$87.00Avg low bid / TON
$88.96Avg of all bids
$85.23Avg engineer's estimate
156Jobs · 1,129,059.04 TON
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 34 | 265,637.49 | $92.25 | $92.01 |
| 2020 | 46 | 342,835.44 | $90.48 | $93.53 |
| 2019 | 42 | 315,548.36 | $88.14 | $90.88 |
| 2018 | 34 | 205,037.75 | $72.60 | $76.04 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Nov 18, 2021 | 210347 | DelawareDivision 8 | 663 TON | $175.00 | C-GAWF CONSTRUCTION, INC. |
| Sep 16, 2021 | 200324 | Osage, Pawnee | 3,186 TON | $89.00 | BECCO CONTRACTORS, INC. |
| Aug 19, 2021 | 210232 | GarfieldDivision 4 | 2,245.98 TON | $107.25 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 15, 2021 | 210111 | LincolnDivision 3 | 8,287 TON | $87.70 | HASKELL LEMON CONSTRUCTION CO. |
| Jul 15, 2021 | 210211 | LoganDivision 4 | 2,708 TON | $88.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jul 15, 2021 | 210228 | KayDivision 4 | 7,200 TON | $104.50 | HASKELL LEMON CONSTRUCTION CO. |
| Jun 17, 2021 | 210174 | GrantDivision 4 | 8,200 TON | $106.50 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jun 17, 2021 | 210195 | TulsaDivision 8 | 696 TON | $96.50 | Paragon Contractors, LLC |
| May 20, 2021 | 210148 | PayneDivision 4 | 6,881 TON | $74.00 | BECCO CONTRACTORS, INC. |
| May 20, 2021 | 210133 | EllisDivision 6 | 4,482 TON | $114.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210140 | McclainDivision 3 | 3,496 TON | $109.20 | Treas Construction Inc |
| Apr 15, 2021 | 210109 | Jefferson | 13,900 TON | $89.90 | OVERLAND CORPORATION |
| Apr 15, 2021 | 210123 | TexasDivision 6 | 11,900 TON | $102.00 | J & R SAND COMPANY, INC. |
| Apr 15, 2021 | 210100 | CanadianDivision 4 | 15,400 TON | $78.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210104 | CraigDivision 8 | 13,089 TON | $87.50 | Rosscon, LLC |
| Apr 15, 2021 | 210108 | HarperDivision 6 | 12,450 TON | $110.00 | J & R SAND COMPANY, INC. |
| Mar 18, 2021 | 210076 | CimarronDivision 6 | 21,300 TON | $115.00 | J & R SAND COMPANY, INC. |
| Mar 18, 2021 | 210086 | PittsburgDivision 2 | 8,471 TON | $91.23 | Robinson Construction, LLC |
| Mar 18, 2021 | 210089 | StephensDivision 7 | 13,900 TON | $82.26 | T & G CONSTRUCTION, INC. |
| Mar 18, 2021 | 210075 | CarterDivision 7 | 7,500 TON | $89.00 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210060 | OttawaDivision 8 | 2,078 TON | $133.88 | Treas Construction Inc |
| Feb 18, 2021 | 210062 | Pontotoc | 2,522 TON | $97.20 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210066 | Ssr-266c(092)sr | 13,296 TON | $71.00 | BECCO CONTRACTORS, INC. |
| Feb 18, 2021 | 210066 | Ssr-266c(092)sr | 9,306 TON | $71.00 | BECCO CONTRACTORS, INC. |
| Feb 18, 2021 | 210045 | ClevelandDivision 3 | 14,069 TON | $80.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Feb 18, 2021 | 210070 | WoodwardDivision 6 | 445 TON | $162.07 | BRIDGECO CONTRACTORS, INC. |
| Feb 18, 2021 | 210056 | NobleDivision 4 | 5,700 TON | $99.90 | HASKELL LEMON CONSTRUCTION CO. |
| Jan 21, 2021 | 210033 | OsageDivision 8 | 5,699 TON | $84.75 | BECCO CONTRACTORS, INC. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 1,046 TON | $100.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210018 | HarperDivision 6 | 7,403.51 TON | $97.85 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210034 | OttawaDivision 8 | 10,040 TON | $78.95 | EMERY SAPP & SONS, INC. |
| Jan 21, 2021 | 210024 | KayDivision 4 | 7,800 TON | $119.45 | Evans & Associates Construction Co., Inc. |
| Jan 21, 2021 | 210028 | LoveDivision 7 | 4,720 TON | $74.25 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210029 | MayesDivision 8 | 11,938 TON | $78.00 | BECCO CONTRACTORS, INC. |
| Jan 21, 2021 | 210031 | OklahomaDivision 4 | 3,620 TON | $105.00 | SCHWARZ PAVING CO., INC. |
| Nov 19, 2020 | 200355 | RogersDivision 8 | 565 TON | $95.00 | EMERY SAPP & SONS, INC. |
| Nov 19, 2020 | 200356 | SeminoleDivision 3 | 354 TON | $122.97 | Frontier Bridge, Inc. |
| Oct 15, 2020 | 200325 | PawneeDivision 8 | 250 TON | $275.00 | CONCRETE SERVICES CORPORATION |
| Oct 15, 2020 | 200309 | GarfieldDivision 4 | 3,396.54 TON | $103.16 | THE CUMMINS CONSTRUCTION CO., INC. |
| Oct 15, 2020 | 200310 | GarfieldDivision 4 | 519 TON | $128.85 | HASKELL LEMON CONSTRUCTION CO. |
| Oct 15, 2020 | 200322 | OsageDivision 8 | 3,656 TON | $85.97 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200323 | OsageDivision 8 | 597 TON | $144.44 | BRIDGECO CONTRACTORS, INC. |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 8,500 TON | $72.40 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 9,021 TON | $75.35 | OVERLAND CORPORATION |
| Jul 23, 2020 | 200257 | TulsaDivision 8 | 32 TON | $400.00 | Built Right Construction, LLC |
| Jul 23, 2020 | 200260 | AtokaDivision 2 | 7,141 TON | $85.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200261 | Pontotoc | 9,896 TON | $75.75 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200247 | ClevelandDivision 3 | 247 TON | $110.00 | CGC, LLC. |
| Jun 18, 2020 | 200228 | Leflore | 3,542 TON | $102.60 | Robinson Construction, LLC |
| May 14, 2020 | 200022 | OttawaDivision 8 | 2,702 TON | $89.00 | APAC-CENTRAL, INC. |
| Apr 16, 2020 | 200169 | RogersDivision 8 | 16,755 TON | $70.00 | BECCO CONTRACTORS, INC. |
| Apr 16, 2020 | 200175 | WagonerDivision 1 | 4,134 TON | $81.50 | APAC-CENTRAL, INC. |
| Apr 16, 2020 | 200142 | CaddoDivision 7 | 5,700 TON | $88.80 | T & G CONSTRUCTION, INC. |
| Apr 16, 2020 | 200147 | CreekDivision 8 | 13,744 TON | $80.00 | Rosscon, LLC |
| Apr 16, 2020 | 200065 | HughesDivision 3 | 580 TON | $123.39 | Treas Construction Inc |
| Apr 16, 2020 | 200185 | OklahomaDivision 4 | 265 TON | $145.23 | Frontier Bridge, Inc. |
| Apr 16, 2020 | 200151 | GarfieldDivision 4 | 239 TON | $215.00 | BRIDGECO CONTRACTORS, INC. |
| Apr 16, 2020 | 200157 | MarshallDivision 2 | 19,536 TON | $80.40 | OVERLAND CORPORATION |
| Mar 19, 2020 | 200136 | MajorDivision 6 | 252.9 TON | $143.44 | Frontier Bridge, Inc. |
| Mar 19, 2020 | 200099 | CanadianDivision 4 | 17,800 TON | $83.50 | Atlas Paving Company |
| Mar 19, 2020 | 200100 | CarterDivision 7 | 4,355 TON | $76.45 | OVERLAND CORPORATION |
| Mar 19, 2020 | 200085 | TulsaDivision 8 | 277 TON | $130.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Mar 19, 2020 | 200130 | Ssr-273n(054)sr | 16,747 TON | $82.00 | Rosscon, LLC |
| Mar 19, 2020 | 200130 | Ssr-273n(054)sr | 4,547 TON | $82.00 | Rosscon, LLC |
| Mar 19, 2020 | 200131 | WoodwardDivision 6 | 28,500 TON | $110.70 | THE CUMMINS CONSTRUCTION CO., INC. |
| Mar 19, 2020 | 200098 | CaddoDivision 7 | 6,825 TON | $90.68 | T & G CONSTRUCTION, INC. |
| Feb 20, 2020 | 200071 | LoganDivision 4 | 7,700 TON | $115.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Feb 20, 2020 | 200060 | Delaware, Ottawa | 13,383 TON | $84.60 | EMERY SAPP & SONS, INC. |
| Feb 20, 2020 | 200074 | MuskogeeDivision 1 | 8,176 TON | $86.00 | APAC-CENTRAL, INC. |
| Feb 20, 2020 | 190350 | Stp-224b(059)ss | 11,902 TON | $105.00 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Feb 20, 2020 | 200062 | EllisDivision 6 | 6,875 TON | $95.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 200183 | Stp-170c(127)pm | 6,258 TON | $128.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 190350 | Stp-224b(059)ss | 11,150 TON | $105.00 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Feb 20, 2020 | 200090 | CoalDivision 3 | 179 TON | $240.00 | Built Right Construction, LLC |
| Feb 20, 2020 | 200066 | Jefferson | 7,138 TON | $85.30 | OVERLAND CORPORATION |
| Feb 20, 2020 | 200067 | KayDivision 4 | 6,100 TON | $128.31 | Evans & Associates Construction Co., Inc. |
| Feb 20, 2020 | 200059 | CraigDivision 8 | 4,190 TON | $94.05 | EMERY SAPP & SONS, INC. |
| Jan 16, 2020 | 200026 | Ssr-258b(057)sr | 7,026 TON | $86.00 | APAC-CENTRAL, INC. |
| Jan 16, 2020 | 200005 | CarterDivision 7 | 10,400 TON | $76.30 | OVERLAND CORPORATION |
| Jan 16, 2020 | 200026 | Ssr-258b(057)sr | 8,125 TON | $85.60 | APAC-CENTRAL, INC. |
| Jan 16, 2020 | 200006 | CarterDivision 7 | 8,015 TON | $86.00 | Pavers, Inc. |
| Jan 16, 2020 | 200045 | JohnstonDivision 3 | 3,593 TON | $122.55 | C3 Construction, Inc. |
| Jan 16, 2020 | 200015 | Ssr-242b(074)sr | 4,025 TON | $107.50 | HASKELL LEMON CONSTRUCTION CO. |
| Jan 16, 2020 | 200092 | TulsaDivision 8 | 15,515 TON | $81.00 | APAC-CENTRAL, INC. |
| Jan 16, 2020 | 190356 | KayDivision 4 | 7,287 TON | $81.75 | Evans & Associates Construction Co., Inc. |
| Jan 16, 2020 | 200015 | Ssr-242b(074)sr | 5,123 TON | $107.50 | HASKELL LEMON CONSTRUCTION CO. |
| Nov 14, 2019 | 190341 | CaddoDivision 7 | 1,166.47 TON | $105.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Nov 14, 2019 | 190109 | CanadianDivision 4 | 3,285 TON | $109.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Nov 14, 2019 | 190351 | GarfieldDivision 4 | 110 TON | $250.00 | LOGOS CONSTRUCTION CO., LLC |
| Nov 14, 2019 | 190340 | BlaineDivision 5 | 248 TON | $156.45 | BRIDGECO CONTRACTORS, INC. |
| Oct 17, 2019 | 190315 | GrantDivision 4 | 8,200 TON | $100.72 | Evans & Associates Construction Co., Inc. |
| Oct 17, 2019 | 190319 | Logan, Oklahoma | 3,700 TON | $120.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Oct 17, 2019 | 190323 | Nhpp-255n(489)eh | 697 TON | $197.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Oct 17, 2019 | 190331 | TulsaDivision 8 | 269 TON | $136.83 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 180304 | SeminoleDivision 3 | 1,315 TON | $87.00 | OVERLAND CORPORATION |
| Sep 19, 2019 | 190225 | OklahomaDivision 4 | 11,359 TON | $89.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Aug 22, 2019 | 190243 | CreekDivision 8 | 24,852 TON | $76.00 | BECCO CONTRACTORS, INC. |
| Aug 22, 2019 | 190250 | OklahomaDivision 4 | 332 TON | $115.50 | Wyatt Contracting |
| Jul 25, 2019 | 190235 | OkmulgeeDivision 1 | 2,236 TON | $108.00 | Paragon Contractors, LLC |
| Jul 25, 2019 | 190236 | Ssr-268c(057)sr | 14,512 TON | $95.30 | APAC-CENTRAL, INC. |
| Jul 25, 2019 | 190236 | Ssr-268c(057)sr | 5,689 TON | $95.45 | APAC-CENTRAL, INC. |
| Jul 25, 2019 | 190208 | CarterDivision 7 | 231 TON | $200.00 | Built Right Construction, LLC |
| Jul 25, 2019 | 190215 | MarshallDivision 2 | 1,520 TON | $95.75 | OVERLAND CORPORATION |
| Jun 20, 2019 | 190194 | CaddoDivision 7 | 3,770 TON | $91.88 | T & G CONSTRUCTION, INC. |
| Jun 20, 2019 | 190195 | Stp-214b(069)ag | 2,580 TON | $92.00 | Silver Star Construction Company, Inc. |
| Jun 20, 2019 | 190156 | OklahomaDivision 4 | 3,341 TON | $102.00 | SCHWARZ PAVING CO., INC. |
| Jun 20, 2019 | 190128 | OsageDivision 8 | 13,140 TON | $84.50 | Rosscon, LLC |
| May 16, 2019 | 190088 | OkmulgeeDivision 1 | 10,500 TON | $84.00 | Rosscon, LLC |
| May 16, 2019 | 190132 | Pontotoc | 4,225 TON | $96.65 | OVERLAND CORPORATION |
| May 16, 2019 | 190072 | Nhpp-032n(006)3p | 18,610 TON | $102.50 | J & R SAND COMPANY, INC. |
| May 16, 2019 | 190134 | RogersDivision 8 | 7,020 TON | $85.50 | Rosscon, LLC |
| May 16, 2019 | 190072 | Nhpp-032n(006)3p | 22,980 TON | $105.00 | J & R SAND COMPANY, INC. |
| May 16, 2019 | 190153 | LincolnDivision 3 | 156 TON | $305.00 | LOGOS CONSTRUCTION CO., LLC |
| May 16, 2019 | 190023 | PottawatomieDivision 3 | 1,342 TON | $101.78 | CP3 ENTERPRISES, INC. |
| May 16, 2019 | 190027 | WashingtonDivision 8 | 9,631 TON | $73.00 | BECCO CONTRACTORS, INC. |
| Apr 18, 2019 | 190165 | StephensDivision 7 | 8,270 TON | $82.37 | OVERLAND CORPORATION |
| Apr 18, 2019 | 180068 | RogersDivision 8 | 5,981 TON | $78.50 | Paragon Contractors, LLC |
| Apr 18, 2019 | 180201 | McintoshDivision 1 | 9,769 TON | $82.00 | T. McDonald Construction, Inc. |
| Apr 18, 2019 | 190087 | NowataDivision 8 | 174 TON | $100.20 | Tri Star Construction Arkansas, LLC |
| Mar 14, 2019 | 190129 | OsageDivision 8 | 12,796 TON | $77.00 | BECCO CONTRACTORS, INC. |
| Mar 14, 2019 | 190107 | CaddoDivision 7 | 7,010 TON | $91.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Mar 14, 2019 | 190114 | GradyDivision 7 | 10,400 TON | $90.80 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 14, 2019 | 190096 | StephensDivision 7 | 10,900 TON | $85.00 | T & G CONSTRUCTION, INC. |
| Jan 17, 2019 | 190045 | Jefferson | 13,200 TON | $85.10 | OVERLAND CORPORATION |
| Jan 17, 2019 | 190028 | AdairDivision 1 | 4,766 TON | $81.25 | Rosscon, LLC |
| Jan 17, 2019 | 190058 | RogersDivision 8 | 15,891 TON | $72.50 | BECCO CONTRACTORS, INC. |
| Jan 17, 2019 | 190038 | Ssr-219b(068)sr | 12,860 TON | $71.50 | BECCO CONTRACTORS, INC. |
| Jan 17, 2019 | 190038 | Ssr-219b(068)sr | 9,800 TON | $71.50 | BECCO CONTRACTORS, INC. |
| Jan 17, 2019 | 180242 | LoganDivision 4 | 5,038.89 TON | $85.00 | HASKELL LEMON CONSTRUCTION CO. |
| Jan 17, 2019 | 190043 | GradyDivision 7 | 8,776 TON | $90.90 | Silver Star Construction Company, Inc. |
| Jan 17, 2019 | 190044 | GrantDivision 4 | 2,900 TON | $105.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Sep 20, 2018 | 180281 | CreekDivision 8 | 2,067 TON | $80.00 | BECCO CONTRACTORS, INC. |
| Sep 20, 2018 | 180246 | Nhpp-253n(043)pm | 319 TON | $109.44 | A. M. COHRON & SON, INC. |
| Sep 20, 2018 | 180246 | Nhpp-253n(043)pm | 1,135 TON | $107.44 | A. M. COHRON & SON, INC. |
| Aug 16, 2018 | 180274 | WagonerDivision 1 | 13,100 TON | $73.00 | Rosscon, LLC |
| Jul 19, 2018 | 180253 | Nhpp-272n(245)pm | 822 TON | $70.00 | BECCO CONTRACTORS, INC. |
| Jul 19, 2018 | 180256 | WoodsDivision 6 | 196 TON | $170.00 | Bridges, Inc. DBA Scudder Bridge Co. |
| Jun 14, 2018 | 180127 | ClevelandDivision 3 | 1,010 TON | $84.00 | Silver Star Construction Company, Inc. |
| May 17, 2018 | 180215 | WoodsDivision 6 | 1,044.19 TON | $96.00 | Venture Corporation dba VCO Paving |
| May 17, 2018 | 180216 | WoodwardDivision 6 | 150 TON | $111.00 | SEWELL BROS., INC. |
| May 17, 2018 | 180233 | Stp-267c(071)ss | 471 TON | $93.77 | FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. |
| May 17, 2018 | 180193 | CreekDivision 8 | 53 TON | $193.00 | Cimarron Construction Company, LLC |
| May 17, 2018 | 180211 | StephensDivision 7 | 7,305 TON | $76.75 | OVERLAND CORPORATION |
| Apr 19, 2018 | 180164 | Sbr-236n(053)sb | 620 TON | $203.50 | GIBSON & ASSOCIATES, INC. |
| Apr 19, 2018 | 180164 | Sbr-236n(053)sb | 480 TON | $203.50 | GIBSON & ASSOCIATES, INC. |
| Apr 19, 2018 | 180157 | ClevelandDivision 3 | 1,964.06 TON | $69.11 | MARKWELL PAVING COMPANY, INC. |
| Mar 15, 2018 | 180136 | MuskogeeDivision 1 | 1,505 TON | $79.00 | GLOVER & ASSOCIATES, INC. |
| Mar 15, 2018 | 180062 | OsageDivision 8 | 21,554 TON | $69.50 | APAC-CENTRAL, INC. |
| Mar 15, 2018 | 180147 | TexasDivision 6 | 2,332 TON | $92.19 | HIGHWAY CONTRACTORS, INC. |
| Mar 15, 2018 | 180122 | Acstp-277d(044)ur | 2,934 TON | $94.50 | THE CUMMINS CONSTRUCTION CO., INC. |