RRY SERVICES LLC

Oklahoma bid history Sign up free

‹ All contractors

168BidsJan 18, 2018 to Sep 15, 2022
18Wins (low bidder)
10.7%Win rate
$20,435,395Total won

Competitor scorecard

Last 5 years in Oklahoma
19.0%Win rate4 of 21 bids
+10.8%Average bid vs estimate
+3.3%Winning bids vs estimate
+20.2%Over the low bid when they loseAverage field: 5.9 bidders

Bid history

ExcelCSV
Let dateContractProjectRankTheir bidLow bidvs low
Sep 15, 2022 220190 BRIDGE AND APPROACHES COUNTY ROAD (EW-26): OVER WEST CLAY CREEK , 0.2 MILES WEST OF THE SH -8 JUNCTION NEAR CARMEN. PROJECT LENGTH = 0.284 MILEAlfalfa · Division 6 1 of 5 $1,163,271 $1,163,271 Won
Sep 15, 2022 220282 BRIDGE AND APPROACHES COUNTY ROAD (EW-113): OVER WEST ELK CREEK , 1.4 MILES WEST OF THE SH -6 JUNCTION NEAR ELK CITY. PROJECT LENGTH = 0.161 MILEBeckham · Division 5 2 of 3 $1,033,214 $1,011,261SEWELL BROS., INC. +2.2%
Sep 15, 2022 220289 BRIDGE AND APPROACHES COUNTY ROAD (EW-159): OVER TRIBUTARY TO WASHITA RIVER , 5.5 MILES WEST OF THE US -177 JUNCTION NEAR WYNNEWOOD. PROJECT LENGTH = 0.114 MILEGarvin · Division 3 1 of 3 $663,437 $663,437 Won
Sep 15, 2022 220298 BRIDGE AND APPROACHES COUNTY ROAD (N. 108TH STREET): OVER UNNAMED CREEK, 6.5 MILES EAST OF I -44 IN JONES. PROJECT LENGTH = 0.263 MILEOklahoma · Division 4 1 of 7 $910,370 $910,370 Won
Aug 18, 2022 220189 BRIDGE AND APPROACHES COUNTY ROAD (EW-29): OVER WEST CLAY CREEK , 1.4 MILES EAST OF THE SH -8 JUNCTION NEAR CARMEN. PROJECT LENGTH = 0.312 MILEAlfalfa · Division 6 3 of 5 $918,169 $774,393SEWELL BROS., INC. +18.6%
Aug 18, 2022 220253 BRIDGE AND APPROACHES COUNTY ROAD (LADD ROAD): OVER UNNAMED CREEK, 0.3 MILES EAST OF I -35 NEAR NOBLE. PROJECT LENGTH = 0.234 MILEMcclain · Division 3 3 of 7 $962,480 $842,956K & R BUILDERS, INC. +14.2%
Jul 14, 2022 220219 BRIDGE AND APPROACHES COUNTY ROAD (EW-136): OVER ELK CREEK, 5.2 MILES WEST OF THE SH -9 JUNCTION NEAR HOBART . PROJECT LENGTH = 0.266 MILEKiowa · Division 5 5 of 6 $1,400,185 $1,176,073SEWELL BROS., INC. +19.1%
Jul 14, 2022 220234 BRIDGE AND APPROACHES COUNTY ROAD (EW-196): OVER CURTIS CREEK , 5.5 MILES WEST OF THE COTTON COUNTY LINE NEAR GRANDFIELD . PROJECT LENGTH = 0.142 MILETillman · Division 5 4 of 4 $681,486 $529,408Wyatt Contracting +28.7%
Jun 16, 2022 220157 BRIDGE AND APPROACHES COUNTY ROAD (MILLER ROAD): OVER LITTLE CHICKASAW CREEK , 1.8 MILES SOUTH OF SH-43 NEAR STRINGTOWN . PROJECT LENGTH = 0.133 MILEAtoka · Division 2 6 of 7 $879,027 $736,557HUB Construction, Inc. +19.3%
May 19, 2022 210247 BRIDGE AND APPROACHES SH-37: OVER UNNAMED CREEK, 0.4 MILES WEST OF I -35 IN MOORE. PROJECT LENGTH = 0.029 MILECleveland · Division 3 9 of 9 $2,565,983 $1,166,689SAC Services, Inc. +119.9%
Apr 14, 2022 220119 BRIDGE AND APPROACHES COUNTY ROAD (MIDWAY ROAD ): OVER HUG ME TIGHT BRANCH CREEK , 0.9 MILES SOUTH OF THE SH -53 JUNCTION NEAR GRAHAM. PROJECT LENGTH = 0.145 MILECarter · Division 7 4 of 7 $1,342,631 $1,201,036Wyatt Contracting +11.8%
Apr 14, 2022 220124 BRIDGE AND APPROACHES COUNTY ROAD (EW-129): OVER TIGER CREEK , 0.8 MILES EAST OF THE SH -48 JUNCTION NEAR HOLDENVILLE. PROJECT LENGTH = 0.255 MILEHughes · Division 3 4 of 8 $584,578 $525,634Cowboy Contracting, Inc. +11.2%
Apr 14, 2022 220127 BRIDGE AND APPROACHES COUNTY ROAD (EW-72): OVER TREATY CREEK , 4.1 MILES WEST OF US -81 NEAR DOVER. PROJECT LENGTH = 0.208 MILEKingfisher · Division 4 1 of 4 $922,368 $922,368 Won
Apr 14, 2022 220132 BRIDGE AND APPROACHES COUNTY ROAD (NS-409): OVER SALT CREEK , 2.1 MILES NORTH OF THE SH -16 JUNCTION NEAR HASKELL. PROJECT LENGTH = 0.284 MILEMuskogee · Division 1 3 of 5 $837,307 —
Apr 14, 2022 220133 BRIDGE AND APPROACHES COUNTY ROAD (EW-36): OVER BUNCH CREEK, 3.6 MILES WEST OF I -35 NEAR BILLINGS. PROJECT LENGTH = 0.237 MILENoble · Division 4 2 of 3 $1,014,593 $979,341K & R BUILDERS, INC. +3.6%
Mar 17, 2022 220018 BRIDGE AND APPROACHES COUNTY ROAD (EW-46): OVER TURKEY CREEK , 1.3 MILES EAST OF THE SH -132 JUNCTION NEAR DRUMMOND. PROJECT LENGTH = 0.246 MILEGarfield · Division 4 7 of 10 $1,211,755 $1,046,449H & H BRIDGE COMPANY +15.8%
Mar 17, 2022 220080 BRIDGE AND APPROACHES COUNTY ROAD (NS-145): OVER NORTH FORK OF KIOWA CREEK, 1.1 MILES NORTH OF THE TEXAS STATE LINE . PROJECT LENGTH = 0.264 MILEBeaver · Division 6 2 of 3 $896,327 $765,097K & R BUILDERS, INC. +17.2%
Mar 17, 2022 220103 BRIDGE AND APPROACHES COUNTY ROAD (EAST 86TH STREET): OVER STILLWATER CREEK, 0.9 MILES WEST OF SH -108 NEAR RIPLEY. PROJECT LENGTH = 0.402 MILEPayne · Division 4 5 of 8 $1,927,134 $1,545,639H & H BRIDGE COMPANY +24.7%
Feb 17, 2022 220061 BRIDGE AND APPROACHES SH-115: OVER UNNAMED CREEKS, 0.3 MILES AND 6.6 MILES NORTH OF THE SH -19 JUNCTION NEAR MOUNTAINVIEW . PROJECT LENGTH = 0.340 MILEKiowa · Division 5 2 of 5 $1,612,529 $1,548,658SEWELL BROS., INC. +4.1%
Feb 17, 2022 220068 BRIDGE REHABILITATION US-60: OVER CHARLIE CREEK, 8.2 MILES EAST OF THE KAY COUNTY LINE . PROJECT LENGTH = 0.159 MILEOsage · Division 8 2 of 8 $1,555,832 $1,549,498K & R BUILDERS, INC. +0.4%
Jan 20, 2022 220017 BRIDGE AND APPROACHES COUNTY ROAD (EW-088): OVER WEST BARNITZ CREEK , 10.0 MILES EAST OF THE SH -34 JUNCTION NEAR MOOREWOOD. PROJECT LENGTH = 0.151 MILECuster · Division 5 4 of 7 $1,038,131 $917,874K & R BUILDERS, INC. +13.1%
Nov 18, 2021 210304 BRIDGE AND APPROACHES COUNTY ROAD (EW-1230): OVER SUGAR CREEK, 1.6 MILES WEST OF THE US -281 JUNCTION NEAR GRACEMONT. PROJECT LENGTH = 0.169 MILECaddo · Division 7 4 of 4 $1,057,207 $811,238SEWELL BROS., INC. +30.3%
Nov 18, 2021 210312 BRIDGE AND APPROACHES COUNTY ROAD (EW-48): OVER TURKEY CREEK , 1.8 MILES EAST OF THE SH -132 JUNCTION NEAR DRUMMOND. PROJECT LENGTH = 0.208 MILEGarfield · Division 4 4 of 5 $996,343 $899,415K & R BUILDERS, INC. +10.8%
Nov 18, 2021 210313 BRIDGE AND APPROACHES COUNTY ROAD (N4355 ROAD): OVER UNNAMED CREEK, 0.6 MILES NORTH OF THE SH -9 JUNCTION NEAR WHITEFIELD. PROJECT LENGTH = 0.058 MILEHaskell · Division 1 2 of 7 $549,396 $447,819H & G Paving Contractors In… +22.7%
Nov 18, 2021 210329 BRIDGE AND APPROACHES COUNTY ROAD (SUNSHINE ROAD/NS-333): OVER UNNAMED CREEK, 2.2 MILES NORTH OF THE SH -7 JUNCTION NEAR DAVIS . PROJECT LENGTH = 0.207 MILEMurray · Division 7 3 of 6 $790,342 $729,920K & R BUILDERS, INC. +8.3%
Nov 18, 2021 210334 BRIDGE AND APPROACHES COUNTY ROAD (NS-3580): OVER HELLROARING CREEK, 1.4 MILES NORTH OF THE US -64 JUNCTION NEAR CLEVELAND. PROJECT LENGTH = 0.154 MILEPawnee · Division 8 3 of 5 $737,564 $643,382K & R BUILDERS, INC. +14.6%
Nov 18, 2021 210335 BRIDGE AND APPROACHES COUNTY ROAD (EW-129): OVER UNNAMED CREEK, 1.4 MILES WEST OF US-69 NEAR CROWDER. PROJECT LENGTH = 0.113 MILEPittsburg · Division 2 5 of 8 $496,158 $444,969BRIGHT LIGHTING, INC. DBA B… +11.5%
Nov 18, 2021 210337 BRIDGE AND APPROACHES COUNTY ROAD (NS-296): OVER TRIBUTARY TO BLACK BEAR CREEK, 0.5 MILES SOUTH OF THE SH -29 JUNCTION NEAR BRAY . PROJECT LENGTH = 0.228 MILEStephens · Division 7 3 of 5 $878,604 $799,524K & R BUILDERS, INC. +9.9%
Oct 14, 2021 210273 BRIDGE AND APPROACHES COUNTY ROAD (NS-181): OVER OTTER CREEK, 0.7 MILES SOUTH OF THE HARPER COUNTY LINE . PROJECT LENGTH = 0.208 MILEEllis · Division 6 4 of 7 $885,895 $686,856Lopp Construction, LLC +29.0%
Oct 14, 2021 210279 GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (NE 36TH STREET): FROM HARRAH ROAD, EXTEND EAST NEAR HARRAH . PROJECT LENGTH = 0.062 MILEOklahoma · Division 4 4 of 10 $550,955 $491,874SAC Services, Inc. +12.0%
Oct 14, 2021 210294 BRIDGE AND APPROACHES COUNTY ROAD (EW-125): OVER UNNAMED CREEK, 0.6 MILES WEST OF THE SH -44 JUNCTION NEAR SENTINEL. PROJECT LENGTH = 0.161 MILEWashita · Division 5 4 of 8 $538,479 $435,496Lopp Construction, LLC +23.6%
Sep 16, 2021 210252 BRIDGE AND APPROACHES COUNTY ROAD (ENGLISH ROAD/NS-3683): OVER SANDY CREEK, 2.8 MILES NORTH OF SH -48A NEAR COLEMAN. PROJECT LENGTH = 0.171 MILEJohnston · Division 3 3 of 8 $546,372 $517,317Built Right Construction, L… +5.6%
Sep 16, 2021 210253 BRIDGE AND APPROACHES COUNTY ROAD (NS-427): OVER CHOUTEAU CREEK TRIBUTARY , 2.4 MILES NORTH OF US -412 JUNCTION NEAR CHOUTEAU. PROJECT LENGTH = 0.180 MILEMayes · Division 8 1 of 8 $688,499 $688,499 Won
Sep 16, 2021 210266 BRIDGE AND APPROACHES COUNTY ROAD (EW-89): OVER TRIBUTARY TO WOLF CREEK , 5.9 MILES WEST OF THE SH -74 JUNCTION NEAR PIEDMONT. PROJECT LENGTH = 0.135 MILECanadian · Division 4 2 of 5 $734,597 $721,246SEWELL BROS., INC. +1.9%
Sep 16, 2021 210267 BRIDGE AND APPROACHES COUNTY ROAD (EW-68): OVER TRIBUTARY OF CLEAR CREEK, 2.3 MILES EAST OF I -35 NEAR STILLWATER . PROJECT LENGTH = 0.208 MILEPayne · Division 4 4 of 8 $651,254 $626,470H & H BRIDGE COMPANY +4.0%
Jul 15, 2021 210201 BRIDGE AND APPROACHES COUNTY ROAD (EW-068): OVER SALT CREEK , 1.7 MILES EAST OF THE SH -8 JUNCTION NEAR OKEENE. PROJECT LENGTH = 0.199 MILEBlaine · Division 5 5 of 5 $659,764 $530,480SEWELL BROS., INC. +24.4%
Jul 15, 2021 210209 BRIDGE AND APPROACHES COUNTY ROAD (NS-312): OVER SAND CREEK, 2.6 MILES SOUTH OF THE KANSAS STATE LINE NEAR BRAMAN . PROJECT LENGTH = 0.227 MILEKay · Division 4 3 of 4 $667,897 $588,986H & H BRIDGE COMPANY +13.4%
Jun 17, 2021 210172 BRIDGE AND APPROACHES COUNTY ROAD (NS-229): OVER UNNAMED CREEK, 0.8 MILES SOUTH OF THE US -270/US-281/SH-3/SH-51 JUNCTION NEAR SEILING. PROJECT LENGTH = 0.085 MILESDewey · Division 5 3 of 6 $461,818 $421,766Wyatt Contracting +9.5%
May 20, 2021 210131 BRIDGE AND APPROACHES COUNTY ROAD (NS-4501): OVER DOUBLE SPRINGS CREEK, 8.3 MILES NORTH OF SH -82 NEAR TERESITA . PROJECT LENGTH = 0.153 MILECherokee · Division 1 3 of 5 $1,043,510 —
May 20, 2021 210141 BRIDGE AND APPROACHES COUNTY ROAD (CASCARA ROAD /NS-3035): OVER WALNUT CREEK , 0.8 MILES NORTH OF THE SH -74B JUNCTION NEAR BLANCHARD. PROJECT LENGTH = 0.264 MILESMcclain · Division 3 3 of 9 $1,058,714 $1,045,616H & H BRIDGE COMPANY +1.3%
May 20, 2021 210158 BRIDGE AND APPROACHES COUNTY ROAD (NS-245): OVER DEEP RED CREEK, 6.3 MILES NORTH OF THE US -70 JUNCTION NEAR GRANDFIELD. PROJECT LENGTH = 0.208 MILETillman · Division 5 4 of 7 $979,321 $888,257SEWELL BROS., INC. +10.3%
Apr 15, 2021 210103 BRIDGE AND APPROACHES SH-5: OVER COX CREEK, 0.4 MILES WEST OF THE US-277 JUNCTION NEAR WALTERS . PROJECT LENGTH = 0.151 MILECotton · 8 of 7 $1,653,824 $1,075,440SEWELL BROS., INC. +53.8%
Apr 15, 2021 210115 BRIDGE AND APPROACHES COUNTY ROAD (NS-317): OVER LITTLE STILLWATER CREEK , 6.0 MILES SOUTH OF US-77 NEAR PERRY . PROJECT LENGTH = 0.227 MILENoble · Division 4 8 of 13 $760,048 $697,164SEWELL BROS., INC. +9.0%
Mar 18, 2021 200030 BRIDGE AND APPROACHES COUNTY ROAD (E0590): OVER SH-88 AND THE UNION PACIFIC RAILROAD, 9.8 MILES WEST OF THE US -69 JUNCTION NEAR INOLA. PROJECT LENGTH = 0.380 MILERogers · Division 8 7 of 7 $4,302,320 $2,826,236CONCRETE SERVICES CORPORATI… +52.2%
Mar 18, 2021 210078 BRIDGE AND APPROACHES COUNTY ROAD (NORTH AVENUE /EW-23): OVER DEER CREEK, 0.7 MILES WEST OF I -35 NEAR TONKAWA . PROJECT LENGTH = 0.397 MILEKay · Division 4 1 of 6 $991,764 $991,764 Won
Feb 18, 2021 210043 BANK PROTECTION US-64: OVER EAST CLAY CREEK , 1.0 MILE EAST OF THE SH -8 JUNCTION NEAR CHEROKEE. PROJECT LENGTH = 0.000 MILEAlfalfa · Division 6 9 of 9 $803,394 $565,886K & R BUILDERS, INC. +42.0%
Feb 18, 2021 210044 RESURFACE (ASPHALT ) AND BRIDGE REHABILITATION COUNTY ROAD (PETREE ROAD): FROM SW 6TH STREET, EXTEND EAST IN ANADARKO . PROJECT LENGTH = 0.991 MILECaddo · Division 7 4 of 3 $904,870 —
Feb 18, 2021 210046 BRIDGE AND APPROACHES COUNTY ROAD (EW-154): OVER NINEMILE BEAVER CREEK , 0.7 MILES EAST OF THE SH -17 JUNCTION NEAR ELGIN. PROJECT LENGTH = 0.407 MILEComanche · Division 7 4 of 5 $1,236,171 $1,133,370K & R BUILDERS, INC. +9.1%
Feb 18, 2021 210048 BRIDGE AND APPROACHES COUNTY ROAD (NS-445): OVER LITTLE CABIN CREEK, 1.6 MILES NORTH OF THE SH -25 JUNCTION NEAR BLUE JACKET. PROJECT LENGTH = 0.415 MILESCraig · Division 8 4 of 7 $1,748,973 $1,627,329CONCRETE SERVICES CORPORATI… +7.5%
Jan 21, 2021 210012 BRIDGE AND APPROACHES US-75: OVER CANEY CREEK , 0.8 MILES NORTHWEST OF THE SH -31 JUNCTION NEAR COALGATE . PROJECT LENGTH = 0.056 MILECoal · Division 3 4 of 8 $1,516,683 $1,241,460Treas Construction Inc +22.2%
Jan 21, 2021 210014 BRIDGE AND APPROACHES COUNTY ROAD (NS-296): OVER RED ROCK CREEK, 6.5 MILES NORTH OF THE US -64 JUNCTION NEAR BRECKINRIDGE. PROJECT LENGTH = 0.454 MILEGarfield · Division 4 3 of 6 $1,000,000 $921,008K & R BUILDERS, INC. +8.6%
Jan 21, 2021 210016 BRIDGE AND APPROACHES COUNTY ROAD (EW-137): OVER EAST BITTER CREEK , 1.1 MILES SOUTH OF THE US -277 JUNCTION NEAR CHICKASHA. PROJECT LENGTH = 0.266 MILEGrady · Division 7 7 of 8 $1,330,589 $1,060,215K & R BUILDERS, INC. +25.5%
Jan 21, 2021 210017 BRIDGE AND APPROACHES COUNTY ROAD (NS-2958): OVER RUSH CREEK, 5.4 MILES NORTH OF THE SH -29 JUNCTION NEAR COX CITY. PROJECT LENGTH = 0.464 MILEGrady · Division 7 4 of 6 $2,258,557 $2,069,514Treas Construction Inc +9.1%
Jan 21, 2021 210019 BRIDGE REHABILITATION SH-7: OVER KEEL CREEK , 3.8 MILES WEST OF THE US-377 JUNCTION NEAR WAPANUCKA . PROJECT LENGTH = 0.198 MILEJohnston · Division 3 8 of 8 $1,591,271 $1,181,139C3 Construction, Inc. +34.7%
Jan 21, 2021 210023 BRIDGE AND APPROACHES SH-48: OVER UNNAMED CREEK, 1.5 MILES NORTH OF THE SH -48A JUNCTION NEAR COLEMAN. PROJECT LENGTH = 0.084 MILEJohnston · Division 3 4 of 4 $530,856 $423,630Treas Construction Inc +25.3%
Nov 19, 2020 200156 BRIDGE AND APPROACHES COUNTY ROAD (NS-262): OVER DEEP CREEK , 3.9 MILES NORTH OF THE SH -51 JUNCTION NEAR OKEENE. PROJECT LENGTH = 0.208 MILEMajor · Division 6 3 of 4 $573,034 $529,774K & R BUILDERS, INC. +8.2%
Nov 19, 2020 200344 BRIDGE AND APPROACHES COUNTY ROAD (NS-256): OVER COBB CREEK, 1.9 MILES SOUTH OF THE SH -146 JUNCTION NEAR FORT COBB . PROJECT LENGTH = 0.274 MILECaddo · Division 7 4 of 7 $752,123 $673,241K & R BUILDERS, INC. +11.7%
Nov 19, 2020 200349 BRIDGE AND APPROACHES SH-19: OVER PEAVINE CREEK , 0.3 MILES EAST OF THE SH-133 JUNCTION NEAR PAULS VALLEY . PROJECT LENGTH = 0.366 MILEGarvin · Division 3 9 of 11 $2,443,185 $1,970,021Treas Construction Inc +24.0%
Nov 19, 2020 200359 GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (D4615): OVER LITTLE RIVER, 1.3 MILES NORTH OF THE US -70 JUNCTION NEAR IDABEL. PROJECT LENGTH = 0.364 MILEMccurtain · Division 2 4 of 5 $3,879,957 $3,196,115Frontier Bridge, Inc. +21.4%
Oct 15, 2020 200304 BRIDGE AND APPROACHES COUNTY ROAD (NS-254): OVER WEAVERS CREEK , 3.0 MILES SOUTH OF THE US-270 JUNCTION NEAR WATONGA . PROJECT LENGTH = 0.161 MILEBlaine · Division 5 5 of 8 $741,036 $641,854K & R BUILDERS, INC. +15.5%
Oct 15, 2020 200314 BRIDGE AND APPROACHES COUNTY ROAD (EW-67): OVER TURKEY CREEK , 2.5 MILES WEST OF THE US -81 JUNCTION NEAR HENNESSEY. PROJECT LENGTH = 0.284 MILEKingfisher · Division 4 3 of 8 $871,906 $768,168K & R BUILDERS, INC. +13.5%
Oct 15, 2020 200316 BRIDGE AND APPROACHES COUNTY ROADS (EW-141 (180TH STREET) / NS-299): EW-141, OVER TRIBUTARY TO LAFLIN CREEK 1.7 MILES WEST OF SH -76. NS-299, FROM EW-141 EXTEND NORTH NEAR CRINER . PROJECT LENGTH = 0.354 MILEGrady, Mcclain · 3 of 10 $860,612 $766,364Treas Construction Inc +12.3%
Oct 15, 2020 200323 BRIDGE AND APPROACHES US-60: OVER SALT CREEK , 1.5 MILES WEST OF THE SH-18 JUNCTION NEAR BURBANK. PROJECT LENGTH = 0.233 MILESOsage · Division 8 5 of 7 $2,597,907 $2,321,084BRIDGECO CONTRACTORS, INC. +11.9%
Sep 17, 2020 200278 BRIDGE AND APPROACHES COUNTY ROAD (NS-215): OVER KIZER CREEK, 4.3 MILES SOUTH OF SH-51 NEAR CAMARGO. PROJECT LENGTH = 0.123 MILESDewey · Division 5 7 of 8 $797,671 $578,689HASKELL LEMON CONSTRUCTION … +37.8%
Sep 17, 2020 200281 BRIDGE AND APPROACHES COUNTY ROAD (NS-230): OVER UNNAMED CREEK, 1.8 MILES NORTH OF THE SH-9 JUNCTION NEAR GOTEBO. PROJECT LENGTH = 0.114 MILEKiowa · Division 5 5 of 6 $595,515 $487,898SEWELL BROS., INC. +22.1%
Sep 17, 2020 200284 BRIDGE AND APPROACHES COUNTY ROAD (NS-228): OVER WEST CREEK , 4.1 MILES NORTH OF THE US -412 JUNCTION NEAR WAYNOKA . PROJECT LENGTH = 0.189 MILESMajor · Division 6 3 of 7 $762,820 $729,412BRIDGECO CONTRACTORS, INC. +4.6%
Sep 17, 2020 200287 BRIDGE AND APPROACHES COUNTY ROAD (EW-093/NORTH 192ND STREET): OVER BIDDY CREEK , 4.1 MILES WEST OF THE SH -74 JUNCTION NEAR OKLAHOMA CITY . PROJECT LENGTH = 0.140 MILEOklahoma · Division 4 2 of 5 $1,013,378 $1,000,000Cowboy Contracting, Inc. +1.3%
Sep 17, 2020 200290 BRIDGE AND APPROACHES SH-99: OVER BIRCH CREEK, 3.0 MILES NORTH OF THE SH -10 JUNCTION NEAR THE HULAH WILDLIFE MANAGEMENT AREA . PROJECT LENGTH = 0.028 MILESOsage · Division 8 7 of 7 $1,563,715 $996,447BRIDGECO CONTRACTORS, INC. +56.9%
Aug 20, 2020 200230 BRIDGE AND APPROACHES COUNTY ROAD (NS-3210/DORY ROAD ): OVER TRIBUTARY TO WALNUT BAYOU , 2.5 MILES NORTH OF SH -32 NEAR BURNEYVILLE. PROJECT LENGTH = 0.148 MILELove · Division 7 4 of 8 $761,284 $601,019HUB Construction, Inc. +26.7%
Aug 20, 2020 200239 BRIDGE AND APPROACHES COUNTY ROAD (NS-237): OVER GREEN LEAF CREEK, 8.7 MILES NORTH OF THE US -64 JUNCTION NEAR THE KANSAS STATE LINE . PROJECT LENGTH = 0.239 MILEWoods · Division 6 4 of 8 $1,357,085 $1,199,890K & R BUILDERS, INC. +13.1%
Aug 20, 2020 200262 BRIDGE AND APPROACHES COUNTY ROAD (EW-112): OVER WEST ELK CREEK , 3.4 MILES EAST OF THE I-40 BUSINESS JUNCTION IN ELK CITY. PROJECT LENGTH = 0.151 MILEBeckham · Division 5 6 of 7 $907,482 $762,027SEWELL BROS., INC. +19.1%
Aug 20, 2020 200264 BRIDGE AND APPROACHES COUNTY ROAD (NS-464): OVER BRAZIL CREEK , 3.4 MILES SOUTH OF SH-31 NEAR BOKOSHE. PROJECT LENGTH = 0.210 MILELeflore · 4 of 5 $1,218,722 $933,068HUB Construction, Inc. +30.6%
Aug 20, 2020 200265 BRIDGE AND APPROACHES COUNTY ROAD (EW-71): OVER TRIBUTARY TO SKELETON CREEK , 5.9 MILES EAST OF THE SH -74 JUNCTION NEAR CRESCENT. PROJECT LENGTH = 0.208 MILELogan · Division 4 9 of 15 $1,225,967 $882,069Wyatt Contracting +39.0%
Jul 23, 2020 200248 BRIDGE AND APPROACHES COUNTY ROAD (EW-195): OVER TRIBUTARY TO WHISKEY CREEK , 0.7 MILES EAST OF THE SH -65 JUNCTION NEAR TEMPLE . PROJECT LENGTH = 0.080 MILECotton · 6 of 10 $317,599 $243,876SEWELL BROS., INC. +30.2%
Jun 18, 2020 200237 BRIDGE AND APPROACHES COUNTY ROAD (NS-2836): OVER TRIBUTARY TO COW CREEK , 2.1 MILES NORTH OF THE SH -53 JUNCTION NEAR COMANCHE. PROJECT LENGTH = 0.207 MILEStephens · Division 7 4 of 8 $716,226 $585,857SEWELL BROS., INC. +22.3%
May 14, 2020 200192 BRIDGE AND APPROACHES COUNTY ROAD (COOMBS ROAD/EW-169): OVER EAST CACHE CREEK , 1.2 MILES EAST OF I -44 NEAR LAWTON . PROJECT LENGTH = 0.245 MILEComanche · Division 7 5 of 7 $1,463,599 $1,360,552Frontier Bridge, Inc. +7.6%
May 14, 2020 200202 GRADE, DRAIN, AND BRIDGE COUNTY ROAD (EW-111): OVER SOUTH FORK CREEK, 3.0 MILES EAST OF THE SH -2 JUNCTION NEAR PORUM. PROJECT LENGTH = 0.387 MILEMuskogee · Division 1 6 of 6 $1,460,515 $1,205,894Treas Construction Inc +21.1%
May 14, 2020 200212 BRIDGE AND APPROACHES COUNTY ROAD (EW-186): OVER COW CREEK, 0.7 MILES EAST OF THE US-81 JUNCTION NEAR COMANCHE. PROJECT LENGTH = 0.245 MILEStephens · Division 7 5 of 6 $696,043 $584,760SEWELL BROS., INC. +19.0%
May 14, 2020 190347 BRIDGE AND APPROACHES COUNTY ROAD (E550 ROAD): OVER CRAZY CREEK HOLLOW BRIDGE , 3.1 MI WEST OF THE ARKANSAS STATE LINE NEAR WEST SILOAM SPRINGS . PROJECT LENGTH = 0.40 MILEDelaware · Division 8 1 of 1 $1,024,868 $1,024,868 Won
Apr 16, 2020 200153 BRIDGES AND APPROACHES COUNTY ROAD (EW-207): OVER BAKER CR AND TRIBUTARY TO BAKER CR, 4.0 MILES AND 3.0 MILES WEST OF THE SH -32 NEAR GRADY. PROJECT LENGTH = 0.381 MILEJefferson · 4 of 7 $1,026,628 $939,293K & R BUILDERS, INC. +9.3%
Apr 16, 2020 200155 BRIDGE AND APPROACHES COUNTY ROAD (EW-77): OVER SAND CREEK, 0.2 MILES EAST OF THE SH-99 JUNCTION NEAR SHAMROCK. PROJECT LENGTH = 0.180 MILELincoln · Division 3 3 of 4 $532,842 $505,438BRIDGECO CONTRACTORS, INC. +5.4%
Apr 16, 2020 200065 BRIDGE AND APPROACHES US -75: OVER SALT CREEK , 5.7 MILES SOUTH OF THE US -270 JUNCTION NEAR CALVIN . PROJECT LENGTH = 0.159 MILEHughes · Division 3 8 of 10 $2,318,158 $1,832,059Treas Construction Inc +26.5%
Mar 19, 2020 200113 BRIDGE AND APPROACHES COUNTY ROAD (EW-107) : OVER ROCK CREEK, 5.5 MILES EAST OF US-377 NEAR PADEN . PROJECT LENGTH = 0.189 MILEOkfuskee · Division 3 4 of 5 $919,369 $788,391H & H BRIDGE COMPANY +16.6%
Mar 19, 2020 200032 BRIDGE AND APPROACHES COUNTY ROAD (NS-3650 ROAD) : OVER UNNAMED CREEK, 0.1 MILES SOUTH OF THE US -59 JUNCTION NEAR WEWOKA. PROJECT LENGTH = 0.111 MILESeminole · Division 3 1 of 3 $641,975 $641,975 Won
Mar 19, 2020 200102 BRIDGE AND APPROACHES COUNTY ROAD (EW-026): OVER WILD HORSE CREEK, 5.3 MILES EAST OF THE US -81 JUNCTION NEAR POND CREEK. PROJECT LENGTH = 0.298 MILEGrant · Division 4 3 of 4 $809,962 $744,732H & H BRIDGE COMPANY +8.8%
Feb 20, 2020 190255 BRIDGE AND APPROACHES COUNTY ROAD (EW-151): OVER LITTLE SANDY CREEK , 2.4 MILES EAST OF THE US -377 JUNCTION NEAR ADA . PROJECT LENGTH = 0.171 MILEPontotoc · 3 of 7 $1,165,674 $1,114,836BRIDGECO CONTRACTORS, INC. +4.6%
Feb 20, 2020 200069 BRIDGE AND APPROACHES COUNTY ROAD (EW-90): OVER DOSIE CREEK, 2.1 MILES EAST OF THE SH-66 JUNCTION NEAR DAVENPORT . PROJECT LENGTH = 0.391 MILELincoln · Division 3 4 of 7 $982,829 $840,777Cowboy Contracting, Inc. +16.9%
Feb 20, 2020 200073 BRIDGE AND APPROACHES COUNTY ROAD (JOE JOHNSON ROAD/PURSER ROAD): OVER UNNAMED CREEK, 0.8 MILES WEST OF THE SH -99C JUNCTION NEAR OAKLAND. PROJECT LENGTH = 0.112 MILEMarshall · Division 2 3 of 3 $412,884 $300,482HUB Construction, Inc. +37.4%
Jan 16, 2020 190207 BRIDGE AND APPROACHES COUNTY ROAD (EW-176/CARGO ROAD): OVER RATLIFF WEST CREEK , 0.8 MILES WEST OF THE SH -76 JUNCTION NEAR RATLIFF CITY . PROJECT LENGTH = 0.156 MILECarter · Division 7 2 of 7 $917,846 $912,956K & R BUILDERS, INC. +0.5%
Jan 16, 2020 200003 BRIDGE AND APPROACHES COUNTY ROAD (NS-257): OVER TRIBUTARY OF SPRING CREEK , 2.6 MILES SOUTH OF THE SH -51 JUNCTION NEAR OKEENE. PROJECT LENGTH = 0.132 MILEBlaine · Division 5 2 of 2 $696,960 $664,570K & R BUILDERS, INC. +4.9%
Jan 16, 2020 200004 BRIDGE AND APPROACHES COUNTY ROAD (NS-251): OVER WEAVER CREEK , 1.9 MILES SOUTH OF THE US-270 JUNCTION NEAR WATONGA . PROJECT LENGTH = 0.123 MILEBlaine · Division 5 2 of 2 $670,288 $524,789K & R BUILDERS, INC. +27.7%
Jan 16, 2020 200039 BRIDGE AND APPROACHES COUNTY ROAD (NS-246): OVER SAND CREEK, 2.7 MILES NORTH OF SH-45 NEAR DACOMA. PROJECT LENGTH = 0.175 MILEWoods · Division 6 1 of 3 $610,699 $610,699 Won
Nov 14, 2019 190387 BRIDGE AND APPROACHES COUNTY ROAD (NS-333): OVER DUGOUT CREEK , 1.0 MILE NORTH OF THE SH-105 JUNCTION NEAR CARNEY. PROJECT LENGTH = 0.302 MILELincoln · Division 3 2 of 3 $613,561 $591,127BRIDGECO CONTRACTORS, INC. +3.8%
Jun 20, 2019 190056 BRIDGE AND APPROACHES COUNTY ROAD (EW-128): OVER MODOC CREEK, 1.8 MILES WEST OF THE MISSOURI STATE LINE . PROJECT LENGTH = 0.058 MILEOttawa · Division 8 1 of 3 $625,225 $625,225 Won
Jun 20, 2019 180107 BRIDGE AND APPROACHES COUNTY ROAD (EW-28): OVER LITTLE DRUM CREEK, 7.8 MILES EAST OF THE NOBLE COUNTY LINE . PROJECT LENGTH = 0.955 MILEOsage · Division 8 1 of 1 $2,268,477 $2,268,477 Won
Jun 20, 2019 190119 BRIDGE AND APPROACHES COUNTY ROAD (EW-082/DUNCAN ROAD): OVER CONCHARTY CREEK , 4.4 MILES WEST OF THE US -64 JUNCTION NEAR HASKELL. PROJECT LENGTH = 0.269 MILEMuskogee · Division 1 3 of 5 $1,286,646 $1,234,255H & H BRIDGE COMPANY +4.2%
Jun 20, 2019 190125 BRIDGE AND APPROACHES COUNTY ROAD (NS-3890/ROCKY HILL RD ): OVER OKMULGEE CREEK AND UNNAMED CREEK, 0.6 MI AND 0.7 MI S OF SH-56 NEAR OKMULGEE. PROJECT LENGTH = 0.200 MILEOkmulgee · Division 1 1 of 1 $1,150,151 $1,150,151 Won
Jun 20, 2019 190189 BRIDGE AND APPROACHES COUNTY ROAD (SOUTH PECAN ROAD/NS-396.5): OVER UNNAMED CREEK, 0.4 MILES SOUTH OF SH-3 NEAR LANE. PROJECT LENGTH = 0.109 MILESAtoka · Division 2 2 of 3 $649,030 $599,984Built Right Construction, L… +8.2%
Jun 20, 2019 190200 BRIDGE AND APPROACHES COUNTY ROAD (EW-15): OVER CALIFORNIA CREEK LOW WATER CROSSING, 2.3 MILES WEST OF US -169 NEAR DELAWARE . PROJECT LENGTH = 0.985 MILENowata · Division 8 2 of 4 $1,545,276 $1,511,649H & H BRIDGE COMPANY +2.2%
Jun 20, 2019 190204 BRIDGE AND APPROACHES COUNTY ROAD (EW-23): OVER SANTA FE CREEK , 0.3 MILES EAST OF THE SH-156 JUNCTION NEAR PONCA CITY . PROJECT LENGTH = 0.151 MILEKay · Division 4 2 of 3 $583,597 $545,746Evans & Associates Construc… +6.9%
May 16, 2019 190022 BRIDGE AND APPROACHES COUNTY ROAD (EW-500): OVER PEPPER CREEK, 3.9 MILES WEST OF SH-18 NEAR PAWNEE . PROJECT LENGTH = 0.284 MILEPawnee · Division 8 2 of 3 $1,209,942 —
May 16, 2019 190173 BRIDGE AND APPROACHES COUNTY ROAD (EW-112): OVER ARAPAHO CREEK , 2.0 MILES WEST OF THE US-81 JUNCTION NEAR UNION CITY. PROJECT LENGTH = 0.378 MILECanadian · Division 4 2 of 2 $1,499,512 $1,473,205SEWELL BROS., INC. +1.8%
May 16, 2019 190179 BRIDGE AND APPROACHES COUNTY ROAD (EW-130): OVER NORTH FORK OF WALNUT CREEK , 4.6 MILES EAST OF THE US -62 JUNCTION NEAR BLANCHARD. PROJECT LENGTH = 0.296 MILEMcclain · Division 3 3 of 3 $1,688,689 $1,505,087BRIDGECO CONTRACTORS, INC. +12.2%
May 16, 2019 190181 BRIDGE AND APPROACHES COUNTY ROAD (TYLER ROAD): OVER TRIBUTARY OF LITTLE HAUANI CREEK, 1.5 MILES NORTH OF THE US -70 JUNCTION NEAR MCMILLAN. PROJECT LENGTH = 0.209 MILEMarshall · Division 2 3 of 3 $813,186 $660,534HUB Construction, Inc. +23.1%
May 16, 2019 190004 BRIDGE AND APPROACHES COUNTY ROAD (EW-207): OVER UNNAMED CREEK, 0.6 MILES EAST OF SH-93 NEAR HUGO. PROJECT LENGTH = 0.176 MILEChoctaw · Division 2 2 of 2 $610,721 $449,234HUB Construction, Inc. +35.9%
May 16, 2019 180248 BRIDGE AND APPROACHES COUNTY ROAD (EW-19): OVER TRIBUTARY TO HORSE CREEK , 0.6 MILES WEST OF THE US -69 JUNCTION NEAR AFTON . PROJECT LENGTH = 0.166 MILEOttawa · Division 8 2 of 2 $694,293 $656,410B & B BRIDGE COMPANY, LLC +5.8%
May 16, 2019 190017 BRIDGE AND APPROACHES COUNTY ROAD (NS-4140): OVER DOUBLE CREEK, 1.5 MILES SOUTH OF US-169 NEAR NOWATA . PROJECT LENGTH = 0.151 MILENowata · Division 8 3 of 3 $1,205,106 $999,746H & H BRIDGE COMPANY +20.5%
May 16, 2019 190018 BRIDGE AND APPROACHES COUNTY ROAD (EW-27): OVER PANTHER CREEK , 1.8 MILES WEST OF THE SH-28 JUNCTION NEAR CHELSEA. PROJECT LENGTH = 0.117 MILENowata · Division 8 5 of 4 $1,040,599 $768,459H & H BRIDGE COMPANY +35.4%
Apr 18, 2019 190087 BRIDGE REHABILITATION SH -10: OVER UNNAMED CREEK, 1.6 MILES EAST OF THE US -169 JUNCTION NEAR LENAPAH . PROJECT LENGTH = 0.108 MILENowata · Division 8 2 of 5 $582,424 $519,208Tri Star Construction Arkan… +12.2%
Apr 18, 2019 190167 BRIDGE AND APPROACHES COUNTY ROAD (EAST CHESTNUT AVENUE /EW-173): OVER EAST COW CREEK, 2.8 MILES EAST OF SH -7 NEAR DUNCAN. PROJECT LENGTH = 0.208 MILEStephens · Division 7 1 of 5 $1,096,463 $1,096,463 Won
Apr 18, 2019 190006 BRIDGE AND APPROACHES SH -74: OVER UNNAMED CREEK, 6.4 MILES NORTH OF THE SH -29 JUNCTION NEAR ANTIOCH . PROJECT LENGTH = 0.056 MILEGarvin · Division 3 3 of 6 $1,625,579 $1,526,671BRIDGECO CONTRACTORS, INC. +6.5%
Mar 14, 2019 190140 BRIDGE AND APPROACHES COUNTY ROAD (NS-328): OVER COLBERT CREEK , 0.6 MILES SOUTH OF THE SH-7 JUNCTION NEAR DAVIS . PROJECT LENGTH = 0.301 MILEMurray · Division 7 3 of 8 $1,129,469 $1,078,665BRIDGECO CONTRACTORS, INC. +4.7%
Mar 14, 2019 190141 BRIDGE AND APPROACHES COUNTY ROAD (EW-207): OVER TRIBUTARY TO RED RIVER , 3.3 MILES WEST OF THE US -81 JUNCTION NEAR RYAN . PROJECT LENGTH = 0.082 MILEJefferson · 7 of 7 $534,009 $433,988SEWELL BROS., INC. +23.0%
Feb 14, 2019 190066 BRIDGE AND APPROACHES COUNTY ROAD (EW-167): OVER NOLLEYTUBBY CREEK , 4.4 MILES WEST OF THE PITTSBURG COUNTY LINE NEAR WESLEY . PROJECT LENGTH = 0.191 MILEAtoka · Division 2 5 of 6 $633,740 $515,824C3 Construction, Inc. +22.9%
Feb 14, 2019 190080 BRIDGE AND APPROACHES SH -6: OVER UNNAMED CREEK, 2.6 MILES NORTHEAST OF THE SH -34 JUNCTION NEAR OLUSTEE. PROJECT LENGTH = 0.150 MILEJackson · Division 5 6 of 6 $1,104,573 $1,029,093Wyatt Contracting +7.3%
Feb 14, 2019 190090 BRIDGE AND APPROACHES COUNTY ROAD (CABINISS ROAD): OVER BIG WILDHORSE CREEK, 0.6 MILES NORTH OF THE US -270 JUNCTION NEAR CABINISS. PROJECT LENGTH = 0.189 MILEPittsburg · Division 2 4 of 5 $804,192 $752,311HUB Construction, Inc. +6.9%
Feb 14, 2019 190015 BRIDGE AND APPROACHES COUNTY ROAD (NS-449): OVER WHITE OAK CREEK, 4.7 MILES NORTH OF THE US -70 JUNCTION NEAR WRIGHT CITY . PROJECT LENGTH = 0.064 MILESMccurtain · Division 2 3 of 4 $674,979 $616,448L & N BRIDGE, LLC +9.5%
Jan 17, 2019 190039 BRIDGE AND APPROACHES I -40 NORTH FRONTAGE ROAD : OVER LITTLE DEEP CREEK , 1.0 MILE WEST OF THE CADDO COUNTY LINE NEAR WEATHERFORD . PROJECT LENGTH = 0.094 MILECuster · Division 5 4 of 6 $1,577,315 $1,533,773SEWELL BROS., INC. +2.8%
Jan 17, 2019 190040 BRIDGE REPAIR COUNTY ROAD (NS-234): REPAIR SCOUR DAMAGE OVER FLANDERS CREEK , 4.75 MILES NORTH OF THE CUSTER C /L NEAR PUTNAM. PROJECT LENGTH = 0.000 MILEDewey · Division 5 4 of 5 $83,590 $59,508L & M Contractors, Inc. +40.5%
Jan 17, 2019 190059 GRADE, DRAIN, BRIDGE, AND SURFACE COUNTY ROAD (EW-1090): OVER SALLISAW CREEK , 2.6 MILES WEST OF THE US -59 JUNCTION NEAR SALLISAW . PROJECT LENGTH = 0.370 MILESequoyah · Division 1 4 of 5 $2,605,683 $2,096,175T. McDonald Construction, I… +24.3%
Jan 17, 2019 190005 BRIDGE AND APPROACHES COUNTY ROAD (EW-133/SLAUGHTERVILLE RD ): OVER UNNAMED CREEK, 0.3 MILES WEST OF THE US -77 JUNCTION IN SLAUGHTERVILLE . PROJECT LENGTH = 0.033 MILECleveland · Division 3 6 of 9 $363,591 $294,990Silver Star Construction Co… +23.3%
Nov 15, 2018 180273 BRIDGE AND APPROACHES COUNTY ROAD (NS-4170): OVER FIFE CREEK, 1.6 MILES NORTH OF THE SH-51 JUNCTION NEAR COWETA . PROJECT LENGTH = 0.245 MILEWagoner · Division 1 4 of 5 $1,877,804 $1,474,531B & B BRIDGE COMPANY, LLC +27.3%
Nov 15, 2018 180312 BRIDGE AND APPROACHES COUNTY ROAD (NS-230): OVER OAK CREEK, 1.3 MILES SOUTH OF THE SH-55 JUNCTION NEAR ROCKY. PROJECT LENGTH = 0.189 MILEWashita · Division 5 3 of 6 $718,220 $626,266SEWELL BROS., INC. +14.7%
Nov 15, 2018 180161 BRIDGE AND APPROACHES COUNTY ROAD (EW-88): OVER LITTLE DEER CREEK, 0.8 MILES WEST OF THE SH -33 JUNCTION NEAR THOMAS . PROJECT LENGTH = 0.199 MILECuster · Division 5 5 of 5 $824,087 $661,389SEWELL BROS., INC. +24.6%
Nov 15, 2018 180227 BRIDGE AND APPROACHES COUNTY ROAD (NS-330): OVER MULE CREEK, 1.3 MILES NORTH OF THE US-64 JUNCTION NEAR SUMNER. PROJECT LENGTH = 0.170 MILENoble · Division 4 2 of 3 $465,765 $429,155B & B BRIDGE COMPANY, LLC +8.5%
Nov 15, 2018 180238 BRIDGE AND APPROACHES COUNTY ROAD (EW-132): OVER WEST BITTER CREEK , 1.0 MILE EAST OF I-44 NEAR CHICKASHA. PROJECT LENGTH = 0.198 MILEGrady · Division 7 5 of 6 $1,083,603 $885,833SEWELL BROS., INC. +22.3%
Oct 18, 2018 180297 BRIDGE AND APPROACHES US -60: OVER HORSE CREEK, 1.7 MILES SOUTHWEST OF THE US -59 JUNCTION IN THE CITY OF AFTON . PROJECT LENGTH = 0.139 MILEOttawa · Division 8 1 of 3 $3,769,758 $3,769,758 Won
Sep 20, 2018 180278 BRIDGE AND APPROACHES COUNTY ROAD (EW-65): OVER SPRING CREEK, 5.2 MILES EAST OF THE SH-51 JUNCTION NEAR OKEENE. PROJECT LENGTH = 0.127 MILEBlaine · Division 5 6 of 10 $580,286 $451,549Wyatt Contracting +28.5%
Sep 20, 2018 180285 BRIDGE AND APPROACHES COUNTY ROAD (NS-196): OVER TRIBUTARY OF SALT FORK RED RIVER , 3.0 MILES SOUTH OF US-283 NEAR MANGUM. PROJECT LENGTH = 0.142 MILEGreer · Division 5 6 of 7 $276,156 $211,010KLAVER CONSTRUCTION COMPANY… +30.9%
Sep 20, 2018 180287 BRIDGE REHABILITATION SH -48A: OVER BIG SANDY CREEK , 3.4 MILES WEST OF THE SH -48 JUNCTION NEAR MILBURN. PROJECT LENGTH = 0.1543 MILEJohnston · Division 3 4 of 4 $1,636,019 $1,081,736HUB Construction, Inc. +51.2%
Sep 20, 2018 180313 BRIDGE AND APPROACHES US -270: OVER UNNAMED CREEK, 1.6 MILES WEST OF THE SH -3E JUNCTION NEAR SEMINOLE. PROJECT LENGTH = 0.164 MILESeminole · Division 3 6 of 7 $2,067,855 $1,708,926B & B BRIDGE COMPANY, LLC +21.0%
Sep 20, 2018 180202 BRIDGE AND APPROACHES COUNTY ROAD (EW-109): OVER SNAKE CREEK, 5.3 MILES WEST OF THE SH-150 JUNCTION NEAR PIERCE. PROJECT LENGTH = 0.137 MILEMcintosh · Division 1 1 of 4 $402,462 $402,462 Won
Sep 20, 2018 180208 BRIDGE AND APPROACHES COUNTY ROAD (EW-63): OVER SALT CREEK , 2.6 MILES EAST OF THE SH-18 JUNCTION NEAR YALE . PROJECT LENGTH = 0.203 MILEPayne · Division 4 2 of 5 $790,740 $769,370K & R BUILDERS, INC. +2.8%
Aug 16, 2018 180258 BRIDGE AND APPROACHES COUNTY ROAD (EW-123): OVER SAND CREEK, 0.9 MILES WEST OF THE US-283 JUNCTION NEAR SAYRE . PROJECT LENGTH = 0.180 MILEBeckham · Division 5 3 of 4 $515,696 $450,626SEWELL BROS., INC. +14.4%
Aug 16, 2018 180269 BRIDGE AND APPROACHES COUNTY ROAD (NS-328/NORTH HARRAH ROAD ): OVER UNNAMED CREEK, 0.8 MILES SOUTH OF I-44 (TURNER TURNPIKE ) NEAR LUTHER. PROJECT LENGTH = 0.081 MILEOklahoma · Division 4 8 of 10 $488,359 $396,326KLAVER CONSTRUCTION COMPANY… +23.2%
Jul 19, 2018 180184 BRIDGE AND APPROACHES COUNTY ROAD (NS-215): OVER OTTER CREEK, 3.6 MILES NORTH OF THE SH-5 JUNCTION NEAR TIPTON . PROJECT LENGTH = 0.161 MILETillman · Division 5 2 of 3 $976,141 $974,723SEWELL BROS., INC. +0.1%
Jul 19, 2018 180192 GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (EW-198): OVER TRIBUTARY TO THE RED RIVER, 1.9 MILES WEST OF THE SH -36 JUNCTION NEAR DEVOL. PROJECT LENGTH = 0.206 MILECotton · 2 of 7 $907,547 $858,000BREWER CONSTRUCTION OKLAHOM… +5.8%
Jul 19, 2018 180214 BRIDGE AND APPROACHES COUNTY ROAD (NS-250): OVER LAKE CREEK, 4.9 MILES NORTH OF THE SH-45 JUNCTION NEAR DACOMA. PROJECT LENGTH = 0.190 MILEWoods · Division 6 8 of 8 $754,867 $623,431B & B BRIDGE COMPANY, LLC +21.1%
Jul 19, 2018 180240 BRIDGE AND APPROACHES COUNTY ROAD (EW-60): OVER TURKEY CREEK , 2.6 MILES WEST OF THE US-81 JUNCTION NEAR HENNESSEY. PROJECT LENGTH = 0.331 MILEKingfisher · Division 4 1 of 7 $740,615 $740,615 Won
Jul 19, 2018 180256 BRIDGE AND APPROACHES US -64: OVER ANDERSON CREEK , 2.1 MILES EAST OF THE SH -50 JUNCTION NEAR FREEDOM. PROJECT LENGTH = 0.198 MILEWoods · Division 6 2 of 6 $2,441,973 $2,393,762Bridges, Inc. DBA Scudder B… +2.0%
Jul 19, 2018 180257 BRIDGE AND APPROACHES COUNTY ROAD (EW-114): OVER UNNAMED TRIBUTARY TO EUFAULA RESERVOIR , 0.6 MILES EAST OF THE MCINTOSH COUNTY LINE . PROJECT LENGTH = 0.0946 MILEMuskogee · Division 1 1 of 3 $682,824 $682,824 Won
Jun 14, 2018 180222 ADAIR BRIDGE AND APPROACHES AND BRIDGE REHABILITATION SH -51: OVER MULBERRY HOLLOW , 4.3 MILES NORTHWEST OF US -59. SH-100: OVER RUSSELL BRANCH CREEK , 4.5 MILES EAST OF US -59. PROJECT LENGTH = 0.235 MILESbr-201c(001)sb · 6 of 6 $6,274,031 —
Jun 14, 2018 180231 BRIDGE AND APPROACHES SH -152: OVER EAST ELK CREEK , 0.1 MILES EAST OF THE SH -44 JUNCTION NEAR DILL CITY . PROJECT LENGTH = 0.280 MILEWashita · Division 5 7 of 8 $2,716,991 $2,270,084CASWELL CONSTRUCTION, INC. +19.7%
Jun 14, 2018 180232 BRIDGE AND APPROACHES SH -55: OVER LITTLE ELK CREEK, 0.9 MILES WEST OF US -183 NEAR ROCKY. PROJECT LENGTH = 0.437 MILEWashita · Division 5 2 of 3 $2,735,758 $2,450,355SEWELL BROS., INC. +11.6%
May 17, 2018 180154 BRIDGE AND APPROACHES SH -51: OVER NORTH CANADIAN RIVER AND OVERFLOW , 0.4 MILES AND 0.6 MILES EAST OF THE SH -58 JUNCTION IN CANTON . PROJECT LENGTH = 0.378 MILEBlaine · Division 5 2 of 4 $3,525,194 $3,381,458FRONTIER BRIDGE, INC. / BRI… +4.3%
May 17, 2018 180195 BRIDGE AND APPROACHES SH -9: OVER FISH CREEK, 0.4 MILES EAST OF THE SH -84 JUNCTION NEAR DUSTIN. PROJECT LENGTH = 0.492 MILEHughes · Division 3 4 of 5 $2,587,118 $2,498,300C-GAWF CONSTRUCTION, INC. +3.6%
May 17, 2018 180233 SEMINOLE BRIDGE AND APPROACHES SH -99A: OVER SAND CREEK AND TURKEY CREEK , 2.0 MI AND 13.1 MI WEST OF THE SH -56 JUNCTION, NEAR CROMWELL AND LITTLE . PROJECT LENGTH = 0.700 MILEStp-267c(071)ss · 4 of 4 $4,837,853 $4,508,696FRONTIER BRIDGE, INC. / BRI… +7.3%
Apr 19, 2018 180056 BRIDGE AND APPROACHES COUNTY ROAD (EW-112): OVER MUD CREEK, 8.9 MILES EAST OF US -69 NEAR TEXANNA . PROJECT LENGTH = 0.132 MILEMcintosh · Division 1 7 of 6 $528,927 $395,087C3 Construction, Inc. +33.9%
Apr 19, 2018 180168 BRIDGE AND APPROACHES COUNTY ROAD (EW-69): OVER SKELETON CREEK , 5.3 MILES EAST OF THE SH-74 JUNCTION NEAR CRESCENT. PROJECT LENGTH = 0.331 MILELogan · Division 4 3 of 8 $1,347,671 $1,225,821K & R BUILDERS, INC. +9.9%
Apr 19, 2018 180186 BRIDGE AND APPROACHES COUNTY ROAD (LAFLIN CREEK ROAD): OVER TRIBUTARY TO LAFLIN CREEK, 2.6 MILES WEST OF THE SH -76 JUNCTION NEAR DIBBLE. PROJECT LENGTH = 0.343 MILEGrady · Division 7 5 of 6 $727,878 $628,714K & R BUILDERS, INC. +15.8%
Mar 15, 2018 180054 BRIDGE AND APPROACHES COUNTY ROAD (EW-136/SAND CREEK ROAD): OVER DIBBLE CREEK AND TRIBUTARY , 0.8 MILES AND 1.0 MILE EAST SH -76 NEAR DIBBLE. PROJECT LENGTH = 0.239 MILEMcclain · Division 3 5 of 7 $756,275 $684,813SEWELL BROS., INC. +10.4%
Mar 15, 2018 180077 BRIDGE AND APPROACHES COUNTY ROAD (EW-24): OVER TRIBUTARY OF EAGLE CHIEF CREEK , 8.0 MILES EAST OF US -281 NEAR CARMEN. PROJECT LENGTH = 0.139 MILEAlfalfa · Division 6 5 of 7 $530,705 $436,422C3 Construction, Inc. +21.6%
Mar 15, 2018 180134 BRIDGE AND APPROACHES COUNTY ROAD (EW-1490/LINWOOD LANE): OVER PIT CREEK , 1.4 MILES EAST OF THE PITTSBURG COUNTY LINE NEAR HARTSHORNE . PROJECT LENGTH = 0.142 MILELatimer · Division 2 5 of 5 $611,160 $534,170L & N BRIDGE, LLC +14.4%
Mar 15, 2018 180142 BRIDGE AND APPROACHES COUNTY ROAD (E0510): OVER UNNAMED CREEK, 0.6 MILES EAST OF THE SH-18 JUNCTION NEAR PAWNEE . PROJECT LENGTH = 0.05 MILEPawnee · Division 8 5 of 5 $671,366 $581,427T. McDonald Construction, I… +15.5%
Feb 15, 2018 180070 BRIDGE AND APPROACHES COUNTY ROAD (EW-104/ALPHA ROAD ): OVER LITTLE VIAN CREEK, 1.4 MILES EAST OF SH -82 NEAR VIAN. PROJECT LENGTH = 0.427 MILESequoyah · Division 1 5 of 7 $1,374,228 $1,285,423B & B BRIDGE COMPANY, LLC +6.9%
Feb 15, 2018 180078 BRIDGE AND APPROACHES COUNTY ROAD (EW-83): OVER MANARD BAYOU , 0.5 MILES EAST OF THE MUSKOGEE COUNTY LINE . PROJECT LENGTH = 0.198 MILE.Cherokee · Division 1 6 of 8 $854,955 $760,488BRIGHT LIGHTING, INC. DBA B… +12.4%
Feb 15, 2018 180091 BRIDGE AND APPROACHES SH -18: OVER DRY CREEK OVERFLOW AND DRY CREEK , 5.6 MILES AND 5.7 MILES NORTH OF I -44 NEAR CHANDLER. PROJECT LENGTH = 0.661 MILELincoln · Division 3 5 of 6 $3,506,704 $3,216,964BRIDGECO CONTRACTORS, INC. +9.0%
Feb 15, 2018 180108 BRIDGE AND APPROACHES COUNTY ROAD (EW-28/GEORGE BRADEN ROAD): OVER UNNAMED CREEK, 8.9 MILES EAST OF US -177 NEAR PONCA CITY . PROJECT LENGTH = 0.247 MILEOsage · Division 8 4 of 7 $966,979 $874,941BRIDGECO CONTRACTORS, INC. +10.5%
Feb 15, 2018 180010 KIOWA BRIDGE AND APPROACHES SH -19: OVER UNNAMED CREEKS, 0.2 MI AND 3.1 MI WEST OF THE CADDO COUNTY LINE . PROJECT LENGTH = 0.496 MILEStp-238c(046)ss · 1 of 5 $2,082,170 $2,082,170 Won
Feb 15, 2018 180033 GRADE, DRAIN, SURFACE , AND BRIDGE SH-56: OVER JUMPER CREEK, 1.3 MILES EAST OF THE SH-99 INTERSECTION NEAR KONAWA . PROJECT LENGTH = 0.568 MILESeminole · Division 3 8 of 8 $3,511,421 $2,976,296Treas Construction Inc +18.0%
Jan 18, 2018 180043 BRIDGE AND APPROACHES COUNTY ROAD (EW-168/BISHOP ROAD ): OVER POST OAK CREEK , 3.9 MILES WEST OF COUNTY HIGHWAY 115 NEAR INDIAHOMA. PROJECT LENGTH = 0.208 MILEComanche · Division 7 5 of 7 $606,234 $499,591BRIDGECO CONTRACTORS, INC. +21.3%
Jan 18, 2018 180063 BRIDGE AND APPROACHES COUNTY ROAD (EW-0030): OVER FOURMILE CREEK, 4.3 MILES EAST OF THE CRAIG COUNTY LINE NEAR MIAMI. PROJECT LENGTH = 0.340 MILEOttawa · Division 8 5 of 4 $948,993 $815,808Crossland Construction Comp… +16.3%
Jan 18, 2018 180006 BRIDGE AND APPROACHES COUNTY ROAD (NS-366/S. 449TH W. AVENUE ): OVER TRIBUTARIES TO BUCKEYE CREEK, 3.5 MI AND 3.8 MI S OF SH-51 NEAR OILTON . PROJECT LENGTH = 0.572 MILECreek · Division 8 6 of 7 $2,213,444 $1,831,559BRIDGECO CONTRACTORS, INC. +20.9%
Jan 18, 2018 180019 BRIDGE AND APPROACHES US -62: OVER BOLEY CREEK , 4.3 MILES NORTHWEST OF THE SH -48 INTERSECTION NEAR BOLEY. PROJECT LENGTH = 0.320 MILEOkfuskee · Division 3 5 of 8 $2,894,863 $2,519,493Treas Construction Inc +14.9%
Jan 18, 2018 180022 BRIDGE AND APPROACHES COUNTY ROAD (EW-089): OVER SALT CREEK , 3.1 MILES WEST OF THE US-75 ALT . INTERSECTION, NEAR BEGGS. PROJECT LENGTH = 0.396 MILEOkmulgee · Division 1 7 of 8 $994,708 —
Jan 18, 2018 180023 BRIDGE AND APPROACHES COUNTY ROAD (EW-33): OVER DOG THRESHER CREEK , 3.2 MILES WEST OF SH -11 NEAR BARNSDALL. PROJECT LENGTH = 0.302 MILEOsage · Division 8 5 of 7 $1,030,787 —
Jan 18, 2018 180032 BRIDGE AND APPROACHES US -270: OVER MAGNOLIA CREEK , 0.7 MILES EAST OF THE SH -99 INTERSECTION IN SEMINOLE. PROJECT LENGTH = 0.141 MILESeminole · Division 3 9 of 9 $2,941,985 $2,082,389T. McDonald Construction, I… +41.3%
Jan 18, 2018 180039 BRIDGE AND APPROACHES COUNTY ROAD (WELLING ROAD): OVER BARREN FORK CREEK, 4.1 MILES SOUTH OF SH-51 NEAR TAHLEQUAH . PROJECT LENGTH = 0.369 MILECherokee · Division 1 7 of 7 $3,773,637 —

Subcontracts on active jobs 0

No subcontracts on TxDOT's active contract list.