER TRIBUTARY TO WASHITA RIVER , 5.5 MILES WEST OF THE US -177 JUNCTION NEAR WYNNEWOOD. PROJECT LENGTH = 0.114 MILEGarvin · Division 3 | 1 of 3 | $663,437 | $663,437 | Won |
| Sep 15, 2022 | 220298 | BRIDGE AND APPROACHES COUNTY ROAD (N. 108TH STREET): OVER UNNAMED CREEK, 6.5 MILES EAST OF I -44 IN JONES. PROJECT LENGTH = 0.263 MILEOklahoma · Division 4 | 1 of 7 | $910,370 | $910,370 | Won |
| Aug 18, 2022 | 220189 | BRIDGE AND APPROACHES COUNTY ROAD (EW-29): OVER WEST CLAY CREEK , 1.4 MILES EAST OF THE SH -8 JUNCTION NEAR CARMEN. PROJECT LENGTH = 0.312 MILEAlfalfa · Division 6 | 3 of 5 | $918,169 | $774,393SEWELL BROS., INC. | +18.6% |
| Aug 18, 2022 | 220253 | BRIDGE AND APPROACHES COUNTY ROAD (LADD ROAD): OVER UNNAMED CREEK, 0.3 MILES EAST OF I -35 NEAR NOBLE. PROJECT LENGTH = 0.234 MILEMcclain · Division 3 | 3 of 7 | $962,480 | $842,956K & R BUILDERS, INC. | +14.2% |
| Jul 14, 2022 | 220219 | BRIDGE AND APPROACHES COUNTY ROAD (EW-136): OVER ELK CREEK, 5.2 MILES WEST OF THE SH -9 JUNCTION NEAR HOBART . PROJECT LENGTH = 0.266 MILEKiowa · Division 5 | 5 of 6 | $1,400,185 | $1,176,073SEWELL BROS., INC. | +19.1% |
| Jul 14, 2022 | 220234 | BRIDGE AND APPROACHES COUNTY ROAD (EW-196): OVER CURTIS CREEK , 5.5 MILES WEST OF THE COTTON COUNTY LINE NEAR GRANDFIELD . PROJECT LENGTH = 0.142 MILETillman · Division 5 | 4 of 4 | $681,486 | $529,408Wyatt Contracting | +28.7% |
| Jun 16, 2022 | 220157 | BRIDGE AND APPROACHES COUNTY ROAD (MILLER ROAD): OVER LITTLE CHICKASAW CREEK , 1.8 MILES SOUTH OF SH-43 NEAR STRINGTOWN . PROJECT LENGTH = 0.133 MILEAtoka · Division 2 | 6 of 7 | $879,027 | $736,557HUB Construction, Inc. | +19.3% |
| May 19, 2022 | 210247 | BRIDGE AND APPROACHES SH-37: OVER UNNAMED CREEK, 0.4 MILES WEST OF I -35 IN MOORE. PROJECT LENGTH = 0.029 MILECleveland · Division 3 | 9 of 9 | $2,565,983 | $1,166,689SAC Services, Inc. | +119.9% |
| Apr 14, 2022 | 220119 | BRIDGE AND APPROACHES COUNTY ROAD (MIDWAY ROAD ): OVER HUG ME TIGHT BRANCH CREEK , 0.9 MILES SOUTH OF THE SH -53 JUNCTION NEAR GRAHAM. PROJECT LENGTH = 0.145 MILECarter · Division 7 | 4 of 7 | $1,342,631 | $1,201,036Wyatt Contracting | +11.8% |
| Apr 14, 2022 | 220124 | BRIDGE AND APPROACHES COUNTY ROAD (EW-129): OVER TIGER CREEK , 0.8 MILES EAST OF THE SH -48 JUNCTION NEAR HOLDENVILLE. PROJECT LENGTH = 0.255 MILEHughes · Division 3 | 4 of 8 | $584,578 | $525,634Cowboy Contracting, Inc. | +11.2% |
| Apr 14, 2022 | 220127 | BRIDGE AND APPROACHES COUNTY ROAD (EW-72): OVER TREATY CREEK , 4.1 MILES WEST OF US -81 NEAR DOVER. PROJECT LENGTH = 0.208 MILEKingfisher · Division 4 | 1 of 4 | $922,368 | $922,368 | Won |
| Apr 14, 2022 | 220132 | BRIDGE AND APPROACHES COUNTY ROAD (NS-409): OVER SALT CREEK , 2.1 MILES NORTH OF THE SH -16 JUNCTION NEAR HASKELL. PROJECT LENGTH = 0.284 MILEMuskogee · Division 1 | 3 of 5 | $837,307 | — | |
| Apr 14, 2022 | 220133 | BRIDGE AND APPROACHES COUNTY ROAD (EW-36): OVER BUNCH CREEK, 3.6 MILES WEST OF I -35 NEAR BILLINGS. PROJECT LENGTH = 0.237 MILENoble · Division 4 | 2 of 3 | $1,014,593 | $979,341K & R BUILDERS, INC. | +3.6% |
| Mar 17, 2022 | 220018 | BRIDGE AND APPROACHES COUNTY ROAD (EW-46): OVER TURKEY CREEK , 1.3 MILES EAST OF THE SH -132 JUNCTION NEAR DRUMMOND. PROJECT LENGTH = 0.246 MILEGarfield · Division 4 | 7 of 10 | $1,211,755 | $1,046,449H & H BRIDGE COMPANY | +15.8% |
| Mar 17, 2022 | 220080 | BRIDGE AND APPROACHES COUNTY ROAD (NS-145): OVER NORTH FORK OF KIOWA CREEK, 1.1 MILES NORTH OF THE TEXAS STATE LINE . PROJECT LENGTH = 0.264 MILEBeaver · Division 6 | 2 of 3 | $896,327 | $765,097K & R BUILDERS, INC. | +17.2% |
| Mar 17, 2022 | 220103 | BRIDGE AND APPROACHES COUNTY ROAD (EAST 86TH STREET): OVER STILLWATER CREEK, 0.9 MILES WEST OF SH -108 NEAR RIPLEY. PROJECT LENGTH = 0.402 MILEPayne · Division 4 | 5 of 8 | $1,927,134 | $1,545,639H & H BRIDGE COMPANY | +24.7% |
| Feb 17, 2022 | 220061 | BRIDGE AND APPROACHES SH-115: OVER UNNAMED CREEKS, 0.3 MILES AND 6.6 MILES NORTH OF THE SH -19 JUNCTION NEAR MOUNTAINVIEW . PROJECT LENGTH = 0.340 MILEKiowa · Division 5 | 2 of 5 | $1,612,529 | $1,548,658SEWELL BROS., INC. | +4.1% |
| Feb 17, 2022 | 220068 | BRIDGE REHABILITATION US-60: OVER CHARLIE CREEK, 8.2 MILES EAST OF THE KAY COUNTY LINE . PROJECT LENGTH = 0.159 MILEOsage · Division 8 | 2 of 8 | $1,555,832 | $1,549,498K & R BUILDERS, INC. | +0.4% |
| Jan 20, 2022 | 220017 | BRIDGE AND APPROACHES COUNTY ROAD (EW-088): OVER WEST BARNITZ CREEK , 10.0 MILES EAST OF THE SH -34 JUNCTION NEAR MOOREWOOD. PROJECT LENGTH = 0.151 MILECuster · Division 5 | 4 of 7 | $1,038,131 | $917,874K & R BUILDERS, INC. | +13.1% |
| Nov 18, 2021 | 210304 | BRIDGE AND APPROACHES COUNTY ROAD (EW-1230): OVER SUGAR CREEK, 1.6 MILES WEST OF THE US -281 JUNCTION NEAR GRACEMONT. PROJECT LENGTH = 0.169 MILECaddo · Division 7 | 4 of 4 | $1,057,207 | $811,238SEWELL BROS., INC. | +30.3% |
| Nov 18, 2021 | 210312 | BRIDGE AND APPROACHES COUNTY ROAD (EW-48): OVER TURKEY CREEK , 1.8 MILES EAST OF THE SH -132 JUNCTION NEAR DRUMMOND. PROJECT LENGTH = 0.208 MILEGarfield · Division 4 | 4 of 5 | $996,343 | $899,415K & R BUILDERS, INC. | +10.8% |
| Nov 18, 2021 | 210313 | BRIDGE AND APPROACHES COUNTY ROAD (N4355 ROAD): OVER UNNAMED CREEK, 0.6 MILES NORTH OF THE SH -9 JUNCTION NEAR WHITEFIELD. PROJECT LENGTH = 0.058 MILEHaskell · Division 1 | 2 of 7 | $549,396 | $447,819H & G Paving Contractors In… | +22.7% |
| Nov 18, 2021 | 210329 | BRIDGE AND APPROACHES COUNTY ROAD (SUNSHINE ROAD/NS-333): OVER UNNAMED CREEK, 2.2 MILES NORTH OF THE SH -7 JUNCTION NEAR DAVIS . PROJECT LENGTH = 0.207 MILEMurray · Division 7 | 3 of 6 | $790,342 | $729,920K & R BUILDERS, INC. | +8.3% |
| Nov 18, 2021 | 210334 | BRIDGE AND APPROACHES COUNTY ROAD (NS-3580): OVER HELLROARING CREEK, 1.4 MILES NORTH OF THE US -64 JUNCTION NEAR CLEVELAND. PROJECT LENGTH = 0.154 MILEPawnee · Division 8 | 3 of 5 | $737,564 | $643,382K & R BUILDERS, INC. | +14.6% |
| Nov 18, 2021 | 210335 | BRIDGE AND APPROACHES COUNTY ROAD (EW-129): OVER UNNAMED CREEK, 1.4 MILES WEST OF US-69 NEAR CROWDER. PROJECT LENGTH = 0.113 MILEPittsburg · Division 2 | 5 of 8 | $496,158 | $444,969BRIGHT LIGHTING, INC. DBA B… | +11.5% |
| Nov 18, 2021 | 210337 | BRIDGE AND APPROACHES COUNTY ROAD (NS-296): OVER TRIBUTARY TO BLACK BEAR CREEK, 0.5 MILES SOUTH OF THE SH -29 JUNCTION NEAR BRAY . PROJECT LENGTH = 0.228 MILEStephens · Division 7 | 3 of 5 | $878,604 | $799,524K & R BUILDERS, INC. | +9.9% |
| Oct 14, 2021 | 210273 | BRIDGE AND APPROACHES COUNTY ROAD (NS-181): OVER OTTER CREEK, 0.7 MILES SOUTH OF THE HARPER COUNTY LINE . PROJECT LENGTH = 0.208 MILEEllis · Division 6 | 4 of 7 | $885,895 | $686,856Lopp Construction, LLC | +29.0% |
| Oct 14, 2021 | 210279 | GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (NE 36TH STREET): FROM HARRAH ROAD, EXTEND EAST NEAR HARRAH . PROJECT LENGTH = 0.062 MILEOklahoma · Division 4 | 4 of 10 | $550,955 | $491,874SAC Services, Inc. | +12.0% |
| Oct 14, 2021 | 210294 | BRIDGE AND APPROACHES COUNTY ROAD (EW-125): OVER UNNAMED CREEK, 0.6 MILES WEST OF THE SH -44 JUNCTION NEAR SENTINEL. PROJECT LENGTH = 0.161 MILEWashita · Division 5 | 4 of 8 | $538,479 | $435,496Lopp Construction, LLC | +23.6% |
| Sep 16, 2021 | 210252 | BRIDGE AND APPROACHES COUNTY ROAD (ENGLISH ROAD/NS-3683): OVER SANDY CREEK, 2.8 MILES NORTH OF SH -48A NEAR COLEMAN. PROJECT LENGTH = 0.171 MILEJohnston · Division 3 | 3 of 8 | $546,372 | $517,317Built Right Construction, L… | +5.6% |
| Sep 16, 2021 | 210253 | BRIDGE AND APPROACHES COUNTY ROAD (NS-427): OVER CHOUTEAU CREEK TRIBUTARY , 2.4 MILES NORTH OF US -412 JUNCTION NEAR CHOUTEAU. PROJECT LENGTH = 0.180 MILEMayes · Division 8 | 1 of 8 | $688,499 | $688,499 | Won |
| Sep 16, 2021 | 210266 | BRIDGE AND APPROACHES COUNTY ROAD (EW-89): OVER TRIBUTARY TO WOLF CREEK , 5.9 MILES WEST OF THE SH -74 JUNCTION NEAR PIEDMONT. PROJECT LENGTH = 0.135 MILECanadian · Division 4 | 2 of 5 | $734,597 | $721,246SEWELL BROS., INC. | +1.9% |
| Sep 16, 2021 | 210267 | BRIDGE AND APPROACHES COUNTY ROAD (EW-68): OVER TRIBUTARY OF CLEAR CREEK, 2.3 MILES EAST OF I -35 NEAR STILLWATER . PROJECT LENGTH = 0.208 MILEPayne · Division 4 | 4 of 8 | $651,254 | $626,470H & H BRIDGE COMPANY | +4.0% |
| Jul 15, 2021 | 210201 | BRIDGE AND APPROACHES COUNTY ROAD (EW-068): OVER SALT CREEK , 1.7 MILES EAST OF THE SH -8 JUNCTION NEAR OKEENE. PROJECT LENGTH = 0.199 MILEBlaine · Division 5 | 5 of 5 | $659,764 | $530,480SEWELL BROS., INC. | +24.4% |
| Jul 15, 2021 | 210209 | BRIDGE AND APPROACHES COUNTY ROAD (NS-312): OVER SAND CREEK, 2.6 MILES SOUTH OF THE KANSAS STATE LINE NEAR BRAMAN . PROJECT LENGTH = 0.227 MILEKay · Division 4 | 3 of 4 | $667,897 | $588,986H & H BRIDGE COMPANY | +13.4% |
| Jun 17, 2021 | 210172 | BRIDGE AND APPROACHES COUNTY ROAD (NS-229): OVER UNNAMED CREEK, 0.8 MILES SOUTH OF THE US -270/US-281/SH-3/SH-51 JUNCTION NEAR SEILING. PROJECT LENGTH = 0.085 MILESDewey · Division 5 | 3 of 6 | $461,818 | $421,766Wyatt Contracting | +9.5% |
| May 20, 2021 | 210131 | BRIDGE AND APPROACHES COUNTY ROAD (NS-4501): OVER DOUBLE SPRINGS CREEK, 8.3 MILES NORTH OF SH -82 NEAR TERESITA . PROJECT LENGTH = 0.153 MILECherokee · Division 1 | 3 of 5 | $1,043,510 | — | |
| May 20, 2021 | 210141 | BRIDGE AND APPROACHES COUNTY ROAD (CASCARA ROAD /NS-3035): OVER WALNUT CREEK , 0.8 MILES NORTH OF THE SH -74B JUNCTION NEAR BLANCHARD. PROJECT LENGTH = 0.264 MILESMcclain · Division 3 | 3 of 9 | $1,058,714 | $1,045,616H & H BRIDGE COMPANY | +1.3% |
| May 20, 2021 | 210158 | BRIDGE AND APPROACHES COUNTY ROAD (NS-245): OVER DEEP RED CREEK, 6.3 MILES NORTH OF THE US -70 JUNCTION NEAR GRANDFIELD. PROJECT LENGTH = 0.208 MILETillman · Division 5 | 4 of 7 | $979,321 | $888,257SEWELL BROS., INC. | +10.3% |
| Apr 15, 2021 | 210103 | BRIDGE AND APPROACHES SH-5: OVER COX CREEK, 0.4 MILES WEST OF THE US-277 JUNCTION NEAR WALTERS . PROJECT LENGTH = 0.151 MILECotton · | 8 of 7 | $1,653,824 | $1,075,440SEWELL BROS., INC. | +53.8% |
| Apr 15, 2021 | 210115 | BRIDGE AND APPROACHES COUNTY ROAD (NS-317): OVER LITTLE STILLWATER CREEK , 6.0 MILES SOUTH OF US-77 NEAR PERRY . PROJECT LENGTH = 0.227 MILENoble · Division 4 | 8 of 13 | $760,048 | $697,164SEWELL BROS., INC. | +9.0% |
| Mar 18, 2021 | 200030 | BRIDGE AND APPROACHES COUNTY ROAD (E0590): OVER SH-88 AND THE UNION PACIFIC RAILROAD, 9.8 MILES WEST OF THE US -69 JUNCTION NEAR INOLA. PROJECT LENGTH = 0.380 MILERogers · Division 8 | 7 of 7 | $4,302,320 | $2,826,236CONCRETE SERVICES CORPORATI… | +52.2% |
| Mar 18, 2021 | 210078 | BRIDGE AND APPROACHES COUNTY ROAD (NORTH AVENUE /EW-23): OVER DEER CREEK, 0.7 MILES WEST OF I -35 NEAR TONKAWA . PROJECT LENGTH = 0.397 MILEKay · Division 4 | 1 of 6 | $991,764 | $991,764 | Won |
| Feb 18, 2021 | 210043 | BANK PROTECTION US-64: OVER EAST CLAY CREEK , 1.0 MILE EAST OF THE SH -8 JUNCTION NEAR CHEROKEE. PROJECT LENGTH = 0.000 MILEAlfalfa · Division 6 | 9 of 9 | $803,394 | $565,886K & R BUILDERS, INC. | +42.0% |
| Feb 18, 2021 | 210044 | RESURFACE (ASPHALT ) AND BRIDGE REHABILITATION COUNTY ROAD (PETREE ROAD): FROM SW 6TH STREET, EXTEND EAST IN ANADARKO . PROJECT LENGTH = 0.991 MILECaddo · Division 7 | 4 of 3 | $904,870 | — | |
| Feb 18, 2021 | 210046 | BRIDGE AND APPROACHES COUNTY ROAD (EW-154): OVER NINEMILE BEAVER CREEK , 0.7 MILES EAST OF THE SH -17 JUNCTION NEAR ELGIN. PROJECT LENGTH = 0.407 MILEComanche · Division 7 | 4 of 5 | $1,236,171 | $1,133,370K & R BUILDERS, INC. | +9.1% |
| Feb 18, 2021 | 210048 | BRIDGE AND APPROACHES COUNTY ROAD (NS-445): OVER LITTLE CABIN CREEK, 1.6 MILES NORTH OF THE SH -25 JUNCTION NEAR BLUE JACKET. PROJECT LENGTH = 0.415 MILESCraig · Division 8 | 4 of 7 | $1,748,973 | $1,627,329CONCRETE SERVICES CORPORATI… | +7.5% |
| Jan 21, 2021 | 210012 | BRIDGE AND APPROACHES US-75: OVER CANEY CREEK , 0.8 MILES NORTHWEST OF THE SH -31 JUNCTION NEAR COALGATE . PROJECT LENGTH = 0.056 MILECoal · Division 3 | 4 of 8 | $1,516,683 | $1,241,460Treas Construction Inc | +22.2% |
| Jan 21, 2021 | 210014 | BRIDGE AND APPROACHES COUNTY ROAD (NS-296): OVER RED ROCK CREEK, 6.5 MILES NORTH OF THE US -64 JUNCTION NEAR BRECKINRIDGE. PROJECT LENGTH = 0.454 MILEGarfield · Division 4 | 3 of 6 | $1,000,000 | $921,008K & R BUILDERS, INC. | +8.6% |
| Jan 21, 2021 | 210016 | BRIDGE AND APPROACHES COUNTY ROAD (EW-137): OVER EAST BITTER CREEK , 1.1 MILES SOUTH OF THE US -277 JUNCTION NEAR CHICKASHA. PROJECT LENGTH = 0.266 MILEGrady · Division 7 | 7 of 8 | $1,330,589 | $1,060,215K & R BUILDERS, INC. | +25.5% |
| Jan 21, 2021 | 210017 | BRIDGE AND APPROACHES COUNTY ROAD (NS-2958): OVER RUSH CREEK, 5.4 MILES NORTH OF THE SH -29 JUNCTION NEAR COX CITY. PROJECT LENGTH = 0.464 MILEGrady · Division 7 | 4 of 6 | $2,258,557 | $2,069,514Treas Construction Inc | +9.1% |
| Jan 21, 2021 | 210019 | BRIDGE REHABILITATION SH-7: OVER KEEL CREEK , 3.8 MILES WEST OF THE US-377 JUNCTION NEAR WAPANUCKA . PROJECT LENGTH = 0.198 MILEJohnston · Division 3 | 8 of 8 | $1,591,271 | $1,181,139C3 Construction, Inc. | +34.7% |
| Jan 21, 2021 | 210023 | BRIDGE AND APPROACHES SH-48: OVER UNNAMED CREEK, 1.5 MILES NORTH OF THE SH -48A JUNCTION NEAR COLEMAN. PROJECT LENGTH = 0.084 MILEJohnston · Division 3 | 4 of 4 | $530,856 | $423,630Treas Construction Inc | +25.3% |
| Nov 19, 2020 | 200156 | BRIDGE AND APPROACHES COUNTY ROAD (NS-262): OVER DEEP CREEK , 3.9 MILES NORTH OF THE SH -51 JUNCTION NEAR OKEENE. PROJECT LENGTH = 0.208 MILEMajor · Division 6 | 3 of 4 | $573,034 | $529,774K & R BUILDERS, INC. | +8.2% |
| Nov 19, 2020 | 200344 | BRIDGE AND APPROACHES COUNTY ROAD (NS-256): OVER COBB CREEK, 1.9 MILES SOUTH OF THE SH -146 JUNCTION NEAR FORT COBB . PROJECT LENGTH = 0.274 MILECaddo · Division 7 | 4 of 7 | $752,123 | $673,241K & R BUILDERS, INC. | +11.7% |
| Nov 19, 2020 | 200349 | BRIDGE AND APPROACHES SH-19: OVER PEAVINE CREEK , 0.3 MILES EAST OF THE SH-133 JUNCTION NEAR PAULS VALLEY . PROJECT LENGTH = 0.366 MILEGarvin · Division 3 | 9 of 11 | $2,443,185 | $1,970,021Treas Construction Inc | +24.0% |
| Nov 19, 2020 | 200359 | GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (D4615): OVER LITTLE RIVER, 1.3 MILES NORTH OF THE US -70 JUNCTION NEAR IDABEL. PROJECT LENGTH = 0.364 MILEMccurtain · Division 2 | 4 of 5 | $3,879,957 | $3,196,115Frontier Bridge, Inc. | +21.4% |
| Oct 15, 2020 | 200304 | BRIDGE AND APPROACHES COUNTY ROAD (NS-254): OVER WEAVERS CREEK , 3.0 MILES SOUTH OF THE US-270 JUNCTION NEAR WATONGA . PROJECT LENGTH = 0.161 MILEBlaine · Division 5 | 5 of 8 | $741,036 | $641,854K & R BUILDERS, INC. | +15.5% |
| Oct 15, 2020 | 200314 | BRIDGE AND APPROACHES COUNTY ROAD (EW-67): OVER TURKEY CREEK , 2.5 MILES WEST OF THE US -81 JUNCTION NEAR HENNESSEY. PROJECT LENGTH = 0.284 MILEKingfisher · Division 4 | 3 of 8 | $871,906 | $768,168K & R BUILDERS, INC. | +13.5% |
| Oct 15, 2020 | 200316 | BRIDGE AND APPROACHES COUNTY ROADS (EW-141 (180TH STREET) / NS-299): EW-141, OVER TRIBUTARY TO LAFLIN CREEK 1.7 MILES WEST OF SH -76. NS-299, FROM EW-141 EXTEND NORTH NEAR CRINER . PROJECT LENGTH = 0.354 MILEGrady, Mcclain · | 3 of 10 | $860,612 | $766,364Treas Construction Inc | +12.3% |
| Oct 15, 2020 | 200323 | BRIDGE AND APPROACHES US-60: OVER SALT CREEK , 1.5 MILES WEST OF THE SH-18 JUNCTION NEAR BURBANK. PROJECT LENGTH = 0.233 MILESOsage · Division 8 | 5 of 7 | $2,597,907 | $2,321,084BRIDGECO CONTRACTORS, INC. | +11.9% |
| Sep 17, 2020 | 200278 | BRIDGE AND APPROACHES COUNTY ROAD (NS-215): OVER KIZER CREEK, 4.3 MILES SOUTH OF SH-51 NEAR CAMARGO. PROJECT LENGTH = 0.123 MILESDewey · Division 5 | 7 of 8 | $797,671 | $578,689HASKELL LEMON CONSTRUCTION … | +37.8% |
| Sep 17, 2020 | 200281 | BRIDGE AND APPROACHES COUNTY ROAD (NS-230): OVER UNNAMED CREEK, 1.8 MILES NORTH OF THE SH-9 JUNCTION NEAR GOTEBO. PROJECT LENGTH = 0.114 MILEKiowa · Division 5 | 5 of 6 | $595,515 | $487,898SEWELL BROS., INC. | +22.1% |
| Sep 17, 2020 | 200284 | BRIDGE AND APPROACHES COUNTY ROAD (NS-228): OVER WEST CREEK , 4.1 MILES NORTH OF THE US -412 JUNCTION NEAR WAYNOKA . PROJECT LENGTH = 0.189 MILESMajor · Division 6 | 3 of 7 | $762,820 | $729,412BRIDGECO CONTRACTORS, INC. | +4.6% |
| Sep 17, 2020 | 200287 | BRIDGE AND APPROACHES COUNTY ROAD (EW-093/NORTH 192ND STREET): OVER BIDDY CREEK , 4.1 MILES WEST OF THE SH -74 JUNCTION NEAR OKLAHOMA CITY . PROJECT LENGTH = 0.140 MILEOklahoma · Division 4 | 2 of 5 | $1,013,378 | $1,000,000Cowboy Contracting, Inc. | +1.3% |
| Sep 17, 2020 | 200290 | BRIDGE AND APPROACHES SH-99: OVER BIRCH CREEK, 3.0 MILES NORTH OF THE SH -10 JUNCTION NEAR THE HULAH WILDLIFE MANAGEMENT AREA . PROJECT LENGTH = 0.028 MILESOsage · Division 8 | 7 of 7 | $1,563,715 | $996,447BRIDGECO CONTRACTORS, INC. | +56.9% |
| Aug 20, 2020 | 200230 | BRIDGE AND APPROACHES COUNTY ROAD (NS-3210/DORY ROAD ): OVER TRIBUTARY TO WALNUT BAYOU , 2.5 MILES NORTH OF SH -32 NEAR BURNEYVILLE. PROJECT LENGTH = 0.148 MILELove · Division 7 | 4 of 8 | $761,284 | $601,019HUB Construction, Inc. | +26.7% |
| Aug 20, 2020 | 200239 | BRIDGE AND APPROACHES COUNTY ROAD (NS-237): OVER GREEN LEAF CREEK, 8.7 MILES NORTH OF THE US -64 JUNCTION NEAR THE KANSAS STATE LINE . PROJECT LENGTH = 0.239 MILEWoods · Division 6 | 4 of 8 | $1,357,085 | $1,199,890K & R BUILDERS, INC. | +13.1% |
| Aug 20, 2020 | 200262 | BRIDGE AND APPROACHES COUNTY ROAD (EW-112): OVER WEST ELK CREEK , 3.4 MILES EAST OF THE I-40 BUSINESS JUNCTION IN ELK CITY. PROJECT LENGTH = 0.151 MILEBeckham · Division 5 | 6 of 7 | $907,482 | $762,027SEWELL BROS., INC. | +19.1% |
| Aug 20, 2020 | 200264 | BRIDGE AND APPROACHES COUNTY ROAD (NS-464): OVER BRAZIL CREEK , 3.4 MILES SOUTH OF SH-31 NEAR BOKOSHE. PROJECT LENGTH = 0.210 MILELeflore · | 4 of 5 | $1,218,722 | $933,068HUB Construction, Inc. | +30.6% |
| Aug 20, 2020 | 200265 | BRIDGE AND APPROACHES COUNTY ROAD (EW-71): OVER TRIBUTARY TO SKELETON CREEK , 5.9 MILES EAST OF THE SH -74 JUNCTION NEAR CRESCENT. PROJECT LENGTH = 0.208 MILELogan · Division 4 | 9 of 15 | $1,225,967 | $882,069Wyatt Contracting | +39.0% |
| Jul 23, 2020 | 200248 | BRIDGE AND APPROACHES COUNTY ROAD (EW-195): OVER TRIBUTARY TO WHISKEY CREEK , 0.7 MILES EAST OF THE SH -65 JUNCTION NEAR TEMPLE . PROJECT LENGTH = 0.080 MILECotton · | 6 of 10 | $317,599 | $243,876SEWELL BROS., INC. | +30.2% |
| Jun 18, 2020 | 200237 | BRIDGE AND APPROACHES COUNTY ROAD (NS-2836): OVER TRIBUTARY TO COW CREEK , 2.1 MILES NORTH OF THE SH -53 JUNCTION NEAR COMANCHE. PROJECT LENGTH = 0.207 MILEStephens · Division 7 | 4 of 8 | $716,226 | $585,857SEWELL BROS., INC. | +22.3% |
| May 14, 2020 | 200192 | BRIDGE AND APPROACHES COUNTY ROAD (COOMBS ROAD/EW-169): OVER EAST CACHE CREEK , 1.2 MILES EAST OF I -44 NEAR LAWTON . PROJECT LENGTH = 0.245 MILEComanche · Division 7 | 5 of 7 | $1,463,599 | $1,360,552Frontier Bridge, Inc. | +7.6% |
| May 14, 2020 | 200202 | GRADE, DRAIN, AND BRIDGE COUNTY ROAD (EW-111): OVER SOUTH FORK CREEK, 3.0 MILES EAST OF THE SH -2 JUNCTION NEAR PORUM. PROJECT LENGTH = 0.387 MILEMuskogee · Division 1 | 6 of 6 | $1,460,515 | $1,205,894Treas Construction Inc | +21.1% |
| May 14, 2020 | 200212 | BRIDGE AND APPROACHES COUNTY ROAD (EW-186): OVER COW CREEK, 0.7 MILES EAST OF THE US-81 JUNCTION NEAR COMANCHE. PROJECT LENGTH = 0.245 MILEStephens · Division 7 | 5 of 6 | $696,043 | $584,760SEWELL BROS., INC. | +19.0% |
| May 14, 2020 | 190347 | BRIDGE AND APPROACHES COUNTY ROAD (E550 ROAD): OVER CRAZY CREEK HOLLOW BRIDGE , 3.1 MI WEST OF THE ARKANSAS STATE LINE NEAR WEST SILOAM SPRINGS . PROJECT LENGTH = 0.40 MILEDelaware · Division 8 | 1 of 1 | $1,024,868 | $1,024,868 | Won |
| Apr 16, 2020 | 200153 | BRIDGES AND APPROACHES COUNTY ROAD (EW-207): OVER BAKER CR AND TRIBUTARY TO BAKER CR, 4.0 MILES AND 3.0 MILES WEST OF THE SH -32 NEAR GRADY. PROJECT LENGTH = 0.381 MILEJefferson · | 4 of 7 | $1,026,628 | $939,293K & R BUILDERS, INC. | +9.3% |
| Apr 16, 2020 | 200155 | BRIDGE AND APPROACHES COUNTY ROAD (EW-77): OVER SAND CREEK, 0.2 MILES EAST OF THE SH-99 JUNCTION NEAR SHAMROCK. PROJECT LENGTH = 0.180 MILELincoln · Division 3 | 3 of 4 | $532,842 | $505,438BRIDGECO CONTRACTORS, INC. | +5.4% |
| Apr 16, 2020 | 200065 | BRIDGE AND APPROACHES US -75: OVER SALT CREEK , 5.7 MILES SOUTH OF THE US -270 JUNCTION NEAR CALVIN . PROJECT LENGTH = 0.159 MILEHughes · Division 3 | 8 of 10 | $2,318,158 | $1,832,059Treas Construction Inc | +26.5% |
| Mar 19, 2020 | 200113 | BRIDGE AND APPROACHES COUNTY ROAD (EW-107) : OVER ROCK CREEK, 5.5 MILES EAST OF US-377 NEAR PADEN . PROJECT LENGTH = 0.189 MILEOkfuskee · Division 3 | 4 of 5 | $919,369 | $788,391H & H BRIDGE COMPANY | +16.6% |
| Mar 19, 2020 | 200032 | BRIDGE AND APPROACHES COUNTY ROAD (NS-3650 ROAD) : OVER UNNAMED CREEK, 0.1 MILES SOUTH OF THE US -59 JUNCTION NEAR WEWOKA. PROJECT LENGTH = 0.111 MILESeminole · Division 3 | 1 of 3 | $641,975 | $641,975 | Won |
| Mar 19, 2020 | 200102 | BRIDGE AND APPROACHES COUNTY ROAD (EW-026): OVER WILD HORSE CREEK, 5.3 MILES EAST OF THE US -81 JUNCTION NEAR POND CREEK. PROJECT LENGTH = 0.298 MILEGrant · Division 4 | 3 of 4 | $809,962 | $744,732H & H BRIDGE COMPANY | +8.8% |
| Feb 20, 2020 | 190255 | BRIDGE AND APPROACHES COUNTY ROAD (EW-151): OVER LITTLE SANDY CREEK , 2.4 MILES EAST OF THE US -377 JUNCTION NEAR ADA . PROJECT LENGTH = 0.171 MILEPontotoc · | 3 of 7 | $1,165,674 | $1,114,836BRIDGECO CONTRACTORS, INC. | +4.6% |
| Feb 20, 2020 | 200069 | BRIDGE AND APPROACHES COUNTY ROAD (EW-90): OVER DOSIE CREEK, 2.1 MILES EAST OF THE SH-66 JUNCTION NEAR DAVENPORT . PROJECT LENGTH = 0.391 MILELincoln · Division 3 | 4 of 7 | $982,829 | $840,777Cowboy Contracting, Inc. | +16.9% |
| Feb 20, 2020 | 200073 | BRIDGE AND APPROACHES COUNTY ROAD (JOE JOHNSON ROAD/PURSER ROAD): OVER UNNAMED CREEK, 0.8 MILES WEST OF THE SH -99C JUNCTION NEAR OAKLAND. PROJECT LENGTH = 0.112 MILEMarshall · Division 2 | 3 of 3 | $412,884 | $300,482HUB Construction, Inc. | +37.4% |
| Jan 16, 2020 | 190207 | BRIDGE AND APPROACHES COUNTY ROAD (EW-176/CARGO ROAD): OVER RATLIFF WEST CREEK , 0.8 MILES WEST OF THE SH -76 JUNCTION NEAR RATLIFF CITY . PROJECT LENGTH = 0.156 MILECarter · Division 7 | 2 of 7 | $917,846 | $912,956K & R BUILDERS, INC. | +0.5% |
| Jan 16, 2020 | 200003 | BRIDGE AND APPROACHES COUNTY ROAD (NS-257): OVER TRIBUTARY OF SPRING CREEK , 2.6 MILES SOUTH OF THE SH -51 JUNCTION NEAR OKEENE. PROJECT LENGTH = 0.132 MILEBlaine · Division 5 | 2 of 2 | $696,960 | $664,570K & R BUILDERS, INC. | +4.9% |
| Jan 16, 2020 | 200004 | BRIDGE AND APPROACHES COUNTY ROAD (NS-251): OVER WEAVER CREEK , 1.9 MILES SOUTH OF THE US-270 JUNCTION NEAR WATONGA . PROJECT LENGTH = 0.123 MILEBlaine · Division 5 | 2 of 2 | $670,288 | $524,789K & R BUILDERS, INC. | +27.7% |
| Jan 16, 2020 | 200039 | BRIDGE AND APPROACHES COUNTY ROAD (NS-246): OVER SAND CREEK, 2.7 MILES NORTH OF SH-45 NEAR DACOMA. PROJECT LENGTH = 0.175 MILEWoods · Division 6 | 1 of 3 | $610,699 | $610,699 | Won |
| Nov 14, 2019 | 190387 | BRIDGE AND APPROACHES COUNTY ROAD (NS-333): OVER DUGOUT CREEK , 1.0 MILE NORTH OF THE SH-105 JUNCTION NEAR CARNEY. PROJECT LENGTH = 0.302 MILELincoln · Division 3 | 2 of 3 | $613,561 | $591,127BRIDGECO CONTRACTORS, INC. | +3.8% |
| Jun 20, 2019 | 190056 | BRIDGE AND APPROACHES COUNTY ROAD (EW-128): OVER MODOC CREEK, 1.8 MILES WEST OF THE MISSOURI STATE LINE . PROJECT LENGTH = 0.058 MILEOttawa · Division 8 | 1 of 3 | $625,225 | $625,225 | Won |
| Jun 20, 2019 | 180107 | BRIDGE AND APPROACHES COUNTY ROAD (EW-28): OVER LITTLE DRUM CREEK, 7.8 MILES EAST OF THE NOBLE COUNTY LINE . PROJECT LENGTH = 0.955 MILEOsage · Division 8 | 1 of 1 | $2,268,477 | $2,268,477 | Won |
| Jun 20, 2019 | 190119 | BRIDGE AND APPROACHES COUNTY ROAD (EW-082/DUNCAN ROAD): OVER CONCHARTY CREEK , 4.4 MILES WEST OF THE US -64 JUNCTION NEAR HASKELL. PROJECT LENGTH = 0.269 MILEMuskogee · Division 1 | 3 of 5 | $1,286,646 | $1,234,255H & H BRIDGE COMPANY | +4.2% |
| Jun 20, 2019 | 190125 | BRIDGE AND APPROACHES COUNTY ROAD (NS-3890/ROCKY HILL RD ): OVER OKMULGEE CREEK AND UNNAMED CREEK, 0.6 MI AND 0.7 MI S OF SH-56 NEAR OKMULGEE. PROJECT LENGTH = 0.200 MILEOkmulgee · Division 1 | 1 of 1 | $1,150,151 | $1,150,151 | Won |
| Jun 20, 2019 | 190189 | BRIDGE AND APPROACHES COUNTY ROAD (SOUTH PECAN ROAD/NS-396.5): OVER UNNAMED CREEK, 0.4 MILES SOUTH OF SH-3 NEAR LANE. PROJECT LENGTH = 0.109 MILESAtoka · Division 2 | 2 of 3 | $649,030 | $599,984Built Right Construction, L… | +8.2% |
| Jun 20, 2019 | 190200 | BRIDGE AND APPROACHES COUNTY ROAD (EW-15): OVER CALIFORNIA CREEK LOW WATER CROSSING, 2.3 MILES WEST OF US -169 NEAR DELAWARE . PROJECT LENGTH = 0.985 MILENowata · Division 8 | 2 of 4 | $1,545,276 | $1,511,649H & H BRIDGE COMPANY | +2.2% |
| Jun 20, 2019 | 190204 | BRIDGE AND APPROACHES COUNTY ROAD (EW-23): OVER SANTA FE CREEK , 0.3 MILES EAST OF THE SH-156 JUNCTION NEAR PONCA CITY . PROJECT LENGTH = 0.151 MILEKay · Division 4 | 2 of 3 | $583,597 | $545,746Evans & Associates Construc… | +6.9% |
| May 16, 2019 | 190022 | BRIDGE AND APPROACHES COUNTY ROAD (EW-500): OVER PEPPER CREEK, 3.9 MILES WEST OF SH-18 NEAR PAWNEE . PROJECT LENGTH = 0.284 MILEPawnee · Division 8 | 2 of 3 | $1,209,942 | — | |
| May 16, 2019 | 190173 | BRIDGE AND APPROACHES COUNTY ROAD (EW-112): OVER ARAPAHO CREEK , 2.0 MILES WEST OF THE US-81 JUNCTION NEAR UNION CITY. PROJECT LENGTH = 0.378 MILECanadian · Division 4 | 2 of 2 | $1,499,512 | $1,473,205SEWELL BROS., INC. | +1.8% |
| May 16, 2019 | 190179 | BRIDGE AND APPROACHES COUNTY ROAD (EW-130): OVER NORTH FORK OF WALNUT CREEK , 4.6 MILES EAST OF THE US -62 JUNCTION NEAR BLANCHARD. PROJECT LENGTH = 0.296 MILEMcclain · Division 3 | 3 of 3 | $1,688,689 | $1,505,087BRIDGECO CONTRACTORS, INC. | +12.2% |
| May 16, 2019 | 190181 | BRIDGE AND APPROACHES COUNTY ROAD (TYLER ROAD): OVER TRIBUTARY OF LITTLE HAUANI CREEK, 1.5 MILES NORTH OF THE US -70 JUNCTION NEAR MCMILLAN. PROJECT LENGTH = 0.209 MILEMarshall · Division 2 | 3 of 3 | $813,186 | $660,534HUB Construction, Inc. | +23.1% |
| May 16, 2019 | 190004 | BRIDGE AND APPROACHES COUNTY ROAD (EW-207): OVER UNNAMED CREEK, 0.6 MILES EAST OF SH-93 NEAR HUGO. PROJECT LENGTH = 0.176 MILEChoctaw · Division 2 | 2 of 2 | $610,721 | $449,234HUB Construction, Inc. | +35.9% |
| May 16, 2019 | 180248 | BRIDGE AND APPROACHES COUNTY ROAD (EW-19): OVER TRIBUTARY TO HORSE CREEK , 0.6 MILES WEST OF THE US -69 JUNCTION NEAR AFTON . PROJECT LENGTH = 0.166 MILEOttawa · Division 8 | 2 of 2 | $694,293 | $656,410B & B BRIDGE COMPANY, LLC | +5.8% |
| May 16, 2019 | 190017 | BRIDGE AND APPROACHES COUNTY ROAD (NS-4140): OVER DOUBLE CREEK, 1.5 MILES SOUTH OF US-169 NEAR NOWATA . PROJECT LENGTH = 0.151 MILENowata · Division 8 | 3 of 3 | $1,205,106 | $999,746H & H BRIDGE COMPANY | +20.5% |
| May 16, 2019 | 190018 | BRIDGE AND APPROACHES COUNTY ROAD (EW-27): OVER PANTHER CREEK , 1.8 MILES WEST OF THE SH-28 JUNCTION NEAR CHELSEA. PROJECT LENGTH = 0.117 MILENowata · Division 8 | 5 of 4 | $1,040,599 | $768,459H & H BRIDGE COMPANY | +35.4% |
| Apr 18, 2019 | 190087 | BRIDGE REHABILITATION SH -10: OVER UNNAMED CREEK, 1.6 MILES EAST OF THE US -169 JUNCTION NEAR LENAPAH . PROJECT LENGTH = 0.108 MILENowata · Division 8 | 2 of 5 | $582,424 | $519,208Tri Star Construction Arkan… | +12.2% |
| Apr 18, 2019 | 190167 | BRIDGE AND APPROACHES COUNTY ROAD (EAST CHESTNUT AVENUE /EW-173): OVER EAST COW CREEK, 2.8 MILES EAST OF SH -7 NEAR DUNCAN. PROJECT LENGTH = 0.208 MILEStephens · Division 7 | 1 of 5 | $1,096,463 | $1,096,463 | Won |
| Apr 18, 2019 | 190006 | BRIDGE AND APPROACHES SH -74: OVER UNNAMED CREEK, 6.4 MILES NORTH OF THE SH -29 JUNCTION NEAR ANTIOCH . PROJECT LENGTH = 0.056 MILEGarvin · Division 3 | 3 of 6 | $1,625,579 | $1,526,671BRIDGECO CONTRACTORS, INC. | +6.5% |
| Mar 14, 2019 | 190140 | BRIDGE AND APPROACHES COUNTY ROAD (NS-328): OVER COLBERT CREEK , 0.6 MILES SOUTH OF THE SH-7 JUNCTION NEAR DAVIS . PROJECT LENGTH = 0.301 MILEMurray · Division 7 | 3 of 8 | $1,129,469 | $1,078,665BRIDGECO CONTRACTORS, INC. | +4.7% |
| Mar 14, 2019 | 190141 | BRIDGE AND APPROACHES COUNTY ROAD (EW-207): OVER TRIBUTARY TO RED RIVER , 3.3 MILES WEST OF THE US -81 JUNCTION NEAR RYAN . PROJECT LENGTH = 0.082 MILEJefferson · | 7 of 7 | $534,009 | $433,988SEWELL BROS., INC. | +23.0% |
| Feb 14, 2019 | 190066 | BRIDGE AND APPROACHES COUNTY ROAD (EW-167): OVER NOLLEYTUBBY CREEK , 4.4 MILES WEST OF THE PITTSBURG COUNTY LINE NEAR WESLEY . PROJECT LENGTH = 0.191 MILEAtoka · Division 2 | 5 of 6 | $633,740 | $515,824C3 Construction, Inc. | +22.9% |
| Feb 14, 2019 | 190080 | BRIDGE AND APPROACHES SH -6: OVER UNNAMED CREEK, 2.6 MILES NORTHEAST OF THE SH -34 JUNCTION NEAR OLUSTEE. PROJECT LENGTH = 0.150 MILEJackson · Division 5 | 6 of 6 | $1,104,573 | $1,029,093Wyatt Contracting | +7.3% |
| Feb 14, 2019 | 190090 | BRIDGE AND APPROACHES COUNTY ROAD (CABINISS ROAD): OVER BIG WILDHORSE CREEK, 0.6 MILES NORTH OF THE US -270 JUNCTION NEAR CABINISS. PROJECT LENGTH = 0.189 MILEPittsburg · Division 2 | 4 of 5 | $804,192 | $752,311HUB Construction, Inc. | +6.9% |
| Feb 14, 2019 | 190015 | BRIDGE AND APPROACHES COUNTY ROAD (NS-449): OVER WHITE OAK CREEK, 4.7 MILES NORTH OF THE US -70 JUNCTION NEAR WRIGHT CITY . PROJECT LENGTH = 0.064 MILESMccurtain · Division 2 | 3 of 4 | $674,979 | $616,448L & N BRIDGE, LLC | +9.5% |
| Jan 17, 2019 | 190039 | BRIDGE AND APPROACHES I -40 NORTH FRONTAGE ROAD : OVER LITTLE DEEP CREEK , 1.0 MILE WEST OF THE CADDO COUNTY LINE NEAR WEATHERFORD . PROJECT LENGTH = 0.094 MILECuster · Division 5 | 4 of 6 | $1,577,315 | $1,533,773SEWELL BROS., INC. | +2.8% |
| Jan 17, 2019 | 190040 | BRIDGE REPAIR COUNTY ROAD (NS-234): REPAIR SCOUR DAMAGE OVER FLANDERS CREEK , 4.75 MILES NORTH OF THE CUSTER C /L NEAR PUTNAM. PROJECT LENGTH = 0.000 MILEDewey · Division 5 | 4 of 5 | $83,590 | $59,508L & M Contractors, Inc. | +40.5% |
| Jan 17, 2019 | 190059 | GRADE, DRAIN, BRIDGE, AND SURFACE COUNTY ROAD (EW-1090): OVER SALLISAW CREEK , 2.6 MILES WEST OF THE US -59 JUNCTION NEAR SALLISAW . PROJECT LENGTH = 0.370 MILESequoyah · Division 1 | 4 of 5 | $2,605,683 | $2,096,175T. McDonald Construction, I… | +24.3% |
| Jan 17, 2019 | 190005 | BRIDGE AND APPROACHES COUNTY ROAD (EW-133/SLAUGHTERVILLE RD ): OVER UNNAMED CREEK, 0.3 MILES WEST OF THE US -77 JUNCTION IN SLAUGHTERVILLE . PROJECT LENGTH = 0.033 MILECleveland · Division 3 | 6 of 9 | $363,591 | $294,990Silver Star Construction Co… | +23.3% |
| Nov 15, 2018 | 180273 | BRIDGE AND APPROACHES COUNTY ROAD (NS-4170): OVER FIFE CREEK, 1.6 MILES NORTH OF THE SH-51 JUNCTION NEAR COWETA . PROJECT LENGTH = 0.245 MILEWagoner · Division 1 | 4 of 5 | $1,877,804 | $1,474,531B & B BRIDGE COMPANY, LLC | +27.3% |
| Nov 15, 2018 | 180312 | BRIDGE AND APPROACHES COUNTY ROAD (NS-230): OVER OAK CREEK, 1.3 MILES SOUTH OF THE SH-55 JUNCTION NEAR ROCKY. PROJECT LENGTH = 0.189 MILEWashita · Division 5 | 3 of 6 | $718,220 | $626,266SEWELL BROS., INC. | +14.7% |
| Nov 15, 2018 | 180161 | BRIDGE AND APPROACHES COUNTY ROAD (EW-88): OVER LITTLE DEER CREEK, 0.8 MILES WEST OF THE SH -33 JUNCTION NEAR THOMAS . PROJECT LENGTH = 0.199 MILECuster · Division 5 | 5 of 5 | $824,087 | $661,389SEWELL BROS., INC. | +24.6% |
| Nov 15, 2018 | 180227 | BRIDGE AND APPROACHES COUNTY ROAD (NS-330): OVER MULE CREEK, 1.3 MILES NORTH OF THE US-64 JUNCTION NEAR SUMNER. PROJECT LENGTH = 0.170 MILENoble · Division 4 | 2 of 3 | $465,765 | $429,155B & B BRIDGE COMPANY, LLC | +8.5% |
| Nov 15, 2018 | 180238 | BRIDGE AND APPROACHES COUNTY ROAD (EW-132): OVER WEST BITTER CREEK , 1.0 MILE EAST OF I-44 NEAR CHICKASHA. PROJECT LENGTH = 0.198 MILEGrady · Division 7 | 5 of 6 | $1,083,603 | $885,833SEWELL BROS., INC. | +22.3% |
| Oct 18, 2018 | 180297 | BRIDGE AND APPROACHES US -60: OVER HORSE CREEK, 1.7 MILES SOUTHWEST OF THE US -59 JUNCTION IN THE CITY OF AFTON . PROJECT LENGTH = 0.139 MILEOttawa · Division 8 | 1 of 3 | $3,769,758 | $3,769,758 | Won |
| Sep 20, 2018 | 180278 | BRIDGE AND APPROACHES COUNTY ROAD (EW-65): OVER SPRING CREEK, 5.2 MILES EAST OF THE SH-51 JUNCTION NEAR OKEENE. PROJECT LENGTH = 0.127 MILEBlaine · Division 5 | 6 of 10 | $580,286 | $451,549Wyatt Contracting | +28.5% |
| Sep 20, 2018 | 180285 | BRIDGE AND APPROACHES COUNTY ROAD (NS-196): OVER TRIBUTARY OF SALT FORK RED RIVER , 3.0 MILES SOUTH OF US-283 NEAR MANGUM. PROJECT LENGTH = 0.142 MILEGreer · Division 5 | 6 of 7 | $276,156 | $211,010KLAVER CONSTRUCTION COMPANY… | +30.9% |
| Sep 20, 2018 | 180287 | BRIDGE REHABILITATION SH -48A: OVER BIG SANDY CREEK , 3.4 MILES WEST OF THE SH -48 JUNCTION NEAR MILBURN. PROJECT LENGTH = 0.1543 MILEJohnston · Division 3 | 4 of 4 | $1,636,019 | $1,081,736HUB Construction, Inc. | +51.2% |
| Sep 20, 2018 | 180313 | BRIDGE AND APPROACHES US -270: OVER UNNAMED CREEK, 1.6 MILES WEST OF THE SH -3E JUNCTION NEAR SEMINOLE. PROJECT LENGTH = 0.164 MILESeminole · Division 3 | 6 of 7 | $2,067,855 | $1,708,926B & B BRIDGE COMPANY, LLC | +21.0% |
| Sep 20, 2018 | 180202 | BRIDGE AND APPROACHES COUNTY ROAD (EW-109): OVER SNAKE CREEK, 5.3 MILES WEST OF THE SH-150 JUNCTION NEAR PIERCE. PROJECT LENGTH = 0.137 MILEMcintosh · Division 1 | 1 of 4 | $402,462 | $402,462 | Won |
| Sep 20, 2018 | 180208 | BRIDGE AND APPROACHES COUNTY ROAD (EW-63): OVER SALT CREEK , 2.6 MILES EAST OF THE SH-18 JUNCTION NEAR YALE . PROJECT LENGTH = 0.203 MILEPayne · Division 4 | 2 of 5 | $790,740 | $769,370K & R BUILDERS, INC. | +2.8% |
| Aug 16, 2018 | 180258 | BRIDGE AND APPROACHES COUNTY ROAD (EW-123): OVER SAND CREEK, 0.9 MILES WEST OF THE US-283 JUNCTION NEAR SAYRE . PROJECT LENGTH = 0.180 MILEBeckham · Division 5 | 3 of 4 | $515,696 | $450,626SEWELL BROS., INC. | +14.4% |
| Aug 16, 2018 | 180269 | BRIDGE AND APPROACHES COUNTY ROAD (NS-328/NORTH HARRAH ROAD ): OVER UNNAMED CREEK, 0.8 MILES SOUTH OF I-44 (TURNER TURNPIKE ) NEAR LUTHER. PROJECT LENGTH = 0.081 MILEOklahoma · Division 4 | 8 of 10 | $488,359 | $396,326KLAVER CONSTRUCTION COMPANY… | +23.2% |
| Jul 19, 2018 | 180184 | BRIDGE AND APPROACHES COUNTY ROAD (NS-215): OVER OTTER CREEK, 3.6 MILES NORTH OF THE SH-5 JUNCTION NEAR TIPTON . PROJECT LENGTH = 0.161 MILETillman · Division 5 | 2 of 3 | $976,141 | $974,723SEWELL BROS., INC. | +0.1% |
| Jul 19, 2018 | 180192 | GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (EW-198): OVER TRIBUTARY TO THE RED RIVER, 1.9 MILES WEST OF THE SH -36 JUNCTION NEAR DEVOL. PROJECT LENGTH = 0.206 MILECotton · | 2 of 7 | $907,547 | $858,000BREWER CONSTRUCTION OKLAHOM… | +5.8% |
| Jul 19, 2018 | 180214 | BRIDGE AND APPROACHES COUNTY ROAD (NS-250): OVER LAKE CREEK, 4.9 MILES NORTH OF THE SH-45 JUNCTION NEAR DACOMA. PROJECT LENGTH = 0.190 MILEWoods · Division 6 | 8 of 8 | $754,867 | $623,431B & B BRIDGE COMPANY, LLC | +21.1% |
| Jul 19, 2018 | 180240 | BRIDGE AND APPROACHES COUNTY ROAD (EW-60): OVER TURKEY CREEK , 2.6 MILES WEST OF THE US-81 JUNCTION NEAR HENNESSEY. PROJECT LENGTH = 0.331 MILEKingfisher · Division 4 | 1 of 7 | $740,615 | $740,615 | Won |
| Jul 19, 2018 | 180256 | BRIDGE AND APPROACHES US -64: OVER ANDERSON CREEK , 2.1 MILES EAST OF THE SH -50 JUNCTION NEAR FREEDOM. PROJECT LENGTH = 0.198 MILEWoods · Division 6 | 2 of 6 | $2,441,973 | $2,393,762Bridges, Inc. DBA Scudder B… | +2.0% |
| Jul 19, 2018 | 180257 | BRIDGE AND APPROACHES COUNTY ROAD (EW-114): OVER UNNAMED TRIBUTARY TO EUFAULA RESERVOIR , 0.6 MILES EAST OF THE MCINTOSH COUNTY LINE . PROJECT LENGTH = 0.0946 MILEMuskogee · Division 1 | 1 of 3 | $682,824 | $682,824 | Won |
| Jun 14, 2018 | 180222 | ADAIR BRIDGE AND APPROACHES AND BRIDGE REHABILITATION SH -51: OVER MULBERRY HOLLOW , 4.3 MILES NORTHWEST OF US -59. SH-100: OVER RUSSELL BRANCH CREEK , 4.5 MILES EAST OF US -59. PROJECT LENGTH = 0.235 MILESbr-201c(001)sb · | 6 of 6 | $6,274,031 | — | |
| Jun 14, 2018 | 180231 | BRIDGE AND APPROACHES SH -152: OVER EAST ELK CREEK , 0.1 MILES EAST OF THE SH -44 JUNCTION NEAR DILL CITY . PROJECT LENGTH = 0.280 MILEWashita · Division 5 | 7 of 8 | $2,716,991 | $2,270,084CASWELL CONSTRUCTION, INC. | +19.7% |
| Jun 14, 2018 | 180232 | BRIDGE AND APPROACHES SH -55: OVER LITTLE ELK CREEK, 0.9 MILES WEST OF US -183 NEAR ROCKY. PROJECT LENGTH = 0.437 MILEWashita · Division 5 | 2 of 3 | $2,735,758 | $2,450,355SEWELL BROS., INC. | +11.6% |
| May 17, 2018 | 180154 | BRIDGE AND APPROACHES SH -51: OVER NORTH CANADIAN RIVER AND OVERFLOW , 0.4 MILES AND 0.6 MILES EAST OF THE SH -58 JUNCTION IN CANTON . PROJECT LENGTH = 0.378 MILEBlaine · Division 5 | 2 of 4 | $3,525,194 | $3,381,458FRONTIER BRIDGE, INC. / BRI… | +4.3% |
| May 17, 2018 | 180195 | BRIDGE AND APPROACHES SH -9: OVER FISH CREEK, 0.4 MILES EAST OF THE SH -84 JUNCTION NEAR DUSTIN. PROJECT LENGTH = 0.492 MILEHughes · Division 3 | 4 of 5 | $2,587,118 | $2,498,300C-GAWF CONSTRUCTION, INC. | +3.6% |
| May 17, 2018 | 180233 | SEMINOLE BRIDGE AND APPROACHES SH -99A: OVER SAND CREEK AND TURKEY CREEK , 2.0 MI AND 13.1 MI WEST OF THE SH -56 JUNCTION, NEAR CROMWELL AND LITTLE . PROJECT LENGTH = 0.700 MILEStp-267c(071)ss · | 4 of 4 | $4,837,853 | $4,508,696FRONTIER BRIDGE, INC. / BRI… | +7.3% |
| Apr 19, 2018 | 180056 | BRIDGE AND APPROACHES COUNTY ROAD (EW-112): OVER MUD CREEK, 8.9 MILES EAST OF US -69 NEAR TEXANNA . PROJECT LENGTH = 0.132 MILEMcintosh · Division 1 | 7 of 6 | $528,927 | $395,087C3 Construction, Inc. | +33.9% |
| Apr 19, 2018 | 180168 | BRIDGE AND APPROACHES COUNTY ROAD (EW-69): OVER SKELETON CREEK , 5.3 MILES EAST OF THE SH-74 JUNCTION NEAR CRESCENT. PROJECT LENGTH = 0.331 MILELogan · Division 4 | 3 of 8 | $1,347,671 | $1,225,821K & R BUILDERS, INC. | +9.9% |
| Apr 19, 2018 | 180186 | BRIDGE AND APPROACHES COUNTY ROAD (LAFLIN CREEK ROAD): OVER TRIBUTARY TO LAFLIN CREEK, 2.6 MILES WEST OF THE SH -76 JUNCTION NEAR DIBBLE. PROJECT LENGTH = 0.343 MILEGrady · Division 7 | 5 of 6 | $727,878 | $628,714K & R BUILDERS, INC. | +15.8% |
| Mar 15, 2018 | 180054 | BRIDGE AND APPROACHES COUNTY ROAD (EW-136/SAND CREEK ROAD): OVER DIBBLE CREEK AND TRIBUTARY , 0.8 MILES AND 1.0 MILE EAST SH -76 NEAR DIBBLE. PROJECT LENGTH = 0.239 MILEMcclain · Division 3 | 5 of 7 | $756,275 | $684,813SEWELL BROS., INC. | +10.4% |
| Mar 15, 2018 | 180077 | BRIDGE AND APPROACHES COUNTY ROAD (EW-24): OVER TRIBUTARY OF EAGLE CHIEF CREEK , 8.0 MILES EAST OF US -281 NEAR CARMEN. PROJECT LENGTH = 0.139 MILEAlfalfa · Division 6 | 5 of 7 | $530,705 | $436,422C3 Construction, Inc. | +21.6% |
| Mar 15, 2018 | 180134 | BRIDGE AND APPROACHES COUNTY ROAD (EW-1490/LINWOOD LANE): OVER PIT CREEK , 1.4 MILES EAST OF THE PITTSBURG COUNTY LINE NEAR HARTSHORNE . PROJECT LENGTH = 0.142 MILELatimer · Division 2 | 5 of 5 | $611,160 | $534,170L & N BRIDGE, LLC | +14.4% |
| Mar 15, 2018 | 180142 | BRIDGE AND APPROACHES COUNTY ROAD (E0510): OVER UNNAMED CREEK, 0.6 MILES EAST OF THE SH-18 JUNCTION NEAR PAWNEE . PROJECT LENGTH = 0.05 MILEPawnee · Division 8 | 5 of 5 | $671,366 | $581,427T. McDonald Construction, I… | +15.5% |
| Feb 15, 2018 | 180070 | BRIDGE AND APPROACHES COUNTY ROAD (EW-104/ALPHA ROAD ): OVER LITTLE VIAN CREEK, 1.4 MILES EAST OF SH -82 NEAR VIAN. PROJECT LENGTH = 0.427 MILESequoyah · Division 1 | 5 of 7 | $1,374,228 | $1,285,423B & B BRIDGE COMPANY, LLC | +6.9% |
| Feb 15, 2018 | 180078 | BRIDGE AND APPROACHES COUNTY ROAD (EW-83): OVER MANARD BAYOU , 0.5 MILES EAST OF THE MUSKOGEE COUNTY LINE . PROJECT LENGTH = 0.198 MILE.Cherokee · Division 1 | 6 of 8 | $854,955 | $760,488BRIGHT LIGHTING, INC. DBA B… | +12.4% |
| Feb 15, 2018 | 180091 | BRIDGE AND APPROACHES SH -18: OVER DRY CREEK OVERFLOW AND DRY CREEK , 5.6 MILES AND 5.7 MILES NORTH OF I -44 NEAR CHANDLER. PROJECT LENGTH = 0.661 MILELincoln · Division 3 | 5 of 6 | $3,506,704 | $3,216,964BRIDGECO CONTRACTORS, INC. | +9.0% |
| Feb 15, 2018 | 180108 | BRIDGE AND APPROACHES COUNTY ROAD (EW-28/GEORGE BRADEN ROAD): OVER UNNAMED CREEK, 8.9 MILES EAST OF US -177 NEAR PONCA CITY . PROJECT LENGTH = 0.247 MILEOsage · Division 8 | 4 of 7 | $966,979 | $874,941BRIDGECO CONTRACTORS, INC. | +10.5% |
| Feb 15, 2018 | 180010 | KIOWA BRIDGE AND APPROACHES SH -19: OVER UNNAMED CREEKS, 0.2 MI AND 3.1 MI WEST OF THE CADDO COUNTY LINE . PROJECT LENGTH = 0.496 MILEStp-238c(046)ss · | 1 of 5 | $2,082,170 | $2,082,170 | Won |
| Feb 15, 2018 | 180033 | GRADE, DRAIN, SURFACE , AND BRIDGE SH-56: OVER JUMPER CREEK, 1.3 MILES EAST OF THE SH-99 INTERSECTION NEAR KONAWA . PROJECT LENGTH = 0.568 MILESeminole · Division 3 | 8 of 8 | $3,511,421 | $2,976,296Treas Construction Inc | +18.0% |
| Jan 18, 2018 | 180043 | BRIDGE AND APPROACHES COUNTY ROAD (EW-168/BISHOP ROAD ): OVER POST OAK CREEK , 3.9 MILES WEST OF COUNTY HIGHWAY 115 NEAR INDIAHOMA. PROJECT LENGTH = 0.208 MILEComanche · Division 7 | 5 of 7 | $606,234 | $499,591BRIDGECO CONTRACTORS, INC. | +21.3% |
| Jan 18, 2018 | 180063 | BRIDGE AND APPROACHES COUNTY ROAD (EW-0030): OVER FOURMILE CREEK, 4.3 MILES EAST OF THE CRAIG COUNTY LINE NEAR MIAMI. PROJECT LENGTH = 0.340 MILEOttawa · Division 8 | 5 of 4 | $948,993 | $815,808Crossland Construction Comp… | +16.3% |
| Jan 18, 2018 | 180006 | BRIDGE AND APPROACHES COUNTY ROAD (NS-366/S. 449TH W. AVENUE ): OVER TRIBUTARIES TO BUCKEYE CREEK, 3.5 MI AND 3.8 MI S OF SH-51 NEAR OILTON . PROJECT LENGTH = 0.572 MILECreek · Division 8 | 6 of 7 | $2,213,444 | $1,831,559BRIDGECO CONTRACTORS, INC. | +20.9% |
| Jan 18, 2018 | 180019 | BRIDGE AND APPROACHES US -62: OVER BOLEY CREEK , 4.3 MILES NORTHWEST OF THE SH -48 INTERSECTION NEAR BOLEY. PROJECT LENGTH = 0.320 MILEOkfuskee · Division 3 | 5 of 8 | $2,894,863 | $2,519,493Treas Construction Inc | +14.9% |
| Jan 18, 2018 | 180022 | BRIDGE AND APPROACHES COUNTY ROAD (EW-089): OVER SALT CREEK , 3.1 MILES WEST OF THE US-75 ALT . INTERSECTION, NEAR BEGGS. PROJECT LENGTH = 0.396 MILEOkmulgee · Division 1 | 7 of 8 | $994,708 | — | |
| Jan 18, 2018 | 180023 | BRIDGE AND APPROACHES COUNTY ROAD (EW-33): OVER DOG THRESHER CREEK , 3.2 MILES WEST OF SH -11 NEAR BARNSDALL. PROJECT LENGTH = 0.302 MILEOsage · Division 8 | 5 of 7 | $1,030,787 | — | |
| Jan 18, 2018 | 180032 | BRIDGE AND APPROACHES US -270: OVER MAGNOLIA CREEK , 0.7 MILES EAST OF THE SH -99 INTERSECTION IN SEMINOLE. PROJECT LENGTH = 0.141 MILESeminole · Division 3 | 9 of 9 | $2,941,985 | $2,082,389T. McDonald Construction, I… | +41.3% |
| Jan 18, 2018 | 180039 | BRIDGE AND APPROACHES COUNTY ROAD (WELLING ROAD): OVER BARREN FORK CREEK, 4.1 MILES SOUTH OF SH-51 NEAR TAHLEQUAH . PROJECT LENGTH = 0.369 MILECherokee · Division 1 | 7 of 7 | $3,773,637 | — |
Subcontracts on active jobs 0
No subcontracts on TxDOT's active contract list.