| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$16,000.00 |
$100,000.00 |
$225,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 54,325 | CY |
$8.00 |
$5.00 |
$10.50 |
$21.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 10,041 | CY |
$9.20 |
$5.10 |
$8.65 |
$7.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$12,000.00 |
$70,500.00 |
$70,510.49 |
$55,051.85 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 277 | LF |
$2.60 |
$3.00 |
$9.80 |
$5.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,344 | LF |
$6.00 |
$10.00 |
$8.88 |
$10.00 |
| 7 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 62 | CY |
$125.00 |
$120.50 |
$118.45 |
$135.00 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 22,833 | LF |
$1.75 |
$3.00 |
$3.34 |
$2.95 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 149,546 | SY |
$1.30 |
$2.80 |
$2.76 |
$2.45 |
| 10 | 241 2832 |
MOWING | 83 | AC |
$43.00 |
$150.00 |
$168.89 |
$100.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 14,871 | CY |
$64.00 |
$36.50 |
$41.08 |
$40.00 |
| 12 | 307(K) 4300 |
STABILIZED SUBGRADE | 89,035 | SY |
$4.90 |
$4.75 |
$3.97 |
$7.00 |
| 13 | 325 5271 |
SEPARATOR FABRIC | 78,298 | SY |
$1.70 |
$0.8500 |
$0.8600 |
$0.7500 |
| 14 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 11,217 | TON |
$25.00 |
$21.75 |
$20.44 |
$15.00 |
| 15 | 407(B) 0250 |
TACK COAT | 15,813 | GAL |
$2.50 |
$2.00 |
$2.00 |
$2.00 |
| 16 | 408 5774 |
PRIME COAT | 52,691 | GAL |
$3.75 |
$2.60 |
$3.50 |
$1.75 |
| 17 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 6,297 | TON |
$54.50 |
$65.00 |
$67.36 |
$65.00 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 26,455 | TON |
$76.75 |
$56.50 |
$62.69 |
$65.00 |
| 19 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 4,134 | TON |
$73.75 |
$81.50 |
$90.65 |
$85.00 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 4,429 | TON |
$63.00 |
$66.00 |
$80.43 |
$85.00 |
| 21 | 509(D) 0325 |
CLASS C CONCRETE | 4,090 | CY |
$190.00 |
$290.00 |
$220.00 |
$235.00 |
| 22 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 348 | LF |
$68.00 |
$76.75 |
$70.00 |
$100.00 |
| 23 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 148 | LF |
$140.00 |
$98.65 |
$105.88 |
$105.00 |
| 24 | 613(A) 0496 |
48" R.C.PIPE CLASS III | 312 | LF |
$140.00 |
$133.00 |
$207.38 |
$130.00 |
| 25 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 131 | LF |
$130.00 |
$107.00 |
$113.55 |
$130.00 |
| 26 | 613(B) 0688 |
12" CORR. GALV. STEEL PIPE | 48 | LF |
$21.00 |
$30.25 |
$42.02 |
$70.00 |
| 27 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 144 | LF |
$34.00 |
$33.00 |
$46.61 |
$75.00 |
| 28 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 136 | LF |
$54.00 |
$38.10 |
$39.18 |
$80.00 |
| 29 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 222 | LF |
$40.00 |
$49.45 |
$80.17 |
$85.00 |
| 30 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 125 | LF |
$42.00 |
$36.50 |
$68.16 |
$75.00 |
| 31 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 863 | LF |
$16.00 |
$8.05 |
$19.00 |
$5.00 |
| 32 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 288 | LF |
$11.80 |
$10.00 |
$14.37 |
$5.00 |
| 33 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 14 | EA |
$1,500.00 |
$1,610.00 |
$1,412.68 |
$2,000.00 |
| 34 | 613(M) 7198 |
TYPE C6 CULVERT END TREATMENT | 6 | EA |
$2,906.00 |
$2,210.00 |
$1,977.76 |
$2,000.00 |
| 35 | 613(M) 7203 |
TYPE CC6 CULVERT END TREATMENT | 2 | EA |
$4,400.00 |
$2,675.00 |
$2,411.10 |
$2,200.00 |
| 36 | 613(M) 7204 |
TYPE DD6 CULVERT END TREATMENT | 2 | EA |
$4,000.00 |
$3,270.00 |
$5,572.23 |
$2,200.00 |
| 37 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 3 | EA |
$1,100.00 |
$520.00 |
$398.67 |
$500.00 |
| 38 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 263 | CY |
$50.00 |
$31.25 |
$40.00 |
$40.00 |
| 39 | 613(V) 1180 |
TRENCH EXCAVATION | 474 | CY |
$10.00 |
$10.10 |
$10.00 |
$5.00 |
| 40 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$6,950.00 |
$4,986.59 |
$125,000.00 |
| 41 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 44,021 | SY |
$2.85 |
$2.75 |
$2.35 |
$5.00 |
| 42 | 619(C) 0924 |
SAWING PAVEMENT | 2,591 | LF |
$3.75 |
$2.65 |
$3.21 |
$4.00 |
| 43 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 2,596 | LF |
$4.25 |
$5.95 |
$5.67 |
$8.00 |
| 44 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,289.1 | LF |
$9.55 |
$6.80 |
$6.23 |
$8.50 |
| 45 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 387 | LF |
$6.00 |
$7.45 |
$6.52 |
$12.00 |
| 46 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 10 | EA |
$110.00 |
$100.50 |
$141.68 |
$125.00 |
| 47 | 629(C) 4960 |
MAILBOX | 10 | EA |
$50.00 |
$85.75 |
$56.67 |
$50.00 |
| 48 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 10 | EA |
$25.00 |
$25.25 |
$28.34 |
$25.00 |
| 49 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 9,300 | LF |
$0.6000 |
$1.00 |
$0.5700 |
$0.5000 |
| 50 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 1,000 | LF |
$0.6000 |
$1.00 |
$1.13 |
$1.00 |
| 51 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 18,600 | LF |
$0.2500 |
$0.1000 |
$0.1700 |
$0.1500 |
| 52 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,788 | SD |
$0.4500 |
$0.3500 |
$1.13 |
$1.00 |
| 53 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 11,856 | SD |
$0.7000 |
$0.3500 |
$0.2800 |
$0.5000 |
| 54 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,560 | SD |
$1.00 |
$2.00 |
$2.27 |
$2.00 |
| 55 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 10,944 | SD |
$0.5000 |
$0.1000 |
$0.2800 |
$0.2500 |
| 56 | 880(C) 8848 |
WING BARRICADES | 1,824 | SD |
$1.44 |
$0.1000 |
$0.1100 |
$0.1000 |
| 57 | 880(D) 8854 |
VERTICAL PANELS | 6,840 | SD |
$0.1100 |
$0.5000 |
$0.1700 |
$0.1500 |
| 58 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 24,168 | SD |
$0.3000 |
$0.0500 |
$0.0900 |
$0.1000 |
| 59 | 880(F) 8878 |
DRUMS | 10,032 | SD |
$0.2000 |
$0.5000 |
$0.1700 |
$0.2500 |
| 60 | 880(G) 8890 |
CHANNELIZER CONES | 5,472 | SD |
$0.3500 |
$0.5000 |
$0.2800 |
$0.2500 |
| 61 | 880(I) 8902 |
FLAGGER | 30 | SD |
$100.00 |
$213.00 |
$211.96 |
$200.00 |
| 62 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 408 | SD |
$13.00 |
$15.15 |
$11.33 |
$15.00 |
| 63 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 120.76 | SF |
$21.00 |
$18.25 |
$20.40 |
$20.00 |
| 64 | 851(C) 8324 |
2" SQUARE TUBE POST | 148 | LF |
$9.50 |
$5.05 |
$10.20 |
$10.00 |
| 65 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 145 | LF |
$11.50 |
$5.05 |
$11.33 |
$10.00 |
| 66 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 51,190 | LF |
$0.6000 |
$0.4000 |
$0.5700 |
$0.5500 |
| 67 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 950 | LF |
$1.40 |
$1.00 |
$1.53 |
$1.40 |
| 68 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 1,140 | LF |
$2.50 |
$5.05 |
$1.70 |
$2.00 |
| 69 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 72 | LF |
$5.00 |
$10.10 |
$8.50 |
$10.00 |
| 70 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 10 | EA |
$161.00 |
$151.00 |
$136.01 |
$130.00 |
| 71 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$53,242.23 |
$75,000.00 |
$46,811.22 |
$141,530.60 |
| 72 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$27,500.00 |
$35,000.00 |
$2,833.60 |
$15,000.00 |
| 73 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$351,088.00 |
$286,892.05 |
$333,521.99 |
$410,000.00 |