| 1 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 521 | CY |
$50.00 |
$54.00 |
$50.00 |
$45.00 |
| 2 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 16 | TON |
$40.00 |
$50.00 |
$40.00 |
$55.78 |
| 3 | 407(B) 0250 |
TACK COAT | 8,961 | GAL |
$2.00 |
$2.50 |
$2.00 |
$3.00 |
| 4 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 13,140 | TON |
$68.00 |
$84.50 |
$92.75 |
$89.25 |
| 5 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 182 | TON |
$63.00 |
$100.00 |
$92.75 |
$85.00 |
| 6 | 411(H) 6210 |
SUPERPAVE, TYPE S3(PATCH)(PG64-22OK) | 788 | TON |
$92.00 |
$125.00 |
$92.75 |
$122.00 |
| 7 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 281 | TON |
$92.00 |
$125.00 |
$92.75 |
$122.00 |
| 8 | 412 5267 |
COLD MILLING PAVEMENT | 118,321 | SY |
$2.25 |
$1.85 |
$1.20 |
$1.52 |
| 9 | 413(A) 4870 |
RUMBLE STRIP-CENTERLINE HMA-CON | 40,554 | LF |
$0.2000 |
$0.2200 |
$0.4000 |
$0.1600 |
| 10 | 504(E) 1381 |
CONCRETE PARAPET | 20 | LF |
$500.00 |
$500.00 |
$385.00 |
$335.00 |
| 11 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 845 | LF |
$3.50 |
$3.50 |
$7.85 |
$8.00 |
| 12 | 619(B) 6252 |
REMOVAL OF EXISTING PARAPET | 20 | LF |
$500.00 |
$250.00 |
$224.00 |
$300.00 |
| 13 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 575 | LF |
$19.00 |
$18.81 |
$20.00 |
$21.00 |
| 14 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 6 | EA |
$2,400.00 |
$2,600.00 |
$2,400.00 |
$2,400.00 |
| 15 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,950.00 |
$1,750.00 |
$2,200.00 |
$2,300.00 |
| 16 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 23 | EA |
$10.00 |
$11.00 |
$13.00 |
$15.00 |
| 17 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 147,500 | LF |
$0.7000 |
$0.4800 |
$0.4500 |
$0.4300 |
| 18 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 160 | LF |
$6.00 |
$11.00 |
$5.00 |
$6.00 |
| 19 | 857(F) 8820 |
PAVEMENT MARKING REMOVAL (HYDROBLASTING) | 524 | LF |
$3.25 |
$3.30 |
$7.00 |
$8.00 |
| 20 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$15,000.00 |
$6,000.00 |
$24,000.00 |
$7,700.00 |
| 21 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$30,000.00 |
$33,000.00 |
$44,260.70 |
$99,500.00 |