Bid tab 210002

Let Feb 18, 2021 · · Tap-206e(058)tp Sign up free

‹ Feb 2021 results

33010(04) TAP-206E(059)TP BLAINE PEDESTRIAN IMPROVEMENTS (TRAIL CONSTRUCTION ) ROMAN NOSE LODGE, STATE PARK , AND BOARDWALK : TRAILS AT MULTIPLE LOCATIONS WITHIN THE PARK. PROJECT LENGTH = 1.310 MILES

Let date
Thursday, February 18, 2021
Contract
210002
J/P numbers
28830(04)
District
County
Tap-206e(058)tp
Highway
Limits
33010(04) TAP-206E(059)TP BLAINE PEDESTRIAN IMPROVEMENTS (TRAIL CONSTRUCTION ) ROMAN NOSE LODGE, STATE PARK , AND BOARDWALK : TRAILS AT MULTIPLE LOCATIONS WITHIN THE PARK. PROJECT LENGTH = 1.310 MILES
Project number
STP-106E(125)EH

Bidders 4

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,746,336
1 HASKELL LEMON CONSTRUCTION CO. Low bidder $1,680,565 -3.8%
2 SCHIRALLI CONSTRUCTION CORP. $1,847,653 +5.8% +9.9%
3 CROSSLAND HEAVY CONTRACTORS INC. $2,384,800 +36.6% +41.9%
4 DOWNEY CONTRACTING, LLC $2,527,464 +44.7% +50.4%

Bid tab: unit prices 113 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 HASKELL LEMON C…#2 SCHIRALLI CONST…#3 CROSSLAND HEAVY…#4 DOWNEY CONTRACT…
10201(B) 0181 SELECTIVE CLEARING1LSUM $47,200.00 $11,065.00 $32,679.41 $65,500.00 $116,275.00
20202(A) 0183 UNCLASSIFIED EXCAVATION1,324.78CY $20.00 $5.55 $27.54 $30.00 $23.25
30202(C) 0182 ROCK EXCAVATION200CY $100.00 $15.70 $128.25 $112.00 $31.00
40202(D) 0184 UNCLASSIFIED BORROW2,461.34CY $28.00 $10.90 $29.02 $50.00 $27.90
50221(C) 2801 TEMPORARY SILT FENCE4,612LF $2.25 $2.55 $2.73 $3.00 $3.88
60221(K) 0600 TEMPORARY FIBER LOG200LF $3.93 $9.75 $10.43 $2.70 $7.75
70230(A) 2806 SOLID SLAB SODDING3,673.39SY $4.00 $3.25 $3.47 $7.50 $4.65
80303(A) 2100 AGGREGATE BASE TYPE A797.44CY $62.00 $52.10 $110.24 $150.00 $54.25
90310(B) 0149 SUBGRADE, METHOD B5,185.88SY $6.00 $3.95 $3.91 $2.00 $2.33
100409(A) 4242 FABRIC REINFORCEMENT1,280.33SY $5.05 $3.45 $2.33 $1.80 $1.55
105409(B) 4268 BITUMINOUS BINDER320.08GAL $13.00 $4.95 $6.23 $7.25 $12.40
110411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)143.4TON $190.00 $141.00 $166.10 $116.00 $310.00
120411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)143.4TON $203.00 $121.50 $178.10 $145.00 $310.00
130501(G) 6315 CLSM BACKFILL39.87CY $177.00 $198.00 $180.91 $246.00 $224.75
140509(B) 0321 CLASS A CONCRETE4.98CY $750.00 $1,805.00 $2,164.42 $2,500.00 $1,550.00
150510(A) 6336 BLOCK RETAINING WALL & CAP1,727.23SF $45.00 $32.30 $35.67 $54.50 $49.36
160601(A) 0297 TYPE I PLAIN RIPRAP69.52TON $80.00 $56.60 $111.75 $330.00 $162.75
170610(A) 0602 4" CONCRETE SIDEWALK4,328.99SY $64.00 $83.00 $61.40 $78.75 $130.20
180610(A) 0604 5" CONCRETE SIDEWALK28.27SY $72.00 $188.00 $142.76 $79.00 $147.25
190610(B) 0399 6" CONCRETE DRIVEWAY (H.E.S.)75.67SY $85.00 $120.00 $80.55 $94.00 $162.75
200612(E) 0647 VALVE BOXES ADJUST TO GRADE1EA $650.00 $1,030.00 $914.86 $700.00 $1,162.50
210613(A) 0492 24" R.C.PIPE CLASS III48LF $83.00 $77.40 $125.08 $100.00 $113.79
220613(A) 0494 36" R.C.PIPE CLASS III16LF $151.00 $141.50 $149.75 $180.00 $202.90
230613(B) 5168 24" X 18" CORR. GALV. STEEL PIPE ARCH10LF $111.00 $42.60 $139.11 $102.00 $158.10
240613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND2EA $905.00 $897.50 $997.20 $670.00 $2,511.00
250613(L) 5734 36" PREFAB. CULVERT END SECTION, ROUND2EA $1,700.00 $1,795.00 $1,964.40 $1,125.00 $3,465.80
260613(P) 7030 24" X 18" GALV. STEEL CULVERT END SECTION ARCH1EA $935.00 $38.20 $1,036.79 $460.00 $1,164.28
270619(B) 4725 REMOVAL OF FENCE277LF $2.50 $3.35 $4.83 $2.75 $6.98
280619(B) 4728 REMOVAL OF ASPHALT PAVEMENT446.67SY $7.00 $16.80 $6.81 $13.75 $23.25
290619(B) 5918 REMOVAL OF EXISTING PIPE22LF $24.00 $11.20 $68.18 $24.00 $38.75
300619(B) 7250 REMOVE AND RELOCATE UTILITIES1LSUM $4,800.00 $1,120.00 $7,326.69 $4,700.00 $6,542.55
310622(A) 4445 2" PIPE RAILING102LF $115.00 $255.50 $198.42 $290.00 $249.55
320624 4100 (PL) ORNAMENTAL FENCE162LF $29.00 $49.00 $23.46 $73.00 $240.25
330631(A) 0210 (SP)REMOVABLE BOLLARD6EA $1,100.00 $1,639.00 $1,433.99 $1,975.00 $852.50
340643 0500 WIRELESS SOLAR LIGHTING124EA $140.00 $75.10 $75.90 $100.00 $168.95
350829(A) 8200 (PL) PEDESTRIAN / CYCLIST COUNTER1EA $14,035.00 $15,450.00 $16,500.00 $21,750.00 $23,250.00
360850(A) 8110 SHEET ALUMINUM SIGNS19.07SF $26.00 $67.00 $27.50 $36.00 $38.75
370851(C) 8327 2 1/4" SQUARE TUBE POST90LF $18.00 $7.20 $16.50 $22.00 $23.25
380854(A) 8800 TRAFFIC STRIPE(PAINT)(4" WIDE)2,582LF $3.25 $0.9800 $2.75 $3.60 $3.88
390855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)1,145LF $4.00 $3.10 $3.30 $4.40 $4.65
400855(B) 8824 TRAFFIC STRIPE(PLASTIC)(SYMBOLS)2EA $850.00 $257.50 $275.00 $363.00 $387.50
410880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF60SD $1.25 $1.05 $1.10 $1.50 $1.55
420880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF180SD $1.25 $1.05 $2.20 $3.00 $3.10
430880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)90SD $10.00 $1.55 $1.10 $1.50 $1.55
440880(G) 8890 CHANNELIZER CONES360SD $1.05 $0.3600 $0.5500 $0.7500 $0.7800
450880(H) 8896 CONES(36" LARGE)120SD $2.50 $0.5200 $0.5500 $0.7500 $0.7800
470201(B) 0181 SELECTIVE CLEARING1LSUM $4,500.00 $11,065.00 $6,535.88 $23,320.00 $5,037.50
480202(A) 0183 UNCLASSIFIED EXCAVATION369CY $20.00 $5.55 $26.41 $39.00 $23.25
490202(D) 0184 UNCLASSIFIED BORROW624.92CY $28.00 $10.90 $33.60 $46.00 $27.90
500221(C) 2801 TEMPORARY SILT FENCE1,017LF $2.25 $2.55 $2.73 $2.25 $3.88
510221(K) 0600 TEMPORARY FIBER LOG100LF $3.93 $9.75 $10.43 $2.70 $7.75
520230(A) 2806 SOLID SLAB SODDING1,610.23SY $4.00 $3.25 $3.46 $7.50 $7.75
530231(E) 4625 (PL) LANDSCAPING1LSUM $6,000.00 $5,788.00 $7,274.54 $4,300.00 $6,844.80
540303(A) 2100 AGGREGATE BASE TYPE A85.51CY $62.00 $52.10 $117.53 $150.00 $69.75
550310(B) 0149 SUBGRADE, METHOD B769.55SY $6.00 $3.95 $6.60 $2.00 $2.33
560501(G) 6315 CLSM BACKFILL8.55CY $177.00 $162.50 $179.51 $250.00 $240.25
570509(B) 0321 CLASS A CONCRETE2.84CY $750.00 $1,184.00 $2,121.16 $2,190.00 $852.50
580601(A) 0297 TYPE I PLAIN RIPRAP51.73TON $80.00 $56.60 $123.07 $330.00 $159.65
590610(A) 0604 5" CONCRETE SIDEWALK652.7SY $72.00 $83.50 $74.64 $92.00 $131.75
600619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $2,500.00 $8,821.00 $2,926.34 $1,165.00 $3,487.50
610619(B) 4728 REMOVAL OF ASPHALT PAVEMENT167.89SY $8.00 $16.80 $12.57 $14.00 $23.25
620622(A) 4445 2" PIPE RAILING84LF $115.00 $237.00 $204.66 $290.00 $249.55
630631(A) 0210 (SP)REMOVABLE BOLLARD2EA $1,100.00 $1,640.00 $1,431.36 $1,975.00 $1,705.00
640643 0500 WIRELESS SOLAR LIGHTING20EA $140.00 $75.10 $75.90 $100.00 $168.95
650542 4600 (PL)INSTALLATION OF BRIDGE ITEMS1LSUM $145,500.00 $131,260.00 $132,671.42 $188,500.00 $178,483.20
660829(A) 8200 (PL) PEDESTRIAN / CYCLIST COUNTER1EA $14,035.00 $15,450.00 $16,500.00 $21,750.00 $23,250.00
670850(A) 8110 SHEET ALUMINUM SIGNS5.32SF $26.00 $77.30 $27.50 $36.00 $38.75
680851(C) 8327 2 1/4" SQUARE TUBE POST40LF $18.00 $7.20 $16.50 $22.00 $23.25
690854(A) 8800 TRAFFIC STRIPE(PAINT)(4" WIDE)466.86LF $3.25 $1.40 $2.75 $3.60 $3.88
700201(B) 0181 SELECTIVE CLEARING1LSUM $25,000.00 $11,065.00 $16,339.70 $24,300.00 $6,122.50
710202(A) 0183 UNCLASSIFIED EXCAVATION1,625CY $20.00 $5.55 $24.59 $37.50 $23.25
720202(C) 0182 ROCK EXCAVATION200CY $100.00 $15.70 $137.25 $112.00 $31.00
730202(D) 0184 UNCLASSIFIED BORROW1,097CY $28.00 $10.90 $34.52 $33.00 $27.90
740221(C) 2801 TEMPORARY SILT FENCE2,565LF $2.25 $2.55 $2.73 $2.25 $3.88
750221(K) 0600 TEMPORARY FIBER LOG100LF $3.93 $9.75 $10.43 $2.70 $7.75
760230(A) 2806 SOLID SLAB SODDING3,307.28SY $4.00 $3.25 $3.46 $7.50 $5.43
770231(E) 4625 (PL) LANDSCAPING1LSUM $8,400.00 $8,192.00 $12,600.00 $3,100.00 $11,625.00
780303(A) 2100 AGGREGATE BASE TYPE A345.89CY $62.00 $52.10 $121.07 $150.00 $100.75
790310(B) 0149 SUBGRADE, METHOD B3,112.98SY $6.00 $3.95 $3.26 $2.00 $2.33
800411(I) 6310 SUPERPAVE, TYPE S4(PATCH)(PG64-22OK)10TON $200.00 $868.00 $360.00 $435.00 $310.00
810501(G) 6315 CLSM BACKFILL25.94CY $177.00 $198.00 $171.82 $250.00 $240.25
820509(B) 0321 CLASS A CONCRETE6.44CY $750.00 $1,450.00 $2,367.00 $2,525.00 $813.75
830601(A) 0297 TYPE I PLAIN RIPRAP138.28TON $80.00 $56.60 $105.39 $330.00 $159.65
840610(A) 0602 4" CONCRETE SIDEWALK2,631.05SY $64.00 $88.80 $61.14 $75.50 $131.75
850619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $3,000.00 $8,821.00 $2,926.34 $620.00 $4,456.25
860619(B) 4792 REMOVAL OF SIDEWALK10.78SY $16.00 $56.10 $25.98 $15.00 $23.25
870622(A) 4445 2" PIPE RAILING60LF $115.00 $250.00 $198.22 $290.00 $249.55
880631(A) 0210 (SP)REMOVABLE BOLLARD2EA $1,100.00 $1,640.00 $1,431.36 $1,975.00 $1,705.00
890643 0500 WIRELESS SOLAR LIGHTING78EA $140.00 $76.20 $75.90 $100.00 $168.95
900829(A) 8200 (PL) PEDESTRIAN / CYCLIST COUNTER1EA $14,035.00 $15,450.00 $16,500.00 $21,750.00 $23,250.00
910850(A) 8110 SHEET ALUMINUM SIGNS9.43SF $26.00 $77.30 $27.50 $36.00 $38.75
920851(C) 8327 2 1/4" SQUARE TUBE POST60LF $18.00 $7.20 $16.50 $22.00 $23.25
930854(A) 8800 TRAFFIC STRIPE(PAINT)(4" WIDE)1,113.82LF $3.25 $1.20 $2.75 $3.60 $3.88
940880(H) 8896 CONES(36" LARGE)180SD $2.50 $1.20 $0.5500 $0.7500 $0.7800
950642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $20,000.00 $20,480.00 $19,010.78 $20,300.00 $8,912.50
960220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $2,050.00 $4,893.00 $6,222.53 $650.00 $1,472.50
970641 1552 MOBILIZATION1LSUM $103,100.00 $115,817.26 $95,511.86 $73,494.23 $91,740.10
980202(A) 0183 UNCLASSIFIED EXCAVATION17.22CY $20.00 $5.55 $36.26 $36.00 $19.44
990202(D) 0184 UNCLASSIFIED BORROW153.66CY $28.00 $10.90 $43.07 $67.00 $23.76
1,000202(J) 5250 QUARRY STONE EMBANKMENT51TON $140.00 $56.20 $251.90 $375.00 $111.24
1,010230(A) 2806 SOLID SLAB SODDING151.19SY $4.00 $3.25 $3.47 $7.50 $3.51
1,020303(A) 2100 AGGREGATE BASE TYPE A19.87CY $62.00 $52.10 $123.50 $150.00 $70.20
1,030310(B) 0149 SUBGRADE, METHOD B178.8SY $6.00 $3.95 $10.64 $2.00 $2.16
1,040601(A) 0297 TYPE I PLAIN RIPRAP17.6TON $80.00 $56.60 $151.31 $330.00 $111.24
1,050610(A) 0602 4" CONCRETE SIDEWALK149SY $64.00 $82.70 $76.99 $93.00 $91.80
1,060610(A) 0604 5" CONCRETE SIDEWALK33.33SY $72.00 $165.50 $92.84 $75.00 $102.60
1,070613(B) 0692 36" CORR. GALV. STEEL PIPE32LF $133.00 $55.00 $140.99 $132.00 $110.16
1,080619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $5,000.00 $2,244.00 $2,926.34 $15,600.00 $5,346.00
1,090622(A) 4445 2" PIPE RAILING52LF $115.00 $257.00 $198.22 $290.00 $189.00
1,100631(A) 0210 (SP)REMOVABLE BOLLARD2EA $1,100.00 $1,640.00 $1,431.36 $1,975.00 $1,188.00
1,110643 0500 WIRELESS SOLAR LIGHTING7EA $140.00 $84.30 $75.90 $100.00 $117.72
1,120542 4600 (PL)INSTALLATION OF BRIDGE ITEMS1LSUM $62,525.00 $64,735.00 $80,849.15 $110,300.00 $78,047.46
1,130854(A) 8800 TRAFFIC STRIPE(PAINT)(4" WIDE)252LF $3.25 $1.40 $2.75 $3.60 $2.70