$2.59Avg low bid / GAL
$2.79Avg of all bids
$2.86Avg engineer's estimate
433Jobs · 3,370,850.65 GAL
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 70 | 667,079.44 | $2.76 | $2.90 |
| 2020 | 123 | 846,193 | $2.67 | $2.89 |
| 2019 | 109 | 831,933.58 | $2.65 | $2.86 |
| 2018 | 99 | 822,600.79 | $2.45 | $2.54 |
| 2017 | 32 | 203,043.84 | $2.00 | $2.74 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Oct 14, 2021 | 210237 | OklahomaDivision 4 | 5 GAL | $10.00 | SAC Services, Inc. |
| Sep 16, 2021 | 200324 | Osage, Pawnee | 2,613 GAL | $2.50 | BECCO CONTRACTORS, INC. |
| Sep 16, 2021 | 210179 | MurrayDivision 7 | 917 GAL | $3.00 | Pavers, Inc. |
| Aug 19, 2021 | 210232 | GarfieldDivision 4 | 2,337.31 GAL | $4.50 | THE CUMMINS CONSTRUCTION CO., INC. |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 1,167 GAL | $1.05 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 19, 2021 | 210241 | SequoyahDivision 1 | 1,951 GAL | $2.21 | Treas Construction Inc |
| Jul 15, 2021 | 210111 | LincolnDivision 3 | 24,578 GAL | $2.60 | HASKELL LEMON CONSTRUCTION CO. |
| Jul 15, 2021 | 210215 | OklahomaDivision 4 | 260 GAL | $4.00 | K & R BUILDERS, INC. |
| Jul 15, 2021 | 210180 | MuskogeeDivision 1 | 153.63 GAL | $4.00 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 210216 | OkmulgeeDivision 1 | 355 GAL | $4.00 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 210211 | LoganDivision 4 | 3,349 GAL | $2.75 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jun 17, 2021 | 210185 | NowataDivision 8 | 459 GAL | $4.20 | Frontier Bridge, Inc. |
| Jun 17, 2021 | 210171 | DeweyDivision 5 | 6,648 GAL | $4.59 | Frontier Bridge, Inc. |
| Jun 17, 2021 | 210190 | PushmatahaDivision 2 | 1,916 GAL | $3.50 | L & N BRIDGE, LLC |
| Jun 17, 2021 | 210173 | GarvinDivision 3 | 7,729 GAL | $2.25 | OVERLAND CORPORATION |
| Jun 17, 2021 | 210195 | TulsaDivision 8 | 1,069 GAL | $3.00 | Paragon Contractors, LLC |
| Jun 17, 2021 | 210178 | Cleveland, Mcclain | 8,953 GAL | $2.50 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210156 | SeminoleDivision 3 | 13,740 GAL | $2.50 | Rosscon, LLC |
| May 20, 2021 | 210143 | MurrayDivision 7 | 6,883 GAL | $2.25 | OVERLAND CORPORATION |
| May 20, 2021 | 210133 | EllisDivision 6 | 14,060 GAL | $3.75 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210160 | Muskogee, Wagoner | 22,461 GAL | $2.00 | BECCO CONTRACTORS, INC. |
| May 20, 2021 | 210148 | PayneDivision 4 | 16,460 GAL | $2.00 | BECCO CONTRACTORS, INC. |
| May 20, 2021 | 210136 | HughesDivision 3 | 4,423 GAL | $3.50 | C-GAWF CONSTRUCTION, INC. |
| May 20, 2021 | 210139 | McclainDivision 3 | 16,354 GAL | $2.50 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 200338 | BeckhamDivision 5 | 1,895 GAL | $3.91 | OBC, INC. |
| May 20, 2021 | 210126 | BeckhamDivision 5 | 6,128 GAL | $4.00 | Caswell Contracting, Inc. |
| May 20, 2021 | 210153 | Stp-263c(075)3p | 14,470 GAL | $2.65 | HASKELL LEMON CONSTRUCTION CO. |
| May 20, 2021 | 210082 | McclainDivision 3 | 4,312 GAL | $2.50 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 9,417 GAL | $3.40 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210127 | BlaineDivision 5 | 6,551 GAL | $4.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210153 | Stp-263c(075)3p | 8,430 GAL | $2.65 | HASKELL LEMON CONSTRUCTION CO. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 36,349 GAL | $3.40 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210129 | BryanDivision 2 | 32,136 GAL | $3.00 | L & N BRIDGE, LLC |
| Apr 15, 2021 | 210036 | Pontotoc | 5,914 GAL | $2.35 | OVERLAND CORPORATION |
| Apr 15, 2021 | 210114 | NobleDivision 4 | 7,608.5 GAL | $2.75 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210102 | CoalDivision 3 | 1,956 GAL | $3.50 | L & N BRIDGE, LLC |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 19,335 GAL | $4.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210104 | CraigDivision 8 | 8,708 GAL | $2.00 | Rosscon, LLC |
| Apr 15, 2021 | 210105 | CreekDivision 8 | 9,363 GAL | $2.32 | SHERWOOD CONSTRUCTION CO., INC. |
| Apr 15, 2021 | 210107 | GarvinDivision 3 | 5,069 GAL | $3.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Mar 18, 2021 | 210087 | RogersDivision 8 | 11,789 GAL | $1.75 | BECCO CONTRACTORS, INC. |
| Mar 18, 2021 | 200030 | RogersDivision 8 | 1,655 GAL | $2.00 | CONCRETE SERVICES CORPORATION |
| Mar 18, 2021 | 210060 | OttawaDivision 8 | 4,609 GAL | $2.10 | Treas Construction Inc |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 27,108 GAL | $2.50 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210086 | PittsburgDivision 2 | 12,908 GAL | $2.29 | Robinson Construction, LLC |
| Feb 18, 2021 | 190362 | LoveDivision 7 | 156 GAL | $3.87 | C3 Construction, Inc. |
| Feb 18, 2021 | 210052 | LincolnDivision 3 | 12,320 GAL | $1.99 | H & G Paving Contractors Inc. |
| Feb 18, 2021 | 210067 | RogersDivision 8 | 660 GAL | $4.81 | C3 Construction, Inc. |
| Feb 18, 2021 | 210055 | MurrayDivision 7 | 3,440 GAL | $3.40 | HUB Construction, Inc. |
| Feb 18, 2021 | 210045 | ClevelandDivision 3 | 39,931 GAL | $2.20 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Feb 18, 2021 | 210070 | WoodwardDivision 6 | 2,022 GAL | $3.95 | BRIDGECO CONTRACTORS, INC. |
| Feb 18, 2021 | 210046 | ComancheDivision 7 | 440 GAL | $5.05 | K & R BUILDERS, INC. |
| Feb 18, 2021 | 210062 | Pontotoc | 5,955 GAL | $3.55 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210048 | CraigDivision 8 | 494 GAL | $3.00 | CONCRETE SERVICES CORPORATION |
| Feb 18, 2021 | 210066 | Ssr-266c(092)sr | 8,849 GAL | $2.00 | BECCO CONTRACTORS, INC. |
| Feb 18, 2021 | 210050 | JohnstonDivision 3 | 11,081 GAL | $2.25 | OVERLAND CORPORATION |
| Feb 18, 2021 | 210066 | Ssr-266c(092)sr | 6,185 GAL | $2.00 | BECCO CONTRACTORS, INC. |
| Jan 21, 2021 | 210018 | HarperDivision 6 | 35,452 GAL | $3.50 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210003 | WashingtonDivision 8 | 30 GAL | $7.40 | Tri Star Construction Arkansas, LLC |
| Jan 21, 2021 | 210031 | OklahomaDivision 4 | 10,455 GAL | $1.40 | SCHWARZ PAVING CO., INC. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 704 GAL | $2.25 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210022 | Ssr-235c(058)sr | 15,650 GAL | $2.25 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210007 | BeckhamDivision 5 | 403 GAL | $7.78 | C3 Construction, Inc. |
| Jan 21, 2021 | 210032 | OkmulgeeDivision 1 | 7,122 GAL | $2.00 | Rosscon, LLC |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 143 GAL | $2.25 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210022 | Ssr-235c(058)sr | 16,810 GAL | $2.25 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210008 | CaddoDivision 7 | 748 GAL | $5.48 | Treas Construction Inc |
| Jan 21, 2021 | 210033 | OsageDivision 8 | 3,803 GAL | $3.00 | BECCO CONTRACTORS, INC. |
| Jan 21, 2021 | 210025 | KingfisherDivision 4 | 37,813 GAL | $3.35 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210010 | ClevelandDivision 3 | 9,233 GAL | $2.75 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Jan 21, 2021 | 210034 | OttawaDivision 8 | 6,676 GAL | $2.85 | EMERY SAPP & SONS, INC. |
| Jan 21, 2021 | 210028 | LoveDivision 7 | 7,300 GAL | $2.25 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210017 | GradyDivision 7 | 1,741 GAL | $2.83 | Treas Construction Inc |
| Jan 21, 2021 | 210035 | Pontotoc | 17,854 GAL | $3.40 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210029 | MayesDivision 8 | 7,959 GAL | $2.00 | BECCO CONTRACTORS, INC. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 1,099 GAL | $2.25 | OVERLAND CORPORATION |
| Nov 19, 2020 | 200356 | SeminoleDivision 3 | 238 GAL | $5.55 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200357 | SequoyahDivision 1 | 2,482 GAL | $2.70 | APAC-CENTRAL, INC. |
| Nov 19, 2020 | 200358 | Custer, Washita | 7,600 GAL | $2.93 | Caswell Contracting, Inc. |
| Nov 19, 2020 | 200346 | ClevelandDivision 3 | 190 GAL | $5.25 | Redlands Contracting, LLC |
| Nov 19, 2020 | 200359 | MccurtainDivision 2 | 1,294 GAL | $3.97 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200349 | GarvinDivision 3 | 840 GAL | $4.25 | Treas Construction Inc |
| Nov 19, 2020 | 200339 | BlaineDivision 5 | 35,283 GAL | $2.13 | CORNELL CONSTRUCTION COMPANY, INC. |
| Nov 19, 2020 | 200352 | Leflore | 694 GAL | $3.30 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Oct 15, 2020 | 200310 | GarfieldDivision 4 | 240 GAL | $3.67 | HASKELL LEMON CONSTRUCTION CO. |
| Oct 15, 2020 | 200326 | PushmatahaDivision 2 | 926 GAL | $3.85 | L & N BRIDGE, LLC |
| Oct 15, 2020 | 200315 | MajorDivision 6 | 4,479.85 GAL | $3.90 | THE CUMMINS CONSTRUCTION CO., INC. |
| Oct 15, 2020 | 200329 | StephensDivision 7 | 5,801 GAL | $2.25 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200317 | MccurtainDivision 2 | 602 GAL | $4.82 | HUB Construction, Inc. |
| Oct 15, 2020 | 200303 | BeaverDivision 6 | 5,714 GAL | $2.30 | J & R SAND COMPANY, INC. |
| Oct 15, 2020 | 200322 | OsageDivision 8 | 4,138 GAL | $3.35 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200306 | CanadianDivision 4 | 240 GAL | $5.15 | Frontier Bridge, Inc. |
| Oct 15, 2020 | 200323 | OsageDivision 8 | 1,217 GAL | $4.50 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200077 | PottawatomieDivision 3 | 5,829 GAL | $1.00 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200309 | GarfieldDivision 4 | 3,242.63 GAL | $3.95 | THE CUMMINS CONSTRUCTION CO., INC. |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 18,318 GAL | $2.00 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200293 | Hughes, Mcclain, Pontotoc, Seminole | 3 GAL | $50.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Sep 17, 2020 | 200279 | GradyDivision 7 | 4,755 GAL | $4.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200200 | McintoshDivision 1 | 638 GAL | $4.00 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Sep 17, 2020 | 200294 | SequoyahDivision 1 | 7,988 GAL | $4.50 | Rosscon, LLC |
| Sep 17, 2020 | 200287 | OklahomaDivision 4 | 478 GAL | $4.00 | Cowboy Contracting, Inc. |
| Sep 17, 2020 | 200290 | OsageDivision 8 | 391 GAL | $3.15 | BRIDGECO CONTRACTORS, INC. |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 2,050 GAL | $1.11 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 19,338 GAL | $2.00 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200292 | PottawatomieDivision 3 | 15,586 GAL | $2.50 | Silver Star Construction Company, Inc. |
| Aug 20, 2020 | 200262 | BeckhamDivision 5 | 160 GAL | $5.25 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 1,153 GAL | $2.48 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200163 | OkfuskeeDivision 3 | 40,921 GAL | $3.15 | HASKELL LEMON CONSTRUCTION CO. |
| Aug 20, 2020 | 200230 | LoveDivision 7 | 291 GAL | $5.24 | HUB Construction, Inc. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 8,117 GAL | $2.36 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200150 | EllisDivision 6 | 2,526.89 GAL | $2.20 | J & R SAND COMPANY, INC. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 8,434 GAL | $4.20 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200239 | WoodsDivision 6 | 162 GAL | $7.75 | K & R BUILDERS, INC. |
| Jul 23, 2020 | 200261 | Pontotoc | 31,850 GAL | $3.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200247 | ClevelandDivision 3 | 332 GAL | $4.00 | CGC, LLC. |
| Jul 23, 2020 | 200250 | GarvinDivision 3 | 400.4 GAL | $4.16 | Frontier Bridge, Inc. |
| Jul 23, 2020 | 190283 | GarvinDivision 3 | 927 GAL | $4.60 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Jul 23, 2020 | 200108 | Love, Marshall | 3,195 GAL | $1.00 | OVERLAND CORPORATION |
| Jul 23, 2020 | 200251 | HarmonDivision 5 | 5,988 GAL | $4.17 | Frontier Bridge, Inc. |
| Jul 23, 2020 | 200061 | DeweyDivision 5 | 49,895 GAL | $2.50 | J & R SAND COMPANY, INC. |
| Jul 23, 2020 | 200260 | AtokaDivision 2 | 5,546 GAL | $2.02 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 460 GAL | $4.59 | SHERWOOD CONSTRUCTION CO., INC. |
| Jun 18, 2020 | 200228 | Leflore | 2,896 GAL | $2.48 | Robinson Construction, LLC |
| Jun 18, 2020 | 200229 | LincolnDivision 3 | 762 GAL | $2.50 | L & N BRIDGE, LLC |
| Jun 18, 2020 | 200234 | OklahomaDivision 4 | 776 GAL | $6.33 | C3 Construction, Inc. |
| May 14, 2020 | 200210 | Coal, Lincoln, Pontotoc | 66.7 GAL | $8.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| May 14, 2020 | 200022 | OttawaDivision 8 | 12,093 GAL | $2.00 | APAC-CENTRAL, INC. |
| May 14, 2020 | 200197 | JohnstonDivision 3 | 760 GAL | $6.09 | C3 Construction, Inc. |
| May 14, 2020 | 190376 | WashingtonDivision 8 | 5,013 GAL | $3.00 | Paragon Contractors, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 635 GAL | $4.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200210 | Coal, Lincoln, Pontotoc | 56.2 GAL | $8.00 | B & B CONSTRUCTION SERVICE J.T., INC. |
| May 14, 2020 | 190377 | WashingtonDivision 8 | 300 GAL | $3.00 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| May 14, 2020 | 200187 | BlaineDivision 5 | 22 GAL | $16.50 | Wyatt Contracting |
| May 14, 2020 | 190120 | Nhppi-4400-(039)pm | 10 GAL | $0.00 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 200214 | Stp-266d(065)ci | 150.87 GAL | $4.00 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| May 14, 2020 | 200201 | MurrayDivision 7 | 243 GAL | $3.50 | Redlands Contracting, LLC |
| May 14, 2020 | 200191 | ChoctawDivision 2 | 4,096 GAL | $2.65 | Rosscon, LLC |
| May 14, 2020 | 200214 | Stp-266d(065)ci | 159.04 GAL | $4.00 | BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION |
| May 14, 2020 | 200203 | MuskogeeDivision 1 | 423 GAL | $2.67 | Treas Construction Inc |
| May 14, 2020 | 200193 | EllisDivision 6 | 10,591.43 GAL | $2.30 | J & R SAND COMPANY, INC. |
| May 14, 2020 | 200208 | PittsburgDivision 2 | 22,817 GAL | $2.24 | DUIT CONSTRUCTION COMPANY, INC. |
| May 14, 2020 | 200194 | GarfieldDivision 4 | 58 GAL | $4.25 | HASKELL LEMON CONSTRUCTION CO. |
| Apr 16, 2020 | 200028 | Cirb-264d(069)rb | 2,054 GAL | $3.70 | THE CUMMINS CONSTRUCTION CO., INC. |
| Apr 16, 2020 | 200152 | HaskellDivision 1 | 436 GAL | $4.25 | C-GAWF CONSTRUCTION, INC. |
| Apr 16, 2020 | 200147 | CreekDivision 8 | 9,215 GAL | $2.00 | Rosscon, LLC |
| Apr 16, 2020 | 200079 | SeminoleDivision 3 | 14,218 GAL | $3.15 | THE CUMMINS CONSTRUCTION CO., INC. |
| Apr 16, 2020 | 200185 | OklahomaDivision 4 | 178 GAL | $5.15 | Frontier Bridge, Inc. |
| Apr 16, 2020 | 200065 | HughesDivision 3 | 1,208 GAL | $3.35 | Treas Construction Inc |
| Apr 16, 2020 | 200157 | MarshallDivision 2 | 18,253 GAL | $1.60 | OVERLAND CORPORATION |
| Apr 16, 2020 | 200148 | DelawareDivision 8 | 1,103 GAL | $4.40 | C-GAWF CONSTRUCTION, INC. |