$81.20Avg low bid / LF
$87.39Avg of all bids
$73.05Avg engineer's estimate
161Jobs · 77,658.06 LF
Average low bid by year
| Year | Jobs | Quantity | Avg low | Avg all |
|---|---|---|---|---|
| 2021 | 34 | 14,112.4 | $75.39 | $94.44 |
| 2020 | 48 | 21,084.5 | $79.37 | $83.00 |
| 2019 | 47 | 32,575.66 | $87.99 | $91.36 |
| 2018 | 32 | 9,885.5 | $71.06 | $73.49 |
| Let date | Contract | County / District | Quantity | Unit price | Low bidder |
|---|---|---|---|---|---|
| Sep 16, 2021 | 200324 | Osage, Pawnee | 128 LF | $98.00 | BECCO CONTRACTORS, INC. |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 220.4 LF | $77.82 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 19, 2021 | 210149 | Nhpp-260n(054)pm | 1,930 LF | $84.38 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jul 15, 2021 | 190363 | LoveDivision 7 | 202 LF | $74.39 | C3 Construction, Inc. |
| Jul 15, 2021 | 210211 | LoganDivision 4 | 1,888 LF | $73.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Jul 15, 2021 | 210111 | LincolnDivision 3 | 325 LF | $93.40 | HASKELL LEMON CONSTRUCTION CO. |
| Jun 17, 2021 | 210195 | TulsaDivision 8 | 124 LF | $69.00 | Paragon Contractors, LLC |
| May 20, 2021 | 210139 | McclainDivision 3 | 446 LF | $67.00 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 30 LF | $94.75 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210127 | BlaineDivision 5 | 607 LF | $53.95 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210142 | Nhpp-022n(225)pm | 1,656 LF | $84.50 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210129 | BryanDivision 2 | 537 LF | $65.00 | L & N BRIDGE, LLC |
| May 20, 2021 | 210143 | MurrayDivision 7 | 534 LF | $90.00 | OVERLAND CORPORATION |
| May 20, 2021 | 210133 | EllisDivision 6 | 48 LF | $95.40 | THE CUMMINS CONSTRUCTION CO., INC. |
| May 20, 2021 | 210082 | McclainDivision 3 | 290 LF | $69.00 | Silver Star Construction Company, Inc. |
| May 20, 2021 | 210136 | HughesDivision 3 | 44 LF | $76.00 | C-GAWF CONSTRUCTION, INC. |
| Apr 15, 2021 | 210117 | Nhpp-255n(535)pm | 10 LF | $100.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Apr 15, 2021 | 210102 | CoalDivision 3 | 119 LF | $50.00 | L & N BRIDGE, LLC |
| Apr 15, 2021 | 210114 | NobleDivision 4 | 154 LF | $70.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Mar 18, 2021 | 210090 | Nhppi-4440(009)pm | 200 LF | $152.10 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 18, 2021 | 210060 | OttawaDivision 8 | 220 LF | $89.25 | Treas Construction Inc |
| Mar 18, 2021 | 210097 | KayDivision 4 | 75 LF | $106.00 | WILDCAT CONSTRUCTION CO., INC. & SUBSIDIARIES |
| Mar 18, 2021 | 210072 | CaddoDivision 7 | 608 LF | $88.00 | OVERLAND CORPORATION |
| Mar 18, 2021 | 210086 | PittsburgDivision 2 | 1,127 LF | $53.30 | Robinson Construction, LLC |
| Feb 18, 2021 | 210055 | MurrayDivision 7 | 263 LF | $91.67 | HUB Construction, Inc. |
| Feb 18, 2021 | 210002 | Tap-206e(058)tp | 48 LF | $77.40 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210062 | Pontotoc | 144 LF | $61.80 | HASKELL LEMON CONSTRUCTION CO. |
| Feb 18, 2021 | 210045 | ClevelandDivision 3 | 861 LF | $60.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Jan 21, 2021 | 210018 | HarperDivision 6 | 302 LF | $74.20 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210025 | KingfisherDivision 4 | 182 LF | $46.85 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 77 LF | $98.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210031 | OklahomaDivision 4 | 38 LF | $70.00 | SCHWARZ PAVING CO., INC. |
| Jan 21, 2021 | 200340 | Bsap-207c(102)fm | 91 LF | $77.00 | OVERLAND CORPORATION |
| Jan 21, 2021 | 210008 | CaddoDivision 7 | 82 LF | $78.47 | Treas Construction Inc |
| Jan 21, 2021 | 210035 | Pontotoc | 110 LF | $56.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 21, 2021 | 210010 | ClevelandDivision 3 | 344 LF | $57.00 | T.J. CAMPBELL CONSTRUCTION COMPANY |
| Jan 21, 2021 | 210016 | GradyDivision 7 | 48 LF | $109.00 | K & R BUILDERS, INC. |
| Nov 19, 2020 | 200355 | RogersDivision 8 | 1,471 LF | $76.00 | EMERY SAPP & SONS, INC. |
| Nov 19, 2020 | 200339 | BlaineDivision 5 | 94 LF | $73.50 | CORNELL CONSTRUCTION COMPANY, INC. |
| Nov 19, 2020 | 200357 | SequoyahDivision 1 | 240 LF | $69.30 | APAC-CENTRAL, INC. |
| Nov 19, 2020 | 200344 | CaddoDivision 7 | 108 LF | $80.00 | K & R BUILDERS, INC. |
| Nov 19, 2020 | 200346 | ClevelandDivision 3 | 251 LF | $88.15 | Redlands Contracting, LLC |
| Oct 15, 2020 | 200315 | MajorDivision 6 | 61 LF | $71.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Oct 15, 2020 | 200077 | PottawatomieDivision 3 | 148 LF | $54.00 | OVERLAND CORPORATION |
| Oct 15, 2020 | 200316 | Grady, Mcclain | 66 LF | $34.83 | Treas Construction Inc |
| Oct 15, 2020 | 200322 | OsageDivision 8 | 56 LF | $89.12 | BRIDGECO CONTRACTORS, INC. |
| Sep 17, 2020 | 200295 | TulsaDivision 8 | 25 LF | $150.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 835 LF | $58.05 | OVERLAND CORPORATION |
| Sep 17, 2020 | 200290 | OsageDivision 8 | 230 LF | $85.84 | BRIDGECO CONTRACTORS, INC. |
| Sep 17, 2020 | 200200 | McintoshDivision 1 | 889 LF | $75.00 | KOSS CONSTRUCTION COMPANY & SUBSIDIARY |
| Sep 17, 2020 | 200034 | SequoyahDivision 1 | 134 LF | $75.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Sep 17, 2020 | 200291 | PittsburgDivision 2 | 2,626 LF | $61.83 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Sep 17, 2020 | 200292 | PottawatomieDivision 3 | 786 LF | $62.00 | Silver Star Construction Company, Inc. |
| Sep 17, 2020 | 200088 | TulsaDivision 8 | 24 LF | $105.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 17, 2020 | 200294 | SequoyahDivision 1 | 404 LF | $125.00 | Rosscon, LLC |
| Sep 17, 2020 | 200273 | Stp-208b(091)pm | 179 LF | $62.95 | OVERLAND CORPORATION |
| Aug 20, 2020 | 200298 | TulsaDivision 8 | 4 LF | $155.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Aug 20, 2020 | 200225 | GradyDivision 7 | 802 LF | $85.00 | SEWELL BROS., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 231 LF | $84.53 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 20, 2020 | 200270 | Nhppi-4400(077)pm | 1,116.5 LF | $106.61 | SHERWOOD CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200260 | AtokaDivision 2 | 105 LF | $60.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200261 | Pontotoc | 98 LF | $69.90 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 23, 2020 | 200247 | ClevelandDivision 3 | 8 LF | $110.00 | CGC, LLC. |
| Jul 23, 2020 | 200061 | DeweyDivision 5 | 847 LF | $86.30 | J & R SAND COMPANY, INC. |
| Jul 23, 2020 | 200251 | HarmonDivision 5 | 98 LF | $52.50 | Frontier Bridge, Inc. |
| Jun 18, 2020 | 200222 | CanadianDivision 4 | 616 LF | $82.41 | SHERWOOD CONSTRUCTION CO., INC. |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 2,254 LF | $85.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 190376 | WashingtonDivision 8 | 119 LF | $123.00 | Paragon Contractors, LLC |
| May 14, 2020 | 200241 | Nhppi-4000-(095)pm | 1,406 LF | $85.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| May 14, 2020 | 200201 | MurrayDivision 7 | 70 LF | $68.00 | Redlands Contracting, LLC |
| May 14, 2020 | 200202 | MuskogeeDivision 1 | 78 LF | $77.51 | Treas Construction Inc |
| Apr 16, 2020 | 200065 | HughesDivision 3 | 64 LF | $78.28 | Treas Construction Inc |
| Apr 16, 2020 | 200185 | OklahomaDivision 4 | 50 LF | $99.61 | Frontier Bridge, Inc. |
| Apr 16, 2020 | 200028 | Cirb-264d(069)rb | 42 LF | $71.10 | THE CUMMINS CONSTRUCTION CO., INC. |
| Apr 16, 2020 | 200145 | ClevelandDivision 3 | 16 LF | $70.00 | SAC Services, Inc. |
| Apr 16, 2020 | 200175 | WagonerDivision 1 | 348 LF | $76.75 | APAC-CENTRAL, INC. |
| Mar 19, 2020 | 200110 | McintoshDivision 1 | 90 LF | $67.95 | Robinson Construction, LLC |
| Mar 19, 2020 | 200133 | HaskellDivision 1 | 82 LF | $79.67 | C3 Construction, Inc. |
| Mar 19, 2020 | 200085 | TulsaDivision 8 | 1,142 LF | $100.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Feb 20, 2020 | 200183 | Stp-170c(127)pm | 110 LF | $70.00 | J & R SAND COMPANY, INC. |
| Feb 20, 2020 | 190255 | Pontotoc | 80 LF | $92.10 | BRIDGECO CONTRACTORS, INC. |
| Feb 20, 2020 | 200069 | LincolnDivision 3 | 136 LF | $77.50 | Cowboy Contracting, Inc. |
| Feb 20, 2020 | 200050 | BeckhamDivision 5 | 182 LF | $74.37 | Frontier Bridge, Inc. |
| Feb 20, 2020 | 200183 | Stp-170c(127)pm | 66 LF | $70.00 | J & R SAND COMPANY, INC. |
| Jan 16, 2020 | 200020 | NobleDivision 4 | 106 LF | $95.72 | Evans & Associates Construction Co., Inc. |
| Jan 16, 2020 | 200001 | AlfalfaDivision 6 | 218 LF | $74.00 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 16, 2020 | 200009 | CusterDivision 5 | 416 LF | $80.00 | SEWELL BROS., INC. |
| Jan 16, 2020 | 200018 | McintoshDivision 1 | 72 LF | $85.40 | L & N BRIDGE, LLC |
| Jan 16, 2020 | 200092 | TulsaDivision 8 | 1,385 LF | $72.00 | APAC-CENTRAL, INC. |
| Nov 14, 2019 | 190109 | CanadianDivision 4 | 196 LF | $61.00 | MANHATTAN ROAD & BRIDGE COMPANY, LLC |
| Nov 14, 2019 | 190389 | TulsaDivision 8 | 503 LF | $102.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Nov 14, 2019 | 190375 | StephensDivision 7 | 56 LF | $74.10 | Treas Construction Inc |
| Nov 14, 2019 | 190379 | Nhpp-017n(256)pm | 389 LF | $77.25 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 14, 2019 | 190379 | Nhpp-017n(256)pm | 271 LF | $77.25 | THE CUMMINS CONSTRUCTION CO., INC. |
| Nov 14, 2019 | 190341 | CaddoDivision 7 | 354 LF | $72.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Oct 17, 2019 | 190380 | BeckhamDivision 5 | 200 LF | $80.36 | Frontier Bridge, Inc. |
| Oct 17, 2019 | 190323 | Nhpp-255n(489)eh | 44 LF | $62.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Oct 17, 2019 | 190323 | Nhpp-255n(489)eh | 179 LF | $65.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Oct 17, 2019 | 190331 | TulsaDivision 8 | 347 LF | $93.98 | SHERWOOD CONSTRUCTION CO., INC. |
| Oct 17, 2019 | 190264 | Stp-264c(063)pm | 68 LF | $65.06 | HUB Construction, Inc. |
| Sep 19, 2019 | 190242 | ChoctawDivision 2 | 436 LF | $70.00 | HUB Construction, Inc. |
| Sep 19, 2019 | 190216 | McclainDivision 3 | 56 LF | $102.00 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| Aug 22, 2019 | 190271 | TulsaDivision 8 | 853 LF | $87.00 | Paragon Contractors, LLC |
| Aug 22, 2019 | 190257 | SequoyahDivision 1 | 186 LF | $68.20 | JOB CONSTRUCTION CO., INC. |
| Aug 22, 2019 | 190262 | TulsaDivision 8 | 1,720 LF | $88.00 | BECCO CONTRACTORS, INC. |
| Aug 22, 2019 | 190238 | BlaineDivision 5 | 48 LF | $88.90 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jul 25, 2019 | 190145 | BryanDivision 2 | 17,948 LF | $90.26 | DUIT CONSTRUCTION COMPANY, INC. |
| Jul 25, 2019 | 190215 | MarshallDivision 2 | 46 LF | $63.55 | OVERLAND CORPORATION |
| Jul 25, 2019 | 190265 | BeckhamDivision 5 | 320 LF | $89.70 | CASWELL CONSTRUCTION, INC. |
| Jun 20, 2019 | 190137 | TulsaDivision 8 | 419 LF | $70.00 | Paragon Contractors, LLC |
| Jun 20, 2019 | 190195 | Stp-214b(069)ag | 1,504 LF | $85.90 | Silver Star Construction Company, Inc. |
| Jun 20, 2019 | 190142 | Jefferson | 174 LF | $50.70 | OVERLAND CORPORATION |
| Jun 20, 2019 | 190200 | NowataDivision 8 | 46 LF | $85.00 | H & H BRIDGE COMPANY |
| Jun 20, 2019 | 190149 | CusterDivision 5 | 162 LF | $80.25 | Treas Construction Inc |
| Jun 20, 2019 | 190156 | OklahomaDivision 4 | 265 LF | $80.00 | SCHWARZ PAVING CO., INC. |
| Jun 20, 2019 | 190195 | Stp-214b(069)ag | 362 LF | $114.50 | Silver Star Construction Company, Inc. |
| May 16, 2019 | 190078 | HaskellDivision 1 | 51 LF | $75.00 | Rosscon, LLC |
| May 16, 2019 | 190173 | CanadianDivision 4 | 52 LF | $60.00 | SEWELL BROS., INC. |
| May 16, 2019 | 190024 | SeminoleDivision 3 | 34 LF | $916.00 | HASKELL LEMON CONSTRUCTION CO. |
| May 16, 2019 | 190132 | Pontotoc | 118 LF | $65.85 | OVERLAND CORPORATION |
| May 16, 2019 | 190174 | ClevelandDivision 3 | 154 LF | $95.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| May 16, 2019 | 190027 | WashingtonDivision 8 | 314 LF | $100.00 | BECCO CONTRACTORS, INC. |
| May 16, 2019 | 190183 | OklahomaDivision 4 | 250 LF | $102.68 | ALLEN CONTRACTING, INC./SHELL CONSTRUCTION CO., INC. (JV) |
| May 16, 2019 | 190134 | RogersDivision 8 | 80 LF | $75.00 | Rosscon, LLC |
| May 16, 2019 | 190013 | McclainDivision 3 | 74 LF | $96.30 | Silver Star Construction Company, Inc. |
| Apr 18, 2019 | 190169 | GrantDivision 4 | 56 LF | $76.00 | Venture Corporation dba VCO Paving |
| Apr 18, 2019 | 190099 | TulsaDivision 8 | 31 LF | $88.00 | Tri Star Construction Arkansas, LLC |
| Apr 18, 2019 | 190006 | GarvinDivision 3 | 181 LF | $53.31 | BRIDGECO CONTRACTORS, INC. |
| Apr 18, 2019 | 190165 | StephensDivision 7 | 284 LF | $63.30 | OVERLAND CORPORATION |
| Mar 14, 2019 | 190129 | OsageDivision 8 | 54 LF | $125.00 | BECCO CONTRACTORS, INC. |
| Mar 14, 2019 | 190133 | RogersDivision 8 | 931 LF | $83.69 | SHERWOOD CONSTRUCTION CO., INC. |
| Mar 14, 2019 | 190063 | WagonerDivision 1 | 4 LF | $105.00 | Tri Star Construction Arkansas, LLC |
| Feb 14, 2019 | 190100 | Stp-205b(076)pm | 661 LF | $98.38 | Frontier Bridge, Inc. |
| Feb 14, 2019 | 190101 | Pontotoc | 16 LF | $51.40 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 17, 2019 | 190020 | Hsipg-256n(041)pm | 150 LF | $79.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 17, 2019 | 190064 | Major, Woodward | 228 LF | $51.30 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 17, 2019 | 190020 | Hsipg-256n(041)pm | 1,258 LF | $79.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Jan 17, 2019 | 180242 | LoganDivision 4 | 201 LF | $89.60 | HASKELL LEMON CONSTRUCTION CO. |
| Jan 17, 2019 | 190001 | AtokaDivision 2 | 235.66 LF | $85.14 | THE CUMMINS CONSTRUCTION CO., INC. |
| Jan 17, 2019 | 190051 | Ssp-250n(018)pm | 6 LF | $75.00 | Pavers, Inc. |
| Nov 15, 2018 | 180260 | ChoctawDivision 2 | 72 LF | $100.00 | H & H BRIDGE COMPANY |
| Nov 15, 2018 | 180293 | Stp-255c(431)ag | 323 LF | $114.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Oct 18, 2018 | 180188 | CarterDivision 7 | 172 LF | $63.70 | OVERLAND CORPORATION |
| Oct 18, 2018 | 180203 | MarshallDivision 2 | 36 LF | $119.50 | JENSEN CONSTRUCTION COMPANY |
| Sep 20, 2018 | 180280 | CraigDivision 8 | 841 LF | $93.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 20, 2018 | 180281 | CreekDivision 8 | 231 LF | $95.00 | BECCO CONTRACTORS, INC. |
| Sep 20, 2018 | 180259 | CanadianDivision 4 | 48 LF | $100.00 | CROSSLAND HEAVY CONTRACTORS INC. |
| Sep 20, 2018 | 180298 | PawneeDivision 8 | 192 LF | $88.00 | SHERWOOD CONSTRUCTION CO., INC. |
| Aug 16, 2018 | 180263 | GarvinDivision 3 | 992 LF | $64.52 | Allen Contracting, Inc. |
| Jul 19, 2018 | 180251 | Nhppi-4000-(064)pm | 18 LF | $79.00 | SHERWOOD CONSTRUCTION CO., INC. |