$5.58Avg low bid / LF
$6.01Avg of all bids
$5.71Avg engineer's estimate
156Jobs · 825,518.05 LF
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 26 | 192,642 | $5.96 | $6.26 |
| 2020 | 54 | 377,200.98 | $5.10 | $5.76 |
| 2019 | 37 | 131,670.48 | $6.43 | $6.76 |
| 2018 | 39 | 124,004.59 | $5.56 | $5.86 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Sep 16, 2021 | 210179 | MurrayDivision 7 | 344 LF | $6.10 | Pavers, Inc. |
| Aug 19, 2021 | 210232 | GarfieldDivision 4 | 2,916 LF | $9.25 | THE CUMMINS CONSTRUCTION CO., INC. |
| Aug 19, 2021 | 210241 | SequoyahDivision 1 | 107 LF | $7.88 | Treas Construction Inc |
| Jul 15, 2021 | 210216 | OkmulgeeDivision 1 | 5,016 LF | $7.22 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 210111 | LincolnDivision 3 | 8,802 LF | $5.80 | HASKELL LEMON CONSTRUCTION CO. |
| Jun 17, 2021 | 210171 | DeweyDivision 5 | 649 LF | $7.14 | Frontier Bridge, Inc. |
| May 20, 2021 | 210133 | EllisDivision 6 | 7,927 LF | $5.57 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210082 | McclainDivision 3 | 994 LF | $5.30 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210139 | McclainDivision 3 | 6,189 LF | $6.00 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210140 | McclainDivision 3 | 2,273 LF | $6.09 | Treas Construction Inc |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 3,243 LF | $9.20 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 200338 | BeckhamDivision 5 | 4,810 LF | $5.59 | OBC, INC. |
| May 20, 2021 | 210143 | MurrayDivision 7 | 21,599 LF | $6.60 | OVERLAND CORPORATION |
| May 20, 2021 | 210129 | BryanDivision 2 | 4,216 LF | $5.25 | L & N BRIDGE, LLC |
| Mar 18, 2021 | 210086 | PittsburgDivision 2 | 9,553 LF | $6.72 | Robinson Construction, LLC |
| Mar 18, 2021 | 210060 | OttawaDivision 8 | 4,120 LF | $7.14 | Treas Construction Inc |
| Mar 18, 2021 | 210097 | KayDivision 4 | 3,297 LF | $5.90 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 38,841 LF | $5.25 | OVERLAND CORPORATION |
| Feb 18, 2021 | 210045 | ClevelandDivision 3 | 3,872 LF | $6.50 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Feb 18, 2021 | 190362 | LoveDivision 7 | 324 LF | $8.20 | C3 Construction, Inc. |
| Feb 18, 2021 | 210048 | CraigDivision 8 | 1,052 LF | $11.50 | CONCRETE SERVICES CORPORATION |
| Feb 18, 2021 | 210062 | Pontotoc | 7,085 LF | $5.90 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210070 | WoodwardDivision 6 | 988 LF | $10.00 | BRIDGECO CONTRACTORS, INC. |
| Jan 21, 2021 | 210010 | ClevelandDivision 3 | 6,162 LF | $6.75 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Jan 21, 2021 | 210018 | HarperDivision 6 | 32,919 LF | $5.25 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210025 | KingfisherDivision 4 | 15,344 LF | $5.25 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 19, 2020 | 200349 | GarvinDivision 3 | 915 LF | $5.65 | Treas Construction Inc |
| Nov 19, 2020 | 200355 | RogersDivision 8 | 26,143 LF | $5.45 | EMERY SAPP & SONS, INC. |
| Nov 19, 2020 | 200357 | SequoyahDivision 1 | 6,849 LF | $7.30 | APAC-CENTRAL, INC. |
| Nov 19, 2020 | 200344 | CaddoDivision 7 | 259 LF | $7.70 | K & R BUILDERS, INC. |
| Oct 15, 2020 | 200317 | MccurtainDivision 2 | 1,296 LF | $7.00 | HUB Construction, Inc. |
| Oct 15, 2020 | 200322 | OsageDivision 8 | 5,978 LF | $6.25 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200077 | PottawatomieDivision 3 | 8,391 LF | $5.00 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200326 | PushmatahaDivision 2 | 1,984 LF | $8.00 | L & N BRIDGE, LLC |
| Oct 15, 2020 | 200303 | BeaverDivision 6 | 102 LF | $35.00 | J & R SAND COMPANY, INC. |
| Oct 15, 2020 | 200316 | Grady, Mcclain | 2,550 LF | $6.90 | Treas Construction Inc |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 12,662 LF | $5.00 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200290 | OsageDivision 8 | 1,358 LF | $6.50 | BRIDGECO CONTRACTORS, INC. |
| Sep 17, 2020 | 200292 | PottawatomieDivision 3 | 13,868 LF | $4.90 | Silver Star Construction Company, Inc. |
| Sep 17, 2020 | 200294 | SequoyahDivision 1 | 974.1 LF | $9.00 | Rosscon, LLC |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 14,207 LF | $5.00 | OVERLAND CORPORATION |
| Aug 20, 2020 | 200225 | GradyDivision 7 | 917 LF | $6.60 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200264 | Leflore | 1,450 LF | $5.50 | HUB Construction, Inc. |
| Aug 20, 2020 | 200230 | LoveDivision 7 | 1,774 LF | $7.00 | HUB Construction, Inc. |
| Jul 23, 2020 | 200248 | Cotton | 607 LF | $13.50 | SEWELL BROS., INC. |
| Jul 23, 2020 | 200108 | Love, Marshall | 1,890 LF | $6.00 | OVERLAND CORPORATION |
| Jul 23, 2020 | 200260 | AtokaDivision 2 | 10,150 LF | $4.40 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200261 | Pontotoc | 18,110 LF | $4.10 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200061 | DeweyDivision 5 | 42,072 LF | $4.65 | J & R SAND COMPANY, INC. |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 4,686 LF | $5.74 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200237 | StephensDivision 7 | 1,089 LF | $5.50 | SEWELL BROS., INC. |
| May 14, 2020 | 200194 | GarfieldDivision 4 | 1,947 LF | $5.30 | HASKELL LEMON CONSTRUCTION CO. |
| May 14, 2020 | 200214 | Stp-266d(065)ci | 395.62 LF | $7.50 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| May 14, 2020 | 200201 | MurrayDivision 7 | 1,893 LF | $10.00 | Redlands Contracting, LLC |
| May 14, 2020 | 200202 | MuskogeeDivision 1 | 215 LF | $6.59 | Treas Construction Inc |
| May 14, 2020 | 200190 | Cirb-210d(071)rb | 2,270 LF | $7.66 | Treas Construction Inc |
| May 14, 2020 | 200022 | OttawaDivision 8 | 3,936 LF | $5.00 | APAC-CENTRAL, INC. |
| May 14, 2020 | 200203 | MuskogeeDivision 1 | 1,778 LF | $6.09 | Treas Construction Inc |
| May 14, 2020 | 200190 | Cirb-210d(071)rb | 1,939 LF | $7.67 | Treas Construction Inc |
| May 14, 2020 | 200212 | StephensDivision 7 | 2,759 LF | $5.50 | SEWELL BROS., INC. |
| May 14, 2020 | 190376 | WashingtonDivision 8 | 23,857 LF | $4.00 | Paragon Contractors, LLC |
| May 14, 2020 | 200192 | ComancheDivision 7 | 2,840 LF | $8.16 | Frontier Bridge, Inc. |
| May 14, 2020 | 200214 | Stp-266d(065)ci | 717 LF | $7.25 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| Apr 16, 2020 | 200065 | HughesDivision 3 | 3,224 LF | $4.89 | Treas Construction Inc |
| Apr 16, 2020 | 200079 | SeminoleDivision 3 | 367 LF | $8.30 | THE CUMMINS CONSTRUCTION CO., INC. |
| Apr 16, 2020 | 200153 | Jefferson | 1,044 LF | $7.70 | K & R BUILDERS, INC. |
| Apr 16, 2020 | 200028 | Cirb-264d(069)rb | 14,892 LF | $5.25 | THE CUMMINS CONSTRUCTION CO., INC. |
| Apr 16, 2020 | 200175 | WagonerDivision 1 | 2,289.1 LF | $6.80 | APAC-CENTRAL, INC. |
| Apr 16, 2020 | 200028 | Cirb-264d(069)rb | 16,195.36 LF | $5.25 | THE CUMMINS CONSTRUCTION CO., INC. |
| Mar 19, 2020 | 200110 | McintoshDivision 1 | 2,237 LF | $6.95 | Robinson Construction, LLC |
| Mar 19, 2020 | 200125 | Jackson, Tillman | 1,070 LF | $6.00 | BRIDGECO CONTRACTORS, INC. |
| Mar 19, 2020 | 200085 | TulsaDivision 8 | 136 LF | $17.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Feb 20, 2020 | 200062 | EllisDivision 6 | 7,084 LF | $4.75 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200183 | Stp-170c(127)pm | 32,921 LF | $4.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200183 | Stp-170c(127)pm | 1,534 LF | $4.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200057 | ClevelandDivision 3 | 4,622 LF | $5.10 | Silver Star Construction Company, Inc. |
| Jan 16, 2020 | 200043 | HaskellDivision 1 | 23,672.8 LF | $3.80 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Jan 16, 2020 | 190214 | LoveDivision 7 | 1,854 LF | $8.00 | Silver Star Construction Company, Inc. |
| Jan 16, 2020 | 200009 | CusterDivision 5 | 12,256 LF | $5.35 | SEWELL BROS., INC. |
| Jan 16, 2020 | 200044 | Stp-257b(038)pm | 1,030 LF | $5.79 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200018 | McintoshDivision 1 | 4,268 LF | $6.00 | L & N BRIDGE, LLC |
| Jan 16, 2020 | 200044 | Stp-257b(038)pm | 2,380 LF | $5.79 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 190356 | KayDivision 4 | 2,552 LF | $7.85 | Evans & Associates Construction Co., Inc. |
| Jan 16, 2020 | 200092 | TulsaDivision 8 | 11,500 LF | $5.10 | APAC-CENTRAL, INC. |
| Jan 16, 2020 | 190207 | CarterDivision 7 | 852 LF | $8.80 | K & R BUILDERS, INC. |
| Jan 16, 2020 | 200001 | AlfalfaDivision 6 | 4,393 LF | $5.50 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 14, 2019 | 190364 | MayesDivision 8 | 1,007 LF | $8.75 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Nov 14, 2019 | 190297 | RogersDivision 8 | 1,240 LF | $5.00 | B & B BRIDGE COMPANY, LLC |
| Nov 14, 2019 | 190373 | Sbr-264b(066)sb | 750 LF | $7.50 | L & N BRIDGE, LLC |
| Nov 14, 2019 | 190309 | WashingtonDivision 8 | 1,537.92 LF | $9.00 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| Nov 14, 2019 | 190375 | StephensDivision 7 | 6,179 LF | $6.74 | Treas Construction Inc |
| Nov 14, 2019 | 190109 | CanadianDivision 4 | 4,806 LF | $8.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Nov 14, 2019 | 190386 | CoalDivision 3 | 200 LF | $39.45 | BRIDGECO CONTRACTORS, INC. |
| Oct 17, 2019 | 190335 | TulsaDivision 8 | 641 LF | $10.50 | Tri Star Construction Arkansas, LLC |
| Oct 17, 2019 | 180304 | SeminoleDivision 3 | 2,833 LF | $5.00 | OVERLAND CORPORATION |
| Oct 17, 2019 | 190264 | Stp-264c(063)pm | 1,557 LF | $10.00 | HUB Construction, Inc. |
| Aug 22, 2019 | 190257 | SequoyahDivision 1 | 26,716 LF | $5.60 | JOB CONSTRUCTION CO., INC. |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 2,887 LF | $7.77 | DUIT CONSTRUCTION COMPANY, INC. |
| Jul 25, 2019 | 190270 | AlfalfaDivision 6 | 3,534 LF | $5.90 | Venture Corporation dba VCO Paving |
| Jul 25, 2019 | 190215 | MarshallDivision 2 | 2,934 LF | $6.10 | OVERLAND CORPORATION |
| Jul 25, 2019 | 190234 | Jefferson | 1,074 LF | $8.00 | OVERLAND CORPORATION |
| Jun 20, 2019 | 190125 | OkmulgeeDivision 1 | 2,194.4 LF | $7.50 | RRY SERVICES LLC |
| Jun 20, 2019 | 190149 | CusterDivision 5 | 1,086 LF | $8.56 | Treas Construction Inc |
| Jun 20, 2019 | 190195 | Stp-214b(069)ag | 1,000 LF | $8.40 | Silver Star Construction Company, Inc. |
| Jun 20, 2019 | 190056 | OttawaDivision 8 | 134 LF | $20.00 | RRY SERVICES LLC |
| Jun 20, 2019 | 190142 | Jefferson | 14,707 LF | $5.10 | OVERLAND CORPORATION |
| Jun 20, 2019 | 190119 | MuskogeeDivision 1 | 2,605.16 LF | $7.91 | H & H BRIDGE COMPANY |
| May 16, 2019 | 190017 | NowataDivision 8 | 496 LF | $7.00 | H & H BRIDGE COMPANY |
| May 16, 2019 | 190081 | JohnstonDivision 3 | 4,441 LF | $6.18 | Treas Construction Inc |
| May 16, 2019 | 190024 | SeminoleDivision 3 | 5,418 LF | $4.65 | HASKELL LEMON CONSTRUCTION CO. |
| May 16, 2019 | 190132 | Pontotoc | 5,991 LF | $5.30 | OVERLAND CORPORATION |
| May 16, 2019 | 190027 | WashingtonDivision 8 | 9,360 LF | $9.00 | BECCO CONTRACTORS, INC. |
| May 16, 2019 | 190139 | WagonerDivision 1 | 629 LF | $10.65 | Paragon Contractors, LLC |
| May 16, 2019 | 190013 | McclainDivision 3 | 1,512 LF | $5.30 | Silver Star Construction Company, Inc. |
| Apr 18, 2019 | 190165 | StephensDivision 7 | 16,828 LF | $5.00 | OVERLAND CORPORATION |
| Apr 18, 2019 | 190167 | StephensDivision 7 | 860 LF | $10.00 | RRY SERVICES LLC |
| Apr 18, 2019 | 190006 | GarvinDivision 3 | 377 LF | $15.00 | BRIDGECO CONTRACTORS, INC. |
| Apr 18, 2019 | 180235 | BryanDivision 2 | 385 LF | $4.80 | L & N BRIDGE, LLC |
| Mar 14, 2019 | 190140 | MurrayDivision 7 | 1,314 LF | $6.50 | BRIDGECO CONTRACTORS, INC. |
| Feb 14, 2019 | 190097 | Nhpp-008n(090)fp | 705 LF | $12.50 | J & R SAND COMPANY, INC. |
| Feb 14, 2019 | 190100 | Stp-205b(076)pm | 194 LF | $9.81 | Frontier Bridge, Inc. |
| Jan 17, 2019 | 190039 | CusterDivision 5 | 58 LF | $58.00 | SEWELL BROS., INC. |
| Jan 17, 2019 | 190059 | SequoyahDivision 1 | 3,480 LF | $7.50 | T. McDonald Construction, Inc. |
| Nov 15, 2018 | 180243 | LoveDivision 7 | 736 LF | $7.17 | SCHIRALLI CONSTRUCTION CORP. |
| Nov 15, 2018 | 180245 | MurrayDivision 7 | 1,456 LF | $9.07 | Wyatt Contracting |
| Nov 15, 2018 | 180260 | ChoctawDivision 2 | 10,652 LF | $4.10 | H & H BRIDGE COMPANY |
| Nov 15, 2018 | 180238 | GradyDivision 7 | 536 LF | $16.50 | SEWELL BROS., INC. |
| Oct 18, 2018 | 180205 | OkmulgeeDivision 1 | 1,560 LF | $9.25 | BECCO CONTRACTORS, INC. |
| Oct 18, 2018 | 180297 | OttawaDivision 8 | 451 LF | $12.00 | RRY SERVICES LLC |
| Oct 18, 2018 | 180188 | CarterDivision 7 | 8,467.02 LF | $5.60 | OVERLAND CORPORATION |
| Sep 20, 2018 | 180313 | SeminoleDivision 3 | 2,403 LF | $4.80 | B & B BRIDGE COMPANY, LLC |
| Sep 20, 2018 | 180202 | McintoshDivision 1 | 991 LF | $4.80 | RRY SERVICES LLC |
| Sep 20, 2018 | 180281 | CreekDivision 8 | 953 LF | $10.00 | BECCO CONTRACTORS, INC. |
| Sep 20, 2018 | 180291 | MuskogeeDivision 1 | 1,138 LF | $7.25 | T. McDonald Construction, Inc. |
| Sep 20, 2018 | 180298 | PawneeDivision 8 | 8,897 LF | $5.50 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 16, 2018 | 180269 | OklahomaDivision 4 | 763 LF | $6.75 | KLAVER CONSTRUCTION COMPANY, INC. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 1,387 LF | $5.50 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 14, 2018 | 180231 | WashitaDivision 5 | 4,647 LF | $6.14 | CASWELL CONSTRUCTION, INC. |
| Jun 14, 2018 | 180232 | WashitaDivision 5 | 910 LF | $5.75 | SEWELL BROS., INC. |
| May 17, 2018 | 180154 | BlaineDivision 5 | 3,961 LF | $4.28 | FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. |
| May 17, 2018 | 180233 | Stp-267c(071)ss | 4,204 LF | $4.15 | FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. |
| May 17, 2018 | 180211 | StephensDivision 7 | 8,641 LF | $4.85 | OVERLAND CORPORATION |
| May 17, 2018 | 180233 | Stp-267c(071)ss | 1,246 LF | $4.15 | FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. |
| May 17, 2018 | 180215 | WoodsDivision 6 | 969 LF | $4.95 | Venture Corporation dba VCO Paving |
| May 17, 2018 | 180195 | HughesDivision 3 | 1,714 LF | $3.60 | C-GAWF CONSTRUCTION, INC. |
| Apr 19, 2018 | 180174 | OkfuskeeDivision 3 | 582 LF | $5.55 | H & H BRIDGE COMPANY |
| Apr 19, 2018 | 180056 | McintoshDivision 1 | 805 LF | $10.60 | C3 Construction, Inc. |
| Apr 19, 2018 | 180217 | Sbr-206c(046)sb | 1,767.57 LF | $4.40 | K & R BUILDERS, INC. |
| Mar 15, 2018 | 180036 | AlfalfaDivision 6 | 7,035 LF | $6.75 | Venture Corporation dba VCO Paving |
| Mar 15, 2018 | 180151 | WashingtonDivision 8 | 7,492 LF | $5.00 | BECCO CONTRACTORS, INC. |