| 3 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 102 | CY |
$8.00 |
$25.00 |
$25.00 |
$30.00 |
$50.00 |
| 6 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$500.00 |
$2,100.00 |
$500.00 |
$3,000.00 |
$15,000.00 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 432 | SY |
$5.00 |
$1.50 |
$6.32 |
$1.50 |
$6.30 |
| 20 | 307(K) 4300 |
STABILIZED SUBGRADE | 204 | SY |
$9.00 |
$20.00 |
$12.50 |
$21.00 |
$78.50 |
| 30 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 204 | SY |
$25.00 |
$33.00 |
$15.00 |
$31.50 |
$41.20 |
| 40 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 45 | CY |
$200.00 |
$145.00 |
$165.00 |
$147.00 |
$166.50 |
| 50 | 509(D) 1331 |
CLASS C CONCRETE | 10 | CY |
$500.00 |
$300.00 |
$400.00 |
$480.00 |
$551.50 |
| 60 | 609(B) 1500 |
1'-8" COMB. CURB & GUTTER (4" MNTBLE) | 131 | LF |
$25.00 |
$38.00 |
$32.00 |
$41.14 |
$21.70 |
| 70 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 131 | LF |
$10.00 |
$19.00 |
$8.50 |
$13.50 |
$10.00 |
| 80 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 204 | SY |
$10.00 |
$19.00 |
$17.00 |
$14.40 |
$10.30 |
| 90 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,565 | SY |
$8.00 |
$16.00 |
$6.00 |
$6.10 |
$12.80 |
| 100 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 294 | LF |
$5.50 |
$16.00 |
$2.11 |
$9.00 |
$8.15 |
| 110 | 619(C) 0924 |
SAWING PAVEMENT | 312 | LF |
$8.00 |
$5.00 |
$7.00 |
$4.50 |
$6.15 |
| 120 | 623 0100 |
(PL)GUARDRAIL CURBING | 6 | EA |
$2,000.00 |
$900.00 |
$2,005.58 |
$1,200.00 |
$1,176.00 |
| 130 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 94 | LF |
$21.00 |
$23.00 |
$22.11 |
$25.10 |
$25.20 |
| 140 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 6 | EA |
$2,300.00 |
$2,600.00 |
$2,421.84 |
$2,170.00 |
$2,180.00 |
| 145 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 290 | CY |
$15.00 |
$16.00 |
$22.50 |
$31.40 |
$34.70 |
| 150 | 501(G) 6309 |
CLSM BACKFILL | 288.6 | CY |
$250.00 |
$250.00 |
$126.00 |
$240.00 |
$304.50 |
| 160 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$50,000.00 |
$21,000.00 |
$15,500.00 |
$28,500.00 |
$8,403.00 |
| 170 | 504(A) 1304 |
APPROACH SLAB | 859.7 | SY |
$200.00 |
$300.00 |
$300.00 |
$287.00 |
$315.00 |
| 180 | 504(B) 1305 |
SAW-CUT GROOVING | 806.7 | SY |
$5.00 |
$6.50 |
$3.80 |
$4.00 |
$4.00 |
| 190 | 504(C) 6250 |
SEALED EXPANSION JOINT | 288.7 | LF |
$300.00 |
$425.00 |
$340.00 |
$410.00 |
$472.50 |
| 200 | 504(E) 1381 |
CONCRETE PARAPET | 363.6 | LF |
$110.00 |
$175.00 |
$85.00 |
$183.00 |
$236.50 |
| 210 | 506(A) 1322 |
STRUCTURAL STEEL | 1,000 | LB |
$5.00 |
$14.00 |
$9.50 |
$14.20 |
$12.60 |
| 220 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 1 | EA |
$2,500.00 |
$3,900.00 |
$11,050.00 |
$3,775.00 |
$4,202.00 |
| 230 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 1 | EA |
$2,500.00 |
$5,000.00 |
$12,150.00 |
$4,930.00 |
$5,252.00 |
| 240 | 509 5000 |
ELASTOMERIC COATING | 2,130 | SF |
$15.00 |
$14.00 |
$13.50 |
$13.60 |
$9.45 |
| 250 | 509 6152 |
SPECIAL CONCRETE FINISH | 314 | SY |
$35.00 |
$30.00 |
$45.00 |
$29.30 |
$31.50 |
| 260 | 509(A) 1326 |
CLASS AA CONCRETE | 8 | CY |
$650.00 |
$1,700.00 |
$790.00 |
$731.00 |
$840.50 |
| 270 | 509(D) 1331 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$850.00 |
$660.00 |
$546.00 |
$1,786.00 |
| 280 | 510(C) 6137 |
SLOPE WALL (4") | 250 | SY |
$200.00 |
$190.00 |
$87.50 |
$141.00 |
$136.50 |
| 290 | 511 6306 |
MECHANICAL SPLICES | 5 | EA |
$100.00 |
$120.00 |
$100.00 |
$105.00 |
$57.80 |
| 300 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 100 | SY |
$400.00 |
$375.00 |
$300.00 |
$261.00 |
$289.00 |
| 310 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 229.8 | SY |
$750.00 |
$800.00 |
$324.00 |
$846.00 |
$1,171.00 |
| 320 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,513 | SY |
$5.00 |
$5.00 |
$4.00 |
$4.20 |
$4.20 |
| 330 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 100 | LF |
$40.00 |
$31.00 |
$38.00 |
$31.50 |
$18.90 |
| 340 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 15 | GAL |
$90.00 |
$42.00 |
$90.00 |
$42.00 |
$84.00 |
| 350 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 70 | SY |
$700.00 |
$550.00 |
$1,050.00 |
$545.00 |
$604.00 |
| 360 | 523(A) 6550 |
SEALER CRACK PREPARATION | 151.2 | LF |
$5.00 |
$4.25 |
$4.00 |
$4.20 |
$4.20 |
| 370 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$200.00 |
$115.00 |
$150.00 |
$157.00 |
$157.50 |
| 380 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 2,686 | SY |
$18.00 |
$19.25 |
$16.20 |
$17.00 |
$17.00 |
| 390 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$50,000.00 |
$46,000.00 |
$31,400.00 |
$65,000.00 |
$35,000.00 |
| 395 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 270 | CY |
$15.00 |
$16.00 |
$22.50 |
$32.00 |
$34.70 |
| 400 | 501(G) 6309 |
CLSM BACKFILL | 263.5 | CY |
$250.00 |
$250.00 |
$126.00 |
$241.00 |
$304.50 |
| 410 | 502 6116 |
(PL)FALSEWORK JACKING | 1 | LSUM |
$50,000.00 |
$21,000.00 |
$15,500.00 |
$28,000.00 |
$8,403.00 |
| 420 | 504(A) 1304 |
APPROACH SLAB | 783.1 | SY |
$200.00 |
$300.00 |
$300.00 |
$287.00 |
$315.00 |
| 430 | 504(B) 1305 |
SAW-CUT GROOVING | 732.9 | SY |
$5.00 |
$6.50 |
$3.80 |
$4.00 |
$4.00 |
| 440 | 504(C) 6250 |
SEALED EXPANSION JOINT | 255.8 | LF |
$300.00 |
$425.00 |
$340.00 |
$410.00 |
$472.50 |
| 450 | 504(E) 1381 |
CONCRETE PARAPET | 347 | LF |
$110.00 |
$175.00 |
$85.00 |
$183.00 |
$236.50 |
| 460 | 506(A) 1322 |
STRUCTURAL STEEL | 1,000 | LB |
$5.00 |
$14.00 |
$9.50 |
$14.20 |
$12.60 |
| 470 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 1 | EA |
$2,500.00 |
$3,900.00 |
$11,050.00 |
$3,800.00 |
$4,202.00 |
| 480 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 1 | EA |
$2,500.00 |
$5,000.00 |
$12,150.00 |
$4,930.00 |
$5,252.00 |
| 490 | 509 5000 |
ELASTOMERIC COATING | 1,864 | SF |
$15.00 |
$14.00 |
$13.50 |
$13.60 |
$9.45 |
| 500 | 509 6152 |
SPECIAL CONCRETE FINISH | 314 | SY |
$15.00 |
$30.00 |
$45.00 |
$29.50 |
$31.50 |
| 510 | 509(A) 1326 |
CLASS AA CONCRETE | 8 | CY |
$650.00 |
$1,700.00 |
$790.00 |
$731.00 |
$840.50 |
| 520 | 509(D) 1331 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$850.00 |
$660.00 |
$546.00 |
$1,786.00 |
| 530 | 510(C) 6137 |
SLOPE WALL (4") | 250 | SY |
$200.00 |
$190.00 |
$87.50 |
$141.00 |
$136.50 |
| 540 | 511 6306 |
MECHANICAL SPLICES | 5 | EA |
$100.00 |
$120.00 |
$100.00 |
$105.00 |
$57.80 |
| 550 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 100 | SY |
$400.00 |
$375.00 |
$300.00 |
$261.00 |
$289.00 |
| 560 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 196.6 | SY |
$750.00 |
$800.00 |
$324.00 |
$846.00 |
$1,171.00 |
| 570 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,479 | SY |
$5.00 |
$5.00 |
$4.00 |
$4.20 |
$4.20 |
| 580 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 100 | LF |
$40.00 |
$31.00 |
$38.00 |
$31.50 |
$18.90 |
| 590 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 15 | GAL |
$90.00 |
$42.00 |
$90.00 |
$42.00 |
$84.00 |
| 600 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 70 | SY |
$700.00 |
$550.00 |
$1,050.00 |
$545.00 |
$604.00 |
| 610 | 523(A) 6550 |
SEALER CRACK PREPARATION | 126.9 | LF |
$5.00 |
$4.25 |
$4.00 |
$4.20 |
$4.20 |
| 620 | 523(B) 6560 |
SEALER RESIN | 1.4 | GAL |
$200.00 |
$115.00 |
$150.00 |
$157.00 |
$157.50 |
| 630 | 523(C) 6570 |
DECK AREA SEALED (FLOODCOATS) | 2,252 | SY |
$18.00 |
$19.25 |
$16.20 |
$17.00 |
$17.00 |
| 640 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$50,000.00 |
$60,000.00 |
$30,500.00 |
$65,000.00 |
$35,000.00 |
| 650 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$25,000.00 |
$18,900.00 |
$30,700.00 |
$65,000.00 |
| 660 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 10,808 | CY |
$8.00 |
$10.00 |
$13.50 |
$8.00 |
$10.00 |
| 670 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,801 | CY |
$12.00 |
$2.00 |
$20.00 |
$0.5000 |
$20.00 |
| 680 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$52,000.00 |
$55,000.00 |
$85,000.00 |
$101,000.00 |
$125,000.00 |
| 690 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,120 | LF |
$2.50 |
$2.25 |
$2.11 |
$1.60 |
$2.10 |
| 700 | 221(F) 0100 |
TEMPORARY SILT DIKE | 210 | LF |
$14.00 |
$7.00 |
$15.79 |
$6.75 |
$15.80 |
| 710 | 229 4318 |
DITCH LINER PROTECTION | 2,491 | LF |
$4.00 |
$1.00 |
$2.11 |
$1.00 |
$2.10 |
| 720 | 230(A) 2806 |
SOLID SLAB SODDING | 62,080 | SY |
$3.25 |
$1.50 |
$2.00 |
$1.50 |
$2.00 |
| 730 | 233(A) 2817 |
VEGETATIVE MULCHING | 12.83 | AC |
$1,100.00 |
$275.00 |
$631.78 |
$261.00 |
$630.50 |
| 740 | 241 2832 |
MOWING | 25.66 | AC |
$150.00 |
$80.00 |
$105.30 |
$78.00 |
$105.00 |
| 750 | 307(K) 4300 |
STABILIZED SUBGRADE | 25,304 | SY |
$6.00 |
$7.00 |
$5.50 |
$7.00 |
$6.85 |
| 760 | 407(B) 0250 |
TACK COAT | 19,335 | GAL |
$3.25 |
$4.00 |
$3.50 |
$2.50 |
$3.15 |
| 770 | 409(A) 4242 |
FABRIC REINFORCEMENT | 4,436 | SY |
$4.00 |
$4.25 |
$3.25 |
$4.15 |
$10.50 |
| 780 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 2,152 | TON |
$95.00 |
$73.00 |
$87.00 |
$82.64 |
$89.00 |
| 790 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 15,397 | TON |
$85.00 |
$67.00 |
$76.50 |
$62.10 |
$71.75 |
| 800 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 13,981 | TON |
$100.00 |
$83.00 |
$96.00 |
$84.30 |
$91.00 |
| 810 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 3,596 | TON |
$90.00 |
$70.00 |
$82.00 |
$71.05 |
$73.50 |
| 820 | 411(G) 6150 |
RICH BOTTOM LAYER | 2,152 | TON |
$90.00 |
$90.00 |
$95.00 |
$83.95 |
$100.50 |
| 830 | 412 5267 |
COLD MILLING PAVEMENT | 141,763 | SY |
$3.00 |
$0.8500 |
$3.00 |
$2.90 |
$1.65 |
| 840 | 509(D) 0325 |
CLASS C CONCRETE | 366 | CY |
$550.00 |
$300.00 |
$375.00 |
$428.00 |
$275.00 |
| 850 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 10 | LF |
$80.00 |
$100.00 |
$59.00 |
$162.00 |
$205.00 |
| 860 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$985.00 |
$1,000.00 |
$1,550.00 |
$2,183.00 |
$2,500.00 |
| 870 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 4 | CY |
$45.00 |
$80.00 |
$55.00 |
$324.00 |
$30.00 |
| 880 | 613(V) 1180 |
TRENCH EXCAVATION | 7 | CY |
$8.00 |
$25.00 |
$9.50 |
$178.00 |
$99.50 |
| 890 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$40,000.00 |
$9,000.00 |
$59,000.00 |
$19,700.00 |
| 900 | 619(B) 0291 |
REMOVAL OF HEADWALL | 1 | EA |
$1,500.00 |
$1,100.00 |
$1,100.00 |
$1,380.00 |
$2,400.00 |
| 910 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 12,431 | SY |
$5.50 |
$3.50 |
$6.00 |
$10.00 |
$8.60 |
| 920 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 615 | LF |
$4.00 |
$19.00 |
$2.11 |
$6.00 |
$6.05 |
| 930 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 1,298 | LF |
$9.00 |
$25.00 |
$4.50 |
$9.00 |
$5.65 |
| 940 | 619(C) 0924 |
SAWING PAVEMENT | 10,110 | LF |
$4.00 |
$2.50 |
$5.00 |
$4.45 |
$2.60 |
| 950 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,538 | LF |
$20.00 |
$23.00 |
$22.11 |
$22.00 |
$22.10 |
| 960 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$1,000.00 |
$1,100.00 |
$1,052.97 |
$1,227.00 |
$1,234.00 |
| 970 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 3 | EA |
$3,000.00 |
$2,800.00 |
$2,632.43 |
$3,550.00 |
$3,571.00 |
| 980 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 3 | EA |
$2,300.00 |
$2,600.00 |
$2,421.84 |
$2,030.00 |
$3,046.00 |
| 990 | 625(B) 1252 |
REMOVE AND RECONSTRUCT FENCE | 130 | LF |
$15.00 |
$15.50 |
$27.00 |
$17.20 |
$21.00 |
| 1,000 | 805(D) 8762 |
(PL)REMOVE & RESET G.E.T. GUARD RAIL END SECTION | 1 | EA |
$5,000.00 |
$1,700.00 |
$1,579.46 |
$3,550.00 |
$3,571.00 |
| 1,010 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 39 | EA |
$22.00 |
$22.00 |
$21.06 |
$14.00 |
$13.90 |
| 1,020 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 54,779 | LF |
$0.2500 |
$0.1500 |
$0.1500 |
$0.3000 |
$0.1400 |
| 1,030 | 804(A) 2915 |
STRUCTURAL CONCRETE | 6.38 | CY |
$800.00 |
$375.00 |
$352.75 |
$313.30 |
$315.00 |
| 1,040 | 804(B) 2916 |
REINFORCING STEEL | 2,244 | LB |
$1.85 |
$2.50 |
$2.37 |
$2.10 |
$2.10 |
| 1,050 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 8 | EA |
$100.00 |
$85.00 |
$78.97 |
$157.00 |
$157.50 |
| 1,055 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 1 | EA |
$1,000.00 |
$200.00 |
$184.27 |
$1,600.00 |
$1,576.00 |
| 1,060 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 212 | SF |
$24.00 |
$20.00 |
$18.95 |
$27.15 |
$27.30 |
| 1,070 | 850(B) 8114 |
EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 784 | SF |
$28.00 |
$31.00 |
$29.48 |
$31.30 |
$31.50 |
| 1,080 | 851(A) 3212 |
8"@40 GALV.STEEL WIDE FLANGE BEAM POST | 263 | LF |
$65.00 |
$68.00 |
$63.18 |
$54.30 |
$54.60 |
| 1,090 | 851(B) 3217 |
2 1/2"@5.79 GALV.STEEL PIPE POST | 87 | LF |
$22.00 |
$22.00 |
$21.06 |
$23.00 |
$23.10 |
| 1,100 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 14 | LF |
$30.00 |
$28.00 |
$26.32 |
$31.30 |
$31.50 |
| 1,110 | 851(C) 8324 |
2" SQUARE TUBE POST | 249 | LF |
$10.00 |
$11.00 |
$10.53 |
$7.30 |
$7.35 |
| 1,115 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 35 | EA |
$25.00 |
$20.00 |
$18.95 |
$39.70 |
$39.90 |
| 1,120 | 856(A) 8410 |
TRAF. STR(MULT.)(AW)(INLAID)(6" WIDE) | 81,802 | LF |
$1.25 |
$1.50 |
$1.42 |
$1.10 |
$1.10 |
| 1,130 | 856(A) 8420 |
TRAF. STR(MULT.)(AW)(INLAID)(8" WIDE) | 3,600 | LF |
$1.75 |
$1.75 |
$1.68 |
$1.90 |
$1.90 |
| 1,140 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 6,720 | LF |
$2.75 |
$2.00 |
$1.90 |
$2.60 |
$2.65 |
| 1,150 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 20 | EA |
$200.00 |
$200.00 |
$184.27 |
$366.00 |
$367.50 |
| 1,160 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 95 | DAY |
$600.00 |
$600.00 |
$600.00 |
$600.00 |
$600.00 |
| 1,170 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 25,000 | LF |
$0.1500 |
$0.1400 |
$0.1300 |
$0.2000 |
$0.1900 |
| 1,180 | 857(E) 8881 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS | 600 | EA |
$1.25 |
$9.00 |
$8.42 |
$5.00 |
$5.00 |
| 1,190 | 857(E) 8884 |
(PL)C/L CONSTRUCTION ZONE PAVEMENT MARKERS(YELLOW) | 300 | EA |
$1.60 |
$9.00 |
$8.42 |
$5.00 |
$5.00 |
| 1,200 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 6,060 | EA |
$0.8000 |
$1.15 |
$0.5300 |
$0.6500 |
$0.6500 |
| 1,210 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 33,000 | LF |
$0.2500 |
$0.2000 |
$0.1900 |
$0.2000 |
$0.1900 |
| 1,220 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 798 | SD |
$10.00 |
$7.50 |
$7.37 |
$10.45 |
$10.50 |
| 1,230 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 13,765 | LF |
$25.00 |
$10.00 |
$9.00 |
$24.50 |
$11.70 |
| 1,240 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 2,350 | LF |
$4.00 |
$9.00 |
$7.00 |
$3.70 |
$1.50 |
| 1,250 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 140 | SD |
$6.00 |
$11.00 |
$10.53 |
$10.50 |
$10.50 |
| 1,260 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 27,424 | SD |
$0.5000 |
$0.1500 |
$0.1600 |
$0.0200 |
$0.0200 |
| 1,270 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 14,874 | SD |
$0.7500 |
$0.1000 |
$0.1100 |
$0.0200 |
$0.0200 |
| 1,280 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 18,249 | SD |
$1.50 |
$0.5000 |
$0.5300 |
$0.0200 |
$0.0200 |
| 1,290 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,212 | SD |
$1.00 |
$1.00 |
$1.05 |
$0.4500 |
$0.4200 |
| 1,300 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,728 | SD |
$0.3500 |
$5.00 |
$4.74 |
$1.05 |
$1.05 |
| 1,310 | 880(F) 8878 |
DRUMS | 26,938 | SD |
$0.1800 |
$0.0500 |
$0.0500 |
$0.0200 |
$0.0200 |
| 1,320 | 880(G) 8884 |
TUBE CHANNELIZERS | 60,600 | SD |
$0.3000 |
$0.2500 |
$0.2600 |
$0.0200 |
$0.0200 |
| 1,330 | 880(K) 8908 |
SURVEILLANCE TRAFFIC CONTROL | 95 | SD |
$400.00 |
$325.00 |
$590.00 |
$522.00 |
$525.00 |
| 1,340 | 880(L) 8920 |
(SP) TRAFFIC SURVEILLANCE, OHP (NON-BIDDABLE) | 200 | HOUR |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
$69.00 |
| 1,350 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 520 | SD |
$12.00 |
$13.00 |
$12.64 |
$17.75 |
$17.90 |
| 1,355 | 802(A) 8316 |
3" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 20 | LF |
$35.00 |
$68.00 |
$159.54 |
$157.00 |
$157.50 |
| 1,360 | 802(B) 8346 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 4,160 | LF |
$15.50 |
$13.00 |
$12.76 |
$12.50 |
$12.60 |
| 1,365 | 802(E) 8372 |
JUNCTION BOX(8" X 8" X 6") | 2 | EA |
$858.43 |
$850.00 |
$1,169.97 |
$1,150.00 |
$1,155.00 |
| 1,370 | 803(A) 8065 |
PULL BOX(SIZE I) | 25 | EA |
$776.76 |
$1,000.00 |
$1,169.97 |
$1,150.00 |
$1,155.00 |
| 1,380 | 804(A) 2915 |
STRUCTURAL CONCRETE | 6.67 | CY |
$622.88 |
$250.00 |
$2,339.94 |
$2,300.00 |
$2,311.00 |
| 1,390 | 805(A) 8712 |
(PL)REMOVAL OF LIGHT POLE | 23 | EA |
$432.62 |
$550.00 |
$372.26 |
$365.00 |
$367.50 |
| 1,400 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$98,146.00 |
$133,000.00 |
$60,000.00 |
$50,000.00 |
$75,000.00 |
| 1,410 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$75,000.00 |
$7,000.00 |
$20,000.00 |
$15,000.00 |
| 1,420 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$370,912.00 |
$345,000.00 |
$315,417.00 |
$344,803.30 |
$373,734.54 |