$6.80Avg low bid / CY
$8.04Avg of all bids
$7.04Avg engineer's estimate
498Jobs · 14,932,168.44 CY
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 75 | 2,577,928.73 | $7.07 | $8.10 |
| 2020 | 148 | 5,174,506.59 | $6.24 | $7.79 |
| 2019 | 138 | 3,393,451.2 | $7.52 | $9.61 |
| 2018 | 116 | 3,435,183.94 | $6.90 | $7.39 |
| 2017 | 21 | 351,097.98 | $5.24 | $6.57 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Nov 18, 2021 | 210347 | DelawareDivision 8 | 76,946 CY | $12.45 | C-GAWF CONSTRUCTION, INC. |
| Nov 18, 2021 | 210347 | DelawareDivision 8 | 62 CY | $25.00 | C-GAWF CONSTRUCTION, INC. |
| Nov 18, 2021 | 210347 | DelawareDivision 8 | 44 CY | $25.00 | C-GAWF CONSTRUCTION, INC. |
| Oct 14, 2021 | 210273 | EllisDivision 6 | 1,070 CY | $6.50 | Lopp Construction, LLC |
| Sep 16, 2021 | 210267 | PayneDivision 4 | 2,778 CY | $7.00 | H & H BRIDGE COMPANY |
| Sep 16, 2021 | 200324 | Osage, Pawnee | 28,674 CY | $25.00 | BECCO CONTRACTORS, INC. |
| Sep 16, 2021 | 210251 | Cirb-230c(045)rb | 1,435 CY | $9.00 | K & R BUILDERS, INC. |
| Sep 16, 2021 | 210251 | Cirb-230c(045)rb | 2,218 CY | $9.00 | K & R BUILDERS, INC. |
| Sep 16, 2021 | 210179 | MurrayDivision 7 | 5,289 CY | $10.00 | Pavers, Inc. |
| Sep 16, 2021 | 210253 | MayesDivision 8 | 5,798 CY | $8.00 | RRY SERVICES LLC |
| Aug 19, 2021 | 210232 | GarfieldDivision 4 | 12,462.04 CY | $10.60 | THE CUMMINS CONSTRUCTION CO., INC. |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 22,438 CY | $14.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 19, 2021 | 210241 | SequoyahDivision 1 | 4,862 CY | $12.60 | Treas Construction Inc |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 4,464.25 CY | $14.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jul 15, 2021 | 190363 | LoveDivision 7 | 23,902 CY | $9.84 | C3 Construction, Inc. |
| Jul 15, 2021 | 210197 | Stp-270c(036)ad | 400 CY | $15.00 | RUDY CONSTRUCTION CO. |
| Jul 15, 2021 | 210209 | KayDivision 4 | 3,707 CY | $6.00 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 210211 | LoganDivision 4 | 3,920 CY | $9.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jul 15, 2021 | 210111 | LincolnDivision 3 | 94,028 CY | $8.85 | HASKELL LEMON CONSTRUCTION CO. |
| Jul 15, 2021 | 210215 | OklahomaDivision 4 | 50 CY | $29.00 | K & R BUILDERS, INC. |
| Jul 15, 2021 | 210197 | Stp-270c(036)ad | 680 CY | $15.00 | RUDY CONSTRUCTION CO. |
| Jul 15, 2021 | 210180 | MuskogeeDivision 1 | 3,903 CY | $7.00 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 210216 | OkmulgeeDivision 1 | 2,190 CY | $6.00 | H & H BRIDGE COMPANY |
| Jul 15, 2021 | 210197 | Stp-270c(036)ad | 355 CY | $15.00 | RUDY CONSTRUCTION CO. |
| Jun 17, 2021 | 210185 | NowataDivision 8 | 7,091 CY | $7.41 | Frontier Bridge, Inc. |
| Jun 17, 2021 | 210190 | PushmatahaDivision 2 | 18,419 CY | $5.50 | L & N BRIDGE, LLC |
| Jun 17, 2021 | 210171 | DeweyDivision 5 | 19,561 CY | $5.71 | Frontier Bridge, Inc. |
| Jun 17, 2021 | 210195 | TulsaDivision 8 | 5,139 CY | $27.50 | Paragon Contractors, LLC |
| Jun 17, 2021 | 210176 | Leflore, Mccurtain | 2,130 CY | $10.50 | HUB Construction, Inc. |
| Jun 17, 2021 | 210195 | TulsaDivision 8 | 272 CY | $18.00 | Paragon Contractors, LLC |
| May 20, 2021 | 210130 | BryanDivision 2 | 1,500 CY | $1.00 | OVERLAND CORPORATION |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 46,797 CY | $11.05 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 200338 | BeckhamDivision 5 | 15,458 CY | $7.30 | OBC, INC. |
| May 20, 2021 | 210133 | EllisDivision 6 | 23,771 CY | $6.65 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 98,741 CY | $9.50 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210136 | HughesDivision 3 | 7,109 CY | $12.50 | C-GAWF CONSTRUCTION, INC. |
| May 20, 2021 | 210143 | MurrayDivision 7 | 42,959 CY | $8.00 | OVERLAND CORPORATION |
| May 20, 2021 | 210138 | Leflore | 1,650 CY | $19.50 | JOB CONSTRUCTION CO., INC. |
| May 20, 2021 | 210127 | BlaineDivision 5 | 39,597 CY | $6.45 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210148 | PayneDivision 4 | 101,932 CY | $7.50 | BECCO CONTRACTORS, INC. |
| May 20, 2021 | 210082 | McclainDivision 3 | 47,558 CY | $8.50 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210139 | McclainDivision 3 | 50,862 CY | $8.50 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210129 | BryanDivision 2 | 41,534 CY | $6.00 | L & N BRIDGE, LLC |
| May 20, 2021 | 210140 | McclainDivision 3 | 23,242 CY | $4.99 | Treas Construction Inc |
| Apr 15, 2021 | 210115 | NobleDivision 4 | 2,303 CY | $7.00 | SEWELL BROS., INC. |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 102 CY | $25.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 10,808 CY | $10.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210102 | CoalDivision 3 | 19,784 CY | $7.00 | L & N BRIDGE, LLC |
| Apr 15, 2021 | 210114 | NobleDivision 4 | 86,611 CY | $3.50 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 73,813.44 CY | $16.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 434,816 CY | $4.25 | OVERLAND CORPORATION |
| Mar 18, 2021 | 200030 | RogersDivision 8 | 6,096 CY | $3.00 | CONCRETE SERVICES CORPORATION |
| Mar 18, 2021 | 210060 | OttawaDivision 8 | 47,318 CY | $5.99 | Treas Construction Inc |
| Mar 18, 2021 | 210097 | KayDivision 4 | 7,853 CY | $8.60 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Mar 18, 2021 | 210077 | GarvinDivision 3 | 52,040 CY | $9.51 | IHC Scott, INC. |
| Mar 18, 2021 | 210078 | KayDivision 4 | 4,938 CY | $5.50 | RRY SERVICES LLC |
| Mar 18, 2021 | 210086 | PittsburgDivision 2 | 65,679 CY | $5.55 | Robinson Construction, LLC |
| Feb 18, 2021 | 210070 | WoodwardDivision 6 | 38,606 CY | $6.31 | BRIDGECO CONTRACTORS, INC. |
| Feb 18, 2021 | 210055 | MurrayDivision 7 | 8,953 CY | $6.28 | HUB Construction, Inc. |
| Feb 18, 2021 | 210002 | Tap-206e(058)tp | 17.22 CY | $5.55 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210061 | PittsburgDivision 2 | 919 CY | $12.00 | BRIDGECO CONTRACTORS, INC. |
| Feb 18, 2021 | 210045 | ClevelandDivision 3 | 146,451 CY | $3.75 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Feb 18, 2021 | 210002 | Tap-206e(058)tp | 1,324.78 CY | $5.55 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210062 | Pontotoc | 78,255 CY | $5.90 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210046 | ComancheDivision 7 | 14,440 CY | $6.95 | K & R BUILDERS, INC. |
| Feb 18, 2021 | 210002 | Tap-206e(058)tp | 369 CY | $5.55 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210067 | RogersDivision 8 | 15,147 CY | $8.42 | C3 Construction, Inc. |
| Feb 18, 2021 | 190362 | LoveDivision 7 | 7,447 CY | $9.03 | C3 Construction, Inc. |
| Feb 18, 2021 | 210048 | CraigDivision 8 | 8,116 CY | $6.75 | CONCRETE SERVICES CORPORATION |
| Feb 18, 2021 | 210002 | Tap-206e(058)tp | 1,625 CY | $5.55 | HASKELL LEMON CONSTRUCTION CO. |
| Jan 21, 2021 | 210017 | GradyDivision 7 | 15,374 CY | $7.95 | Treas Construction Inc |
| Jan 21, 2021 | 210008 | CaddoDivision 7 | 6,540 CY | $5.50 | Treas Construction Inc |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 55,055 CY | $4.50 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210040 | Stp-269f(076)ad | 361 CY | $29.98 | SCHIRALLI CONSTRUCTION CORP. |
| Jan 21, 2021 | 210018 | HarperDivision 6 | 36,695 CY | $4.25 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210010 | ClevelandDivision 3 | 55,421 CY | $5.25 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Jan 21, 2021 | 210040 | Stp-269f(076)ad | 656 CY | $23.64 | SCHIRALLI CONSTRUCTION CORP. |
| Jan 21, 2021 | 210003 | WashingtonDivision 8 | 111 CY | $35.00 | Tri Star Construction Arkansas, LLC |
| Jan 21, 2021 | 210025 | KingfisherDivision 4 | 126,681 CY | $3.85 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210010 | ClevelandDivision 3 | 290 CY | $8.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Jan 21, 2021 | 210004 | RogersDivision 8 | 2,000 CY | $20.00 | BECCO CONTRACTORS, INC. |
| Jan 21, 2021 | 200282 | KiowaDivision 5 | 100 CY | $25.09 | TOM HUDSON PAVING, INC. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 27,026 CY | $5.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210030 | McclainDivision 3 | 54,000 CY | $11.45 | IHC Scott, INC. |
| Jan 21, 2021 | 210014 | GarfieldDivision 4 | 2,628 CY | $5.75 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 210005 | AlfalfaDivision 6 | 783 CY | $5.75 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 5,448 CY | $5.25 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210031 | OklahomaDivision 4 | 13,155 CY | $9.50 | SCHWARZ PAVING CO., INC. |
| Jan 21, 2021 | 210016 | GradyDivision 7 | 2,302 CY | $5.85 | K & R BUILDERS, INC. |
| Jan 21, 2021 | 210007 | BeckhamDivision 5 | 11,600 CY | $6.74 | C3 Construction, Inc. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 49,367 CY | $6.50 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210035 | Pontotoc | 81,507 CY | $5.85 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 19, 2020 | 200337 | AtokaDivision 2 | 542 CY | $18.00 | Built Right Construction, LLC |
| Nov 19, 2020 | 200358 | Custer, Washita | 3,400 CY | $11.56 | Caswell Contracting, Inc. |
| Nov 19, 2020 | 200349 | GarvinDivision 3 | 16,344 CY | $4.00 | Treas Construction Inc |
| Nov 19, 2020 | 200359 | MccurtainDivision 2 | 1,797 CY | $5.46 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200352 | Leflore | 223.4 CY | $11.20 | B & B CONSTRUCTION SERVICE J.T., INC. |
| Nov 19, 2020 | 200344 | CaddoDivision 7 | 2,355 CY | $6.38 | K & R BUILDERS, INC. |
| Nov 19, 2020 | 200339 | BlaineDivision 5 | 30,153 CY | $6.95 | CORNELL CONSTRUCTION COMPANY, INC. |
| Nov 19, 2020 | 200355 | RogersDivision 8 | 743,862 CY | $3.45 | EMERY SAPP & SONS, INC. |
| Nov 19, 2020 | 200345 | ClevelandDivision 3 | 232 CY | $25.00 | SAC Services, Inc. |
| Nov 19, 2020 | 200156 | MajorDivision 6 | 3,285 CY | $6.70 | K & R BUILDERS, INC. |
| Nov 19, 2020 | 200356 | SeminoleDivision 3 | 100 CY | $25.50 | Frontier Bridge, Inc. |
| Nov 19, 2020 | 200346 | ClevelandDivision 3 | 14,725 CY | $13.10 | Redlands Contracting, LLC |
| Nov 19, 2020 | 200357 | SequoyahDivision 1 | 16,152 CY | $15.65 | APAC-CENTRAL, INC. |
| Nov 19, 2020 | 200348 | CusterDivision 5 | 4,444 CY | $7.05 | Frontier Bridge, Inc. |
| Oct 15, 2020 | 200323 | OsageDivision 8 | 2,591 CY | $9.00 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200077 | PottawatomieDivision 3 | 97,286 CY | $4.50 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200316 | Grady, Mcclain | 8,698 CY | $9.00 | Treas Construction Inc |
| Oct 15, 2020 | 200317 | MccurtainDivision 2 | 15,196 CY | $8.75 | HUB Construction, Inc. |
| Oct 15, 2020 | 200306 | CanadianDivision 4 | 590 CY | $10.30 | Frontier Bridge, Inc. |
| Oct 15, 2020 | 200326 | PushmatahaDivision 2 | 4,661 CY | $7.00 | L & N BRIDGE, LLC |
| Oct 15, 2020 | 200318 | McintoshDivision 1 | 250 CY | $37.38 | C-P INTEGRATED SERVICES, INC. |
| Oct 15, 2020 | 200180 | WoodsDivision 6 | 50 CY | $36.65 | SCHIRALLI CONSTRUCTION CORP. |
| Oct 15, 2020 | 200309 | GarfieldDivision 4 | 20,379.18 CY | $10.35 | THE CUMMINS CONSTRUCTION CO., INC. |
| Oct 15, 2020 | 200327 | PushmatahaDivision 2 | 250 CY | $26.17 | C-P INTEGRATED SERVICES, INC. |
| Oct 15, 2020 | 200320 | OklahomaDivision 4 | 25 CY | $25.00 | SAC Services, Inc. |
| Oct 15, 2020 | 200313 | JohnstonDivision 3 | 650 CY | $23.00 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200329 | StephensDivision 7 | 15,372 CY | $7.68 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200297 | WoodsDivision 6 | 28 CY | $55.54 | HASKELL LEMON CONSTRUCTION CO. |
| Oct 15, 2020 | 200322 | OsageDivision 8 | 42,795 CY | $6.10 | BRIDGECO CONTRACTORS, INC. |
| Oct 15, 2020 | 200315 | MajorDivision 6 | 312.53 CY | $10.95 | THE CUMMINS CONSTRUCTION CO., INC. |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 80,143 CY | $14.87 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200088 | TulsaDivision 8 | 2,043 CY | $26.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 69,238 CY | $5.00 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200200 | McintoshDivision 1 | 187,509 CY | $9.50 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Sep 17, 2020 | 200174 | TulsaDivision 8 | 4,674 CY | $25.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 17, 2020 | 200292 | PottawatomieDivision 3 | 226,036 CY | $6.00 | Silver Star Construction Company, Inc. |
| Sep 17, 2020 | 200279 | GradyDivision 7 | 19,356 CY | $12.50 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200294 | SequoyahDivision 1 | 7,000 CY | $9.00 | Rosscon, LLC |
| Sep 17, 2020 | 200034 | SequoyahDivision 1 | 688 CY | $15.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200295 | TulsaDivision 8 | 7,925 CY | $37.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 17, 2020 | 200287 | OklahomaDivision 4 | 873 CY | $20.00 | Cowboy Contracting, Inc. |
| Sep 17, 2020 | 200290 | OsageDivision 8 | 2,804 CY | $6.50 | BRIDGECO CONTRACTORS, INC. |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 105,457 CY | $5.00 | OVERLAND CORPORATION |
| Aug 20, 2020 | 200163 | OkfuskeeDivision 3 | 58,855 CY | $10.80 | HASKELL LEMON CONSTRUCTION CO. |
| Aug 20, 2020 | 200298 | TulsaDivision 8 | 1,206 CY | $25.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Aug 20, 2020 | 200268 | PittsburgDivision 2 | 800 CY | $20.00 | Rosscon, LLC |
| Aug 20, 2020 | 200298 | TulsaDivision 8 | 747.3 CY | $20.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 21,835 CY | $10.58 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200225 | GradyDivision 7 | 69,683 CY | $8.50 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 161,570 CY | $10.58 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200010 | DeweyDivision 5 | 55,061.9 CY | $9.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 1,414 CY | $44.60 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200239 | WoodsDivision 6 | 1,737 CY | $6.40 | K & R BUILDERS, INC. |
| Aug 20, 2020 | 200264 | Leflore | 1,600 CY | $5.50 | HUB Construction, Inc. |
| Aug 20, 2020 | 200150 | EllisDivision 6 | 22,128.95 CY | $9.00 | J & R SAND COMPANY, INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 887 CY | $108.31 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200265 | LoganDivision 4 | 10,275 CY | $8.00 | Wyatt Contracting |
| Aug 20, 2020 | 200230 | LoveDivision 7 | 2,092 CY | $5.50 | HUB Construction, Inc. |