| 10 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 58,855 | CY |
$10.00 |
$10.80 |
$10.35 |
$22.00 |
$10.10 |
| 20 | 202(D) 0184 |
UNCLASSIFIED BORROW | 412 | CY |
$25.00 |
$13.30 |
$12.75 |
$35.00 |
$35.20 |
| 30 | 221(K) 0600 |
TEMPORARY FIBER LOG | 61,590 | LF |
$4.00 |
$2.20 |
$3.05 |
$2.02 |
$12.50 |
| 40 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 51,705 | CY |
$42.00 |
$58.10 |
$57.65 |
$62.00 |
$79.95 |
| 50 | 307(K) 4300 |
STABILIZED SUBGRADE | 173,495 | SY |
$4.50 |
$4.30 |
$4.65 |
$6.20 |
$3.80 |
| 60 | 325 5271 |
SEPARATOR FABRIC | 199,593 | SY |
$1.00 |
$1.60 |
$1.55 |
$1.20 |
$1.60 |
| 70 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 50,657 | TON |
$27.00 |
$29.10 |
$30.20 |
$28.00 |
$31.50 |
| 80 | 407(B) 0250 |
TACK COAT | 40,921 | GAL |
$3.00 |
$3.15 |
$3.55 |
$3.00 |
$2.10 |
| 90 | 408 5774 |
PRIME COAT | 109,974 | GAL |
$3.50 |
$6.25 |
$4.50 |
$2.00 |
$3.40 |
| 100 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 13,968 | TON |
$80.00 |
$72.80 |
$81.75 |
$82.00 |
$80.95 |
| 110 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 54,874 | TON |
$75.00 |
$64.90 |
$71.00 |
$74.00 |
$72.15 |
| 120 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 6,790 | TON |
$80.00 |
$68.50 |
$78.45 |
$83.00 |
$79.70 |
| 130 | 411(F) 6100 |
STONE MATRIX ASPHALT | 9,231 | TON |
$105.00 |
$102.50 |
$115.00 |
$110.00 |
$114.35 |
| 140 | 411(G) 6150 |
RICH BOTTOM LAYER | 22,432 | TON |
$115.00 |
$74.70 |
$85.40 |
$88.00 |
$85.65 |
| 150 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 320 | LF |
$50.00 |
$61.80 |
$59.00 |
$50.00 |
$56.40 |
| 160 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$1,050.00 |
$1,419.00 |
$4,240.00 |
$1,950.00 |
$4,160.00 |
| 165 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 34,104 | SY |
$7.00 |
$7.10 |
$6.80 |
$8.00 |
$2.65 |
| 170 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 98,465 | SY |
$4.00 |
$6.05 |
$4.50 |
$8.50 |
$6.55 |
| 180 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 3,112 | LF |
$4.00 |
$6.25 |
$6.10 |
$3.50 |
$3.45 |
| 190 | 619(C) 0924 |
SAWING PAVEMENT | 2,236 | LF |
$6.00 |
$8.30 |
$7.95 |
$5.00 |
$5.75 |
| 200 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 3,025 | LF |
$20.00 |
$19.70 |
$19.20 |
$18.00 |
$20.70 |
| 210 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$852.00 |
$1,719.00 |
$1,675.00 |
$500.00 |
$1,150.00 |
| 220 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 7 | EA |
$2,500.00 |
$3,382.00 |
$3,295.00 |
$2,600.00 |
$2,760.00 |
| 230 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 6 | EA |
$2,000.00 |
$3,213.00 |
$3,127.00 |
$1,600.00 |
$1,725.00 |
| 240 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 68 | EA |
$15.00 |
$14.40 |
$14.05 |
$13.50 |
$17.25 |
| 250 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 169,448 | LF |
$0.7500 |
$0.3000 |
$0.3000 |
$0.3000 |
$0.3500 |
| 260 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 1,000 | LF |
$0.1500 |
$1.10 |
$1.10 |
$0.2000 |
$0.2500 |
| 270 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 5,066 | EA |
$0.8000 |
$0.6500 |
$0.6500 |
$0.5000 |
$0.6000 |
| 280 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 156,533 | LF |
$0.1500 |
$0.2500 |
$0.2500 |
$0.0100 |
$0.0100 |
| 290 | 858(A) 8911 |
PAVEMENT MARKERS CLASS A TYPE 2-C | 2,240 | EA |
$5.35 |
$5.15 |
$5.05 |
$6.00 |
$6.90 |
| 300 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 660 | SD |
$15.00 |
$10.90 |
$10.60 |
$15.00 |
$17.25 |
| 310 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 35,750 | LF |
$25.00 |
$12.60 |
$36.65 |
$25.00 |
$33.05 |
| 320 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 9,000 | LF |
$3.00 |
$9.35 |
$18.95 |
$4.00 |
$4.90 |
| 330 | 878(B) 8487 |
MODULAR GLARE SCREEN (TEMPORARY) | 30,960 | SD |
$0.1000 |
$0.1100 |
$0.1100 |
$0.2500 |
$0.3000 |
| 340 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 560 | SD |
$4.50 |
$2.20 |
$2.15 |
$5.00 |
$5.75 |
| 350 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 6,000 | SD |
$0.3500 |
$0.0200 |
$0.0300 |
$0.8500 |
$0.9500 |
| 360 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 14,400 | SD |
$0.5500 |
$0.0200 |
$0.0300 |
$0.8500 |
$0.9500 |
| 370 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 19,800 | SD |
$1.45 |
$0.0200 |
$0.0300 |
$0.3500 |
$0.4000 |
| 380 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 15,000 | SD |
$0.7500 |
$0.0200 |
$0.0300 |
$0.1000 |
$0.1500 |
| 390 | 880(C) 8848 |
WING BARRICADES | 1,040 | SD |
$1.75 |
$1.10 |
$1.10 |
$3.00 |
$3.45 |
| 400 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 49,800 | SD |
$0.3500 |
$0.0200 |
$0.0300 |
$0.0200 |
$0.0200 |
| 410 | 880(F) 8878 |
DRUMS | 65,400 | SD |
$0.2000 |
$0.2200 |
$0.0300 |
$0.4000 |
$0.4500 |
| 420 | 880(G) 8890 |
CHANNELIZER CONES | 8,640 | SD |
$0.3000 |
$0.0500 |
$0.0500 |
$0.4000 |
$0.4500 |
| 430 | 880(L) 8920 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BIDDABLE) | 2,000 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 440 | 882 8360 |
(SP)SMART WORK ZONE SYSTEM | 240 | SD |
$30.00 |
$8.70 |
$8.50 |
$200.00 |
$230.00 |
| 450 | 882 8370 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | 4,320 | SD |
$15.00 |
$22.90 |
$22.30 |
$15.00 |
$17.25 |
| 460 | 882 8372 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) | 4,320 | SD |
$5.00 |
$22.90 |
$22.30 |
$12.00 |
$13.80 |
| 470 | 882 8374 |
(SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) | 960 | SD |
$13.00 |
$6.55 |
$6.40 |
$25.00 |
$28.75 |
| 480 | 882 8376 |
(SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM | 240 | SD |
$50.00 |
$5.45 |
$5.30 |
$85.00 |
$97.75 |
| 490 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 61,600 | LF |
$0.2000 |
$0.1300 |
$0.2000 |
$0.1400 |
$0.2000 |
| 500 | 804(A) 2915 |
STRUCTURAL CONCRETE | 0.72 | CY |
$567.00 |
$381.00 |
$371.00 |
$250.00 |
$287.50 |
| 510 | 804(B) 2916 |
REINFORCING STEEL | 130 | LB |
$1.50 |
$2.70 |
$2.65 |
$2.00 |
$2.30 |
| 520 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 8 | EA |
$125.00 |
$136.00 |
$132.50 |
$100.00 |
$115.00 |
| 530 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 11 | EA |
$217.00 |
$381.00 |
$371.00 |
$200.00 |
$230.00 |
| 540 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 63 | SF |
$15.50 |
$43.60 |
$42.40 |
$30.00 |
$34.50 |
| 550 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 44.5 | LF |
$13.25 |
$21.80 |
$21.20 |
$45.00 |
$51.75 |
| 560 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 148,500 | LF |
$0.7500 |
$0.3800 |
$0.4000 |
$0.5000 |
$0.5500 |
| 570 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 3,800 | LF |
$1.20 |
$0.8700 |
$0.8500 |
$2.00 |
$2.30 |
| 580 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 2,800 | LF |
$2.45 |
$1.75 |
$1.70 |
$3.00 |
$3.45 |
| 590 | 856(A) 8561 |
RECESSED TRAF STRIPE(MULTI-POLY)(6" W) | 17,000 | LF |
$1.75 |
$1.65 |
$1.60 |
$1.00 |
$1.15 |
| 600 | 509(A) 0319 |
CLASS AA CONCRETE | 48.15 | CY |
$400.00 |
$321.00 |
$291.50 |
$365.00 |
$316.25 |
| 610 | 619(B) 5190 |
REMOVAL OF CABLE BARRIER | 3,162 | LF |
$3.50 |
$7.00 |
$6.40 |
$9.15 |
$6.90 |
| 620 | 628(B) 5125 |
HIGH-TENSION CABLE BARRIER(TL-4) | 3,162 | LF |
$25.00 |
$6.75 |
$6.15 |
$9.15 |
$6.70 |
| 630 | 628(C) 5110 |
END ANCHORS | 6 | EA |
$2,000.00 |
$6,158.00 |
$5,592.00 |
$1,485.00 |
$6,050.00 |
| 640 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$75,000.00 |
$93,975.00 |
$127,200.00 |
$50,000.00 |
$80,500.00 |
| 650 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$7,000.00 |
$6,990.00 |
$7,240.00 |
$5,000.00 |
$5,750.00 |
| 660 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$7,000.00 |
$3,500.00 |
$9,010.00 |
$18,000.00 |
$17,000.00 |
| 670 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$775,000.00 |
$562,985.18 |
|
$842,685.00 |
$800,000.00 |