| 1 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 4,355 | TON |
$93.50 |
$76.45 |
$98.90 |
| 2 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,827 | TON |
$83.00 |
$70.90 |
$96.75 |
| 3 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 225 | TON |
$200.00 |
$220.00 |
$235.00 |
| 4 | 412 5267 |
COLD MILLING PAVEMENT | 69,248 | SY |
$1.75 |
$1.35 |
$4.40 |
| 5 | 623(A) 1418 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$26.00 |
$31.50 |
$32.60 |
| 6 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,200.00 |
$2,890.00 |
$2,940.00 |
| 7 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 13,886 | LF |
$0.2500 |
$0.2100 |
$0.2500 |
| 8 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 17,772 | LF |
$0.1500 |
$0.1600 |
$0.2500 |
| 9 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 50,000 | LF |
$0.5000 |
$0.4100 |
$0.4200 |
| 10 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 120 | LF |
$15.00 |
$4.30 |
$4.35 |
| 11 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$40,000.00 |
$69,800.00 |
$33,005.55 |