$4.26Avg low bid / LF
$4.39Avg of all bids
$3.96Avg engineer's estimate
130Jobs · 625,121 LF
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 10 | 111,964 | $3.23 | $3.65 |
| 2020 | 17 | 123,248 | $4.99 | $5.51 |
| 2019 | 20 | 101,359 | $4.20 | $5.95 |
| 2018 | 25 | 65,880 | $9.01 | $6.26 |
| 2017 | 18 | 33,555 | $2.77 | $2.77 |
| 2016 | 17 | 60,850 | $3.36 | $3.50 |
| 2015 | 8 | 4,592 | $4.66 | $4.04 |
| 2014 | 11 | 100,387 | $2.72 | $2.82 |
| 2013 | 4 | 23,286 | $3.18 | $2.96 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Jul 15, 2021 | 210197 | Stp-270c(036)ad | 47 LF | $15.00 | RUDY CONSTRUCTION CO. |
| Jun 17, 2021 | 210171 | DeweyDivision 5 | 462 LF | $10.20 | Frontier Bridge, Inc. |
| May 20, 2021 | 210143 | MurrayDivision 7 | 196 LF | $9.80 | OVERLAND CORPORATION |
| May 20, 2021 | 200338 | BeckhamDivision 5 | 7,034 LF | $5.31 | OBC, INC. |
| Mar 18, 2021 | 210077 | GarvinDivision 3 | 67,618 LF | $2.23 | IHC Scott, INC. |
| Feb 18, 2021 | 210070 | WoodwardDivision 6 | 4,759 LF | $8.45 | BRIDGECO CONTRACTORS, INC. |
| Feb 18, 2021 | 210002 | Tap-206e(058)tp | 200 LF | $9.75 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210002 | Tap-206e(058)tp | 100 LF | $9.75 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210002 | Tap-206e(058)tp | 100 LF | $9.75 | HASKELL LEMON CONSTRUCTION CO. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 250 LF | $6.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 250 LF | $5.90 | OVERLAND CORPORATION |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 250 LF | $5.90 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210030 | McclainDivision 3 | 26,400 LF | $3.63 | IHC Scott, INC. |
| Jan 21, 2021 | 210035 | Pontotoc | 4,298 LF | $5.10 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 19, 2020 | 200349 | GarvinDivision 3 | 3,170 LF | $5.98 | Treas Construction Inc |
| Nov 19, 2020 | 200350 | GradyDivision 7 | 1,219 LF | $7.50 | RUDY CONSTRUCTION CO. |
| Oct 15, 2020 | 200180 | WoodsDivision 6 | 250 LF | $9.61 | SCHIRALLI CONSTRUCTION CORP. |
| Aug 20, 2020 | 200163 | OkfuskeeDivision 3 | 61,590 LF | $2.20 | HASKELL LEMON CONSTRUCTION CO. |
| Aug 20, 2020 | 200230 | LoveDivision 7 | 128 LF | $12.00 | HUB Construction, Inc. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 1,320 LF | $8.69 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200229 | LincolnDivision 3 | 70 LF | $6.75 | L & N BRIDGE, LLC |
| May 14, 2020 | 200126 | TulsaDivision 8 | 300 LF | $18.72 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 200198 | KiowaDivision 5 | 100 LF | $4.25 | TOM HUDSON PAVING, INC. |
| May 14, 2020 | 200208 | PittsburgDivision 2 | 2,000 LF | $4.25 | DUIT CONSTRUCTION COMPANY, INC. |
| Apr 16, 2020 | 200216 | BlaineDivision 5 | 421 LF | $6.05 | K & R BUILDERS, INC. |
| Apr 16, 2020 | 200157 | MarshallDivision 2 | 1,250 LF | $19.00 | OVERLAND CORPORATION |
| Apr 16, 2020 | 200065 | HughesDivision 3 | 244 LF | $5.25 | Treas Construction Inc |
| Apr 16, 2020 | 200148 | DelawareDivision 8 | 20 LF | $24.99 | C-GAWF CONSTRUCTION, INC. |
| Apr 16, 2020 | 200154 | KayDivision 4 | 150 LF | $4.61 | Lopp Construction, LLC |
| Mar 19, 2020 | 200085 | TulsaDivision 8 | 128 LF | $2.85 | CROSSLAND HEAVY CONTRACTORS INC. |
| Jan 16, 2020 | 200046 | McclainDivision 3 | 50,888 LF | $7.70 | SHERWOOD CONSTRUCTION CO., INC. |
| Nov 14, 2019 | 190389 | TulsaDivision 8 | 140 LF | $2.70 | CROSSLAND HEAVY CONTRACTORS INC. |
| Nov 14, 2019 | 190383 | CimarronDivision 6 | 360 LF | $11.94 | IHC Scott, INC. |
| Oct 17, 2019 | 190323 | Nhpp-255n(489)eh | 1,020 LF | $2.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Oct 17, 2019 | 190323 | Nhpp-255n(489)eh | 120 LF | $2.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Oct 17, 2019 | 190331 | TulsaDivision 8 | 1,180 LF | $9.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 180304 | SeminoleDivision 3 | 419 LF | $9.00 | OVERLAND CORPORATION |
| Oct 17, 2019 | 190334 | TulsaDivision 8 | 600 LF | $12.00 | Grade Line Construction, LLC |
| Oct 17, 2019 | 180349 | Atoka, Coal | 1,400 LF | $15.41 | Treas Construction Inc |
| Sep 19, 2019 | 190272 | AlfalfaDivision 6 | 32 LF | $18.40 | THE CUMMINS CONSTRUCTION CO., INC. |
| Sep 19, 2019 | 190216 | McclainDivision 3 | 98 LF | $7.80 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 22, 2019 | 190271 | TulsaDivision 8 | 400 LF | $14.50 | Paragon Contractors, LLC |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 19,889 LF | $3.99 | DUIT CONSTRUCTION COMPANY, INC. |
| Jun 20, 2019 | 190182 | OkfuskeeDivision 3 | 61,590 LF | $2.95 | HASKELL LEMON CONSTRUCTION CO. |
| Jun 20, 2019 | 190195 | Stp-214b(069)ag | 581 LF | $4.25 | Silver Star Construction Company, Inc. |
| Jun 20, 2019 | 190195 | Stp-214b(069)ag | 756 LF | $3.30 | Silver Star Construction Company, Inc. |
| Jun 20, 2019 | 190149 | CusterDivision 5 | 3,678 LF | $6.30 | Treas Construction Inc |
| May 16, 2019 | 190027 | WashingtonDivision 8 | 1,680 LF | $6.00 | BECCO CONTRACTORS, INC. |
| May 16, 2019 | 180356 | JacksonDivision 5 | 112 LF | $5.50 | SEWELL BROS., INC. |
| May 16, 2019 | 190023 | PottawatomieDivision 3 | 2,082 LF | $15.79 | CP3 ENTERPRISES, INC. |
| Apr 18, 2019 | 180235 | BryanDivision 2 | 2,740 LF | $7.98 | L & N BRIDGE, LLC |
| Apr 18, 2019 | 180235 | BryanDivision 2 | 1,908 LF | $4.25 | L & N BRIDGE, LLC |
| Jan 17, 2019 | 190033 | CarterDivision 7 | 30 LF | $5.25 | SCHIRALLI CONSTRUCTION CORP. |
| Jan 17, 2019 | 190039 | CusterDivision 5 | 544 LF | $10.50 | SEWELL BROS., INC. |
| Nov 15, 2018 | 180331 | Tap-252e(049)tp | 400 LF | $8.90 | SCHIRALLI CONSTRUCTION CORP. |
| Nov 15, 2018 | 180359 | OklahomaDivision 4 | 15,893 LF | $21.50 | JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY |
| Nov 15, 2018 | 180331 | Tap-252e(049)tp | 100 LF | $8.86 | SCHIRALLI CONSTRUCTION CORP. |
| Nov 15, 2018 | 180365 | WashitaDivision 5 | 150 LF | $5.50 | SCHIRALLI CONSTRUCTION CORP. |
| Nov 15, 2018 | 180347 | CarterDivision 7 | 2,500 LF | $7.50 | OVERLAND CORPORATION |
| Nov 15, 2018 | 180352 | GarfieldDivision 4 | 270 LF | $10.00 | T. McDonald Construction, Inc. |
| Sep 20, 2018 | 180307 | Ssp-272n(206)pm | 240 LF | $10.00 | BECCO CONTRACTORS, INC. |
| Sep 20, 2018 | 180280 | CraigDivision 8 | 30 LF | $4.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 20, 2018 | 180288 | Hsipg-240n(068)ad | 150 LF | $3.50 | JOB CONSTRUCTION CO., INC. |
| Sep 20, 2018 | 180301 | PottawatomieDivision 3 | 250 LF | $4.35 | PBX Corporation |
| Sep 20, 2018 | 180307 | Ssp-272n(206)pm | 180 LF | $10.00 | BECCO CONTRACTORS, INC. |
| Aug 16, 2018 | 180263 | GarvinDivision 3 | 1,170 LF | $4.01 | Allen Contracting, Inc. |
| Jun 14, 2018 | 170236 | SeminoleDivision 3 | 777 LF | $7.25 | OVERLAND CORPORATION |
| Jun 14, 2018 | 180127 | ClevelandDivision 3 | 4,503 LF | $5.22 | Silver Star Construction Company, Inc. |
| May 17, 2018 | 180233 | Stp-267c(071)ss | 350 LF | $4.69 | FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. |
| May 17, 2018 | 180233 | Stp-267c(071)ss | 2,970 LF | $4.20 | FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. |
| May 17, 2018 | 180190 | ClevelandDivision 3 | 11,452 LF | $3.50 | Silver Star Construction Company, Inc. |
| May 17, 2018 | 180216 | WoodwardDivision 6 | 294 LF | $3.15 | SEWELL BROS., INC. |
| Mar 15, 2018 | 180138 | Tap-254d(038)tp | 150 LF | $8.81 | C3 Construction, Inc. |
| Mar 15, 2018 | 180138 | Tap-254d(038)tp | 150 LF | $8.81 | C3 Construction, Inc. |
| Mar 15, 2018 | 180122 | Acstp-277d(044)ur | 1,036 LF | $8.52 | THE CUMMINS CONSTRUCTION CO., INC. |
| Mar 15, 2018 | 180148 | TulsaDivision 8 | 280 LF | $3.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 15, 2018 | 180122 | Acstp-277d(044)ur | 161 LF | $8.50 | THE CUMMINS CONSTRUCTION CO., INC. |
| Mar 15, 2018 | 180150 | TulsaDivision 8 | 100 LF | $9.00 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| Mar 15, 2018 | 180126 | ClevelandDivision 3 | 250 LF | $4.25 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 15, 2018 | 180091 | LincolnDivision 3 | 2,245 LF | $4.16 | BRIDGECO CONTRACTORS, INC. |
| Feb 15, 2018 | 180010 | Stp-238c(046)ss | 224 LF | $3.50 | RRY SERVICES LLC |
| Jan 18, 2018 | 180011 | LatimerDivision 2 | 16,016 LF | $6.05 | HUB Construction, Inc. |
| Jan 18, 2018 | 180019 | OkfuskeeDivision 3 | 3,519 LF | $2.06 | Treas Construction Inc |
| Jan 18, 2018 | 180032 | SeminoleDivision 3 | 70 LF | $3.00 | T. McDonald Construction, Inc. |
| Nov 16, 2017 | 170355 | MurrayDivision 7 | 5,127 LF | $2.15 | OVERLAND CORPORATION |
| Nov 16, 2017 | 170351 | LoganDivision 4 | 1,499 LF | $2.25 | RRY SERVICES LLC |
| Oct 19, 2017 | 170295 | TulsaDivision 8 | 350 LF | $10.00 | BECCO CONTRACTORS, INC. |
| Oct 19, 2017 | 170332 | Stpg-257e(235)ig | 100 LF | $8.50 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| Oct 19, 2017 | 170337 | TulsaDivision 8 | 100 LF | $6.00 | Keystone Services, Inc. |
| Aug 17, 2017 | 170273 | PittsburgDivision 2 | 28 LF | $8.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Aug 17, 2017 | 170267 | MajorDivision 6 | 17,792 LF | $2.34 | Frontier Bridge, Inc. |
| Jun 15, 2017 | 170204 | OttawaDivision 8 | 112 LF | $5.29 | Crossland Construction Company, Inc. |
| Apr 20, 2017 | 170156 | GarfieldDivision 4 | 168 LF | $2.45 | THE CUMMINS CONSTRUCTION CO., INC. |
| Mar 16, 2017 | 170128 | MajorDivision 6 | 2,948 LF | $3.49 | Frontier Bridge, Inc. |
| Mar 16, 2017 | 170141 | TulsaDivision 8 | 490 LF | $3.92 | GLOVER & ASSOCIATES, INC. |
| Mar 16, 2017 | 170084 | Nhppy-234n(043)ss | 329 LF | $3.73 | Frontier Bridge, Inc. |
| Mar 16, 2017 | 170117 | CarterDivision 7 | 325 LF | $6.00 | T. McDonald Construction, Inc. |
| Mar 16, 2017 | 170118 | CimarronDivision 6 | 3,247 LF | $3.50 | Bridges, Inc. DBA Scudder Bridge Co. |
| Feb 16, 2017 | 170082 | GrantDivision 4 | 80 LF | $5.00 | Venture Corporation dba VCO Paving |
| Feb 16, 2017 | 170107 | TulsaDivision 8 | 300 LF | $2.99 | SHERWOOD CONSTRUCTION CO., INC. |
| Feb 16, 2017 | 170069 | ClevelandDivision 3 | 56 LF | $13.00 | HASKELL LEMON CONSTRUCTION CO. |
| Jan 19, 2017 | 170056 | WashitaDivision 5 | 504 LF | $4.00 | K & R BUILDERS, INC. |
| Nov 17, 2016 | 160425 | OklahomaDivision 4 | 2,066 LF | $4.14 | DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV |
| Nov 17, 2016 | 160424 | OkfuskeeDivision 3 | 21,302 LF | $4.10 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 20, 2016 | 160363 | CreekDivision 8 | 1,980 LF | $4.75 | Paragon Contractors, LLC |
| Sep 15, 2016 | 160290 | LoganDivision 4 | 306 LF | $4.65 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 15, 2016 | 160245 | CreekDivision 8 | 2,472 LF | $5.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 15, 2016 | 160321 | LincolnDivision 3 | 688 LF | $4.05 | HASKELL LEMON CONSTRUCTION CO. |
| Aug 18, 2016 | 160307 | WoodwardDivision 6 | 1,972 LF | $5.00 | SEWELL BROS., INC. |
| Aug 18, 2016 | 160289 | Acnhppi-3500-(039)ss | 1,360 LF | $2.46 | OBC, INC. |
| Jul 21, 2016 | 160255 | Creek, Okmulgee | 2,954 LF | $2.45 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 21, 2016 | 160262 | StephensDivision 7 | 122 LF | $3.00 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Jun 16, 2016 | 160225 | Acnhpp-140n(171)ss | 379 LF | $25.00 | C-GAWF CONSTRUCTION, INC. |
| Apr 21, 2016 | 160189 | Acnhppi-2350-(005)ss | 3,800 LF | $1.63 | Allen Contracting, Inc. |
| Apr 21, 2016 | 160156 | TulsaDivision 8 | 250 LF | $10.00 | BECCO CONTRACTORS, INC. |
| Apr 21, 2016 | 160161 | AlfalfaDivision 6 | 2,500 LF | $4.30 | SEWELL BROS., INC. |
| Feb 18, 2016 | 160069 | AlfalfaDivision 6 | 3,962 LF | $1.50 | Bridges, Inc. DBA Scudder Bridge Co. |
| Jan 21, 2016 | 150258 | CraigDivision 8 | 14,500 LF | $1.83 | GLOVER & ASSOCIATES, INC. |
| Jan 21, 2016 | 160046 | OklahomaDivision 4 | 237 LF | $1.75 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Nov 19, 2015 | 150229 | Stp-218d(040)ci | 23 LF | $2.95 | RRY SERVICES LLC |
| Oct 15, 2015 | 150335 | HarperDivision 6 | 780 LF | $7.77 | SEWELL BROS., INC. |
| Sep 17, 2015 | 150318 | WoodsDivision 6 | 1,740 LF | $4.00 | Venture Corporation dba VCO Paving |
| Aug 20, 2015 | 150270 | TulsaDivision 8 | 755 LF | $5.47 | SHERWOOD CONSTRUCTION CO., INC. |
| May 21, 2015 | 150162 | GarvinDivision 3 | 414 LF | $2.60 | Munoz Construction, Inc. |
| Apr 16, 2015 | 150135 | HarperDivision 6 | 500 LF | $2.60 | SEWELL BROS., INC. |
| Feb 19, 2015 | 150040 | TulsaDivision 8 | 80 LF | $6.00 | Midstate Traffic Control, Inc. |
| Jan 22, 2015 | 150039 | TulsaDivision 8 | 300 LF | $4.47 | SHERWOOD CONSTRUCTION CO., INC. |
| Nov 20, 2014 | 140373 | Pontotoc | 753 LF | $4.15 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Nov 20, 2014 | 140357 | GreerDivision 5 | 98 LF | $5.15 | SEWELL BROS., INC. |
| Nov 20, 2014 | 140287 | Nhppiy-0035-2(304) | 2,237 LF | $4.71 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 16, 2014 | 140304 | Nhppiy-0244-2(501) | 2,528 LF | $4.39 | DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV |
| Oct 16, 2014 | 140304 | Nhppiy-0244-2(501) | 5,267 LF | $4.39 | DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV |
| Oct 16, 2014 | 140347 | Ssp-277n(008)ss | 11,840 LF | $4.30 | THE CUMMINS CONSTRUCTION CO., INC. |
| Sep 18, 2014 | 140294 | HarperDivision 6 | 1,015 LF | $4.25 | KLAVER CONSTRUCTION COMPANY, INC. |
| May 15, 2014 | 140099 | HarperDivision 6 | 800 LF | $3.20 | Bridges, Inc. DBA Scudder Bridge Co. |
| Apr 17, 2014 | 140147 | Sbr-136n(216)sb | 3,101 LF | $3.30 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Mar 20, 2014 | 140128 | MajorDivision 6 | 68,978 LF | $2.13 | J & R SAND COMPANY, INC. |
| Feb 20, 2014 | 140092 | Nhppiy-0040-3(085) | 500 LF | $2.50 | HASKELL LEMON CONSTRUCTION CO. |
| Jan 23, 2014 | 140043 | KiowaDivision 5 | 3,270 LF | $2.50 | SEWELL BROS., INC. |
| Nov 21, 2013 | 130395 | OsageDivision 8 | 12,000 LF | $3.64 | SHERWOOD CONSTRUCTION CO., INC. |
| Nov 21, 2013 | 130407 | WoodsDivision 6 | 6,800 LF | $2.50 | Venture Corporation dba VCO Paving |
| Jun 20, 2013 | 130261 | OklahomaDivision 4 | 186 LF | $2.50 | Olivas Construction Company, Inc. |
| May 16, 2013 | 130199 | WoodsDivision 6 | 4,300 LF | $3.00 | SEWELL BROS., INC. |