Bid tab 160363

Let Oct 20, 2016 · Division 8 · Creek Sign up free

‹ Oct 2016 results

GRADE, DRAIN, AND SURFACE COUNTY ROAD (WEST 81ST STREET SOUTH ): FROM SH-97, EXTEND EAST IN SAPULPA . PROJECT LENGTH = 1.590 MILES

Let date
Thursday, October 20, 2016
Contract
160363
J/P numbers
22350(08)
District
Division 8
County
Creek
Highway
Limits
GRADE, DRAIN, AND SURFACE COUNTY ROAD (WEST 81ST STREET SOUTH ): FROM SH-97, EXTEND EAST IN SAPULPA . PROJECT LENGTH = 1.590 MILES
Project number
CIRB-119C(192)RB

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$6,248,985
1 Paragon Contractors, LLC Low bidder $5,418,418 -13.3%
2 MCGUIRE BROTHERS CONSTRUCTION, INC. $5,667,278 -9.3% +4.6%
3 BECCO CONTRACTORS, INC. $5,675,000 -9.2% +4.7%
4 SHERWOOD CONSTRUCTION CO., INC. $6,039,387 -3.4% +11.5%
5 Tri Star Construction Arkansas, LLC $6,252,824 +0.1% +15.4%
6 FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. $7,066,438 +13.1% +30.4%

Bid tab: unit prices 92 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 Paragon Contrac…#2 MCGUIRE BROTHER…#3 BECCO CONTRACTO…#4 SHERWOOD CONSTR…#5 Tri Star Constr…#6 FRONTIER BRIDGE…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $50,000.00 $65,000.00 $108,000.00 $150,000.00 $200,000.00 $104,000.00 $93,340.00
2202(A) 0183 UNCLASSIFIED EXCAVATION67,877CY $6.00 $5.00 $6.00 $5.60 $4.53 $6.35 $9.89
3202(C) 0182 ROCK EXCAVATION7,944CY $15.00 $13.00 $12.00 $8.00 $15.11 $15.00 $50.33
4202(D) 0184 UNCLASSIFIED BORROW96,823CY $9.00 $5.75 $7.50 $5.60 $5.00 $8.50 $12.18
5205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $30,000.00 $65,000.00 $62,000.00 $50,000.00 $54,457.68 $39,500.00 $88,036.00
6210 0121 OBLITERATING ABANDONED ROAD1,297LF $6.00 $13.00 $31.00 $20.00 $14.58 $7.00 $12.48
7221(A) 2800 TEMPORARY SLOPE DRAINS595LF $150.00 $20.00 $21.00 $15.00 $22.78 $53.20 $156.00
8221(C) 2801 TEMPORARY SILT FENCE4,377LF $2.50 $1.40 $1.50 $1.40 $2.07 $2.25 $1.12
9221(F) 0100 TEMPORARY SILT DIKE1,368LF $8.00 $14.00 $13.00 $13.00 $8.50 $8.25 $6.54
10221(K) 0600 TEMPORARY FIBER LOG1,980LF $5.00 $4.75 $5.00 $4.50 $3.50 $3.50 $3.63
11227 0300 (SP)TURF REINFORCEMENT MAT2,685SY $23.00 $31.00 $20.00 $15.00 $34.46 $37.50 $18.95
12230(A) 2806 SOLID SLAB SODDING65,130SY $1.75 $1.55 $1.60 $1.50 $1.68 $2.50 $1.24
13233(A) 2817 VEGETATIVE MULCHING22.5AC $850.00 $105.00 $110.00 $110.00 $310.00 $2,000.00 $312.00
14241 2832 MOWING27AC $100.00 $42.00 $43.00 $44.00 $45.55 $100.00 $71.76
15242 0400 (PL)STABILIZED CONSTRUCTION EXIT2EA $2,500.00 $2,100.00 $1,500.00 $3,500.00 $1,347.89 $3,125.50 $2,381.60
16303(A) 2100 AGGREGATE BASE TYPE A10,357CY $45.00 $40.00 $41.00 $30.00 $40.68 $39.50 $40.83
17307(D) 4230 LIME50TON $250.00 $195.00 $225.00 $150.00 $145.00 $186.00 $202.80
18307(H) 4270 LIME STABILIZED SUBGRADE1,971SY $4.00 $7.00 $3.50 $3.00 $7.30 $4.00 $3.42
19310(B) 0149 SUBGRADE, METHOD B32,550SY $1.50 $0.7500 $1.25 $0.5000 $1.16 $1.50 $1.97
20325 5271 SEPARATOR FABRIC42,090SY $1.00 $1.50 $1.00 $1.00 $0.9300 $1.50 $1.12
21402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E544TON $35.00 $29.00 $28.00 $18.00 $20.35 $28.00 $23.33
22411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)12,609TON $65.00 $59.00 $52.00 $44.00 $77.36 $64.75 $63.02
23411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)4,575TON $80.00 $68.00 $62.50 $54.00 $83.70 $76.00 $70.51
24412 5267 COLD MILLING PAVEMENT2,286SY $5.00 $6.75 $7.00 $5.00 $3.70 $6.75 $5.20
25414(B) 5725 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT )5,038SY $25.00 $31.00 $31.00 $22.00 $20.27 $24.00 $26.56
26414(G) 5275 P.C. CONCRETE FOR PAVEMENT1,261CY $150.00 $124.00 $118.00 $110.00 $116.81 $123.00 $127.56
27501(A) 0313 STRUCTURAL EXCAVATION UNCLASSIFIED629CY $15.00 $21.00 $10.00 $20.00 $11.68 $16.00 $10.40
28509(A) 0319 CLASS AA CONCRETE1,851CY $350.00 $400.00 $320.00 $400.00 $403.04 $441.00 $330.36
29509(D) 0325 CLASS C CONCRETE93CY $250.00 $375.00 $440.00 $400.00 $291.54 $266.00 $283.09
30510(D) 6341 MSE RETAINING WALL200SY $400.00 $460.00 $75.00 $330.00 $452.45 $440.00 $189.87
31511(A) 0332 REINFORCING STEEL288,760LB $0.9000 $0.4500 $0.7000 $1.00 $0.9900 $0.9000 $0.7800
32601(B) 0536 TYPE I-A PLAIN RIPRAP1,940TON $40.00 $35.00 $40.00 $50.00 $27.86 $38.50 $33.03
33601(C) 0538 TYPE I-A FILTER BLANKET1,404TON $25.00 $26.00 $25.00 $30.00 $32.45 $23.50 $22.57
34609(B) 0383 COMBINED CURB & GUTTER (6" BARRIER)14,420LF $16.00 $18.00 $18.00 $20.00 $15.51 $13.25 $17.87
35609(B) 0384 COMBINED CURB & GUTTER (8" BARRIER)210LF $17.00 $22.00 $19.00 $22.00 $25.06 $30.00 $19.00
36610(B) 0604 6" CONCRETE DRIVEWAY295SY $60.00 $53.00 $62.00 $80.00 $42.55 $57.00 $63.80
37611(A) 2657 MANHOLE (4' DIAMETER)7EA $2,200.00 $1,850.00 $1,800.00 $2,500.00 $2,307.02 $1,645.00 $2,459.60
38611(A) 2659 MANHOLE (6' DIAMETER)2EA $4,000.00 $3,380.00 $3,500.00 $4,500.00 $3,855.09 $4,030.00 $4,602.00
39611(A) 2661 MANHOLE (8' DIA.METER)1EA $6,000.00 $5,900.00 $4,000.00 $7,500.00 $7,612.86 $6,175.00 $8,476.00
40611(G) 5112 INLET CI DES. 2 (STD)26EA $2,000.00 $3,200.00 $2,900.00 $4,000.00 $2,769.34 $1,882.00 $3,764.80
41611(G) 5113 INLET CI DES. 2 (B)4EA $2,200.00 $3,900.00 $3,700.00 $5,000.00 $3,289.88 $2,125.00 $4,903.60
42611(G) 5120 INLET CI DES. 3 (STD)4EA $2,500.00 $4,400.00 $4,100.00 $6,500.00 $4,877.11 $2,612.00 $5,340.40
43611(G) 5337 INLET GPI TYPE 2 (DES. 11)1EA $3,000.00 $3,100.00 $4,100.00 $5,000.00 $3,180.70 $4,070.00 $4,154.80
44611(G) 6000 INLET (SMD-TYPE 1)6EA $2,200.00 $2,750.00 $3,000.00 $4,500.00 $2,562.40 $2,797.00 $3,416.40
45611(G) 6006 INLET (SMD-TYPE 2B)5EA $2,500.00 $2,850.00 $2,700.00 $5,000.00 $2,331.33 $2,352.00 $3,494.40
46612(A) 0641 MANHOLES ADJUST TO GRADE2EA $600.00 $980.00 $850.00 $2,000.00 $707.92 $1,263.50 $634.00
47612(C) 0645 INLET ADJUST TO GRADE2EA $500.00 $1,000.00 $500.00 $2,000.00 $2,128.61 $1,350.00 $634.00
48613(A) 0491 18" R.C.PIPE CLASS III2,811LF $55.00 $49.00 $51.00 $70.00 $58.19 $56.75 $67.52
49613(A) 0493 30" R.C.PIPE CLASS III353LF $95.00 $80.00 $68.00 $115.00 $127.20 $84.50 $102.91
50613(A) 0494 36" R.C.PIPE CLASS III199LF $95.00 $110.00 $86.00 $125.00 $139.71 $95.00 $128.23
51613(A) 0495 42" R.C.PIPE CLASS III80LF $140.00 $150.00 $110.00 $150.00 $163.83 $110.00 $179.79
52613(A) 0496 48" R.C.PIPE CLASS III43LF $170.00 $185.00 $131.00 $215.00 $250.79 $146.00 $192.91
53613(B) 0689 18" CORR. GALV. STEEL PIPE100LF $30.00 $41.00 $50.00 $50.00 $34.14 $56.00 $30.44
54613(B) 0696 60" CORR. GALV. STEEL PIPE144LF $60.00 $84.00 $105.00 $85.00 $147.50 $98.00 $128.26
55613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND15EA $850.00 $635.00 $730.00 $600.00 $640.54 $604.00 $806.00
56613(L) 5732 30" PREFAB. CULVERT END SECTION, ROUND2EA $1,100.00 $910.00 $950.00 $950.00 $988.63 $881.00 $1,164.80
57613(L) 5734 36" PREFAB. CULVERT END SECTION, ROUND2EA $1,500.00 $1,350.00 $1,400.00 $1,400.00 $1,517.10 $1,325.00 $1,518.40
58613(L) 5738 48" PREFAB. CULVERT END SECTION, ROUND1EA $2,000.00 $2,100.00 $1,800.00 $2,200.00 $2,663.94 $2,076.00 $2,485.60
59613(N) 7503 TYPE D4 SLOPED CONCRETE END SECTION2EA $2,200.00 $2,755.00 $3,500.00 $2,500.00 $1,977.78 $1,528.00 $3,166.80
60619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $30,000.00 $24,501.75 $30,000.00 $139,140.80 $20,453.02 $45,600.00 $36,618.40
61619(B) 4728 REMOVAL OF ASPHALT PAVEMENT13,014SY $4.00 $3.00 $5.00 $4.00 $3.86 $5.00 $5.20
62619(B) 5113 REMOVAL OF RIPRAP269SY $4.00 $10.00 $10.00 $20.00 $9.78 $8.00 $26.00
63623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE131LF $20.00 $33.00 $35.00 $50.00 $36.50 $42.00 $32.50
64624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)432LF $6.00 $10.00 $13.00 $15.00 $9.35 $7.00 $12.22
65629(A) 4958 MAILBOX INSTALLATION-SINGLE5EA $90.00 $79.50 $85.00 $150.00 $87.60 $99.75 $78.00
66629(B) 4959 MAILBOX INSTALLATION-MULTIPLE2EA $150.00 $212.00 $220.00 $275.00 $233.59 $266.00 $208.00
67629(C) 4960 MAILBOX14EA $35.00 $26.00 $30.00 $55.00 $29.20 $33.25 $26.00
68104 0955 (SP) RAILROAD FLAGGING(NON-BIDDABLE)30DAY $475.00 $475.00 $475.00 $475.00 $475.00 $475.00 $475.00
69805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS1EA $100.00 $53.00 $55.00 $220.00 $58.40 $66.50 $52.00
70805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS3EA $150.00 $159.00 $165.00 $275.00 $175.20 $199.50 $156.00
71850(A) 8110 SHEET ALUMINUM SIGNS140SF $16.00 $21.00 $22.00 $22.00 $23.36 $26.50 $20.80
72851(C) 8330 2 1/2" SQUARE TUBE POST220LF $8.50 $10.00 $11.00 $11.00 $11.68 $13.25 $10.40
73853 9024 DELINEATORS(TYPE 1, CODE 1)4EA $25.00 $53.00 $55.00 $55.00 $58.40 $66.50 $52.00
74856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)26,260LF $0.7500 $0.5000 $0.4900 $0.5000 $0.5100 $0.6000 $0.4600
75856(B) 8860 TRAFFIC STRIPE(MULTI-POLY.)(ARROWS)39EA $150.00 $106.00 $110.00 $110.00 $116.80 $133.00 $104.00
76856(B) 8870 TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS)3EA $350.00 $795.00 $850.00 $800.00 $875.99 $997.50 $780.00
77857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)9,184LF $0.2500 $0.3000 $0.2800 $0.2500 $0.2900 $0.3300 $0.2600
78857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)1,000LF $1.50 $0.3000 $0.2800 $0.2500 $0.2900 $0.3300 $0.2600
79871(B) 8705 (SP)CONST.ZONE IMPACT ATTEN.330SD $10.00 $10.00 $11.00 $11.00 $11.68 $13.30 $10.40
80877(B) 8484 DELIVER PORTABLE LONGITUDINAL BARRIER225LF $25.00 $50.00 $45.00 $20.00 $45.78 $46.50 $31.20
81877(C) 8486 RELOCATION OF PORTABLE LONGITUDINAL BARRIER225LF $10.00 $15.00 $10.00 $10.00 $11.74 $4.00 $3.12
82880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF7,030SD $0.2500 $0.2700 $0.2800 $0.3000 $0.2900 $0.3300 $0.2600
83880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF3,280SD $0.5000 $2.15 $2.25 $2.20 $2.34 $2.66 $2.08
84880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF7,470SD $1.00 $0.3000 $0.2800 $0.3000 $0.2900 $0.3300 $0.2600
85880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)2,250SD $0.5000 $3.20 $3.30 $3.30 $3.50 $4.00 $3.12
86880(C) 8848 WING BARRICADES6,980SD $0.5000 $0.1500 $0.1100 $0.1500 $0.1200 $0.1300 $0.1000
87880(E) 8860 WARNING LIGHTS(TYPE A)30,520SD $0.1000 $0.0200 $0.0300 $0.0200 $0.0200 $0.0300 $0.0200
88880(F) 8878 DRUMS10,050SD $0.2500 $0.3000 $0.2800 $0.3000 $0.2900 $0.3300 $0.2600
89882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN1,230SD $10.00 $5.30 $5.50 $10.00 $5.84 $6.65 $5.20
90642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $60,000.00 $59,000.00 $62,000.00 $50,000.00 $57,114.57 $37,300.00 $56,888.00
91220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $10,000.00 $4,000.00 $10,000.00 $5,000.00 $2,500.00 $8,645.00 $5,720.00
92641 1552 MOBILIZATION1LSUM $300,000.00 $60,000.00 $280,000.00 $290,000.00 $241,586.89 $157,400.00 $282,411.43