$1,176.69Avg low bid / AC
$1,339.10Avg of all bids
$781.80Avg engineer's estimate
396Jobs · 5,625.51 AC
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 64 | 1,384.44 | $729.80 | $828.81 |
| 2020 | 128 | 1,767.72 | $1,452.06 | $1,274.68 |
| 2019 | 100 | 1,428.77 | $1,396.95 | $1,805.63 |
| 2018 | 104 | 1,044.58 | $1,001.72 | $1,551.65 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Nov 18, 2021 | 210347 | DelawareDivision 8 | 87.6 AC | $1.00 | C-GAWF CONSTRUCTION, INC. |
| Oct 14, 2021 | 210273 | EllisDivision 6 | 1.79 AC | $2,885.00 | Lopp Construction, LLC |
| Sep 16, 2021 | 210251 | Cirb-230c(045)rb | 1.7 AC | $3,500.00 | K & R BUILDERS, INC. |
| Sep 16, 2021 | 210267 | PayneDivision 4 | 1.5 AC | $745.00 | H & H BRIDGE COMPANY |
| Sep 16, 2021 | 200324 | Osage, Pawnee | 7.8 AC | $900.00 | BECCO CONTRACTORS, INC. |
| Sep 16, 2021 | 210179 | MurrayDivision 7 | 6.88 AC | $2,000.00 | Pavers, Inc. |
| Sep 16, 2021 | 210251 | Cirb-230c(045)rb | 2.23 AC | $3,500.00 | K & R BUILDERS, INC. |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 3 AC | $1,596.96 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 19, 2021 | 210232 | GarfieldDivision 4 | 7.75 AC | $125.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Aug 19, 2021 | 210241 | SequoyahDivision 1 | 2.3 AC | $1,155.00 | Treas Construction Inc |
| Jul 15, 2021 | 210211 | LoganDivision 4 | 1.06 AC | $450.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jul 15, 2021 | 210216 | OkmulgeeDivision 1 | 4.62 AC | $95.00 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 210111 | LincolnDivision 3 | 47.8 AC | $618.50 | HASKELL LEMON CONSTRUCTION CO. |
| Jul 15, 2021 | 210200 | BeckhamDivision 5 | 2.6 AC | $1,000.00 | SEWELL BROS., INC. |
| Jul 15, 2021 | 210201 | BlaineDivision 5 | 0.93 AC | $850.00 | SEWELL BROS., INC. |
| Jul 15, 2021 | 190363 | LoveDivision 7 | 19 AC | $2,007.50 | C3 Construction, Inc. |
| Jul 15, 2021 | 210209 | KayDivision 4 | 1.71 AC | $495.00 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 210180 | MuskogeeDivision 1 | 0.5 AC | $1,250.00 | H & H BRIDGE COMPANY |
| Jun 17, 2021 | 210185 | NowataDivision 8 | 1.26 AC | $2,362.50 | Frontier Bridge, Inc. |
| Jun 17, 2021 | 210190 | PushmatahaDivision 2 | 8.95 AC | $1,100.00 | L & N BRIDGE, LLC |
| Jun 17, 2021 | 210171 | DeweyDivision 5 | 15.34 AC | $408.00 | Frontier Bridge, Inc. |
| Jun 17, 2021 | 210172 | DeweyDivision 5 | 0.83 AC | $1,020.00 | Wyatt Contracting |
| May 20, 2021 | 210140 | McclainDivision 3 | 68 AC | $729.75 | Treas Construction Inc |
| May 20, 2021 | 210127 | BlaineDivision 5 | 49.7 AC | $498.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210158 | TillmanDivision 5 | 1.63 AC | $540.00 | SEWELL BROS., INC. |
| May 20, 2021 | 200338 | BeckhamDivision 5 | 11.5 AC | $532.50 | OBC, INC. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 8.8 AC | $615.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210129 | BryanDivision 2 | 78 AC | $611.00 | L & N BRIDGE, LLC |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 23.1 AC | $615.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210082 | McclainDivision 3 | 4 AC | $715.00 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210133 | EllisDivision 6 | 18 AC | $2,115.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210143 | MurrayDivision 7 | 30 AC | $100.00 | OVERLAND CORPORATION |
| May 20, 2021 | 210136 | HughesDivision 3 | 70 AC | $100.00 | C-GAWF CONSTRUCTION, INC. |
| May 20, 2021 | 210148 | PayneDivision 4 | 64.25 AC | $900.00 | BECCO CONTRACTORS, INC. |
| May 20, 2021 | 210139 | McclainDivision 3 | 123.2 AC | $516.00 | Silver Star Construction Company, Inc. |
| Apr 15, 2021 | 210102 | CoalDivision 3 | 13.5 AC | $1,000.00 | L & N BRIDGE, LLC |
| Apr 15, 2021 | 210114 | NobleDivision 4 | 17.38 AC | $1,000.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210115 | NobleDivision 4 | 2.26 AC | $880.00 | SEWELL BROS., INC. |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 12.83 AC | $275.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Mar 18, 2021 | 210097 | KayDivision 4 | 2 AC | $1,250.00 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 70.24 AC | $100.00 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210078 | KayDivision 4 | 3.23 AC | $500.00 | RRY SERVICES LLC |
| Mar 18, 2021 | 210060 | OttawaDivision 8 | 17.78 AC | $840.00 | Treas Construction Inc |
| Mar 18, 2021 | 210086 | PittsburgDivision 2 | 22 AC | $690.00 | Robinson Construction, LLC |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 20 AC | $996.79 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 200030 | RogersDivision 8 | 1 AC | $900.00 | CONCRETE SERVICES CORPORATION |
| Feb 18, 2021 | 210055 | MurrayDivision 7 | 7 AC | $700.00 | HUB Construction, Inc. |
| Feb 18, 2021 | 210061 | PittsburgDivision 2 | 1.81 AC | $2,100.00 | BRIDGECO CONTRACTORS, INC. |
| Feb 18, 2021 | 210045 | ClevelandDivision 3 | 164.48 AC | $750.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Feb 18, 2021 | 190362 | LoveDivision 7 | 0.5 AC | $4,074.60 | C3 Construction, Inc. |
| Feb 18, 2021 | 210062 | Pontotoc | 28.3 AC | $811.00 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210046 | ComancheDivision 7 | 2.63 AC | $500.00 | K & R BUILDERS, INC. |
| Feb 18, 2021 | 210070 | WoodwardDivision 6 | 5.11 AC | $525.00 | BRIDGECO CONTRACTORS, INC. |
| Feb 18, 2021 | 210048 | CraigDivision 8 | 7.54 AC | $995.00 | CONCRETE SERVICES CORPORATION |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 36 AC | $100.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210018 | HarperDivision 6 | 37.22 AC | $4,768.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210008 | CaddoDivision 7 | 4 AC | $695.00 | Treas Construction Inc |
| Jan 21, 2021 | 210025 | KingfisherDivision 4 | 64.84 AC | $1,014.50 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 7 AC | $100.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210010 | ClevelandDivision 3 | 20.76 AC | $430.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Jan 21, 2021 | 210035 | Pontotoc | 15 AC | $818.85 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210014 | GarfieldDivision 4 | 3.04 AC | $400.00 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 210003 | WashingtonDivision 8 | 0.36 AC | $4,256.00 | Tri Star Construction Arkansas, LLC |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 8 AC | $100.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210016 | GradyDivision 7 | 1.9 AC | $750.00 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 210005 | AlfalfaDivision 6 | 2.73 AC | $400.00 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 2.27 AC | $100.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210017 | GradyDivision 7 | 3 AC | $400.00 | Treas Construction Inc |
| Jan 21, 2021 | 210007 | BeckhamDivision 5 | 1.4 AC | $419.51 | C3 Construction, Inc. |
| Nov 19, 2020 | 200156 | MajorDivision 6 | 1.55 AC | $400.00 | K & R BUILDERS, INC. |
| Nov 19, 2020 | 200353 | OttawaDivision 8 | 1 AC | $100.00 | Robin Hausner Demolition, LLC |
| Nov 19, 2020 | 200355 | RogersDivision 8 | 61.79 AC | $635.00 | EMERY SAPP & SONS, INC. |
| Nov 19, 2020 | 200344 | CaddoDivision 7 | 4.28 AC | $500.00 | K & R BUILDERS, INC. |
| Nov 19, 2020 | 200339 | BlaineDivision 5 | 43.66 AC | $900.00 | CORNELL CONSTRUCTION COMPANY, INC. |
| Nov 19, 2020 | 200356 | SeminoleDivision 3 | 0.4 AC | $1,014.90 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200346 | ClevelandDivision 3 | 4 AC | $418.00 | Redlands Contracting, LLC |
| Nov 19, 2020 | 200357 | SequoyahDivision 1 | 7.27 AC | $1,080.00 | APAC-CENTRAL, INC. |
| Nov 19, 2020 | 200348 | CusterDivision 5 | 1.2 AC | $698.70 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200359 | MccurtainDivision 2 | 1.13 AC | $911.55 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200349 | GarvinDivision 3 | 5.19 AC | $395.00 | Treas Construction Inc |
| Oct 15, 2020 | 200309 | GarfieldDivision 4 | 19.9 AC | $900.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Oct 15, 2020 | 200329 | StephensDivision 7 | 8 AC | $926.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200319 | OklahomaDivision 4 | 0.01 AC | $100,000.00 | CGC, LLC. |
| Oct 15, 2020 | 200312 | GreerDivision 5 | 0.6 AC | $500.00 | K & R BUILDERS, INC. |
| Oct 15, 2020 | 200077 | PottawatomieDivision 3 | 40.3 AC | $200.00 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200322 | OsageDivision 8 | 17 AC | $825.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200313 | JohnstonDivision 3 | 0.34 AC | $50.00 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200323 | OsageDivision 8 | 2 AC | $1,450.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200314 | KingfisherDivision 4 | 1.91 AC | $500.00 | K & R BUILDERS, INC. |
| Oct 15, 2020 | 200303 | BeaverDivision 6 | 0.5 AC | $7,750.00 | J & R SAND COMPANY, INC. |
| Oct 15, 2020 | 200315 | MajorDivision 6 | 3.47 AC | $954.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Oct 15, 2020 | 200304 | BlaineDivision 5 | 1.8 AC | $500.00 | K & R BUILDERS, INC. |
| Oct 15, 2020 | 200326 | PushmatahaDivision 2 | 3.3 AC | $1,100.00 | L & N BRIDGE, LLC |
| Oct 15, 2020 | 200316 | Grady, Mcclain | 8.32 AC | $850.00 | Treas Construction Inc |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 37 AC | $1,440.81 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200280 | JacksonDivision 5 | 1.45 AC | $900.00 | SEWELL BROS., INC. |
| Sep 17, 2020 | 200292 | PottawatomieDivision 3 | 69 AC | $825.00 | Silver Star Construction Company, Inc. |
| Sep 17, 2020 | 200281 | KiowaDivision 5 | 1.62 AC | $900.00 | SEWELL BROS., INC. |
| Sep 17, 2020 | 200294 | SequoyahDivision 1 | 7.06 AC | $1,500.00 | Rosscon, LLC |
| Sep 17, 2020 | 200284 | MajorDivision 6 | 1.37 AC | $1,550.00 | BRIDGECO CONTRACTORS, INC. |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 47 AC | $250.00 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200287 | OklahomaDivision 4 | 1.86 AC | $500.00 | Cowboy Contracting, Inc. |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 25 AC | $250.00 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200290 | OsageDivision 8 | 2 AC | $2,150.00 | BRIDGECO CONTRACTORS, INC. |
| Sep 17, 2020 | 200278 | DeweyDivision 5 | 2.55 AC | $517.50 | HASKELL LEMON CONSTRUCTION CO. |
| Aug 20, 2020 | 200225 | GradyDivision 7 | 126.4 AC | $870.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200266 | LoveDivision 7 | 1 AC | $4,500.00 | KC Durtworks, LLC |
| Aug 20, 2020 | 200239 | WoodsDivision 6 | 2.91 AC | $300.00 | K & R BUILDERS, INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 34.6 AC | $1,013.05 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200150 | EllisDivision 6 | 8.63 AC | $1,500.00 | J & R SAND COMPANY, INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 17.93 AC | $1,013.05 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200230 | LoveDivision 7 | 1.37 AC | $550.00 | HUB Construction, Inc. |
| Aug 20, 2020 | 200262 | BeckhamDivision 5 | 1.97 AC | $350.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 66.9 AC | $825.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200265 | LoganDivision 4 | 7.2 AC | $420.00 | Wyatt Contracting |
| Jul 23, 2020 | 200253 | LoveDivision 7 | 1 AC | $250.00 | RMR DEMOLITION, LLC |
| Jul 23, 2020 | 200260 | AtokaDivision 2 | 33 AC | $1,500.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200061 | DeweyDivision 5 | 100 AC | $1,250.00 | J & R SAND COMPANY, INC. |
| Jul 23, 2020 | 200261 | Pontotoc | 98 AC | $1,522.50 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200248 | Cotton | 2 AC | $1,375.00 | SEWELL BROS., INC. |
| Jul 23, 2020 | 190283 | GarvinDivision 3 | 0.11 AC | $4,800.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Jul 23, 2020 | 200108 | Love, Marshall | 9.03 AC | $250.00 | OVERLAND CORPORATION |
| Jul 23, 2020 | 200249 | CusterDivision 5 | 0.24 AC | $165.00 | SEWELL BROS., INC. |
| Jul 23, 2020 | 200251 | HarmonDivision 5 | 49.32 AC | $525.00 | Frontier Bridge, Inc. |
| Jun 18, 2020 | 200228 | Leflore | 1 AC | $2,700.00 | Robinson Construction, LLC |
| Jun 18, 2020 | 200229 | LincolnDivision 3 | 1.98 AC | $650.00 | L & N BRIDGE, LLC |
| Jun 18, 2020 | 200232 | Ssp-249c(052)ss | 0.25 AC | $10,000.00 | OCCI, INC. |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 25 AC | $803.67 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200237 | StephensDivision 7 | 6.24 AC | $1,000.00 | SEWELL BROS., INC. |
| May 14, 2020 | 200190 | Cirb-210d(071)rb | 4.52 AC | $1,260.00 | Treas Construction Inc |
| May 14, 2020 | 200213 | TexasDivision 6 | 3.38 AC | $688.00 | KLAVER CONSTRUCTION COMPANY, INC. |
| May 14, 2020 | 200202 | MuskogeeDivision 1 | 6.58 AC | $3,038.50 | Treas Construction Inc |
| May 14, 2020 | 200190 | Cirb-210d(071)rb | 1.54 AC | $1,260.00 | Treas Construction Inc |
| May 14, 2020 | 200022 | OttawaDivision 8 | 7.58 AC | $1,225.00 | APAC-CENTRAL, INC. |
| May 14, 2020 | 200214 | Stp-266d(065)ci | 0.77 AC | $2,500.00 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 5.21 AC | $1,000.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200203 | MuskogeeDivision 1 | 4.84 AC | $4,226.50 | Treas Construction Inc |
| May 14, 2020 | 200192 | ComancheDivision 7 | 6.18 AC | $104.00 | Frontier Bridge, Inc. |
| May 14, 2020 | 190376 | WashingtonDivision 8 | 16 AC | $1,525.00 | Paragon Contractors, LLC |
| May 14, 2020 | 200214 | Stp-266d(065)ci | 0.62 AC | $2,500.00 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| May 14, 2020 | 200206 | OttawaDivision 8 | 1 AC | $1,000.00 | H & G Paving Contractors Inc. |
| May 14, 2020 | 200193 | EllisDivision 6 | 9.85 AC | $1,250.00 | J & R SAND COMPANY, INC. |
| May 14, 2020 | 200208 | PittsburgDivision 2 | 23 AC | $1,100.00 | DUIT CONSTRUCTION COMPANY, INC. |
| May 14, 2020 | 200197 | JohnstonDivision 3 | 0.73 AC | $2,174.60 | C3 Construction, Inc. |
| May 14, 2020 | 200189 | CaddoDivision 7 | 1 AC | $100.00 | Robin Hausner Demolition, LLC |
| May 14, 2020 | 200212 | StephensDivision 7 | 2.95 AC | $875.00 | SEWELL BROS., INC. |
| May 14, 2020 | 190120 | Nhppi-4400-(039)pm | 2 AC | $1,766.17 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 200201 | MurrayDivision 7 | 2.6 AC | $1,250.00 | Redlands Contracting, LLC |
| Apr 16, 2020 | 200149 | DelawareDivision 8 | 2.59 AC | $6,380.00 | K & R BUILDERS, INC. |
| Apr 16, 2020 | 200008 | CreekDivision 8 | 0.13 AC | $19,000.00 | LOGOS CONSTRUCTION CO., LLC |