| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$30,000.00 |
$29,900.00 |
$24,000.00 |
$43,200.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$1.65 |
$2.55 |
$2.00 |
$2.55 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 500 | LF |
$7.00 |
$12.00 |
$17.00 |
$11.00 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 3,200 | SY |
$1.65 |
$2.70 |
$2.00 |
$2.75 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.67 | AC |
$600.00 |
$500.00 |
$1,000.00 |
$550.00 |
| 6 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 423 | TON |
$33.00 |
$33.00 |
$31.00 |
$36.00 |
| 7 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$280.00 |
$300.00 |
$225.00 |
$312.50 |
| 8 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 220 | LF |
$35.00 |
$40.00 |
$40.00 |
$30.00 |
| 9 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 6 | EA |
$1,300.00 |
$1,300.00 |
$1,500.00 |
$1,112.50 |
| 10 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 210.6 | CY |
$14.00 |
$15.00 |
$15.00 |
$10.00 |
| 11 | 501(F) 6352 |
GRANULAR BACKFILL | 109.6 | CY |
$60.00 |
$63.00 |
$75.00 |
$65.00 |
| 12 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 717 | LF |
$207.50 |
$205.00 |
$200.00 |
$200.00 |
| 13 | 504(C) 6250 |
SEALED EXPANSION JOINT | 35.5 | LF |
$240.00 |
$275.00 |
$260.00 |
$235.00 |
| 14 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 433.2 | LF |
$66.00 |
$70.00 |
$75.00 |
$75.50 |
| 15 | 506(A) 1322 |
STRUCTURAL STEEL | 1,420 | LB |
$2.85 |
$2.00 |
$3.00 |
$3.00 |
| 16 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$800.00 |
$350.00 |
$900.00 |
$800.00 |
| 17 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$800.00 |
$350.00 |
$900.00 |
$800.00 |
| 18 | 509(A) 1326 |
CLASS AA CONCRETE | 155.8 | CY |
$540.00 |
$550.00 |
$550.00 |
$625.00 |
| 19 | 509(B) 1328 |
CLASS A CONCRETE | 123.6 | CY |
$540.00 |
$550.00 |
$550.00 |
$650.00 |
| 20 | 511(A) 1332 |
REINFORCING STEEL | 61,288 | LB |
$0.9400 |
$1.00 |
$1.00 |
$0.9700 |
| 21 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 160 | LF |
$33.00 |
$30.00 |
$33.00 |
$31.50 |
| 22 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 400 | LF |
$42.50 |
$35.00 |
$44.00 |
$38.50 |
| 23 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 160 | LF |
$15.00 |
$15.00 |
$10.00 |
$13.50 |
| 24 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 400 | LF |
$15.00 |
$15.00 |
$10.00 |
$16.50 |
| 25 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 26 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 172 | LF |
$750.00 |
$740.00 |
$550.00 |
$575.00 |
| 27 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 4,234 | TON |
$33.00 |
$41.00 |
$41.50 |
$40.00 |
| 28 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 1,987 | TON |
$24.50 |
$31.00 |
$29.00 |
$30.50 |
| 29 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 66 | LF |
$27.00 |
$25.00 |
$33.00 |
$30.00 |
| 30 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 28 | LF |
$21.00 |
$25.00 |
$33.00 |
$30.00 |
| 31 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$4,750.00 |
$7,500.00 |
$6,000.00 |
$9,000.00 |
| 32 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$2,100.00 |
$3,285.00 |
$2,850.00 |
$3,300.00 |
| 33 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,750.00 |
$3,300.00 |
$3,000.00 |
$3,300.00 |
| 34 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$6,820.00 |
$8,500.00 |
$7,000.00 |
| 35 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,500.00 |
$3,500.00 |
$1,275.00 |
$3,000.00 |
| 36 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$55,000.00 |
$45,000.00 |
$75,000.00 |
$50,000.00 |