Bid tab 200175

Let Apr 16, 2020 · Division 1 · Wagoner Sign up free

‹ Apr 2020 results

GRADE, DRAIN, AND SURFACE SH -72: FROM 4.4 MILES NORTH OF THE US -64 JUNCTION, EXTEND NORTH NEAR HASKELL . PROJECT LENGTH = 2.301 MILES

Let date
Thursday, April 16, 2020
Contract
200175
J/P numbers
20916(04)
District
Division 1
County
Wagoner
Highway
Limits
GRADE, DRAIN, AND SURFACE SH -72: FROM 4.4 MILES NORTH OF THE US -64 JUNCTION, EXTEND NORTH NEAR HASKELL . PROJECT LENGTH = 2.301 MILES
Project number
STP-173C(087)PM

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$7,518,557
1 APAC-CENTRAL, INC. Low bidder $6,945,000 -7.6%
2 SHERWOOD CONSTRUCTION CO., INC. $7,411,155 -1.4% +6.7%
3 BECCO CONTRACTORS, INC. $8,637,000 +14.9% +24.4%

Bid tab: unit prices 73 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 APAC-CENTRAL, I…#2 SHERWOOD CONSTR…#3 BECCO CONTRACTO…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $20,000.00 $16,000.00 $100,000.00 $225,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION54,325CY $8.00 $5.00 $10.50 $21.00
3202(D) 0184 UNCLASSIFIED BORROW10,041CY $9.20 $5.10 $8.65 $7.50
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $12,000.00 $70,500.00 $70,510.49 $55,051.85
5221(C) 2801 TEMPORARY SILT FENCE277LF $2.60 $3.00 $9.80 $5.00
6221(F) 0100 TEMPORARY SILT DIKE1,344LF $6.00 $10.00 $8.88 $10.00
7221(G) 0150 TEMPORARY ROCK FILTER DAM TYPE 162CY $125.00 $120.50 $118.45 $135.00
8229 4318 DITCH LINER PROTECTION22,833LF $1.75 $3.00 $3.34 $2.95
9230(A) 2806 SOLID SLAB SODDING149,546SY $1.30 $2.80 $2.76 $2.45
10241 2832 MOWING83AC $43.00 $150.00 $168.89 $100.00
11303(A) 2100 AGGREGATE BASE TYPE A14,871CY $64.00 $36.50 $41.08 $40.00
12307(K) 4300 STABILIZED SUBGRADE89,035SY $4.90 $4.75 $3.97 $7.00
13325 5271 SEPARATOR FABRIC78,298SY $1.70 $0.8500 $0.8600 $0.7500
14402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E11,217TON $25.00 $21.75 $20.44 $15.00
15407(B) 0250 TACK COAT15,813GAL $2.50 $2.00 $2.00 $2.00
16408 5774 PRIME COAT52,691GAL $3.75 $2.60 $3.50 $1.75
17411(B) 5940 SUPERPAVE, TYPE S3(PG 70-28 OK)6,297TON $54.50 $65.00 $67.36 $65.00
18411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)26,455TON $76.75 $56.50 $62.69 $65.00
19411(C) 5955 SUPERPAVE, TYPE S4(PG 70-28 OK)4,134TON $73.75 $81.50 $90.65 $85.00
20411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)4,429TON $63.00 $66.00 $80.43 $85.00
21509(D) 0325 CLASS C CONCRETE4,090CY $190.00 $290.00 $220.00 $235.00
22613(A) 0492 24" R.C.PIPE CLASS III348LF $68.00 $76.75 $70.00 $100.00
23613(A) 0493 30" R.C.PIPE CLASS III148LF $140.00 $98.65 $105.88 $105.00
24613(A) 0496 48" R.C.PIPE CLASS III312LF $140.00 $133.00 $207.38 $130.00
25613(A) 4496 28" X 18" R.C.PIPE ARCH CLASS A-III131LF $130.00 $107.00 $113.55 $130.00
26613(B) 0688 12" CORR. GALV. STEEL PIPE48LF $21.00 $30.25 $42.02 $70.00
27613(B) 0689 18" CORR. GALV. STEEL PIPE144LF $34.00 $33.00 $46.61 $75.00
28613(B) 0690 24" CORR. GALV. STEEL PIPE136LF $54.00 $38.10 $39.18 $80.00
29613(B) 0691 30" CORR. GALV. STEEL PIPE222LF $40.00 $49.45 $80.17 $85.00
30613(B) 4527 21" X 15" CORR. GALV. STEEL PIPE ARCH125LF $42.00 $36.50 $68.16 $75.00
31613(H) 0450 6" PERFORATED PIPE UNDERDRAIN ROUND863LF $16.00 $8.05 $19.00 $5.00
32613(I) 1096 6" NON-PERF.PIPE UNDERDRAIN RND.288LF $11.80 $10.00 $14.37 $5.00
33613(M) 7197 TYPE B6 CULVERT END TREATMENT14EA $1,500.00 $1,610.00 $1,412.68 $2,000.00
34613(M) 7198 TYPE C6 CULVERT END TREATMENT6EA $2,906.00 $2,210.00 $1,977.76 $2,000.00
35613(M) 7203 TYPE CC6 CULVERT END TREATMENT2EA $4,400.00 $2,675.00 $2,411.10 $2,200.00
36613(M) 7204 TYPE DD6 CULVERT END TREATMENT2EA $4,000.00 $3,270.00 $5,572.23 $2,200.00
37613(Q) 5946 OUTLET LATERAL HEADWALL3EA $1,100.00 $520.00 $398.67 $500.00
38613(S) 1186 STANDARD BEDDING MATERIAL, CLASS B263CY $50.00 $31.25 $40.00 $40.00
39613(V) 1180 TRENCH EXCAVATION474CY $10.00 $10.10 $10.00 $5.00
40619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $5,000.00 $6,950.00 $4,986.59 $125,000.00
41619(B) 4728 REMOVAL OF ASPHALT PAVEMENT44,021SY $2.85 $2.75 $2.35 $5.00
42619(C) 0924 SAWING PAVEMENT2,591LF $3.75 $2.65 $3.21 $4.00
43624(C) 4458 FENCE-STYLE SWF (4 BARBED WIRE)2,596LF $4.25 $5.95 $5.67 $8.00
44624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)2,289.1LF $9.55 $6.80 $6.23 $8.50
45624(C) 7181 FENCE-STYLE SWF (6 BARBED WIRE)387LF $6.00 $7.45 $6.52 $12.00
46629(A) 4958 MAILBOX INSTALLATION-SINGLE10EA $110.00 $100.50 $141.68 $125.00
47629(C) 4960 MAILBOX10EA $50.00 $85.75 $56.67 $50.00
48629(D) 4961 REMOVAL OF MAILBOX INSTALLATION10EA $25.00 $25.25 $28.34 $25.00
49856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)9,300LF $0.6000 $1.00 $0.5700 $0.5000
50857(C) 8851 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE)1,000LF $0.6000 $1.00 $1.13 $1.00
51857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)18,600LF $0.2500 $0.1000 $0.1700 $0.1500
52880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF4,788SD $0.4500 $0.3500 $1.13 $1.00
53880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF11,856SD $0.7000 $0.3500 $0.2800 $0.5000
54880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF4,560SD $1.00 $2.00 $2.27 $2.00
55880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)10,944SD $0.5000 $0.1000 $0.2800 $0.2500
56880(C) 8848 WING BARRICADES1,824SD $1.44 $0.1000 $0.1100 $0.1000
57880(D) 8854 VERTICAL PANELS6,840SD $0.1100 $0.5000 $0.1700 $0.1500
58880(E) 8860 WARNING LIGHTS(TYPE A)24,168SD $0.3000 $0.0500 $0.0900 $0.1000
59880(F) 8878 DRUMS10,032SD $0.2000 $0.5000 $0.1700 $0.2500
60880(G) 8890 CHANNELIZER CONES5,472SD $0.3500 $0.5000 $0.2800 $0.2500
61880(I) 8902 FLAGGER30SD $100.00 $213.00 $211.96 $200.00
62882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN408SD $13.00 $15.15 $11.33 $15.00
63850(A) 8110 SHEET ALUMINUM SIGNS120.76SF $21.00 $18.25 $20.40 $20.00
64851(C) 8324 2" SQUARE TUBE POST148LF $9.50 $5.05 $10.20 $10.00
65851(C) 8330 2 1/2" SQUARE TUBE POST145LF $11.50 $5.05 $11.33 $10.00
66856(A) 8535 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE)51,190LF $0.6000 $0.4000 $0.5700 $0.5500
67856(A) 8540 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE)950LF $1.40 $1.00 $1.53 $1.40
68856(A) 8548 TRAFFIC STRIPE(MULTI-POLY)(12" WIDE)1,140LF $2.50 $5.05 $1.70 $2.00
69856(A) 8555 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE)72LF $5.00 $10.10 $8.50 $10.00
70856(B) 8860 TRAFFIC STRIPE(MULTI-POLY.)(ARROWS)10EA $161.00 $151.00 $136.01 $130.00
71642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $53,242.23 $75,000.00 $46,811.22 $141,530.60
72220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $27,500.00 $35,000.00 $2,833.60 $15,000.00
73641 1552 MOBILIZATION1LSUM $351,088.00 $286,892.05 $333,521.99 $410,000.00