Bid tab 200230

Let Aug 20, 2020 · Division 7 · Love Sign up free

‹ Aug 2020 results

BRIDGE AND APPROACHES COUNTY ROAD (NS-3210/DORY ROAD ): OVER TRIBUTARY TO WALNUT BAYOU , 2.5 MILES NORTH OF SH -32 NEAR BURNEYVILLE. PROJECT LENGTH = 0.148 MILE

Let date
Thursday, August 20, 2020
Contract
200230
J/P numbers
30463(04)
District
Division 7
County
Love
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (NS-3210/DORY ROAD ): OVER TRIBUTARY TO WALNUT BAYOU , 2.5 MILES NORTH OF SH -32 NEAR BURNEYVILLE. PROJECT LENGTH = 0.148 MILE
Project number
STP-243D(034)CI

Bidders 8

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,015,512
1 HUB Construction, Inc. Low bidder $601,019 -40.8%
2 BRIDGECO CONTRACTORS, INC. $661,075 -34.9% +10.0%
3 Treas Construction Inc $751,054 -26.0% +25.0%
4 RRY SERVICES LLC $761,284 -25.0% +26.7%
5 BREWER CONSTRUCTION OKLAHOMA, LLC $786,788 -22.5% +30.9%
6 OVERLAND CORPORATION $796,424 -21.6% +32.5%
7 KLAVER CONSTRUCTION COMPANY, INC. $909,885 -10.4% +51.4%
8 Built Right Construction, LLC $1,170,220 +15.2% +94.7%

Bid tab: unit prices 38 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 HUB Constructio…#2 BRIDGECO CONTRA…#3 Treas Construct…#4 RRY SERVICES LLC#5 BREWER CONSTRUC…#6 OVERLAND CORPOR…#7 KLAVER CONSTRUC…#8 Built Right Con…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $32,000.00 $10,000.00 $15,800.00 $16,050.00 $15,000.00 $22,425.00 $35,000.00 $30,000.00 $45,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION2,092CY $21.50 $5.50 $7.55 $8.56 $10.00 $12.00 $12.00 $12.00 $18.00
3202(D) 0184 UNCLASSIFIED BORROW6,586CY $11.00 $10.00 $8.45 $14.98 $14.00 $20.00 $13.00 $15.00 $18.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $30,000.00 $6,000.00 $4,500.00 $10,700.00 $18,500.00 $14,950.00 $30,000.00 $7,500.00 $35,000.00
5221(C) 2801 TEMPORARY SILT FENCE2,200LF $2.30 $2.55 $3.75 $4.27 $3.99 $3.00 $2.55 $3.99 $6.00
6221(G) 0152 TEMPORARY ROCK FILTER DAM TYPE 320CY $295.00 $75.18 $72.00 $160.50 $200.00 $58.00 $150.00 $150.00 $175.00
7221(K) 0600 TEMPORARY FIBER LOG128LF $7.25 $12.00 $10.50 $16.29 $6.55 $7.00 $6.50 $15.22 $16.00
8230(A) 2806 SOLID SLAB SODDING11,200SY $3.00 $3.50 $3.20 $3.64 $3.00 $3.81 $3.00 $3.40 $5.00
9233(A) 2817 VEGETATIVE MULCHING1.37AC $950.00 $550.00 $550.00 $4,595.65 $4,295.00 $518.00 $450.00 $4,295.00 $5,000.00
10303(A) 2100 AGGREGATE BASE TYPE A555CY $61.00 $58.00 $57.57 $63.21 $65.00 $46.00 $60.00 $59.07 $60.00
11325 5271 SEPARATOR FABRIC4,784SY $3.00 $1.50 $2.17 $2.08 $1.95 $5.00 $1.00 $1.95 $4.25
12402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E1,194TON $30.50 $30.00 $29.76 $24.62 $29.16 $31.00 $27.00 $29.16 $47.00
13407(B) 0250 TACK COAT291GAL $10.00 $5.24 $5.50 $5.61 $5.24 $5.00 $2.00 $5.24 $4.00
14408 5774 PRIME COAT650GAL $15.00 $5.24 $9.88 $10.30 $9.63 $7.00 $6.00 $9.63 $7.00
15411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)358TON $125.00 $120.00 $129.39 $125.88 $117.64 $120.00 $103.00 $117.64 $115.00
16411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)232TON $140.00 $141.91 $158.27 $151.84 $141.91 $138.00 $129.00 $141.91 $145.00
17412 5267 COLD MILLING PAVEMENT1,820SY $10.00 $4.95 $5.75 $4.89 $4.57 $6.00 $4.00 $4.57 $12.00
18613(A) 0491 18" R.C.PIPE CLASS III29LF $100.00 $80.00 $92.55 $123.05 $85.00 $86.00 $152.00 $100.00 $70.00
19613(B) 0696 60" CORR. GALV. STEEL PIPE64LF $200.00 $95.00 $192.00 $155.15 $275.00 $103.00 $240.00 $250.00 $65.00
20613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND2EA $1,000.00 $1,500.00 $950.00 $1,284.00 $1,250.00 $1,115.00 $850.00 $1,350.00 $1,250.00
21619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $50,000.00 $5,000.00 $4,500.00 $4,815.00 $6,500.00 $5,290.00 $47,000.00 $50,000.00 $25,000.00
22619(C) 0924 SAWING PAVEMENT48LF $6.25 $10.00 $14.00 $10.70 $5.00 $8.00 $8.00 $7.00 $20.00
23624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)1,774LF $10.00 $7.00 $7.75 $7.49 $8.90 $8.00 $14.00 $5.00 $8.00
24501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED99CY $50.00 $13.00 $35.00 $37.45 $25.00 $29.00 $30.00 $10.00 $20.00
25509(A) 1326 CLASS AA CONCRETE220CY $800.00 $450.00 $575.00 $655.19 $700.00 $567.00 $525.00 $884.40 $1,100.00
26511(A) 1332 REINFORCING STEEL36,896LB $1.50 $1.09 $1.10 $1.57 $1.15 $1.19 $1.20 $0.9000 $2.00
27601(B) 1353 TYPE I-A PLAIN RIPRAP680TON $60.00 $42.00 $43.00 $47.46 $54.00 $62.22 $45.00 $45.00 $65.00
28601(C) 1355 TYPE I-A FILTER BLANKET102TON $100.00 $35.00 $37.00 $35.74 $41.00 $52.85 $32.00 $35.00 $45.00
29619(B) 2500 REMOVAL OF BRIDGE ITEMS1LSUM $30,000.00 $5,000.00 $6,500.00 $2,321.90 $8,000.00 $16,790.00 $17,000.00 $25,000.00 $30,000.00
30856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)4,400LF $2.00 $2.00 $1.75 $1.79 $1.67 $2.00 $1.70 $1.67 $2.00
31871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.300SD $25.00 $12.03 $10.50 $10.70 $10.00 $29.00 $10.10 $10.00 $25.00
32871(C) 8709 (SP) RELOCATION OF IMPACT ATTENUATOR2EA $1,000.00 $600.00 $550.00 $535.00 $500.00 $978.00 $525.00 $500.00 $850.00
33877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER150LF $75.00 $30.00 $65.00 $23.54 $50.00 $41.00 $1.00 $50.00 $36.00
34877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER150LF $40.00 $10.00 $25.00 $5.35 $6.00 $12.00 $1.00 $25.00 $10.00
35880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $30,000.00 $6,800.00 $6,500.00 $5,350.00 $5,000.00 $12,190.00 $10,000.00 $5,000.00 $25,000.00
36642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $33,000.00 $8,000.00 $7,500.00 $7,276.00 $6,800.00 $11,500.00 $30,000.00 $6,800.00 $15,000.00
37220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $15,000.00 $2,700.00 $3,000.00 $2,675.00 $2,000.00 $4,025.00 $10,000.00 $2,500.00 $5,000.00
38641 1399 MOBILIZATION1LSUM $80,000.00 $50,000.00 $54,000.00 $63,548.42 $63,750.00 $39,876.00 $59,000.00 $117,092.34 $125,000.00